The document is a technical specification section (SECT-35_PRESSURE_CONNECTION.doc) related to pressure connection installations for water and sewer infrastructure, likely for a municipal engineering project. The section provides detailed technical requirements for tapping sleeves, mechanical joint sleeves, steel tapping sleeves, and tapping valves for pressure connections 4 inches and larger. The specification outlines rigorous standards for materials, including requirements for gray-iron, ductile-iron, and steel sleeves with specific pressure ratings, coating specifications, and connection protocols.

The specification mandates a comprehensive connection process that requires contractors to submit detailed written requests to the city at least five working days before planned connections, including specific connection points, fitting details, and estimated construction time. The city will review and approve the connection procedure, and contractors are prohibited from operating system valves without prior notification and city personnel presence. The document also specifies technical installation requirements, including excavation, support methods, cleaning protocols for potable water systems, pressure testing procedures, and coupon submission after tapping. While not directly linked to a specific bid, the technical specifications appear to be part of a broader municipal infrastructure improvement project with strict engineering and procedural standards.

View the file

Other files

File Type Posted
17th_Street_T-Ball_and_Baseball_Field_Improvements_REBID_(Addendum_#5_Revision).pdf PDF
Building_Department_Fee_Schedule.pdf PDF
Pole_Barn.pdf PDF
Restroom_Building_Specifications.pdf PDF
Civil_Plans_-_BID_SET_-_17th_Street_Ball_Field_2024-02-23.pdf PDF
SECT-30_GENERAL.pdf PDF
Survey.pdf PDF
Restroom_Building_Plans_&_Site_Electrical.pdf PDF
Landscape_Plans_-_Bid_Set_-_17th_Street_Ball_Field_2023-05-18.pdf PDF
Geotechnical_Reports.pdf PDF
SFWMD_-_ERP_Permit_-_17th_Street_Ball_Fields.pdf PDF
Dugout_Plan.pdf PDF
FDOT_Drainage_Connection_Permit.pdf PDF
City_SDP22-00037_Permit_Approval.pdf PDF
Sect-20_Special_Conditions.pdf PDF
Insurance_Requirements_.pdf PDF
Acord_Certificate_of_Insurance_Sample_.pdf PDF
SECT-30_GENERAL.docx DOCX document
Contractual_Documents.pdf PDF
Payment_And_ContractCompletion_Forms.pdf PDF
SECT-56_CULVERTS_AND_STORM_SEWERS.docx DOCX document
SECT-54_PIPE_INSTALLATION_FOR_RECLAIMED_WATER_SYSTEMS.DOC DOC document
SECT-61_PAVEMENT_MARKING_REMOVAL_(THERMPLASTIC).docx DOCX document
SECT-58_HIGHWAY_SIGNING.docx DOCX document
Performance_Bond.pdf PDF
SECT-60_THERMOPLASTIC_TRAFFIC_STRIPES_AND_MARKINGS.docx DOCX document
SECT-55_VALVES_AND_ACCESS_FOR_RECLAIMED_WATER_MAINS.doc DOC document
SECT-57_INLETS_MANHOLES_AND_JUNCTION_BOXES.docx DOCX document
SECT-59_REFLECTIVE_PAVEMENT_MARKERS.docx DOCX document
SECT-52_VALVES_HYDRANTS_&_ACCESS_FOR_WATER_MAINS.DOC DOC document
SECT-49_Blank.DOC DOC document
SECT-40_PIPE_MATERIAL_FOR_GRAVITY_SANITARY_SEWERS.docx DOCX document
SECT-53_RECLAIMED_WATER_SYSTEMS.DOC DOC document
SECT-46_SEWAGE_PUMPING_STATIONS.rtf RTF text file
SECT-36_PAVEMENT_REMOVAL_AND_RESTORATION.doc DOC document
SECT-45_WASTEWATER_FORCE_MAINS.DOC DOC document
SECT-41_GRAVITY_SEWER_PIPE_LAYING_JOINTING_AND_MISC_CONSTRUCTION_DETAILS.doc DOC document
SECT-47_SUBMERSIBLE_WASTEWATER_PUMPS.DOC DOC document
SECT-39_GRASSING_AND_SEEDING.docx DOCX document
SECT-51_PIPE_INSTALLATION_FOR_WATER_MAINS.DOC DOC document
SECT-32_EXCAVATION_BACKFILL_COMPACTION_GRADING.docx DOCX document
SECT-38_CONCRETE.docx DOCX document
SECT-31_SITE_PREP_SURF_REMOVE.docx DOCX document
SECT-48_PUMP_STATION_ELECTRICAL_POWER_&_CONTROL_SYSTEM.DOC DOC document
SECT-50_WATER_DISTRIBUTION.DOC DOC document
SECT-43_SERVICE_LATERALS.docx DOCX document
SECT-42_MANHOLES.docx DOCX document
Payment_Bond.pdf PDF
SECT-37_ROADWAY_CONSTRUCTION_STANDARDS.doc DOC document
SECT-33_BORING_&_JACKING.docx DOCX document
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 35 - PRESSURE CONNECTION

Item No.

