ATTACHMENT_3_ENG_Form_4025_Shop_Drawing_Transmittal.pdf

ENG Form PDF 32 KB Posted

Attached to
Fencing of LOT 12 at DDJC Tracy CA
Solicitation number
SP330017B0015
Issued by

About this file

Attachment 3 Engineering Form 4025

View the file

Other versions and copies of ENG Form 4025

File Revision Posted Attached to
Attachment_B_Eng_Form_4025-R_14AUG23.pdf Aug 14, 2023 Rehab Units 6 Servomotors and Optional Unit 8 Servomotors Big Bend Dam, SD
ATTACHMENT 14 - 24-29 MATOC Eng_Form_4025_2017May - 2 Pages.pdf 2017 Construction Requirements Contract
A21. Attachment Eng_Form_4025_2017May.pdf 2017 W912P923B0008 - W912P9 St. Louis District Lake Shelbyville Park Roads IDIQ
Attachment 4- ENG FORM 4025-R (Mar 2012).pdf Mar 2012 Job Order Contract Fort Drum
ATTACHMENT C_Eng_Form_4025-R.pdf Revision not stated Gavins Point Powerhouse Drain Rehab
ATTACHMENT C_Eng_Form_4025-R.pdf Revision not stated Cherry Creek Dam (CO) Rehab Gate Stems
Attachment 7 - ENG Form 4025-R Shop Drawings.pdf Revision not stated Security System Upgrades
TE-05 Eng Form 4025-R.pdf Revision not stated Solicitation for Protective Coatings
Eng_Form_4025-R.pdf Revision not stated Roof Repair B20187
Eng_Form_4025-R.pdf Revision not stated Roof Repair B2902 Fort Bliss, TX
Eng_Form_4025-R.pdf Revision not stated Roof Repair B11341
Appendix D - ENG Form 4025-R.pdf Revision not stated Lock and Dam 25 Dewater Rental Equipment
Appendix D - ENG Form 4025-R.pdf Revision not stated Lock and Dam 25 Dewater Rental Equipment
A02. Appendix F - Transmittals ENG Form 4025-R.pdf Revision not stated Lock & Dam Bulkhead Crane Generator Upgrade
A02_Eng_Form_4025-R.pdf Revision not stated Combined Synopsis/Solicitation for Supply and Installation of Various LED Light Fixtures and Low-Voltage Electrical Equipment at Jerry F. Costello Lock & Dam
Attachment 2 Eng Form 4025.pdf Revision not stated Four HVAC Units and Install
Exhibit 4 - Eng Form 4025-R.pdf Revision not stated Multiple Award Task Order Contract (MATOC) Mechanical HVAC/Mechanical Maintenance, Repair and Minor Construction Work Amendment 2
SOW Attachment (10) Eng_Form_4025-R.pdf Revision not stated NSWCPD Building 77H Fuel Pump Controller Repairs
Attachment 10 - Eng_Form_4025-R.pdf Revision not stated JBLM Firehouse #3 Kitchen and Bathroom Remodel
Attachment 7-ENG FORM 4025-R.pdf Revision not stated Project: CSC-20049 Water Heater (Solar) Improvements Bldg 11
Show all 20

Who attaches ENG Form 4025

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENG Form 4025 *U.S. Government Printing Office: 1991 – 523.366/400989

TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL

SAMPLES, OR MANUFACTURER’S CERTIFICATE OF COMPLIANCE

(Read instructions on the reverse side prior to initiating this form)

DATE TRANSMITTAL NO.

SECTION I – REQUEST FOR APPROVAL FOR THE FOLLOWING ITEMS (This section will be initiated by the contractor)

TO: FROM:

CONTRACT NO. CHECK ONE:

THIS IS A NEW TRANSMITTAL

THIS IS A RESUBMITTAL OF

TRANSMITTAL

SPECIFICATION SECTION NO.

(Cover only one section with each transmittal)

PROJECT TITLE AND LOCATION

Install Fencing at Lot 12 at DLA – San Joaquin, Tracy CA.

ITEM

NO.

a.

DESCRIPTION OF ITEM SUBMITTED

(Type size, model number/etc.)

b.

MFG. OR CONTR. CAT.,

CURVE DRAWING OR

BROCHURE NO.

(See instruction No. 8) c.

NO. OF

COPIES

d.

CONTRACT REFERENCE

DOCUMENT

SPEC. DRAWING

PARA. NO. SHEET NO.

e. f.

FOR

CONTRACTOR

USE CODE

g.

VARIATION

(See instruction No. 6.)

h.

FOR

CE USE

CODE

i.

REMARKS I certify that the above submitted items have been reviewed in detail and are correct and in strict conformance with the contract drawings and specifications except as otherwise stated.

NAME AND SIGNATURE OF CONTRACTOR

SECTION II – APPROVAL ACTION

ENCLOSURES RETURNED (List by Item No.)

NAME TITLE AND SIGNATURE OF APPROVING AUTHORITY DATE

SHEET ____ OF ____

INSTRUCTIONS

Reverse of ENG Form 4025 *U.S. Government Printing Office: 1991 – 523.366/400989

1. Section I will be initiated by the Contractor in the required number of copies.

2. Each transmittal shall be numbered consecutively in the space provided for the “Transmittal No.”. This number, in addition to the contract number, will form a serial number for identifying each submittal. For new submittals or resubmittals mark the appropriate box; on resubmittals, insert transmittal number of last submission as well as the new submittal number.

3. The “Item No.” will be the same “Item No.” as indicated on ENG FORM 4288 for each entry on this form.

4. Submittals requiring expedition handling will be submitted on separate form.

5. Separate transmittal form will be used for submittals under separate sections of the specifications.

6. A check shall be placed in the “Variation” column when a submittal is not in accordance with the plans and specifications – also, a written statement to that effect shall be included in the space provided for “Remarks”.

7. Form is self-transmittal, letter of transmittal is not required.

8. When a sample of material or Manufacturer’s Certificate of Compliance is transmitted, indicate “Sample” or “Certificate” in column c, Section I.

9. U.S. Army Corps of Engineers approving authority will assign action codes as indicated below in space provided in Section I, column I to each item submitted. In addition they will ensure enclosures are indicated and attached to the form prior to return to the contractor. The Contractor will assign action codes as indicated below in Section I, column g, to each item submitted.

THE FOLLOWING ACTION COIDES ARE GIVE TO ITEMS SUBMITTED

A -- Approved as Submitted

B -- Approved, except as noted on drawings

C -- Approved, except as noted on drawings.

Refer to attached sheet resubmission required

D -- Will be returned by separate correspondence

E -- Disapproved (See attached)

F -- Receipt acknowledged

FX -- Receipt acknowledged, does not comply as noted with contract requirements

G -- Other (Specify)

10. Approval of items does not relieve the contractor from complying with all the requirements of the plans and specifications.

File details come from the government source that posted it. Updated .