The document is a detailed architectural plan for a dugout structure, specifically designed for the 17th Street T-Ball and Baseball Field Improvements project in St. Cloud, Florida. The plan, labeled as drawing A1, provides a comprehensive technical blueprint showing a plan view, elevation, and cross-section of a dugout with precise measurements and construction specifications. The structural design includes a 15'-0" by 20'-0" concrete slab on grade with turned-down edges, 3"x3"x1/4" pipe columns, a roof with a 1-1/2" per 12" slope, and a chain link fence with green vinyl slats on the south, east, and west sides.

The construction details specify a players bench to be provided and installed by the owner, with specific attachment instructions using expansion bolts, and structural elements like continuous 2x10 headers, 2x6 framing, and Simpson anchors. The plan also includes technical specifications for concrete finishing (light broom finish), concrete slope, column embedment, and galvanic protection measures. While the document does not provide direct pricing information, it is part of a municipal infrastructure improvement project for the City of St. Cloud, with electronic bid submissions accepted through the OpenGov e-Procurement Platform until 2:00 pm on Tuesday, June 4, 2024, with a deadline for questions on Tuesday, May 28, 2024, at 5:00 pm.

View the file

Other files

File Type Posted
17th_Street_T-Ball_and_Baseball_Field_Improvements_REBID_(Addendum_#5_Revision).pdf PDF
Building_Department_Fee_Schedule.pdf PDF
Pole_Barn.pdf PDF
Restroom_Building_Specifications.pdf PDF
Civil_Plans_-_BID_SET_-_17th_Street_Ball_Field_2024-02-23.pdf PDF
SECT-30_GENERAL.pdf PDF
Survey.pdf PDF
Restroom_Building_Plans_&_Site_Electrical.pdf PDF
Landscape_Plans_-_Bid_Set_-_17th_Street_Ball_Field_2023-05-18.pdf PDF
Geotechnical_Reports.pdf PDF
SFWMD_-_ERP_Permit_-_17th_Street_Ball_Fields.pdf PDF
FDOT_Drainage_Connection_Permit.pdf PDF
City_SDP22-00037_Permit_Approval.pdf PDF
Sect-20_Special_Conditions.pdf PDF
Insurance_Requirements_.pdf PDF
Acord_Certificate_of_Insurance_Sample_.pdf PDF
SECT-30_GENERAL.docx DOCX document
Contractual_Documents.pdf PDF
Payment_And_ContractCompletion_Forms.pdf PDF
SECT-56_CULVERTS_AND_STORM_SEWERS.docx DOCX document
SECT-54_PIPE_INSTALLATION_FOR_RECLAIMED_WATER_SYSTEMS.DOC DOC document
SECT-61_PAVEMENT_MARKING_REMOVAL_(THERMPLASTIC).docx DOCX document
SECT-58_HIGHWAY_SIGNING.docx DOCX document
Performance_Bond.pdf PDF
SECT-60_THERMOPLASTIC_TRAFFIC_STRIPES_AND_MARKINGS.docx DOCX document
SECT-55_VALVES_AND_ACCESS_FOR_RECLAIMED_WATER_MAINS.doc DOC document
SECT-57_INLETS_MANHOLES_AND_JUNCTION_BOXES.docx DOCX document
SECT-59_REFLECTIVE_PAVEMENT_MARKERS.docx DOCX document
SECT-52_VALVES_HYDRANTS_&_ACCESS_FOR_WATER_MAINS.DOC DOC document
SECT-49_Blank.DOC DOC document
SECT-40_PIPE_MATERIAL_FOR_GRAVITY_SANITARY_SEWERS.docx DOCX document
SECT-53_RECLAIMED_WATER_SYSTEMS.DOC DOC document
SECT-46_SEWAGE_PUMPING_STATIONS.rtf RTF text file
SECT-36_PAVEMENT_REMOVAL_AND_RESTORATION.doc DOC document
SECT-45_WASTEWATER_FORCE_MAINS.DOC DOC document
SECT-41_GRAVITY_SEWER_PIPE_LAYING_JOINTING_AND_MISC_CONSTRUCTION_DETAILS.doc DOC document
SECT-47_SUBMERSIBLE_WASTEWATER_PUMPS.DOC DOC document
SECT-39_GRASSING_AND_SEEDING.docx DOCX document
SECT-51_PIPE_INSTALLATION_FOR_WATER_MAINS.DOC DOC document
SECT-32_EXCAVATION_BACKFILL_COMPACTION_GRADING.docx DOCX document
SECT-38_CONCRETE.docx DOCX document
SECT-35_PRESSURE_CONNECTION.doc DOC document
SECT-31_SITE_PREP_SURF_REMOVE.docx DOCX document
SECT-48_PUMP_STATION_ELECTRICAL_POWER_&_CONTROL_SYSTEM.DOC DOC document
SECT-50_WATER_DISTRIBUTION.DOC DOC document
SECT-43_SERVICE_LATERALS.docx DOCX document
SECT-42_MANHOLES.docx DOCX document
Payment_Bond.pdf PDF
SECT-37_ROADWAY_CONSTRUCTION_STANDARDS.doc DOC document
SECT-33_BORING_&_JACKING.docx DOCX document
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15' - 0"

