S02 Drawings 1 of 2 - 553-19-101.pdf
PDF 22 MB Posted
- Attached to
- Z1DA--Replace Parking Structures Elevators 553-19-101 Federal contract opportunity
- Solicitation number
- 36C25022B0071
About this file
This pre-solicitation notice announces the Department of Veterans Affairs' intent to issue an invitation for bids to replace parking structure elevators at the John D. Dingell Veterans Administration Medical Center in Detroit, Michigan. The project entails furnishing all necessary labor, materials, equipment, and supervision to complete the work according to drawings and specifications. The magnitude of cost is estimated between $5 million and $10 million. The solicitation will be available for download on September 9, 2022 from SAM.gov and only offers from verified Service-Disabled Veteran Owned Small Businesses registered in Vendor Information Pages will be considered for this 100% set-aside acquisition. The contract type will be firm-fixed-price with an anticipated award within 120 days of bid opening. All questions must be submitted in writing to the specified contracting officer by email.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASSOCIATE MEDICAL CENTER DIRECTOR
DATE
DATE
MEDICAL CENTER DIRECTOR
VA APPROVAL
CHIEF, FACILITY MANAGEMENT SERVICES DATE
ASSISTANT CHIEF, FMS DATE
SAFETY AND OCCUPATIONAL HEALTH MANAGER DATE
ENERGY MANAGER DATE
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
BRAND ITEM SPECIFICATION SECTION NOTES
HILTI FS1-FIRESTOP 07 84 00 BOTH SIDES OF FIRE-RATED WALLS, SMOKE BARRIERS, AND
FLOORS REGARDLESS OF FIRE RATING
DIVISION 08 - OPENINGS
BRAND ITEM SPECIFICATION SECTION NOTES
YALE LOCKS & DOOR HARDWARE 08 71 00 LARGE FORMAT 7-PIN REMOVABLE CORE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
BRAND ITEM SPECIFICATION SECTION NOTES
SIEMENS HVAC CONTROLS 23 09 23
SIEMENS BUILDING MANAGEMENT SYSTEM (BMS)
DIVISION 26 - ELECTRICAL
BRAND ITEM SPECIFICATION SECTION NOTES
SIEMENS ELECTRICAL 26 22 00
26 24 16 26 29 11 26 29 21 26 43 13
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
BRAND ITEM SPECIFICATION SECTION NOTES
SECURITY 2000 PHYSICAL SECURITY 28 13 00
28 23 00
SIMPLEX FIRE ALARM SYSTEM / VENDOR 28 31 00
EN-GAUGE EN-VISION OBSTRUCTION SENSOR 28 31 00 VA SUPPLIED / CONTRACTOR INSTALLED
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
JOHN D. DINGELL
VA MEDICAL
CENTER
35 % SCHEMATIC DESIGN SUBMISSION 1 12/23/2020
65% DESIGN DESIGN SUBMISSION 2 04/02/2021
65% DESIGN DEVELOPMENT RE-SUBMISSION3 05/28/2021
95% CONSTRUCTION DOCUMENTS SUBMISSION4 08/23/2021
BID DOCUMENTS5 02/16/2022
/2
/2
:5
:2
P
M
G-001
COVER
1 11CDC
REPLACE/ADD PARKING
STRUCTURE ELEVATORS
VAMC DETROIT 4646 JOHN R. ST.
DETROIT, MI 48201
FEBRUARY 16, 2022
BID DOCUMENTS
553-19-10118-319
101 & 102
REPLACE/ADD PARKING STRUCTURE
ELEVATORS
VAMC DETROIT 4646 JOHN R. ST.
DETROIT, MI 48201
VA PROJECT #: 553-19-101
MJC
DRAWING LIST
No. Description Dwg of Dwg
ELECTRICAL
E-001 ELECTRICAL AND TECHNOLOGY GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 20
ED101 ELECTRICAL DEMOLITION PLAN - BUILDING 101 2 20
ED102 ELECTRICAL DEMOLITION PLAN - BUILDING 102 3 20
EP101 ELECTRICAL POWER PLAN - BUILDING 101 4 20
EP102 ELECTRICAL POWER PLAN - BUILDING 102 5 20
EL101 ELECTRICAL LIGHTING PLANS - BUILDING 101 6 20
EL102 ELECTRICAL LIGHTING PLANS - BUILDING 102 7 20
EM101 ELECTRICAL MECHANICAL POWER PLAN - BUILDING 101 8 20
EM102 ELECTRICAL MECHANICAL POWER PLAN - BUILDING 102 9 20
ET101 ELEVATOR TECHNOLOGY PLAN 10 20
ET102 ELEVATOR TECHNOLOGY PLAN 11 20
ED301 ELECTRICAL ELEVATIONS DEMO WORK 12 20
E-301 ELECTRICAL ELEVATIONS NEW WORK 13 20
E-501 ELECTRICAL DETAILS 14 20
E-502 LIGHTNING PROTECTION DETAILS 15 20
E-601 ONE-LINE DIAGRAM 16 20
E-602 EXISTING ELECTRICAL PANEL SCHEDULES 17 20
E-603 NEW ELECTRICAL PANEL SCHEDULES 18 20
E-604 ELECTRICAL PANEL SCHEDULES 19 20
E-701 ELECTRICAL SCHEDULES 20 20
FIRE ALARM
FA001 FIRE ALARM GENERAL NOTES, SYMBOL LEGEND, AND RISER 1 3
FA101 FIRE ALARM PLANS - BUILDING 101 2 3
