Attachment J.26 TE 5.0 APLs.doc

DOC document 107 KB Posted

Attached to
Warehousing Services at DLA Distribution San Diego, CA
Solicitation number
SP3300-20-R-5001
Issued by

About this file

This document contains a solicitation for warehousing services at the Defense Logistics Agency Distribution facility in San Diego, California. The solicitation seeks a contractor to provide warehouse and distribution support services, including receipt, storage, inventory management, order fulfillment and shipment of depot level repairables, electronics, industrial, medical, general, construction, clothing, packaged petroleum, chemicals, steel, sheet metal, bar stock, ship and aviation repair parts, and boats/amphibious craft. The contractor will support distribution operations at the Primary wholesale support location at Naval Base San Diego and Naval Air Station North Island, as well as Retail Support services at Naval Base Coronado. Additional support services are provided at Naval Base Point Loma. The contractor must process new procurement receipts within timeframes ranging from 24 hours to 4 days depending on the type, and customer returns within 120 hours to 10 days. Acceptable performance levels are defined for issues quality, receipt processing timelines, and shipping MRO items within 1 day on average.

View the file

Other files

File Type Posted
Attachment J.38 Staffing Matrix 3-20-2020.xlsx XLSX spreadsheet
DDDC SP3300-20-R-5001 Questions 3.19.2020.docx DOCX document
SP330020R5001 Amend 0008 3-20-2020.docx DOCX document
Attachment J.28 TE 5.2 DDDC Projected Workload 3-19-2020.xlsx XLSX spreadsheet
Amendment 0008.pdf PDF
Amendment 0007.pdf PDF
SP330020R5001 Amend 0007 3-16-2020.docx DOCX document
Attachment J.38 Staffing Matrix 3-12-2020.xlsx XLSX spreadsheet
Amendment 0006.pdf PDF
A007 - 3.13.2020 Customer Service Support (CSS) Procedures-On-Call Response Roster.pdf PDF
DDDC SP3300-20-R-5001 Questions 3.11.2020 AF Responses.docx DOCX document
SP330020R5001 Amend 0006 3-12-2020.docx DOCX document
Attachment J.1 DDDC Performance Work Statement 3-12-2020.docx DOCX document
SP330020R5001 Amend 0005 3-9-2020.docx DOCX document
Attachment J.38 Staffing Matrix 3-9-2020.xlsx XLSX spreadsheet
Amendment 0005.pdf PDF
DDDC SP3300-20-R-5001 Questions 3.9.2020.docx DOCX document
SP330020R5001 Amend 0004 3-3-2020.docx DOCX document
DDDC SP3300-20-R-5001 Questions 3.2.2020.docx DOCX document
Attachment J.38 Staffing Matrix 3-2-2020.xlsx XLSX spreadsheet
Amendment 0004.pdf PDF
Attachment J.4 Wage Determination 2015-5635, Rev 12.pdf PDF
Attachment J.33_TE 5.6_ Local Delivery and Pick Up Points.pdf PDF
Attachment J.1 DDDC Performance Work Statement 2-27-2020.docx DOCX document
Attachment J.39 Training Plan 2-12-2020.xlsx XLSX spreadsheet
Amendment 0003.pdf PDF
Attachment J.2 Site Specific PWS 2-26-2020.docx DOCX document
DDDC SP3300-20-R-5001 Questions 2.26.2020.docx DOCX document
SP330020R5001 Amend 0003 2-27-2020.docx DOCX document
Attachment J.38 Staffing Matrix 2-14-2020.xlsx XLSX spreadsheet
Attachment J.28 TE 5.2 DDDC Projected Workload 2-5-2020.xlsx XLSX spreadsheet
DDDC SP3300-20-R-5001 Questions 2-5-2020.pdf PDF
Attachment J.1 DDDC Performance Work Statement 2-5-2020.docx DOCX document
Attachment J.38 Staffing Matrix 2-5-2020.xlsx XLSX spreadsheet
SP330020R5001 Amend 0002 2-5-2020.docx DOCX document
DDDC Occupancy and Density report as of Jan 2020.pdf PDF
Amendment 0002.pdf PDF
Attachment J.40 Draft Distribution Training Schedule 2-5-2020.xlsx XLSX spreadsheet
Attachment J.2 Site Specific PWS 2-5-2020.docx DOCX document
Attachment J.22, TE 4.1 Contractor Training 2-5-2020.docx DOCX document
A004 - MECSP 1.28.20.pdf PDF
DDDC SP3300-20-R-5001 Questions 1.29.2020.pdf PDF
Attachment J.45, TE 5.13N - MTIS - Process Map.pdf PDF
DLA i6055.01 Aug 10 2018.pdf PDF
Attachment J.39, Training Plan.xlsx XLSX spreadsheet
Attachment J.27, TE 5.1 DDDC Historical Workload Mar 2019 - update thru FY19.docx DOCX document
Attachment J.22, TE 4.1 Contractor Training.docx DOCX document
SP330020R5001 Amend 0001 (w tracked changes).docx DOCX document
A002 - SOH Plan and Reporting Amend0001.pdf PDF
A006 - Quality Control Plan Amend 001.pdf PDF
Show 40 more