Title 35.1

GENERAL

35.2

TAPPING SLEEVES

35.2.1

General

35.2.2

Mechanical Joint Sleeves

35.2.3

Steel Tapping Sleeves

35.2.4

Tapping Valves

35.3

NOTIFICATION AND CONNECTION TO EXISTING MAINS

35.4

INSTALLATION

35.4.1

Excavation, Backfill, Compaction and Grading

35.4.2

Construction Details

35.1

GENERAL

Installations of pressure connections 4" and larger shall be made in accordance with this section.

35.2

TAPPING SLEEVES

35.2.1

GENERAL

Tapping sleeves shall be mechanical joint sleeves or fabricated steel sleeves as specified below. All pressure connections to asbestos cement pipe and all "size on size" taps shall utilize mechanical joint sleeves.

35.2.2

MECHANICAL JOINT SLEEVES

Sleeves shall be cast of gray-iron or ductile-iron and have an outlet flange with the dimensions of the Class 125 flanges shown in ANSI B16.1 properly recessed for tapping valve. Glands shall be gray-iron or ductile iron. Gaskets shall be vulcanized natural or synthetic rubber. Bolts and nuts shall comply with ANSI/AWWA C111/A21.11. Sleeves shall be capable of withstanding a 200 psi working pressure.

35.2.3

STEEL TAPPING SLEEVES

For potable water and reuse applications:

Sleeves shall be fabricated of minimum 3/8" carbon steel meeting ASTM A285 Grade C. Outlet flange shall meet AWWA C-207, Class "D" ANSI 150 lb. drilling and be properly recessed for the tapping valve. Bolts and nuts shall be 304 stainless steel. Gaskets shall be vulcanized natural or synthetic rubber. Sleeves shall have manufacturer applied fusion bonded epoxy coating, minimum 12 mil thickness.

For sanitary sewer force main applications:

Sleeves shall be stainless steel (JCM 432 or approved equal); maximum working pressure 150 psi; maximum test pressure 200 psi.

35.2.4

TAPPING VALVES

Tapping valves shall meet the requirements of Section 52.2 except that units shall be flange by mechanical joint ends. Valves shall be compatible with tapping sleeves as specified above and specifically designed for pressure connection operations.

35.3

NOTIFICATION AND CONNECTION TO EXISTING MAINS

All connections to existing mains shall be made by the CONTRACTOR only after the connection procedure and his work scheduling has been reviewed and approved by the CITY. The CONTRACTOR shall submit a written request to the CITY a minimum of five (5) working days prior to scheduling said connections. In his request he shall outline the following:

1.)

Points of Connection, fittings to be used, and method of flushing and disinfection if applicable.

2.)

Estimated construction time for said connections.

The CITY shall review the submittal within three (3) working days after receiving it and inform the CONTRACTOR regarding approval or denial of his request. If his request is rejected by the CITY, the CONTRACTOR shall resubmit his request modifying it in a manner acceptable to the CITY.

All connections shall only be made on the agreed upon date and time. If the CONTRACTOR does not initiate and complete the connection work in the agreed upon manner, he shall be required to reschedule the said connection by following the procedure outlined above.

The CONTRACTOR shall not operate any valves in the system without prior notification to and in the presence of duly authorized CITY personnel.

35.4

INSTALLATION

35.4.1

EXCAVATION, BACKFILL, COMPACTION AND GRADING

The applicable provisions of Section 32 shall apply.

35.4.2

CONSTRUCTION DETAILS

Sufficient length of main shall be exposed to allow for installation of the tapping sleeve and valve and the operation of the tapping machinery. The main shall be supported on concrete pedestals or bedding rock at sufficient intervals to properly carry its own weight, plus the weight of the tapping sleeve valve and machinery. Any damage to the main due to improper or insufficient supports shall be repaired at the CONTRACTOR'S expense.

For potable water only, the inside of the tapping sleeve and valve, the outside of the main, and the tapping machine shall be cleaned and swabbed or sprayed with 10% liquid chlorine prior to beginning installation for water system pressure connections.

After the tapping sleeve has been mounted on the main, the tapping valve shall be bolted to the outlet flange, making a pressure tight connection. Prior to beginning the tapping operation, the sleeve and valve shall be pressure tested at 150 psi for a period of not less than fifteen (15) minutes to ensure that no leakage will occur.

For pressure connections through 12" diameter or less the minimum diameter cut shall be 2” less than the nominal diameter of the pipe to be attached. For larger taps the allowable minimum diameter shall be 2" to 3" less than the nominal diameter of the pipe being attached. After the tapping procedure is complete the CONTRACTOR shall submit the coupon to the CITY.

Adequate restrained joint fittings shall be provided to prevent movement of the installation when test pressure is applied. Provisions of Section 34 shall apply.