FA102 FIRE ALARM PLANS - BUILDING 102 3 3
DRAWING LIST
No. Description Dwg of Dwg
GENERAL
G-001 COVER 1 11
G-100 GENERAL INFORMATION 2 11
G-101 INFECTION CONTROL RISK ASSESSMENT (ICRA) 3 11
G-102 INFECTION CONTROL RISK ASSESSMENT (ICRA) PHASE ONE PLANS 4 11
G-103 INFECTION CONTROL RISK ASSESSMENT (ICRA) PHASE TWO PLANS 5 11
G-104 INFECTION CONTROL RISK ASSESSMENT (ICRA) PHASE THREE PLANS 6 11
G-105 INFECTION CONTROL RISK ASSESSMENT (ICRA) PHASE FOUR PLANS 7 11
GL101 LIFE SAFETY PLANS - BUILDING 101 8 11
GL102 LIFE SAFETY PLANS - BUILDING 102 9 11
GL103 LIFE SAFETY PLANS - BUILDING 101 10 11
GL104 LIFE SAFETY PLANS - BUILDING 102 11 11
STRUCTURAL
S-001 GENERAL NOTES & SCHEDULES 1 5
S-101 PLANS BUILDING 101 BLUE 2 5
S-102 PLANS BUILDING 102 RED 3 5
S-201 WALL SECTIONS 4 5
S-301 DETAILS 5 5
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 27
AD101 DEMOLITION PLANS - BUILDING 101 2 27
AD102 DEMOLITION PLANS - BUILDING 101 3 27
AD103 DEMOLITION PLANS - BUILDING 101 4 27
AD111 BASEMENT DEMOLITION PLAN - BUILDING 102 5 27
AD112 LOWER LEVEL DEMOLITION PLAN - BUILDING 102 6 27
AD113 DEMOLITION PLANS - BUILDING 102 7 27
AD114 DEMOLITION PLANS - BUILDING 102 8 27
A-101 ELEVATOR PIT AND LOWER LEVEL FLOOR PLANS - BUILDING 101 9 27
A-102 FIRST THROUGH FOURTH LEVEL FLOOR PLANS - BUILDING 101 10 27
A-103 FIFTH FLOOR AND LOBBY ROOF PLANS - BUILDING 101 11 27
A-104 PENTHOUSE FLOOR, ROOF PLAN, AND DOOR SCHEDULE - BUILDING 101 12 27
A-111 BASEMENT FLOOR PLAN - BUILDING 102 13 27
A-112 LOWER LEVEL FLOOR PLAN - BUILDING 102 14 27
A-113 FIRST THROUGH FOURTH LEVEL FLOOR PLANS - BUILDING 102 15 27
A-114 FIFTH FLOOR AND LOBBY ROOF PLANS - BUILDING 102 16 27
A-115 PENTHOUSE FLOOR, ROOF PLAN, AND DOOR SCHEDULE - BUILDING 102 17 27
A-201 EXTERIOR ELEVATIONS 18 27
A-301 BUILDING SECTIONS - BUILDING 101 19 27
A-302 BUILDING SECTIONS - BUILDING 102 20 27
A-303 PENTHOUSE SECTION 21 27
A-401 ELEVATOR HOISTWAY ENTRANCE ELEVATIONS AND DETAILS 22 27
A-402 PASSENGER ELEVATOR CAB, ELEVATIONS AND REFLECTED CEILING PLAN 23 27
A-501 EXTERIOR DETAILS 24 27
A-502 ROOFING DETAILS 25 27
A-701 ENLARGED STAIR PLANS AND SECTIONS - BLDG 101 26 27
A-702 ENLARGED STAIR PLANS AND SECTIONS - BLDG 102 27 27
FIRE SUPPRESSION
FX001 FIRE SUPPRESSION GENERAL INFORMATION 1 3
FX101 FIRE SUPPRESSION PLANS - BUILDING 101 2 3
FX111 FIRE SUPPRESSION PLANS - BUILDING 102 3 3
PLUMBING
P-001 PLUMBING GENERAL INFORMATION 1 12
PD103 5TH LEVEL PLUMBING DEMOLITION PLAN - BUILDING 101 2 12
PD111 BASEMENT PLUMBING DEMOLITION PLAN - BUILDING 102 3 12
PD113 5TH LEVEL PLUMBING DEMOLITION PLAN - BUILDING 102 4 12
P-101 ELEVATOR PIT AND LOWER LEVEL PLUMBING PLANS - BUILDING 101 5 12
P-103 5TH LEVEL AND LOBBY ROOF PLUMBING PLANS - BUILDING 101 6 12
P-104 NEW PENTHOUSE AND PENTHOUSE ROOF PLUMBING PLANS - BUILDING 101 7 12
P-111 BASEMENT PLUMBING PLAN - BLDG 102 8 12
P-113 5TH LEVEL AND LOBBY ROOF PLUMBING PLANS - BUILDING 102 9 12
P-114 NEW PENTHOUSE AND PENTHOUSE ROOF PLUMBING PLANS - BUILDING 102 10 12
P-501 PLUMBING DETAILS 11 12
P-901 STAIRWELL STORM DRAIN PIPING ISOMETRICS 12 12
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 13
MD101 LOWER LEVEL MECHANICAL DEMOLITION PLAN - BUILDING 101 2 13
MD103 5TH LEVEL MECHANICAL DEMOLITION PLAN - BUILDING 101 3 13
MD111 LOWER LEVEL MECHANICAL DEMOLITION PLAN - BUILDING 102 4 13
MD113 5TH LEVEL MECHANICAL DEMOLITION PLAN - BUILDING 102 5 13
M-101 LOWER LEVEL MECHANICAL PLAN - BUILDING 101 6 13
M-103 5TH LEVEL MECHANICAL PLAN - BUILDING 101 7 13
M-104 NEW PENTHOUSE MECHANICAL PLAN - BUILDING 101 8 13
M-111 LOWER LEVEL MECHANICAL PLAN - BUILDING 102 9 13
M-113 5TH LEVEL MECHANICAL PLAN - BUILDING 102 10 13
M-114 NEW PENTHOUSE MECHANICAL PLAN - BUILDING 102 11 13
M-501 MECHANICAL DETAILS 12 13
M-601 MECHANICAL SCHEDULES AND CONTROLS 13 13
DETROIT VAMC
PROJECT SCOPE
5409 Rapidan Court Lothian, MD 20711 410.798.8504
SITE BOUNDARY
PROJECT SCOPE
PROJECT SCOPE
SOLE SOURCE LIST
Pamela J. Reeves 244478
Digitally signed by Pamela J.
