A007 - 3.13.2020 Customer Service Support (CSS) Procedures-On-Call Response Roster.pdf

PDF 172 KB Posted

Attached to
Warehousing Services at DLA Distribution San Diego, CA Federal contract opportunity
Solicitation number
SP3300-20-R-5001
Issued by
Defense Logistics Agency Distribution

About this file

This Contract Data Requirements List (CDRL) outlines reporting requirements for a customer service support contract. The contractor must submit a customer service plan and on-call response roster within 30 calendar days of full performance, detailing customer service hours, locations, directions, communication systems, complaint tracking, methods for identifying customer needs and measuring satisfaction, and samples of documents. Subsequent revisions are due within 2 working days of any changes. The contractor provides the original to the Contract Specialist and a copy to the Contracting Officer's Representative. The Defense Logistics Agency Distribution will review and accept the plan and roster.

The related solicitation seeks proposals for warehousing services at Defense Logistics Agency Distribution sites in San Diego, California. The contractor will provide distribution operations and support at Naval Base San Diego, Naval Air Station North Island, and Naval Base Coronado, handling depot-level repairables, electronics, industrial, medical, general, construction, clothing, packaged petroleum, chemicals, steel, sheet metal, bar stock, ship and aviation repair parts, and boats/amphibious craft.

View the file

Other files for this federal contract opportunity

Other files attached to Warehousing Services at DLA Distribution San Diego, CA, newest first.
File Type Posted
Attachment J.28 TE 5.2 DDDC Projected Workload 3-19-2020.xlsx XLSX spreadsheet
Attachment J.38 Staffing Matrix 3-20-2020.xlsx XLSX spreadsheet
Amendment 0008.pdf PDF
Amendment 0007.pdf PDF
SP330020R5001 Amend 0006 3-12-2020.docx DOCX document
DDDC SP3300-20-R-5001 Questions 3.9.2020.docx DOCX document
DDDC SP3300-20-R-5001 Questions 3.2.2020.docx DOCX document
Attachment J.39 Training Plan 2-12-2020.xlsx XLSX spreadsheet
Attachment J.33_TE 5.6_ Local Delivery and Pick Up Points.pdf PDF
Attachment J.38 Staffing Matrix 2-5-2020.xlsx XLSX spreadsheet
Attachment J.1 DDDC Performance Work Statement 2-5-2020.docx DOCX document
Attachment J.40 Draft Distribution Training Schedule 2-5-2020.xlsx XLSX spreadsheet
Amendment 0002.pdf PDF
DLA i6055.01 Aug 10 2018.pdf PDF
A002 - SOH Plan and Reporting Amend0001.pdf PDF
A006 - Quality Control Plan Amend 001.pdf PDF
Attachment J.43 - Small Business Participation Commitment Document Template.docx DOCX document
A023 - Storage and Warehousing Plan.pdf PDF
A019 - Storage Space Management Report (SSMR).pdf PDF
Attachment J.38, Staffing Matrix.xlsx XLSX spreadsheet
SP330020R5001.pdf PDF
A028 - Floor to Book Report (Portfolio).pdf PDF
A021 - Training Report.pdf PDF
Attachment J.2 DDDC PWS.docx DOCX document
Attachment J.5 DD254 DDDC 2019.pdf PDF
Attachment J.29, TE 5.4 Transshipment of Hazardous Assets 07.03.19.rtf RTF text file
Attachment J.12, TE 1.1 Contractor Personnel Security - UPDATE 26FEB2018.docx DOCX document
A018 - DOT Exemption Usage Report.pdf PDF
Attachment J.28, TE 5.2 DDDC Projected Workload 08.26.19.._.xlsx XLSX spreadsheet
Attachment J.24, TE 4.3 MHE PM Tasks REV.xls XLS spreadsheet
A007 - Customer Service Support (CSS) Procedures-On-Call Response Roster.pdf PDF
A030 - Phase-out Plan.pdf PDF
Attachment J.16 TE 3.2 Government Training Sept 20 2019.docx DOCX document
A008 - Location Survey Schedule.pdf PDF
Attachment J.21, TE 3.7 Automated Material Handling Systems (AMHS).xlsx XLSX spreadsheet
A016 - Open and Unconfirmed Material Release Orders (MRO).pdf PDF
A038 - Small Business Participation Quarterly Progress Report.pdf PDF
A010 - Monthly Cost Report for CLIN X001- DDDC 9.23.19 Signed.pdf PDF
A013 - Monthly Cost Report for Material Support CLIN.pdf PDF
A015 - Monthly Cost Report for Special Projects and Surge and Sustainment CLIN.pdf PDF
A006 - Quality Control Plan.pdf PDF
Attachment J.26, TE 5.0 APLs.doc DOC document
A009 - Management Plan (MCCP).pdf PDF
A020 - Shipment to Restricted Country - Approval Necessary.pdf PDF
A024 - Physical Security Plan.pdf PDF
A036 - Local Delivery Refusal Log.pdf PDF
A017 - Government Cargo Recovery Effort Program (GOCARE) Program.pdf PDF
A001 - Transition Plan and Weekly Reports.pdf PDF
Attachment J.18, TE 3.4 GE MHE.xlsx XLSX spreadsheet
Attachment J.40 Draft Distribution Operations Training Schedule.xlsx XLSX spreadsheet
Show all 50

