SOW ISO 9001.docx

ISO Standard DOCX document 37 KB Posted

Attached to
PD-1410-0219; Safety Engineer Services
Solicitation number
N64498-25-SIMACQ-PD-1410-0219
Issued by

About this file

This is a Statement of Work (SOW) for Safety Engineer Services at the Naval Foundry and Propeller Center (NFPC) in Philadelphia. The contract seeks a contractor to assist NFPC in developing, implementing, and sustaining an ISO 9001:2015-compliant Quality Management System (QMS) and preparing for third-party certification by September 2026. Key requirements include conducting internal facility process audits biannually for three years after certification, facilitating ISO 9001 certification and re-certification audits, and providing ongoing QMS support.

The contract is for one year with two additional option years, to be performed at NFPC's Philadelphia location (1701 Kitty Hawk Ave). Contractor personnel must be U.S. citizens with a SECRET clearance, have proven experience in obtaining ISO 9001 certification for heavy manufacturing processes, and possess a classified security clearance. The workspace will be government-provided, with work hours from 0700-1530 Monday through Friday, excluding federal holidays. Contractors will be escorted on-site and must adhere to strict security protocols regarding access, vehicle inspection, and handling of Controlled Unclassified Information (CUI).

View the file

Other versions and copies of ISO 9001

File Revision Posted Attached to
RFI_ISO_9001_20191113.docx Nov 13, 2019 ISO 9001:2015 Auditing Services
Attach1_SOW_ISO_9001_20191113.docx Nov 13, 2019 ISO 9001:2015 Auditing Services
1-ISO-9001 2015 DNV 2023.pdf 2015 Radiation Equipment Maintenance, Repair, and Calibration
FEDERAL PRISON INDUSTRIES_UNICOR SOW for ISO 9001_2015.pdf 2015 ISO Certifications for Various FPI Factory Locations
Sources Sought_ISO 9001 Revised.docx Revision not stated PD-1410-0219; Safety Engineer Services
(U) ISO 9001_QA.xlsx Revision not stated ISO 9001 Audit
(U) ISO 9001_QA.xlsx Revision not stated ISO 9001 Audit
(U) ISO 9001_QA.xlsx Revision not stated ISO 9001 Audit
(U) ISO 9001_QA.xlsx Revision not stated ISO 9001 Audit
Q and A FA857125Q0045 - ISO9001AS9110 - External Registration.xlsx Revision not stated ISO9001AS9110 - EXTERNAL REGISTRATION
Appendix C for ISO9001 AS9100 and AS9110 External Registration.docx Revision not stated ISO9001AS9110 - EXTERNAL REGISTRATION
QA Form DMC - ISO 9001.pdf Revision not stated ISO 9001:2015 Certification
ISO 9001 contractor questions and answers.pdf Revision not stated ISO 9001 FY 23-25 Service
B01_M6700422Q0033_Source Sought Notice and PWS_ISO 9001.pdf Revision not stated ISO 9001:2015 3rd Party Auditor and Registrar
Appendix C for ISO9001 AS9100 and AS9110 External Registration.pdf Revision not stated Audit and registration services for ISO9001/AS9110 certification of the Warner Robins Air Logistics Complex (WR-ALC)
ISO 9001 Justification_Redacted.pdf Revision not stated Purchase of a Dual Media Shot Peen Machine
Exhibit__4_ISO_9001-AS_9100_Requirements_final.pdf Revision not stated Calibration and Metrology Laboratory Services
Attachment E ISO-9001-2015-reg-annex.pdf Revision not stated Federal Aviation Administration’s (FAA) ISO Audit requirement SIR - Final due date
Attachment E ISO-9001-2015-reg-annex.pdf Revision not stated Federal Aviation Administration’s (FAA) ISO Audit requirement SIR - Final due date
Attachment E ISO-9001-2015-reg-annex.pdf Revision not stated Federal Aviation Administration’s (FAA) ISO Audit requirement SIR - Final due date
Show all 20

Who attaches ISO 9001

State Files
Arizona 1

Other files

File Type Posted
Sources Sought_ISO 9001 Revised.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) Procurement of Safety Engineer Services at Naval Foundry and Propeller Center (NFPC)

1.0 INTRODUCTION

1.0.1 The Naval Surface Warfare Center Philadelphia Division (NSWCPD) is a Department of Defense entity responsible for research and development, test and evaluation, engineering and fleet support organization for the Navy’s ships, submarines, military watercraft and unmanned vehicles. This requirement is for Naval Foundry and Propeller Center (NFPC) who is responsible for the design, manufacture, and repair propellers for the US Navy.