Reeves 244478 Date: 2022.05.04 14:23:45 -04'00'
TIMOTHY SCHEID
Digitally signed by TIMOTHY
SCHEID
Date: 2022.05.04 10:00:23 -04'00'
CASEY P. THAYER
183619
Digitally signed by CASEY P.
THAYER 183619
Date: 2022.03.22 13:21:18 -04'00'
Robert D. Peters 471483
Digitally signed by Robert D.
Peters 471483 Date: 2022.03.23 09:15:50 -04'00'
JEFFREY EDGE
Digitally signed by JEFFREY
EDGE
Date: 2022.03.22 13:49:44 -04'00'
CEDRIC WHITNEY
Digitally signed by CEDRIC
WHITNEY
Date: 2022.03.23 07:38:28 -04'00'
WALL SECTION
SYMBOL INTERIOR ELEVATION
SYMBOL
NEW COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
VIEW NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTHNORTH
0 4 8 16
XX.X EXISTING COLUMN GRID
REFERENCE SECTION 00 2113 AND 00 4100 OF THE PROJECT MANUAL FOR THE SCHEDULE OF BID ALTERNATES INCLUDED WITH THE BID PACKAGE
DEDUCT ALTERNATE #1: DO NOT PROVIDE AND INSTALL THE NEW TRACTION ELEVATOR 102-3 IN BUILDING 102. SECURE ELEVATOR DOORS ON ALL LEVELS AND LEAVE HOISTWAY EMPTY, BUT PREPARED, FOR NEW ELEVATOR INSTALLATION. ALL EXISTING ELEVATOR EQUIPMENT SHALL BE REMOVED, AND ALL SERVICES REQUIRED FOR A
NEW ELEVATOR INSTALL SHALL BE READILY AVAILABLE FOR FUTURE CONNECTION.
DEDUCT ALTERNATE #2: DO NOT PROVIDE AND INSTALL THE NEW TRACTION ELEVATOR 101-1 IN BUILDING 101. SECURE ELEVATOR DOORS ON ALL LEVELS AND LEAVE HOISTWAY EMPTY, BUT PREPARED, FOR NEW ELEVATOR INSTALLATION. ALL EXISTING ELEVATOR EQUIPMENT SHALL BE REMOVED, AND ALL SERVICES REQUIRED FOR A
NEW ELEVATOR INSTALL SHALL BE READILY AVAILABLE FOR FUTURE CONNECTION.
BUILDING LOCATION: DETROIT, MICHIGAN
CLIMATE ZONE: 5(A)
REFERENCE CODES:
ASHRAE 90.1 - 2019 EDITION
INTERNATIONAL ENERGY CONSERVATION CODE
BUILDING ENVELOPE REQUIREMENTS:
ROOFS: CODE REQUIRED: DESIGNED:
INSULATION ABOVE DECK R-30ci R-30ci
WALLS, ABOVE GRADE:
STEEL FRAMED R-13 + R-10ci R-19
FLOORS:
STEEL JOIST R-30 R-30
OPAQUE DOORS:
SWINGING U-0.370 U-0.370
DEFINITIONS
ci = CONTINUOUS INSULATION
NR = NO REQUIREMENT
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND
CONTRACTOR BEFORE THE START OF THE WORK.
2. DRAWINGS ARE PREPARED USING PRODUCT DIMENSIONS AND DETAILS FROM BASIS OF DESIGN PRODUCT. PRODUCTS MAY CHANGE IN DIMENSION AND DETAIL BEFORE THEY ARE INCORPORATED INTO WORK. PRODUCTS FROM OTHER MANUFACTURER’S ARE ALSO ACCEPTABLE. DIMENSIONS AND DETAILS FOR ALTERNATE PRODUCTS MAY VARY FROM BASIS OF DESIGN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED INTO WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS REPONSIBLE FOR ACCOMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR
PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE.
THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED
WHOLE.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE
CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER QUANTITY OF WORK.
5. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE DRAWINGS AND SPECIFICATIONS.
6. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT, FOR EACH PHASE. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD CONDITIONS, NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.
7. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED
CONDITIONS. WRITTEN DIMENSIONS SHALL GOVERN.
8. PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN DIFFERENT MATERIALS.
9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
10. REFER TO ALL OTHER TRADE DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION ON THIS PROJECT.
11. PROVIDE BLOCKING AT PARTITIONS AS REQUIRED FOR MOUNTING OF WALL-MOUNTED ITEMS: PROVIDE SUPPLEMENTAL FRAMING AT WALL OPENINGS INCLUDING KING
STUDS, JACK STUDS, AND CRIPPLE STUDS, AS REQUIRED FOR COMPLETION OF THE WORK.
12. DIMENSIONS SHOWN ARE TO FACE OF STUD FRAMING, FACE OF CONCRETE/MASONRY WALLS, OR FINISHED FACE OF EXISTING WALL SURFACE.
13. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED.
14. ALL REQUESTS FOR UTILITY SHUTDOWNS REQUIRE A (3) THREE-WEEK ADVANCE NOTICE TO THE GOVERNMENT.
1. TWO ELEVATOR CARS SHALL REMAIN FULLY OPERATIONAL AT ALL TIMES. THIS WILL RESULT IN A GRADUAL SWITCH-OVER FROM HYDRAULIC TO TRACTION ELEVATORS.
BOTH ELEVATOR SYSTEMS WILL BE RUNNING CONCURRENTLY UNTIL THE LAST HYDRAULIC ELEVATOR IS REMOVED FROM SERVICE.
2. CONSTRUCTION ACTIVITY FOR EACH ELEVATOR TOWER SHALL BE DIVIDED INTO FOUR CONSECUTIVE PROJECT PHASES AS FOLLOWS:
A. PHASE 1: CONSTRUCT NEW PENTHOUSE STRUCTURE ABOVE THE EXISTING LEVEL 5 STAIR & ELEVATOR LOBBY. CONSTRUCT STAIRS FROM LEVEL 5 TO LEVEL 6
PENTHOUSE. CREATE A WEATHER-TIGHT ENVIRONMENT ABOVE THE EXISTING STAIRS AND ELEVATOR HOISTWAYS. LEVEL 5 SHALL BE TEMPORARILY CLOSED TO THE
PUBLIC DURING PHASE 1.
B. PHASE 2: INSTALL NEW ELEVATOR IN EXISTING EMPTY HOISTWAY, INCLUDING INSTALLATION OF ALL EQUIPMENT AND SERVICES REQUIRED FOR FULL OPERATION.
a. ELEVATOR 101-3 AT BUILDING 101
b. ELEVATOR 102-1 AT BUILDING 102
c. EXISTING ROOF STRUCTURE SHALL BE REMOVED ABOVE THE PHASE 2 HOISTWAY ONLY.
C. PHASE 3: REMOVE EXISTING ELEVATOR AND EQUIPMENT, AND INSTALL NEW ELEVATOR IN EXISTING HOISTWAY, INCLUDING ALL EQUIPMENT AND SERVICES REQUIRED
FOR FULL OPERATION.
a. ELEVATOR 101-2 AT BUILDING 101
b. ELEVATOR 102-2 AT BUILDING 102
c. EXISTING ROOF STRUCTURE SHALL BE REMOVED ABOVE THE PHASE 3 HOISTWAY ONLY.
D. PHASE 4: REMOVE EXISTING ELEVATOR AND INSTALL NEW ELEVATOR IN EXISTING HOISTWAY, INCLUDING ALL EQUIPMENT AND SERVICES REQUIRED FOR FULL
OPERATION.
a. ELEVATOR 101-1 AT BUILDING 101
b. ELEVATOR 102-3 AT BUILDING 102
c. THE REMAINDER OF THE EXISTING ROOF STRUCTURE SHALL BE REMOVED ABOVE THE PHASE 3 HOISTWAY.
3. PHASE 2 SHALL NOT BEGIN UNTIL A WEATHER-TIGHT ENCLOSURE IS CONSTRUCTED ABOVE THE EXISTING ELEVATOR AND STAIR SHAFTS.
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
CL
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
JOHN D. DINGELL
VA MEDICAL
CENTER
35 % SCHEMATIC DESIGN SUBMISSION 1 12/23/2020
65% DESIGN DESIGN SUBMISSION 2 04/02/2021
65% DESIGN DEVELOPMENT RE-SUBMISSION3 05/28/2021
95% CONSTRUCTION DOCUMENTS SUBMISSION4 08/23/2021
BID DOCUMENTS5 02/16/2022
/2
/2
:4
:2
A
M
G-100
GENERAL INFORMATION
2 11CDC
REPLACE/ADD PARKING
STRUCTURE ELEVATORS
VAMC DETROIT 4646 JOHN R. ST.
DETROIT, MI 48201
FEBRUARY 16, 2022
BID DOCUMENTS
553-19-10118-319
101 & 102
MJC
GENERAL SYMBOL LEGEND
DEDUCT ALTERNATES
ENERGY REQUIREMENTS
GENERAL NOTES
DEDUCT ALTERNATE#
PHASING NOTES
GENERAL ABBREVIATIONS
1301078103
RENEE M.