Latest 50 of 132 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SP3300-20-R-5001

Attachment J 26

TECHNICAL EXHIBIT 5.0

ACCEPTABLE PERFORMANCE LEVELS (APLS)

5.2 RECEIVING

TIMELINESS

ACTIVITY
STANDARD
APL
MEASUREMENT UNIVERSE

Receipt Processing

– New Procurement Receipts Tailgate to Induction

Tailgate to Induction and post to accountable record in 24 business hours or less
< 24 hours average each month excluding weekends and holidays (DSS-MIS Data Element 15176) .
New Procurement lines received per month (DSS-MIS Data Element 15101).
Receipt Processing – New Procurement Receipts Tailgate to Stow
Tailgate to Stow in 4 calendar days or less
≤ 4 days average each month (DSS-MIS Data Element 15117) No receipt older than 30 calendar days.
New Procurement lines stowed per month (DSS-MIS Data Element 15102).
Receipt Processing – Customer Returns Receipts Tailgate to Induction
Tailgate/Turn-in to Induction and post to accountable record in 120 business hours or less
≤ 120 hours average each month

excluding weekends and holidays (DSS-MIS Data Element 15376) Customer Return lines received per month (DSS-MIS Data Element 15301).

Receipt Processing

– Customer Return Receipts Tailgate to Stow

Tailgate/Turn-in to Stow in 10 calendar days or less
< 10 days average each month (DSS-MIS Data Element 15317) No receipt older than 30 calendar days.
Customer Return lines stowed per month (DSS-MIS Data Element 15302).
Receipt Processing – MILSVC Redistributions Order (RDO) Tailgate to Induction
Tailgate to Induction and post to accountable record in 48 business hours or less
≤ 48 hours average each month excluding weekends and holidays (DSS-MIS Data Element 15276)
Redistribution Order (RDO) lines received per month (DSS-MIS Data Element 15201).
Receipt Processing – MILSVC Redistribution (RDO) Receipts Tailgate to Stow
Tailgate to Stow in 10 calendar days or less
≤ 10 days average each month (DSS-MIS Data Element 15217) No receipt older than 30 calendar days.
Redistribution Order (RDO) lines stowed per month (DSS-MIS Data Element 15202).
Receipt Processing – (DLA) Stock Transfer Order (STO) Tailgate to Induction
Tailgate to Induction and post to accountable record in 48 business hours or less
≤ 48 hours average each month excluding weekends and holidays (DSS-MIS Data Element 15576)
Stock Transfer Order (STO) lines received per month (DSS-MIS Data Element 15501).
Receipt Processing – DLA Stock Transfer Orders STO) Receipts Tailgate to Stow
Tailgate to Stow in 10 calendar days or less
≤ 10 days average each month (DSS-MIS Data Element 15517) No receipt older than 30 calendar days.
Stock Transfer Order (STO) lines stowed per month (DSS-MIS Data Element 15502).