1.0.2 This contract is for non-personal services. It does not create employment rights with the U.S. Government whether actual, inherent, or implied.

1.0.3 Government / Contractor Relationship

(a) The services to be delivered under this contract are non-personal services and the parties recognize and agree that no employer-employee relationship exists or will exist under the contract between the Government and the Contractor's personnel. Therefore, it is in the best interest of the Government to provide both parties with a full understanding of their respective obligations.

(b) The Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishable badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence

(c) Contractor personnel under this contract shall not engage in any of the inherently Governmental functions listed at FAR Subpart 7.5 or DFARS Subpart 207.5.

(d) Employee Relationship:

1)The services to be performed under this contract do not require the Contractor or its personnel to exercise personal judgment and discretion on behalf of the Government. Rather the Contractor's personnel will act and exercise personal judgment and discretion on behalf of the Contractor.
2)Rules, regulations, directives, and requirements that are issued by the U. S. Navy and NSWCPD under its responsibility for good order, administration, and security are applicable to all personnel who enter a government installation or who travel on Government transportation. This is not to be construed or interpreted to establish any degree of Government control that is inconsistent with a non-personal services contract.

(e) Inapplicability of Employee Benefits: This contract does not create an employer-employee relationship. Accordingly, entitlements and benefits applicable to such relationships do not apply.

(f) Notice. It is the Contractor's, as well as the Government's, responsibility to monitor contract activities and notify the Contracting Officer if the Contractor believes that the intent of this Section has been or may be violated.

1) The Contractor should notify the Contracting Officer in writing within three (3) calendar days from the date of any incident that the Contractor considers to constitute a violation of this Section. The notice should include the date, nature, and circumstances of the conduct; the name, function, and activity of each Government employee or Contractor official or employee involved or knowledgeable about such conduct; identify any documents or substance of any oral communication involved in the conduct; and the estimate in time by which the Government must respond to this notice to minimize cost, delay, or disruption of performance.

2) The Contracting Officer will, within five (5) calendar days after receipt of notice, respond to the notice in writing. In response, the Contracting Officer will either:

(i)Confirm the conduct is in violation and when necessary direct the mode of further performance,
(ii)Countermand any communication regarded as a violation,
(iii)Deny that the conduct constitutes a violation and when necessary direct the mode of further performance, or
(iv)In the event the notice is inadequate to make a decision, advise the Contractor what additional information is required, and establish the date by which it should be furnished by the Contractor.

0. BACKGROUND

NFPC is committed to delivering high quality propellers and other various material that meet the Navy’s requirements. To strengthen our quality management practices, improve organizational efficiency, and enhance satisfaction, NFPC has elected to pursue certification to the ISO 9001:2015 Quality Management System (QMS) standard.

1.2 SCOPE OF WORK

The contractor shall provide all personnel, expertise, management, materials, and services necessary to assist NFPC in developing, implementing, and sustaining an ISO 9001:2015-compliant Quality Management System (QMS) and preparing for a third party certification.

2.0 APPLICABLE DOCUMENTS

Not Applicable

3.0 REQUIREMENTS

3.1 The contractor shall assist in the establishment and maintenance of an ISO 9001 compliant quality management system by evaluating current state process documentation and providing recommendations to achieve ISO 9001 certification. ISO 9001 certification is requested to be obtained by September 2026.

3.2 The contractor shall have proven industrial experience and success in obtaining ISO 9001 certification for heavy manufacturing to include foundry and machine shop processes to ensure knowledge is sufficient to support certification. The contractor will be expected to identify and provide documentation for the maintenance of QMS system.

3.3 The contracting company shall have a classified security clearance for access to confidential material necessary to complete a thorough evaluation of facility processes.

3.4 The contractor shall conduct an internal audit of facility processes and supply a detailed report of findings on a biannual basis after obtaining certification for a period of three (3) years. To identify areas of non-compliance with established procedures and identify areas of concern with ISO 9001 requirements.

3.5 The contractor shall facilitate the scheduling and payment of an ISO 9001 audit to conduct a certification inspection no later than June 2026. In the event that the facility does not pass initial certification, the contractor shall facilitate the scheduling and payment of an additional auditor.

3.6 The contractor shall provide continuing support of ISO 9001 compliant quality management system after certification to ensure continued compliance with standard requirements. The contractor shall facilitate the scheduling and payment of the triennial re-certification no later than three years after obtaining initial certification.