CLARKE
DocuSign Envelope ID: A2E84575-819A-4324-B109-CAAD6666B90C
3/25/2022
NEGATIVE AIR UNIT
WITH FILTER
FINISHED FLOORING SHALL BE KEPT
CLEAN. FLOORS NOT BEING REPLACED
SHALL BE PROTECTED. COVER WITH
CONSTRUCTION GRADE TEMPORARY
FLOOR PROTECTION.
C L
E A
R T
O P
O F
E L
E V
A T
O R
E D
O O
R H
E
IG
H T
M
IN
IM
U M
RUN EXHAUST AIR TO EXTERIOR
THROUGH HOISTWAY ROOF
RATED WALL DAMPER REQUIRED -
MATCH WALL RATING
EXISTING CEILING VERIFY
HEIGHT
BARRIER WALL & CEILING
PAINT
EXISTING FLOOR
UNDERSIDE OF EXISTING
CEILING
LOBBYELEVATOR
FIRE RESISTANT
SEALANT
TOP OF ELEVATOR
DOOR OPENING
WALL ASSEMBLY - UL U423*
2-HOUR FIRE-RESISTANCE-RATED
-(2) LAYERS 5/8" TYPE 'X' GYP BD
-3-5/8" STEEL STUDS
-(2) LAYERS 5/8" TYPE X GYP BD
NON-LOAD-BEARING CEILING ASSEMBLY - UL I503*
2-HOUR FIRE-RESISTANCE-RATED
-(2) LAYERS 5/8" TYPE 'X' GYP BD
-6" STEEL STUDS
-(2) LAYERS 5/8" TYPE X GYP BD
FIRE RESISTANT
SEALANT
*ASSEMBLIES SHALL MEET UL ASSEMBLY DESIGN.
CONFIGURATION SHOWN AS BASIS-OF-DESIGN.
OTHER COMPLYING CONFIGURATIONS ACCEPTABLE.
NOTE: WALL ASSEMBLY MAY TERMINATE AT RATED
CEILING ABOVE IN LIEU OF CONSTRUCTING
TEMPORARY CEILING ASSEMBLY
ICRA, ILSM, FIRE
WATCH AND
MISC. FORMS
PAPER CADDY
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT
FOR RENOVATION BUILDING 1,
SECOND FLOOR, 2E AT UD
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA.
PLEASE USE ALL ALTERNATE EXITS AS MARKED.
1' - 5"
1/2"1/2"
/2
/2
/2
/2
/2
/2
EQ.EQ.
ILSM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
A P
P R
O X
A .F
.F
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
D000
FIRE EXTINGUISHER ON
PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
PROVIDE STICKY MATS
(CHANGED END OF SHIFT OR
MORE IF NECESSARY TO
MAINTAIN CLEANLINESS).
NEGATIVE AIR UNIT W/ FILTER
EXHAUSTING THROUGH HOISTWAY
ROOF. ENTIRE ELEVATOR SHALL BE
UNDER NEGATIVE PRESSURE.
LOCATION OF AIR UNIT BY
CONTRACTOR. SEE GENERAL
NOTES.
SEAL & CAP SUPPLY,
RETURN TRANSFER, &
EXHAUST DUCTS WITH
MATERIAL MATCHING
DUCT CONSTRUCTION
MATERIAL
BARRIER WALL
F L E
X D
U C
T
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
EXIST WALL
EXISTING HOISTWAY
OPENING
D000
M A
N U
F A
C T
U R
A B
IL
IT
Y
A S
D E
T E
R M
IN
E
D F
O R
G-101
TEMPORARY GUARD
FOR FALL PROTECTION
A. CONTRACTOR SHALL VISIT ALL AREAS OF WORK, INCLUDING WALKING THE SITE, FIELD
VERIFY EXISTING DIMENSIONS AND OBSERVING EXISTING CONDITIONS BEFORE BEGINNING
WORK, ORDERING MATERIALS, OR STARTING ANY CONSTRUCTION.
B. CONTRACTOR SHALL RECYCLE REMOVED MATERIALS WHENEVER POSSIBLE. SEE DIVISION 1
SPECIFICATIONS
C. CONTRACTOR SHALL PROTECT AREA ADJACENT TO SELECTIVE DEMOLITION AND NEW
CONSTRUCTION WORK TO PREVENT DAMAGES. (IF DAMAGED, REPAIR, PATCH, REPLACE, OR
SAND SMOOTH AND TO MATCH EXISTING ADJACENT MATERIALS.)
D. CONTRACTOR SHALL INSTALL TEMPORARY DIGITAL MANOMETER TO MONITOR AND ENSURE
PRESSURE LEVEL TO MEET VA GUIDELINE WITHIN CONSTRUCTION AREA. CONTRACTOR TO
VERIFY LOCATIONS WITH VA COR PRIOR TO INSTALLATION.
E. CONTRACTOR SHALL MAINTAIN NEGATIVE PRESSURE WITHIN THE ICRA BOUNDARY. A SINGLE
AIR FILTER UNIT MAY BE USED FOR AN ENTIRE HOISTWAY, OR MULTIPLE UNITS AS NEEDED.
