SECT-60_THERMOPLASTIC_TRAFFIC_STRIPES_AND_MARKINGS.docx

DOCX document 14 KB Posted

Attached to
17th Street T-Ball and Baseball Field Improvements REBID
Solicitation number
2024-040
Issued by
Polk County, Florida

About this file

This document is a technical specification (Section 60) for thermoplastic traffic stripes and markings, applicable to the City of St. Cloud, Florida. The specification details the requirements for placing reflectorized traffic stripes and markings using a thermoplastic compound, including various line types such as skip lines, solid lines, pavement messages, and directional arrows in different widths (4", 6", 8", 12", 18", and 24"). The project is part of a rebid for 17th Street T-Ball and Baseball Field Improvements, with sealed electronic bids to be submitted via the OpenGov e-Procurement Platform by 2:00 pm on Tuesday, June 4, 2024. Questions regarding the solicitation must be submitted by Tuesday, May 28, 2024, at 5:00 pm through the platform's question and answer module.

The specification provides detailed payment terms for multiple line types, with pricing to be determined per linear foot or gross mile for different stripe configurations. Contractors must apply the thermoplastic compound by extrusion or spray, ensuring a minimum average thickness of 0.090 inches for crosswalks, stop bars, symbols, and lane lines. The application requires immediate application of reflective glass spheres at a rate of 1 pound per 20 square feet, with at least 20% being water-white true spheres. The document lists multiple bid items with specific codes (A711-1 through A711-8-241) covering various thermoplastic traffic stripe and marking types, indicating a comprehensive approach to road marking for the project.

View the file

Other files

File Type Posted
17th_Street_T-Ball_and_Baseball_Field_Improvements_REBID_(Addendum_#5_Revision).pdf PDF
Building_Department_Fee_Schedule.pdf PDF
Pole_Barn.pdf PDF
Restroom_Building_Specifications.pdf PDF
Civil_Plans_-_BID_SET_-_17th_Street_Ball_Field_2024-02-23.pdf PDF
SECT-30_GENERAL.pdf PDF
Survey.pdf PDF
Restroom_Building_Plans_&_Site_Electrical.pdf PDF
Landscape_Plans_-_Bid_Set_-_17th_Street_Ball_Field_2023-05-18.pdf PDF
Geotechnical_Reports.pdf PDF
SFWMD_-_ERP_Permit_-_17th_Street_Ball_Fields.pdf PDF
Dugout_Plan.pdf PDF
FDOT_Drainage_Connection_Permit.pdf PDF
City_SDP22-00037_Permit_Approval.pdf PDF
Sect-20_Special_Conditions.pdf PDF
Insurance_Requirements_.pdf PDF
Acord_Certificate_of_Insurance_Sample_.pdf PDF
SECT-30_GENERAL.docx DOCX document
Contractual_Documents.pdf PDF
Payment_And_ContractCompletion_Forms.pdf PDF
SECT-56_CULVERTS_AND_STORM_SEWERS.docx DOCX document
SECT-54_PIPE_INSTALLATION_FOR_RECLAIMED_WATER_SYSTEMS.DOC DOC document
SECT-61_PAVEMENT_MARKING_REMOVAL_(THERMPLASTIC).docx DOCX document
SECT-58_HIGHWAY_SIGNING.docx DOCX document
Performance_Bond.pdf PDF
SECT-55_VALVES_AND_ACCESS_FOR_RECLAIMED_WATER_MAINS.doc DOC document
SECT-57_INLETS_MANHOLES_AND_JUNCTION_BOXES.docx DOCX document
SECT-59_REFLECTIVE_PAVEMENT_MARKERS.docx DOCX document
SECT-52_VALVES_HYDRANTS_&_ACCESS_FOR_WATER_MAINS.DOC DOC document
SECT-49_Blank.DOC DOC document
SECT-40_PIPE_MATERIAL_FOR_GRAVITY_SANITARY_SEWERS.docx DOCX document
SECT-53_RECLAIMED_WATER_SYSTEMS.DOC DOC document
SECT-46_SEWAGE_PUMPING_STATIONS.rtf RTF text file
SECT-36_PAVEMENT_REMOVAL_AND_RESTORATION.doc DOC document
SECT-45_WASTEWATER_FORCE_MAINS.DOC DOC document
SECT-41_GRAVITY_SEWER_PIPE_LAYING_JOINTING_AND_MISC_CONSTRUCTION_DETAILS.doc DOC document
SECT-47_SUBMERSIBLE_WASTEWATER_PUMPS.DOC DOC document
SECT-39_GRASSING_AND_SEEDING.docx DOCX document
SECT-51_PIPE_INSTALLATION_FOR_WATER_MAINS.DOC DOC document
SECT-32_EXCAVATION_BACKFILL_COMPACTION_GRADING.docx DOCX document
SECT-38_CONCRETE.docx DOCX document
SECT-35_PRESSURE_CONNECTION.doc DOC document
SECT-31_SITE_PREP_SURF_REMOVE.docx DOCX document
SECT-48_PUMP_STATION_ELECTRICAL_POWER_&_CONTROL_SYSTEM.DOC DOC document
SECT-50_WATER_DISTRIBUTION.DOC DOC document
SECT-43_SERVICE_LATERALS.docx DOCX document
SECT-42_MANHOLES.docx DOCX document
Payment_Bond.pdf PDF
SECT-37_ROADWAY_CONSTRUCTION_STANDARDS.doc DOC document
SECT-33_BORING_&_JACKING.docx DOCX document
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 60 - THERMOPLASTIC TRAFFIC STRIPES AND MARKINGS