4.0 DATA REQUIREMENTS

Not Applicable

5.0 SECURITY REQUIREMENTS

5.1 The contractor shall be escorted onto the site, observed while they perform the work, and escorted off the site.

5.2 Escorted visit. Escorted visits are required for any person who is not assigned to NNSY/NFPC and/or does not have a valid security clearance. Visitors will always be escorted by an NFPC employee and no exposure to any classified open storage areas or material. Requests for escorted access must be submitted 5 working days prior to arrival. If it is service or maintenance that needs to be done or an emergency, the request needs to be submitted immediately to allow for ample time for proper vetting of individual/individuals requesting access.

The requesting NFPC code/shop will coordinate the visit and security code 1123 will verify two forms of Government issued identification. The code responsible shall provide escorts during the contractor’s visit.

Acceptable documents include:

· US Birth Certificate (original)

· US Voters registration

· US Passport

· (Homeland security), Transportation Workers Identification Credential (TWIC)

· Naturalization paperwork

· Driver’s License

· Social Security Card

Installation Access for Visitors/Contractors

All visitors/contractors having a valid purpose for access shall submit a completed and signed Form 5512/1 to their identified Government sponsor 14 working days prior to the date of their required visit.

The entire document shall be completed, and form dated/signed by the visitor/contractor.

Visitor/Contractor shall retain a copy of the form 5512/1 to present on the first day at the installation.

The visitor/contractor shall communicate all on-site day-to-day schedules and schedule changes to the NFPC base sponsor to be submitted to code 1123 in a detailed security plan.

Note: It is critical that start/end dates/work hours are identified, accurate, and short-term visitors/contractors are not granted extended or after-hours access if not required Reporting to PNY-A for the first time.

Visitor/Contractor Responsibility

Visitor/Contractor shall report to the location designated by their sponsor (Security Office or other designated location, Pass and ID office) or if operating a Commercial Vehicle requiring inspection, to the Vehicle Inspection Station.

Visitor/Contractor shall present their completed and signed 5512/1.

The Sentry or Security Assistant shall verify vetting is cleared and issue the appropriate passes. If visitor/contractor has not completed the 5512/1 their access will be delayed until they correct the form.

Code 1123 will review request and when acceptable notify requesting NFPC code/shop to arrange visit.

5.3 Contractor Vehicle Parking: (OPNAV 5530.14E) All contractor commercial vehicles must be visually inspected at Lot 753 prior to entry into any NFPC buildings and are subject to random inspections anywhere on the compound. Vehicles must clearly display an authorized company sign or logo including a company phone number. Vehicles must only be allowed in the compound for transportation of contractors' tools, parts, and materials to and from the work site with the exception of MILCON scope projects. Vehicles must be registered to the company and not to an individual. Parking of POV's is available at Lot 753, which is approximately one mile from the work site. Contractors shall ensure that their vehicles, including delivery trucks, have valid and current vehicle registration and insurance upon arrival to NFPC. Non-valid and outdated or missing vehicle registration and insurance shall result in denied facility access requiring the Contractor to reschedule delivery immediately at the contractor’s expense. Delivery drivers must present two forms of Government issued identification.

5.4 PEDs (Portable Electronic Devices) are not allowed in areas where work is being performed.

Should the Contractor require a laptop, tablet or other similar device on-site to fulfill the Scope of Work, the Contractor must complete an asset authorization form for each device and submit the devices to code 109 for inspection and approval prior to site access. The laptops cannot have camera capabilities. Procedures regarding laptop access are subject to change.

PEDs (Portable Electronic Devices) are PROHIBITED:

In Restricted Areas (Open Storage Confidential Areas, Secure Rooms, Vaults, etc.) and any location (office, trailer, shop, work area, etc.) where NAVSEA business is conducted.

PEDs are permitted in Personally Owned Vehicles parked outside of the Controlled Access Area. (General parking lots across the street.)

Cell Phones/Smart Watches/Fitness Bands/ Wireless Headsets and Speakers are permitted in outside areas of the CAA and where Naval Sea Systems Command (NAVSEA) business of a sensitive nature is NOT conducted. Cell Phones, Smart Watches, Fitness Bands or Wireless Headsets and Speakers are prohibited in the OSC Areas.

PEDs are PROHIBITED in Secure Rooms (regardless of where any of these areas are located), and in any meeting, discussion or forum where NAVSEA business of a sensitive nature is carried on.

Cellphone lockers/boxes will be placed at the entrance to facilities, or as close to the entrance as possible in order to facilitate this policy.