F. CONTRACTOR SHALL PROVIDE EXHAUST EQUIPMENT CAPABLE OF EXHAUSTING
APPROXIMATELY 500 CFM (2 ACH) OF AIR FROM EACH HOISTWAY DURING CONSTRUCTION
FOR DUST CONTROL & MITIGATION. EXHAUST AIR SHALL BE DUCTED THROUGH THE ROOF OF
EACH HOISTWAY AND MAY NOT BE EXHAUSTED WITHIN THE BUILDING. A FILTER SHALL BE
USED TO CATCH DUST PARTICLES AND PREVENT DUST ACCUMULATION ON ROOF.
A. SEE SPECIFICATIONS FOR BADGING REQUIREMENTS.
B. NO MAJOR EQUIPMENT ACCESS THROUGH THE BUILDING BETWEEN 7 AM TO 5PM.
CONTRACTOR TO COORDINATE WITH COR.
C. ALL LOBBY-SIDE WORK THAT IS NOT CONTAINED WITHIN THE ICRA BARRIERS SHALL BE
COMPLETED DURING AFTER HOURS 4:00 PM TO 11:00 PM.
D. WHERE HOISTWAY DOORS ARE TO REMAIN REMOVED OR OPEN FOR AN EXTENDED PERIOD OF
TIME, PROVIDE RATED ICRA ENCLOSURE WITH MATCHING FIRE RATING, MAIN ACCESS -
GROUND FLOOR, COORDINATE WITH COR.
E. WHERE HOISTWAY DOORS ARE NOT REMAINING OPEN FOR AN EXTENDED PERIOD OF TIME,
PROVIDE NON-RATED ICRA ENCLOSURE. BASIS OF DESIGN, EDGEGUARD SYSTEM OR STARC.
SUBMITTAL REQUIRED.
F. HOISTWAY DOORS SHALL BE BARRICADED AT EACH LANDING WHEN HOISTWAY DOORS ARE
OPEN.
IF APPLICABLE:
A. HOT WORK PERMITS. HOT WORK PERMITS ARE ONLY VALID FOR A LENGTH OF ONE DAY.
PERMITS SHALL BE OBTAINED AT LEAST 24 HOURS PRIOR TO COMMENCEMENT OF WORK,
WHENEVER POSSIBLE. ORIGINAL PERMIT SHALL BE POSTED WHERE WORK IS BEING
PERFORMED; CONTRACTOR SHALL RETURN PERMIT TO SAFETY OFFICE WHEN WORK IS
COMPLETED.
B. FIRE WATCH. CONTRACTOR SHALL INITIAL, DATE AND TIME EVERY 30 MINUTES AFTER HOT
WORK HAS STARTED.
C. CONTRACTOR TO PROVIDE WARNING SIGNAGE AND DIRECTIONAL SIGNAGE THAT SHALL BE
POSTED IN CONSTRUCTION AREA WHILE WORK IS PERFORMED.
D. CONFINED SPACE. CONTRACTOR TO OBTAIN CONFINED SPACE PERMIT PRIOR TO ENTRY INTO
MECHANICAL CHASE. ENSURE IT IS APPROVED BY VA SAFETY DEPARTMENT AND COR.
GENERAL NOTES:
INFECTION CONTROL RISK ASSESSMENT NOTES:
INTERIM LIFE SAFETY MEASURES NOTES (ILSM):
ABBREVIATIONS
(E) EXISTING
(N) NEW
NIC NOT IN CONTRACT
ETS EXPOSED TO STRUCTURE
NTS NOT TO SCALE
SIM SIMILAR
BLDG BUILDING
PH PHONE
INC INCORPORATED
S SOUTH
DL DEAD LEG
GPM GALLONS PER MINUTE
OC ON CENTER
ICRA GENERAL NOTES:
COR CONTRACTING OFFICER REPRESENTATIVE
PAMNS PUBLIC ADDRESS MASS NOTIFICATION SYSTEM
IT INFORMATION TECHNOLOGY
FO FIBER OPTIC
SM SINGLE MODE
MM MULTIMODE
DR DRIVE
ST STREET
CMU CONCRETE MASONRY UNITS
EQ EQUAL
STL STAINLESS
NR NOT RATED
AFF ABOVE FINISHED FLOOR
QRS QUICK RELEASE SPRINKLER
A. * OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.
B. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE
CONSTRUCTION BEGINS.
C. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
D. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY
THE COR'S SAFETY/ IP AND FACILITIES MANAGEMENT DEPARTMENT, AND AFTER
PROFESSIONAL CLEAN BY GENERAL CONTRACTOR.
E. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
F. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS. WET MOP AREA WITH DISINFECTANT.
G. COVER ALL RETURNS AND SUPPLY DUCTS AT THE GRATE/DIFFUSES WITH FILTER MEDIA OR
BLANK OFF ENTIRELY. RESTORE NORMAL HVAC OPERATION IN IMPACTED AREA AFTER
ENCLOSURE IS REMOVED.
H. KEEP CONSTRUCTION SITE CLEAN & NEAT AT ALL TIMES.
I. CONTRACTOR SHALL CLEAN THE CONSTRUCTION AREA, AND PREPARE FOR SAFETY AND
INFECTION CONTROL'S INSPECTION AND FINAL CLEANING BY VA ECM STAFF.
J. VA INFECTION CONTROL STAFF SHALL PERFORM FINAL VERIFICATION OF CLEANING AND
SANITATION.
