A002 - SOH Plan and Reporting Amend0001.pdf

PDF 75 KB Posted

Attached to
Warehousing Services at DLA Distribution San Diego, CA
Solicitation number
SP3300-20-R-5001
Issued by

About this file

This document contains a Contract Data Requirements List (CDRL) and details of a federal contract opportunity for warehousing services. The CDRL outlines reporting requirements for safety and occupational health plans and quarterly reporting related to a contract for warehouse and distribution support services at Defense Logistics Agency Distribution facilities in San Diego, California. The contractor must submit an initial SOH program plan within 30 days of contract start and updates within 30 days of any changes. Quarterly reporting includes OSHA 300 log posting dates, abatement log reviews, annual self-assessments, council and supervisor inspection dates, total case incident rates, days away rates, and hazard identification metrics. The federal opportunity involves providing warehouse and distribution services at Naval Base San Diego, Naval Air Station North Island, and Naval Base Coronado for commodities including depot-level repairables, electronics, industrial goods, medical supplies, general stock, construction materials, clothing, petroleum, chemicals, metals, and ship/aircraft parts. The Defense Logistics Agency Distribution is seeking these services through solicitation SP3300-20-R-5001.

View the file

Other files

File Type Posted
Attachment J.38 Staffing Matrix 3-20-2020.xlsx XLSX spreadsheet
DDDC SP3300-20-R-5001 Questions 3.19.2020.docx DOCX document
SP330020R5001 Amend 0008 3-20-2020.docx DOCX document
Attachment J.28 TE 5.2 DDDC Projected Workload 3-19-2020.xlsx XLSX spreadsheet
Amendment 0008.pdf PDF
Amendment 0007.pdf PDF
SP330020R5001 Amend 0007 3-16-2020.docx DOCX document
Attachment J.38 Staffing Matrix 3-12-2020.xlsx XLSX spreadsheet
Amendment 0006.pdf PDF
A007 - 3.13.2020 Customer Service Support (CSS) Procedures-On-Call Response Roster.pdf PDF
DDDC SP3300-20-R-5001 Questions 3.11.2020 AF Responses.docx DOCX document
SP330020R5001 Amend 0006 3-12-2020.docx DOCX document
Attachment J.1 DDDC Performance Work Statement 3-12-2020.docx DOCX document
SP330020R5001 Amend 0005 3-9-2020.docx DOCX document
Attachment J.38 Staffing Matrix 3-9-2020.xlsx XLSX spreadsheet
Amendment 0005.pdf PDF
DDDC SP3300-20-R-5001 Questions 3.9.2020.docx DOCX document
SP330020R5001 Amend 0004 3-3-2020.docx DOCX document
DDDC SP3300-20-R-5001 Questions 3.2.2020.docx DOCX document
Attachment J.38 Staffing Matrix 3-2-2020.xlsx XLSX spreadsheet
Amendment 0004.pdf PDF
Attachment J.4 Wage Determination 2015-5635, Rev 12.pdf PDF
Attachment J.33_TE 5.6_ Local Delivery and Pick Up Points.pdf PDF
Attachment J.1 DDDC Performance Work Statement 2-27-2020.docx DOCX document
Attachment J.39 Training Plan 2-12-2020.xlsx XLSX spreadsheet
Amendment 0003.pdf PDF
Attachment J.2 Site Specific PWS 2-26-2020.docx DOCX document
DDDC SP3300-20-R-5001 Questions 2.26.2020.docx DOCX document
SP330020R5001 Amend 0003 2-27-2020.docx DOCX document
Attachment J.38 Staffing Matrix 2-14-2020.xlsx XLSX spreadsheet
Attachment J.28 TE 5.2 DDDC Projected Workload 2-5-2020.xlsx XLSX spreadsheet
DDDC SP3300-20-R-5001 Questions 2-5-2020.pdf PDF
Attachment J.1 DDDC Performance Work Statement 2-5-2020.docx DOCX document
Attachment J.38 Staffing Matrix 2-5-2020.xlsx XLSX spreadsheet
SP330020R5001 Amend 0002 2-5-2020.docx DOCX document
DDDC Occupancy and Density report as of Jan 2020.pdf PDF
Amendment 0002.pdf PDF
Attachment J.40 Draft Distribution Training Schedule 2-5-2020.xlsx XLSX spreadsheet
Attachment J.2 Site Specific PWS 2-5-2020.docx DOCX document
Attachment J.22, TE 4.1 Contractor Training 2-5-2020.docx DOCX document
A004 - MECSP 1.28.20.pdf PDF
DDDC SP3300-20-R-5001 Questions 1.29.2020.pdf PDF
Attachment J.45, TE 5.13N - MTIS - Process Map.pdf PDF
DLA i6055.01 Aug 10 2018.pdf PDF
Attachment J.39, Training Plan.xlsx XLSX spreadsheet
Attachment J.26 TE 5.0 APLs.doc DOC document
Attachment J.27, TE 5.1 DDDC Historical Workload Mar 2019 - update thru FY19.docx DOCX document
Attachment J.22, TE 4.1 Contractor Training.docx DOCX document
SP330020R5001 Amend 0001 (w tracked changes).docx DOCX document
A006 - Quality Control Plan Amend 001.pdf PDF
Show 40 more