********CAA-Controlled Access Area is anywhere within the fence line********

5.5. The contractor shall adhere to the facility/base access guidance per the following website:

https://www.cnic.navy.mil/regions/cnrma/om/contractor_verification_system/faqs.html

5.6. The contractor shall ensure that only contractor employees who meet the security requirements stated below perform under this contract at the Government site (e.g. delivery drivers and passengers, etc.). The contractor shall propose and maintain a list of employees who meet these requirements and be willing to submit this list to the Government, along with the necessary documentation to prove they meet them (e.g. the results of a contractor conducted background check, etc.), for the Government’s security vetting, to include any Government background check, and approval. Once vetted and approved, a list of approved contractor employees must be maintained for the entire period of performance of the contract (i.e. propose new employees, replace existing employees or provide updates to existing employees’ records, as necessary). A minimum of two employees, primary and backup, should be cleared by the Government to perform the necessary functions under this contract (e.g. proposed drivers of a delivery vehicle) throughout the entire period of performance of the contract. Contractors must have the ability to be granted access by ensuring current documentation is available at the submission of their proposal to allow background checks for any proposed driver and passenger under the following criteria:

· Felony conviction of any type within 10 years, or felony arrest that has not been adjudicated yet (includes "deferred findings").

· Misdemeanor conviction or on-base arrest within 5 years, for any of the following types of crimes (includes "deferred findings"): Crimes of violence, sexual assault, larceny, drugs, or a habitual offender.

· On the Sex Offender Registry.

· Is barred from any Navy installation.

If a contractor’s employee is denied entry at delivery due to inaccurate or outdated personal and/or vehicle documentation, the Government is absolved of any costs accrued as a result of the denial and the contractor is still pledged to fulfill the contract requirements. Failure to fulfill the contract requirement may result in a termination for default pursuant to FAR 49.4.

5.7 OPERATIONS SECURITY (OPSEC)

The Contractor shall protect critical information associated with this contract to prevent unauthorized disclosure. NFPC’s Critical Information List, (CIL) will be provided on site, if warranted. Performance under this contract requires the contractor to adhere to OPSEC requirements. The Contractor may not impose OPSEC requirements on its subcontractors unless NFPC approves the OPSEC requirements. During the period of this contract, the Contractor may be exposed to, use, or produce, NFPC Critical Information (CI) and/or observables and indicators which may lead to discovery of CI. NFPC CI will not be distributed to unauthorized third parties, including foreign governments, or companies under Foreign Ownership, Control, or Influence (FOCI) ) unless such FOCI has been appropriately mitigated through measures approved by the Defense Counterintelligence and Security Agency.

CUI correspondence transmitted internally on the contractor's unclassified networks or information systems, and externally, shall be protected per NIST SP-800-171, Protecting Controlled Unclassified Information (CUI) in Non-federal Systems and Organizations.

Assembled large components/systems being transported to and from testing areas, other production or government facilities (whether or not on public roadways) shall be in an enclosed van trailer or covered flatbed trailer. Component/System outside storage, staging, and test areas shall be shielded/obscured from public view wherever physically possible.

NFPC’s CI shall not be publicized in corporate wide newsletters, trade magazines, displays, intranet pages or public facing websites. Media requests related to this project shall be directed to the PCO, and the COR who will forward the required to the NFPC Public Release Authority for review.

Any attempt by unauthorized third parties to solicit, obtain, photograph, or record, or; incidents of loss/compromise of government Classified or CI, Business Sensitive, Company Proprietary information related to this or other program must be immediately reported to the contractor's Facility Security Officer and Cognizant Security Office and/or the Naval Criminal Investigative Service, and the NFPC Security Division (Code 1123). Questions concerning these requirements shall be directed to the PCO, and the COR who will forward the request to the NFPC Security Division (Code 1123).

5.8 RECEIPT, STORAGE, AND GENERATION OF CONTROLLED UNCLASSIFIED INFORMATION (CUI)

All Controlled Unclassified Information (CUI) associated with this contract must follow the minimum marking requirements of DoDI 5200.48, Section 3, paragraph 3.4.a, and include the acronym "CUI" in the banner and footer of the document. In accordance with DoDI 5200.48, CUI must be safeguarded to prevent Unauthorized Disclosure (UD). CUI export controlled technical information or other scientific, technical, and engineering information must be marked with an export control warning as directed in DoDI 5230.24, DoDD 5230.25, and Part 250 of Title 32, CFR. Nonfederal information systems storing and processing CUI shall be protected per NIST SP-800-171, or subsequent revisions. All transmissions to personal email accounts (AOL, Yahoo, Hotmail, Comcast, etc.) and posting on social media websites (Facebook, Instagram, Twitter, LinkedIn, etc.) are prohibited. Destroy CUI associated with this contract by any of the following approved methods: A cross-cut shredder; a certified commercial destruction vendor; a central destruction facility; incineration; chemical decomposition; pulverizing, disintegration; or methods approved for classified destruction.