5.3.8 ISSUE

QUALITY

ACTIVITY
STANDARD
APL
MEASUREMENT UNIVERSE
iSDR Rate
Material shipped is the correct item, quantity, and CC and shipped to the right customer
> 99.75%

Monthly ISDR Report Valid complaints per month as a % of total issues (sum of DSS MIS Elements 21740 and 22002)

MRO High Priority -Wholesale/Retail (Excluding Dedicated Trucks and Special Project Codes)
Receipt of MRO at the Distribution Center to ship in 1 calendar day or less average
<1 day average each month (DSS-MIS Data Element 22303) No more than 5% of pending issues can be older than 30 calendar days.
High priority lines issued per month (DSS-MIS Data Element 22302)
MRO Routine Priority - Wholesale/Retail (Excluding Dedicated Trucks and Special Project Codes)
Receipt of MRO at the Distribution Center to ship in 3 calendar days or less average
≤ 3 days average each month (DSS-MIS Data Element 22308) No more than 5% of pending issues can be older than 30 calendar days
Routine priority lines issued per month (DSS-MIS Data Element 22307)
STO Routines (DLA)- Wholesale/Retail (Excluding Special Project Codes)
Receipt of STO at Distribution Center to ship in 5 calendar days or less average
≤ 5 day average each month (DSS-MIS Data Element 20805) No more than 5% of pending issues can be older than 30 calendar days
DLA Routine STO lines issued per month (DSS-MIS Data Element 20803)
RDO Routines (MILSVC)- Wholesale/Retail (Excluding Special Project Codes)
Receipt of RDO at Distribution Center to ship in 3 calendar days or less average
< 3 day average each month (DSS-MIS Data Element 20705) No more than 5% of pending issues can be older than 30 calendar days
MILSVC Routine RDO lines issued per month (DSS-MIS Data Element 20703)
DROs
Receipt of DRO at Distribution Center to ship in 21 calendar days or less average
< 21 day average each month. QMF/program run by J-3 until a more automated reporting process is available. No more than 5% of pending issues can be older than 60 calendar days
DRO lines issued per month. HAZMAT and Radioactive Material (RAM) DROs excluded. QMF/program run by J-3 until MIS elements are available.
FMS MRO High Priority
Receipt of MRO at the Distribution Center to ship (or to date of first notice, if NOA) in 3 calendar days or less.
≤ 3 day average each month. QMF/program run by J-3 until a more automated reporting process is available. No more than 5% of pending issues can be older than 30 calendar days.
FMS MRO High Priority lines (as defined by DLA Distribution, currently RDD ‘777’, RDD ‘E_’, RDD ‘N_’, Project Code ‘9G_’, and CASREP (11th position of document number is ‘G’ or ‘W’)) received per month. QMF/program run by J-3 until a more automated reporting process is available .
FMS MRO Routine Priority
Receipt of MRO at the Distribution Center to ship (or to date of first notice, if NOA) in 10 calendar days or less.
≤ 10 day average each month. QMF/program run by J-3 until a more automated reporting process is available. No more than 5% of pending issues can be older than 30 calendar days
FMS MRO Routine Priority lines (as defined by DLA Distribution, currently all FMS MROs excluding RDD ‘777’, RDD ‘E_’, RDD ‘N_’, Project Code ‘9G_’, and CASREP (11th position of document number is ‘G’ or ‘W’)) received per month. QMF/program run by J-3 until a more automated reporting process is available.