Item No. Title

60.1 DESCRIPTION

60.2 MATERIALS

60.3 APPLICATION

60.4 METHOD OF MEASUREMENT

60.5 BASIS OF PAYMENT

60.1 DESCRIPTION

The work under this section consists of placing reflectorized traffic stripes and markings in accordance with the details shown in the plans, using a thermoplastic compound meeting CITY approval.

60.2 MATERIALS

The thermoplastic compound shall consist of a CITY approved mixture of appropriate organic binders, glass spheres and pigment.

60.3 APPLICATION

The thermoplastic compound shall be extruded or sprayed onto a clean, prepared surface in a molten state by mechanical means. Where the compound is to be applied to cement concrete pavement, a sealing primer shall be used. Preformed materials, which are directly applied to the pavement, will be permitted as an alternate to the extruded or sprayed application technique for pavement messages and transverse markings only.

All newly applied stripes, stop bars, symbols and lane lines shall be protected from vehicle damage until proper curing takes place.

Crosswalks, stop bars, symbols and lane lines shall have an average thickness of 0.090 inch (2.3 mm).

Reflective glass spheres shall be applied immediately behind the striping mechanism at the rate of 1 pound per 20 square feet of compound. At least 20 per cent of the spheres, by count, shall be water-white true spheres inclusions.

60.4 METHOD MEASUREMENT

The quantities to be paid for under this section shall be as follows:

A.) The net length, in linear feet, of each of the various types of thermoplastic lines, stripes and bands, authorized and acceptably applied.

B.) The number of thermoplastic pavement messages and of directional arrows, authorized and acceptably applied.

C.) The total traversed distance in gross miles of thermoplastic skip line. The actual applied line is 37.5 per cent of the transverse distance for a 3:5 ratio. This equates to 1980 feet of marking per mile of single line.

D.) The total transverse distance in net miles of thermoplastic solid line.

60.5 BASIS OF PAYMENT

The contract price per linear foot or gross mile for each separate type of line or stripe, and the contract unit price each, for pavement messages and directional arrows shall be full compensation for all work specified in this section.

Payment shall be made under:

Item No. A711-1Skip Traffic Stripe/ThermoplasticGM
Item No. A711-2Skip Traffic Stripe/ThermoplasticLF
Item No. A711-3Pavement Messages/ThermoplasticEA
Item No. A711-4Directional Arrows/ThermoplasticEA
Item No. A711-5Guide Lines/Thermoplastic (4" Dotted)LF
Item No. A711-6-41Solid Traffic Stripe/Thermoplastic (4")LF
Item No. A711-6-61Solid Traffic Stripe/Thermoplastic (6")LF
Item No. A711-6-81Solid Traffic Stripe/Thermoplastic (8")LF
Item No. A711-6-121Solid Traffic Stripe/Thermoplastic (12")LF
Item No. A711-6-181Solid Traffic Stripe/Thermoplastic (18")LF
Item No. A711-6-241Solid Traffic Stripe/Thermoplastic (24")LF
Item No. A711-8-41Solid Traffic Stripe/Thermoplastic (4")NM
Item No. A711-8-61Solid Traffic Stripe/Thermoplastic (6")NM
Item No. A711-8-81Solid Traffic Stripe/Thermoplastic (8")NM
Item No. A711-8-121Solid Traffic Stripe/Thermoplastic (12")NM
Item No. A711-8-181Solid Traffic Stripe/Thermoplastic (18")NM
Item No. A711-8-241Solid Traffic Stripe/Thermoplastic (24")NM

SECTION 60 - THERMOPLASTIC TRAFFIC STRIPES AND MARKINGS

File details come from the government source that posted it. Updated .