43.1.1 CLASSIFICATION OF REHABILITATION WORK -
RENOVATION
43.4.2 CAPACITY OF MEANS OF EGRESS. THIS PROJECT
DOES NOT CHANGE OR ALTER EXISTING
OCCUPANT LOAD OR MEANS OF EGRESS. THE
EGRESS CAPACITY SHALL HAVE BEEN
PREVIOUSLY APPROVED AS BEING ADEQUATE.
NFPA 101 - CHAPTER 43
BUILDING REHABILITATION
2"
SEE SCHEDULE
2"
TYPE A TYPE 1
HARDWARE SET 1
MANUFACTURERS:
CORBIN RUSSWIN
McKINNEY
YALE
ROCKWOOD
PEMKO
CO
MK
YA
RO
PE
HARDWARE MANUFACTURER'S LISTED AS BASIS OF DESIGN.
ALTERNATE MANUFACTURERS ACCEPTABLE, SUBJECT TO
REVIEW BY ARCHITECT AND COR FOR EQUAL QUALITY
COMPLIANCE
LATCH SET TO SUPPORT YALE CORES
NOTE:
3 HINGES
1 LATCH SET
1 DOOR CLOSER
1 KICK PLATE
1 GASKETING
TA2714
VA SPEC F07
DC6210xA11
K1050F
S888 x HEAD & JAMBS
26D
32D
MK
YA
CO
RO
PE
TEMPORARY ICRA DOOR AND FRAME SCHEDULE
DOOR INFORMATION FRAME INFORMATION MISCELLANEOUS
NO.
D000
WIDTH
3'-0"
HEIGHT
7'-0"
THICK.
1 3/4"
TYPE
TYPE A
MAT'L
HM
TYPE
TYPE 1
MAT'L
GHM
DEPTH
5 1/4"
RATING
90 MIN.
HRDWR. REMARKS
SET 1 FIELD VERIFY HEAD CONDITION FOR FRAME HEIGHT AT HEAD
NOTE: DOOR AND FRAME SCHEDULE FOR RATED ICRA ENCLOSURES ONLY
A
A
OMIT PARTITION ABOVE
TOP DIVIDER BEAM
OMIT PARTITION BELOW
BOTTOM DIVIDER BEAM
EXISTING DIVIDER BEAM
J-RUNNER
J-RUNNER
1" GYP SHAFT LINER
2-1/2" CT STUD
SECTION A-A
EXIST CMU WALL
EXIST DIVIDER BEAM (BEYOND)
J-RUNNER
1" GYP SHAFT LINER
2-1/2" CT STUD
PLAN VIEW
1. Remove barrier material carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering unless solid lid.
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant.
6. Remove or isolation of HVAC system in areas where work was being performed.
1. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.
2. Complete all critical barriers i.e. gypsum board assemblies, plywood, plastic, to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration unit.
4. Seal holes, pipes, conduits, and punctures appropriately.
5. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.
6. All personnel entering work site are required to wear shoe covers. Shoe covers shall be changed each time the worker exits the work area.
7. Do not remove barriers from work area until completed project is inspected by the owner's Safety Department and Infection Control Department and thoroughly cleaned by the owner's Environmental Services Department.
1. Do not remove barriers from work area until completed project is inspected by the owner's Safety Department and Infection Control Department and thoroughly cleaned by the owner's Environmental Services Department.
2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
3. Vacuum work area with HEPA filtered vacuums.
4. Wet mop area with disinfectant
5. Remove isolation of HVAC system in areas where work is being performed.
1. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
2. Complete all critical barriers i.e. gypsum board assemblies, plywood, plastic to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units if indicated.
4. Contain construction waste before transport in tightly covered containers.
5. Cover transport receptacles or carts. Tape covers.
1. Provide active means to prevent airborne dust from dispersing into atmosphere.
2. Water mist work surfaces to control dust while cutting.
3. Seal unused doors with duct tape.
4. Block off and seal air vents.
5. Place dust mat at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
6. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace a ceiling tile displaced for visual inspection.
Inspection and Non-Invasive Activities
Includes, but is not limited to:
- removal of ceiling tiles for visual inspection limited to 1 tile per 50 square feet
- painting (but not sanding)
- wall covering, electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
- installation of telephone and computer cabling
- access to chase spaces
- cutting of walls or ceiling where dust migration can be controlled
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
- sanding of walls for painting or wall covering
- removal of floor coverings, ceiling tiles and casework
- new wall construction
- minor duct work or electrical work above ceilings
- major cabling activities
- any activity which cannot be completed within a single work shift
Major demolition and construction projects
Includes, but is not limited to:
- activities which require consecutive work shifts
- requires heavy demolition or removal of a complete cabling system
- new construction
• Cardiology
• Echocardiography
• Endoscopy
• Nuclear Medicine
• Physical Therapy
• Radiology / MRI
• Respiratory Therapy
• CCU
• Emergency Room
• Labor & Delivery
• Laboratories (specimen)
• Newborn Nursery
• Outpatient Surgery
• Pediatrics
• Pharmacy
• Post Anesthesia Care Unit
• Surgical Units
• Any area caring for immunocompromised patients
• Burn Unit
• Cardiac Cath Lab
• Central Sterile Supply
• Intensive Care Units
• Medical Unit
• Negative pressure isolation rooms
• Oncology
• Operation rooms including C-section rooms
• Office Spaces
C L
A S
S I V
C L
A S
S I
II
C L
A S
S I I
C L
A S
S
I
PATIENT RISK GROUPS
LOW Risk Group
MEDIUM Risk Group
HIGH Risk Group
HIGHEST Risk Group
TYPE A TYPE B TYPE C TYPE D
I II II III/IV
I II III IV
I II III/IV IV
II III/IV I/IV IV
During Construction Project: Upon Completion of Project:
TYPE D
TYPE C
TYPE B
TYPE A
Group 1 Low Risk
Group 2 Medium Risk
Group 3 High Risk
Group 4 Highest Risk
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project any Patient Risk
Construction Project Type
Note: Infection Control approval shall be required when the Construction Activity and Risk Level indicated that Class III or Class IV Control procedures are necessary.