Warehousing Services at DLA Distribution San Diego, CA has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

1_DATA_ITEM_NO: A007
2_TITLE_OF_DATA_ITEM: Customer Service Support Procedures/On-Call Response Roster
3_SUBTITLE:
4_AUTHORITY_Data_Acquisit:
5_CONTRACT_REFERENCE: J1 PWS Paragraph C-5.1.5
6_REQUIRING_OFFICE: DLA Distribution J-7
7_DID_250_REQ: See Block 16
8_APP_CODE:
DIST_STATEMENT: B
10_FREQUENCY: See Block 16
11_AS_OF_DATE: N/A
12_DATE_OF_FIRST_SUBMISSI: See Block 16
13_DATE_OF_SUBSEQUENT_SUB: See Block 16
addressee1: J7 Contract Spec
draft1:
reg1:
repro1: 1
addressee2: COR
draft2:
reg2: 1
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_repro: 1
16_REMARKS: Tailored to permit contractor's format. Submit electronically

Submit customer service plan and support procedures not later than 30 calendar days prior to the start of full performance that address at the minimum the following:

1. Customer service hours, location(s) and directions to customer service office(s) and contractor specific instructions to customers and an on-call response roster IAW C-5.1.5.

2. System for communicating with customers and obtaining feedback.

3. System for tracking the receipt, progress, and resolution of customer complaints.

4. Methods for identifying customer needs and expectations and implementing them throughout the workforce.

5. Methods for measuring customer satisfaction.

6. Establishment of a customer satisfaction reporting system.

7. Samples of all documents that will be used for customer satisfaction actions.

8. Methods of direct and indirect, formal and informal communications with the Government regarding customer satisfaction.

Subsequent submissions shall be submitted when the Contractor updates or revises the customer service plan and support procedures or on-call response roster within 2 working days of the change.

Block 7 - Inspection and acceptance requirements:

The KO will review and accept the customer service plan and support procedures and updates after coordination with the J-3 Depot Operations review and comments.

Block 14 - Distribution - Contractor to submit original to Contract Specialist and copy to the COR.

Once accepted by the KO, the Contractor shall make the procedures available to all customers in writing.

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY:
H_DATE:
1_APPROVED_BY:
J_DATE:
Page: 1
reg38t: 1
A_CONTRACT_LINE_ITEM_NO:
B_EXHIBIT: Attachment J.11
TDP:
TM:
OTHER:
DSYSTEMITEM:
E_CONTRACTPR_NO:
FCONTRACTOR:
of_pages: 1
Reset:
2018-10-29T15:53:11-0400
CRUSEY.SHANE.M.1287981151
2019-02-13T14:10:12-0500
POWERS.CULLEN.MARTIN.1093893227

File details come from the government source that posted it. Updated .