4" CONC. SLAB ON GRADE W/TURNED DOWN

SLAB EDGE OVER COMPACTED FILL

6" 2' - 0" 2' - 0"

6"

20' - 0"

7'

0" 6"

6"

6"

7'

0" 6"

8'

0"

8'

0"

R O

O F

SL

O

PE

-1 /2

2"

C O

N C

. S

LO

PE

/8

CONC. LIGHT BROOM FINISH

A1

3"X3"X1/4" PIPE

COLUMNS 3'

- 0

60°

BENCH

3' - 0"

9'

0" 4'

0"

10' - 0"

2' - 0"

CONCRETE

S/W SHOWN

ON CIVIC

DRAWINGS

5' - 0"

SLOPE 1/8" PER FOOT MIN.

1-1/2"

CHAIN LINK FENCE 9GA -

FABRIC W/ GREEN VINYL

SLATS SOUTH, EAST, WEST

SIDES

3"X3"X1/4" TUBE COL. STD.

10'-0"O.C. MAX

STD HOT DIPPED GALV

8'

0"

9'

0"

7' - 0"

PLAYERS BENCH . PROVIDED AND

INSTALLED BY OWNER

ATTACH BENCH W/(4) 3/8"~X4"

EXPANSION BOLTS PER SUPPORT.

2X10 CONT.

2X10 @ EACH END

(3) 2X6 @ BLOCKING

BETWEEN RAFTERS, STAGGERED

W/(2) 16d NAILS

2X6 @ 24" O.C.

(2) 1/2"~THRU. BOLTS

AT EA. COLUMN

NOTE: END SIM

(W/CONT. DRIP)

METAL DRIP OVER

1X2 ON 2X10 FASCIA

SIMPSON LUS26

ANCHOR AT EA JOIST

W/(4) 10d NAILS TO JOIST & HEADER

NOTE: ALL WOOD IS P.T.

SIMPSON LUS26

ANCHOR AT EA JOIST

W/(4) 10d NAILS TO JOIST & HEADER

PEAK CAP 1x2

RIPPED

(2) #5~ BAR

CONT.

THICKENED SLAB

AND EDGES

COLUMN EMBEDDED IN

CONC. TO BE COATED

W/BITUM. PAINT FOR

GALVANIC PROTECTION

CONCRETE SLAB- OPTION TO BE 4" CONCRETE WITH

FIBERMESH OR 4" CONCRETE W/ 6"x6"x 10/10 WWF

OVER 6 MIL. VAPOR BARRIER. WWF MUST BE SUPPORTED WITH

PLASTIC CHAIRS 3'-0" EACH WAY, IN ACCORDANCE WITH FLORIDA

BUILDING CODE EACH METHOD OVER 6 MIL. VAPOR BARRIER.

ROOF DEAD LOAD= 2 PSF

ROOF LIVE LOAD= 20 PSF

ATTACH CORRUGATED METAL ROOF TO WOOD

MEMBER WITH # 10x 1-1/2" "WOODGRIP" SCREWS

12"O.C. @ FIELD, & 6"O.C. AT EDGES.

FLORIDA BUILDING CODE 2020 7TH EDITION

STRUCTURAL NOTES

BUILDING CATEGORY: II

WIND EXPOSURE: B

INTERNAL PRESSURE COEFFICIENT: 1.0

IMPORTANCE FACTOR: 1.0

BASIC WIND SPEED: 150 MPH

ALL WOOD IS PRESSURE TREATED, SYP. NO 2

CONCRETE. 3,000 PSI @ 20 DAYS, REINFORCED

STEEL, GRADE 60

8" 2'

4"

8"

1'-0" CONCRETE FOOTING

1' - 4" 5' - 4" 1' - 4"

2X10

PEAK CAP 1x2

RIPPED

1' - 0"

3'

8"

SHEET:

JOB NUMBER:

SCALE:

APVD:DRWN:

DATE:

A R

P h.

7)

-0

F ax

7)

-0

A A

C

F R

O N

T S

T R

E E

T C

E L

E B

R A

T

IO

N , F

L O

R

ID

A w w w .B

U M

PU

SA

N D

A

SS

O C

IA

T

E S.

co m

A R

C H

IT

E

C T

U R

E

I

N T

E R

IO

R

D E

SI

G

N B

U M

PU

S

A N

D A

SS

O

C

IA

T E

S, I

N C

A pp ro ve d

B y: D an ie l

L.

B um pu s A

R

D at e

AS SHOWN

3-1-2022

22124

A1

Author Approver

D U

G O

U T

-C

IT

Y O

F

ST

. C

LO

U D

7T

H S

T

ST

. C

LO

U D

, F

LO

R

ID

A

R

EC

R

EA

TI

O

N D

EP

A

R

TM

EN

T

SCALE: 1/2" = 1'-0"

PLAN VIEW

SCALE: 1" = 1'-0"A1