This amendment modifies a solicitation for rebalancing the HVAC system. The purpose is to provide ninety-one attachments with details on the existing HVAC systems and mechanical plans for various buildings, as well as performance surveys, past performance questionnaires, and safety evaluation forms for contractors to submit with their proposals. The solicitation is seeking offers for rebalancing HVAC systems at Gulf Coast Veterans Health Care System facilities in Biloxi, Mississippi to ensure proper air flow and system performance. Responses are due by the date specified in the amended solicitation.
View the file
Other files for this federal contract opportunity
Show all 50
Z2DA--CFM - Rebalance HVAC System has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 5
0001 08-10-2020
629-20-2-6002-0057
629-20-106
Y 36C256
Department of Veterans Affairs
Gulf Coast Veterans Health Care System
Network Contracting Office 16
400 Veterans Avenue
Biloxi MS 39531 email: leslie.robinson@va.gov
Y 36C256
Department of Veterans Affairs
Southeast Lpouisiana Veterans HCS
Network Contracting Office 16
1515 Poydras St. Ste. 1100
New Orleans LA 70112
To all Offerors/Bidders
36C25620R0099
08-07-2020
X
X X
629-3600162-6002-854200NRM-2670-23NR0PA02
X 1
THE PURPOSE OF THIS AMENDMENT IS THE FOLLOWING:
To add (86) eighty-six attachments to solicitation Rebalance HVAC System posted on August 7, 2020.
(see below for a list of attachments)
ALL OTHER TERMS AND CONDITIONS OF THIS SOLICITATION REMAIN UNCHANGED.
CONTINUATION PAGE
AMENDMENT NO 36C25620R0099 –0001
REBALANCE HVAC SYSTEM
PROJECT NO. 629-106
See attached document: P07-General Decision.
See attached document: 000110 Table of Contents.
See attached document: 010000 General Requirements.
See attached document: 013323 Shop Drawings Product Data and Samples.
See attached document: 013526 Safety Requirements.
See attached document: 014219 Reference Standards.
See attached document: ICRA ILSM Rebalance HVAC System.
See attached document: 230511 Common Work Results for HVAC.
See attached document: 230593 Testing Adjusting and Balancing for HVAC.
See attached document: 230923 DDC Control System for HVAC.
See attached document: M-1 Typical Existing Service Bay layout.
See attached document: M-2 DNT Building Existing AHU sequence.
See attached document: M-3 DNT Building Existing DOAS sequence.
See attached document: M-4 OP Building Existing AHU sequence.
See attached document: M-5 OP Building Existing DOAS sequence.
See attached document: VAV PANAM 0252-9MH610.
See attached document: PANAM 101.
See attached document: PANAM 102.
See attached document: PANAM 103.
See attached document: PANAM 104.
See attached document: PANAM 105.
See attached document: CEP 115-7MH608.
See attached document: CEP L01.
See attached document: CEP L02.
See attached document: CEP L03.
See attached document: CEP L04.
See attached document: AMS Research 340-8MH601.
See attached document: AMS Research 348-8MH609.
See attached document: RESEARCH 1st mech plan.
See attached document: RESEARCH 2nd mech plan.
See attached document: RESEARCH 3rd mech plan.
See attached document: RESEARCH 3 5 mech plan.
See attached document: RESEARCH 4th mech plan.
See attached document: RESEARCH 5 dixie penthouse.
See attached document: VAV Research 351-8MH612.
See attached document: VAV Research 352-8MH613.
See attached document: VAV Research 353-8MH614.
See attached document: DNT 02288-2MH613.
See attached document: DNT 02289-2MH614.
See attached document: DNT L04 F-G.
See attached document: DNT L05 D.
See attached document: DNT L01 F-G.
See attached document: DNT L05 E.
See attached document: DNT L05 G.
See attached document: DNT L06 D.
See attached document: DNT L01i D-E.
See attached document: DNT L01i F-G.
See attached document: DNT L03 D-E.
See attached document: DNT L02 D-E.
See attached document: DNT L02i D-E.
See attached document: DNT L02i F-G.
See attached document: DNT L03i D-E.
See attached document: DNT L03 F-G.
See attached document: DNT L01 D-E.
See attached document: DNT L04 D-E.
See attached document: VAV DNT 02301-2MH626.
See attached document: VAV DNT 02302-2MH627.
See attached document: VAV DNT 02303-2MH628.
See attached document: VAV DNT 02304-2MH629.
See attached document: VAV DNT 02305-2MH630.
See attached document: VAV DNT 02306-2MH631.
See attached document: IP 01414-1MH604.
See attached document: INP L04.
See attached document: INP L03.
See attached document: INP L05.
See attached document: VAV IP 01421-1MH611.
See attached document: VAV IP 01422-1MH612.
See attached document: AMS IP 01414-1MH604.
See attached document: AMS TLR 03470-6MH604.
See attached document: TLR L01.
See attached document: TLR L02.
See attached document: TLR L03.
See attached document: TLR L04.
See attached document: TLR L05.
See attached document: VAV OP 03038-3MH615.
See attached document: OUT L04.
See attached document: OUT L05.
See attached document: OUT L06.
See attached document: OUT L07.
See attached document: OUT L08.
See attached document: EXHIBIT A PERFORMANCE RELEVANCY SURVEY v2.
See attached document: EXHIBIT B PAST AND PRESENT PERFORMANCE
QUESTIONNAIRE v2.
See attached document: EXHIBIT C SUBCONTRACTOR INFORMATION AND CONSENT v2.
See attached document: EXHIBIT D CONTRACTOR EVALUATION FORM
CONSTRUCTION SAFETY v2.
See attached document: EXHIBIT E SURETY FORM.
See attached document: EXHIBIT F PROPOSAL INQUIRY FORM.