ATTACHMENT_6_Submittal_Registers_Combined.pdf

PDF 94 KB Posted

Attached to
Fencing of LOT 12 at DDJC Tracy CA
Solicitation number
SP330017B0015
Issued by

About this file

Attachment 6 Submittal Registers

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESCRIPTION OF ITEM SUBMITTED

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l1) (l2) (m) (n) (o) (p) (q1) (q2)

01 PS Project Schedule 3.4 G

01 PS Submittal Register 1.9 G

01 PS Quality Control Plan 3.2 G

01 CS Construction Waste, Pollution Prevention Spreadsheet 1.6 G

01 PS Waste Management Plan 1.6 G 01 CS Records 1.7 G

03 PD As-Built Record of Equipment and Materials 1.3.1 G 03 PD Final Approved Shop Drawings 1.3.2 G 03 PD Warranty Management Plan 1.4 G 03 PD Performance Bond 1.4.2 G 3 PD Warranty Tag 1.4.5 03 PD Spare Parts Data 1.4 11 CS Record Drawings (CAD Drawings) 1.2 G 11 CS Record Drawings (Full Size Prints) 1.2 G 11 CS Record Drawings (Full Size Red Line Drawings) 1.2 11 CS Record Drawings (Color Scan of Red Line Drawings) 1.2

01 PS Existing Conditions 1.6 G 07 C Notifications 1.6 G 11 CS Receipts 1.6

02 SD Location of Gate, Corner, End, and Pull Post, 1.2 G 02 SD Gate Assembly, Gate Hardware and Accessories 1.2 G 02 SD Erection/Installation Drawings 1.2.22 G 03 PD Gate Assembly, Gate Hardware and Accessories, Fabric, Stretcher Bar 1.2.22 G, R

32 31 13, Chainlink Fences and Gates Division 32 - Site Improvements

Division 1 - General Requirements

02 41 00, Demolition and Deconstruction Division 2 - Existing Conditions

01 78 00, Close-Out Submittals

01 57 20.00 10, Environmental Protection

01 32 01.00 10, Project Schedule

01 33 00, Submittal Procedures

01 45 00.00, Quality Control

01 74 19, Construction and Demolition Waste Management

SUBMITTAL REGISTER CONTRACT NO:

TITLE: Task Order Construction Services CONTRACTOR:LOCATION: Defense Distribution Depot San Joaquin

JOB NAME: Procure and Construct Fire Training Facility

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E F I C I A T I O N

S E C T I O N

S U B M I T T A L

D O C U M E N T

T Y P E

S U B M I T T A L

D O C U M E N T

D E S C R I P T I O N

PS - PRECONSTRUCTION SUBMITTALS

SD - SHOP DRAWING

PD - PRODUCT DATA

S - SAMPLES

DD - DESIGN DATA

TR - TEST REPORTS

C - CERTIFICATES

MI - MANUFACTURER'S INSTRUCTIONS

MFR - MANUFACTURER'S FIELD REPORTS

O&M - OPERATING AND MAINTENANCE

CS - CLOSE-OUT SUBMITTALS

P A R A G R A P H

N U M B E R

C L A S S I F I C A T I O N

G O V E R N M E N T

O R

A E

R E V I E W E R

CONTRACTOR

SCHEDULE DATES

CONTRA

CTOR

SUBMIT

APPROVAL

NEEDED BY:

MATERIAL

NEEDED

BY:

A C T I O N

C O D E

DAT

E OF

ACTI

ON

D A T E

F O R W A R D E D

T O

R E V I E W E R

D A T E

R E C E I V E D

F R O M

R E V I E W E R

A C T I O N

C O D E

DATE OF

ACTION

D A T E

R E C E I V E D

F R O M

C O N T R A C T O R

D A T E

F O R W A R D E D

T O

A P P R O V I N G

A U T H O R I T Y

APPROVING AUTHORITY

D A T E

R E C E I V E D

F R O M

A P P R O V I N G

A U T H O R I T Y

D A T E

M A I L E D

T O

C O N T R A C T O R

File details come from the government source that posted it. Updated .