Latest 50 of 132 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

1_DATA_ITEM_NO: A002
2_TITLE_OF_DATA_ITEM: Safety and Occupational Health (SOH) and Reporting
3_SUBTITLE: SOH Plan and Reporting
4_AUTHORITY_Data_Acquisit: N/A
5_CONTRACT_REFERENCE: J1 - PWS C-1.5
6_REQUIRING_OFFICE: DLA Distribution J-7
7_DID_250_REQ: See Block 16
8_APP_CODE:
DIST_STATEMENT: C
10_FREQUENCY: XTime
11_AS_OF_DATE: N/A
12_DATE_OF_FIRST_SUBMISSI: See block 16
13_DATE_OF_SUBSEQUENT_SUB: See block 16
addressee1: J-7
draft1:
reg1: 1
repro1:
addressee2: COR
draft2:
reg2:
repro2: 1
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_repro: 1
16_REMARKS: Tailored to permit contractor's format. Submit electronically.

A. SOH program plan shall be submitted NLT 30 days prior to the start of full performance for the first submission. Changes to the SOH Plan that address the Contractor’s approach to conform to applicable Safety and Occupational Health Standards shall be submitted within 30 calendar days of the change. The SOH Plan shall address the Contractor’s approach:

1. Developing and implementing systems to effectively identify, evaluate, prevent, and control occupational hazards to prevent employee injuries and illnesses through: management leadership and employee involvement; worksite analysis; hazard prevention and control; and safety and health training.

2. For the Safety and Occupational Health Representative(s) to perform safety and occupational health management, surveillance, inspections, and safety program enforcement and how integrated into the Contractor's Quality Control Plan (QCP)

3. To establish a Hazard Reporting Program and HAZCOM IAW DoDI 6050.05.

4. Conforming to the SOH standards consistent with the most stringent of applicable Federal, State, local regulations and the DLA Distribution Occupational Safety and Health Manual.

5. To use ESAMS for mishap/incident reporting

B. On a quarterly basis (date to be provided by the COR), the contractor shall provide the following data for the previous three (3) month period:

1. Date OSHA 300 Log Posted

2. Date the Abatement log was last reviewed

3. Date of Last Annual Self Assessment

4. Date of Last Quarterly Council Meeting

5. Date of Last Quarterly Supervisor Inspection

6. TCIR

7. DART

8. Percent of Hazards identified by the Contractor w/ Interim Controls implemented

Block 7 - Inspection and acceptance requirements:

The Contract Specialist will review and accept the SOH plans and updates after coordination with the COR and Distribution Safety Office review and comments. The COR will review and accept the quarterly information.

Block 14 - Distribution - Contractor to submit original to the Contract Specialist and copy to the COR.

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY:
H_DATE:
1_APPROVED_BY:
J_DATE:
Page: 1
reg38t: 1
A_CONTRACT_LINE_ITEM_NO: X007
B_EXHIBIT: Attachment J.11
TDP:
TM:
OTHER:
DSYSTEMITEM:
E_CONTRACTPR_NO:
FCONTRACTOR:
of_pages: 1
Reset:

File details come from the government source that posted it. Updated .