*NOTES:

1. The APL clock starts when the MROs free flow from DAASC into DSS.

5.4 PHYSICAL INVENTORY CONTROL STANDARDS

QUALITY and TIMELINESS

ACTIVITY
STANDARD
APL
MEASUREMENT

UNIVERSE

Denial Rate

(DSS)

The right quantity, condition code and item is located to fill the MRO
≤ 0.40%

(DSS-MIS Data Element 26330) Total MROs Shipped (DSS-MIS Data Element 21740) plus Total Denials with Management Codes 1, 2, 4, 5 (DSS-MIS Data Element 26300) per month

All Inventories
Physical Counts completed IAW Government Inventory Plan
100% Timeliness
Number of inventories completed monthly divided by the number of inventories scheduled for that month
Inventory Schedule
Physical Counts completed IAW Government Inventory Plan
100% Schedule Adherence and Completion
NIINs scheduled quarterly with 100% 1st and 2nd Counts completed within required quarter
TPIC G Inventories
Physical inventory matches accountable records by NSN, CC, Unit of Issue and quantity, with a Zero Tolerance on the count variance
100% Accuracy
All items counted at time of annually scheduled TPIC G inventory (Controlled Items – Classified and Sensitive)
Radiological
Physical inventory matches accountable records by NSN, CC, Unit of Issue and quantity, with a Zero Tolerance on the count variance
100% Accuracy
All items counted at time of annually scheduled inventory

All Inventories

Physical inventory matches accountable records by NSN, CC, Unit of Issue and quantity, with a Zero Tolerance on the count variance
98% Accuracy
Total Counts with zero adjustments / Total Counts (D8A or D9A) transactions from DSS Adjustment Transaction Record Table
Location Accuracy
Physical material in location by NSN, Shelf-Life, CC, and Unit of Issue match storage activity locator records
99.5% Accuracy
Number of location surveys completed per month; DSS Report: YE8B1
TPIC M Floor to Book (Completeness)
Where Floor to Book Discrepancies are identified; TPIC M Inventories scheduled and completed
100% Timeliness
Population of discrepant Floor to Book counts matched with corresponding TPIC M (monthly)

5.6 PACKAGING

TIMELINESS *

ACTIVITY
STANDARDS
APL
MEASUREMENT UNIVERSE
Packaging/PPP&M Actions (Other than FRC Maintenance Returns)
Accomplish all packaging actions within 30 calendar days of an item being in-checked and placed into a PPP&M location
≥ 90% in 30 calendar days (while meeting all other contract terms and conditions)
PPP&M work orders closed per month (LSBJ screen in DSS). Same measurement as the J3 Operations Update.
Packaging/PPP&M Actions (Other than FRC Maintenance Returns)
Accomplish all packaging actions within 60 calendar days of an item being in-checked and placed into a PPP&M location
100% in 60 calendar days (while meeting all other contract terms and conditions)
PPP&M work orders closed per month (LSBJ screen in DSS). Same measurement as the J3 Operations Update.

TIMELINESS * Retail APLs

ACTIVITY
STANDARDS
APL
MEASUREMENT UNIVERSE
New Procurement Receipt Induction
24 hrs
90% On-Time
15177
New Procurement Receipt Stow
3 days
90% On-Time
QMF
Customer Return Induction
24 hrs
90% On-Time
QMF
Customer Return Stow
5 days
90% On-Time
QMF
DLA STO Receipt Induction
48 hrs
90% On-Time
15577
DLA STO Receipt Stow
3 days
90% On-Time
QMF
High Pri MRO Processing
1 day
85% On-Time
22306
Delivery Response Time
3 Days
90% On-Time
QMF
Denial Rate
N/A
1.00% On-Time
26330
Re-warehousing DD Pick Created to IA Stow
7 days
90% On-Time
QMF
Re-warehousing DD Pick Created to DD Delivery
5 days
90% On-Time
QMF
Re-warehousing DD Delivery to IA Stow
2 days
90% On-Time
QMF
Re-warehousing IA to IA (Re-ident Requests)
3 days
90% On-Time
QMF

TE 5.0

Acceptable Performance Levels (APL)

File details come from the government source that posted it. Updated .