6.0 PLACE OF PERFORMANCE

6.1 Performance will occur at the following government sites:

Naval Foundry and Propeller Center 1701 Kitty Hawk Ave # 20A Philadelphia, PA 19112

The period of performance is one (1) year with two (2) additional option years.

6.1.1 Government will provide a workspace and one (1) computer for up to one (1) contractor personnel under this Contract.

6.1.2 The specific location(s) will be provided at time of award of the Contract. The Contractor shall provide a list of employees who require access to these areas, including standard security clearance information for each person, to NFPC no later than three business days after the date of award. The workspace provided to the Contractor personnel shall be identified by the Awardee, with appropriate signage listing the company name and individual Contractor employee name.

6.1.3 Access to Government buildings at Naval Foundry and Propeller Center is from 0600 to 1800 Monday through Friday, except Federal holidays. Contractor is required to arrive at 0700 and end at 1530 with a 30-minute lunch break. The contractor is not required to work during Federal holidays. Overtime is not offered for this requirement. For security purposes, the contractor shall sign-in and sign-out to ensure that the building is secured after regular working hours. Contractor employees shall be under Government oversight at all times. Government oversight requires that a Government employee be present in the same building/facility whenever Contractor employees(s) are performing work under this Contract. Contractor personnel are not allowed to access any Government buildings at NSWCPD outside the hours of 0600 to 1800 without the express approval of the Procuring Contracting Officer (PCO).

6.1.4 Early Dismissal and Closure of Government Facilities

When a Government facility is closed and/or early dismissal of Federal employees is directed due to severe weather, security threat, or a facility related problem that prevents personnel from working, onsite Contractor personnel regularly assigned to work at that facility should follow the same reporting and/or departure directions given to Government personnel. The Contractor shall follow its own company policies regarding leave. Non-essential Contractor personnel, who are not required to remain at or report to the facility, shall follow their parent company policy regarding whether they should go/stay home or report to another facility. Subsequent to an early dismissal and during periods of inclement weather, onsite Contractors should monitor radio and television announcements before departing for work to determine if the facility is closed or operating on a delayed arrival basis.

When Federal employees are excused from work due to a holiday or a special event (that is unrelated to severe weather, a security threat, or a facility related problem), on site Contractors will continue working established work hours or take leave in accordance with parent company policy.

7.0 TRAVEL

The Contractor is required to travel from their primary performance location when supporting this requirement. The number of times the Contractor may be required to travel to the location cited above may vary as program requirements dictate. All travel costs for Government-site services shall be priced into fixed-priced CLINs.

8.0 GOVERNMENT FURNISHED PROPERTY

Not applicable.

9.0 GOVERNMENT FURNISHED INFORMATION

Not applicable.

10.0 PURCHASES

Not Applicable

11.0 COUNTERFEIT MATERIAL PREVENTION

Not Applicable

12.0 PERSONNEL

12.1 Personnel Requirements. All persons proposed shall be U.S. citizens holding at least a current SECRET clearance, or ability to obtain one.

12.1.1 Key Personnel

The following labor categories are designated as the target Key Personnel for this contract. Additional non-key personnel may also be utilized in these labor categories as tasking requires. Resumes will be submitted for each category in the quantities indicated by the key category description. Target qualifications are listed below for each education and work experience qualifications for each key personnel labor category. The proposed combined expertise of all proposed key personnel shall cover at a minimum all requirements identified in paragraph 3.

The Contractor shall provide individuals to fill the key positions identified below:

13.0 NSWCPD ELECTRONIC COST REPORTING AND FINANCIAL TRACKING (ECRAFT) SYSTEM

Not applicable.

14. SPECIAL REQUIREMENTS

To reiterate, no overtime is offered for this requirement. Contractor employees are not required to work during federal holidays as identified on the website below:

https://www.opm.gov/policy-data-oversight/pay-leave/pay-administration/fact-sheets/holidays-work-schedules-and-pay

CLAUSES INCORPORATED BY FULL TEXT

C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018)

(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with the detailed obligations to which the Contractor committed itself in Proposal N64498-19-Q-5026 dated 02/06/19 in response to Solicitation No. N64498-19-Q-5026.

(b) The technical volume(s) of the Contractor's proposal is(are) hereby incorporated by reference and made subject to the "Order of Precedence" (FAR 52.215-8) clause of this contract. Under the "Order of Precedence" clause, the technical volume(s) of the Contractor's proposal referenced herein is (are) hereby designated as item (f) of the clause, following "the specifications" in the order of precedence.

File details come from the government source that posted it. Updated .