It's the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
Type of Construction Project activity (Type A-D)
INFECTION CONTROL RISK ASSESSMENT MATRIX OF PRECAUTIONS FOR
CONSTRUCTION AND RENOVATION
SEE ICRA CONDITION SCHEDULE PER ELEVATOR, PER FLOOR
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
JOHN D. DINGELL
VA MEDICAL
CENTER
35 % SCHEMATIC DESIGN SUBMISSION 1 12/23/2020
65% DESIGN DESIGN SUBMISSION 2 04/02/2021
65% DESIGN DEVELOPMENT RE-SUBMISSION3 05/28/2021
95% CONSTRUCTION DOCUMENTS SUBMISSION4 08/23/2021
BID DOCUMENTS5 02/16/2022
/2
/2
:4
:2
A
M
G-101
INFECTION CONTROL RISK
ASSESSMENT (ICRA)
3 11CDC
REPLACE/ADD PARKING
STRUCTURE ELEVATORS
VAMC DETROIT 4646 JOHN R. ST.
DETROIT, MI 48201
FEBRUARY 16, 2022
BID DOCUMENTS
553-19-10118-319
101 & 102
MJC
Scale: 1/2" = 1'-0"
ICRA ENCLOSURE CROSS SECTION
Scale: 3/4" = 1'-0"
ICRA TEMPORARY BARRIER WALL DETAIL
Scale: 3" = 1'-0"
ILSM SIGNAGE
ILSM TEMPORARY BARRIER TAG
Scale: 1/2" = 1'-0"
EXTERIOR ICRA ENCLOSURE ELEVATION
Scale: 1/2" = 1'-0"
TYPICAL ICRA RATED ENCLOSURE
Scale: 1 1/2" = 1'-0"
HOISTWAY SEPARATION WALL
1301078103
RENEE M.
CLARKE
DN
ELEVATOR
LOBBY
SP601
STAIR 01
SPS601
ELEVATOR
#1
E01
STAIR 02
S602
STAIR 03
S603
STAIR 04
S604
ELECTRICAL
SP604
DN
DN
DN
UP
SD-3
SD-EE
SD-A
SD-B
1 SD-2.7SD-1.6 SD-1.9 SD-2.3
SD-BB
SD-3.3 SD-3.6 SD-4
N
P.4
G-102
RESTRICT PUBLIC ACCESS
WITH BARRIER
RESTRICT PUBLIC ACCESS WITH
TEMPORARY CONSTRUCTION
FENCING AND SIGNAGE
CONSTRUCTION
LAYDOWN ZONE
TRAVEL DISTANCE = 99'-0"
T R
A V
E L D
IS
T
A N
C E
TRAVEL DISTANCE = 212-0"
T R
A V
E L D
IS
T
A N
C E
TRAVEL DISTANCE = 99'-0"
SD-2.1
G-102
SIM
SD-.9 SD-1 SD-2 SD-2.8
SD-DD
SD-EE
SD-AA
SD-A
SD-B
SD-A.9
1 SD-2.7SD-1.6 SD-1.9
SD-CC
SD-2.3
SD-BB
PROVIDE TEMPORARY
CONSTRUCTION DOOR &
LOCKING HARDWARE
SIGN, "EXIT TEMPORARILY
CLOSED, PLEASE USE
ALTERNATE MARKED EXITS
IN PARKING RAMP"
SD-2.1
ELEVATOR
LOBBY
SP601
STAIR #1
SPS601
ELEV
101-1
ELEV
101-2
FUTURE
ELEV
101-3
UNASSIGNED
SP602
SD-.9 SD-1 SD-2 SD-2.8
SD-DD
SD-EE
SD-AA
SD-A
SD-B
SD-A.9
1 SD-2.7SD-1.6 SD-1.9
SD-CC
SD-2.3
SD-BB
TEMPORARY CHAIN LINK FENCE
ENCLOSURE WITH LOCKABLE
GATE TO RESTRICT ACCESS
SIGN, "RESTRICTED.
CONSTRUCTION ACCESS ONLY"
SD-2.1
ELEVATOR
LOBBY
SP501
ELEV
101-2
ELEV
101-1
FUTURE
ELEV
101-3
UNASSIGNED
STAIR #1
4" MAX.
EGRESS PATH
EGRESS PATH TAG
EGRESS PATH TAG - COMMON PATH
EGRESS IDENTIFICATION
AREA OF REFUGE
HAZARDOUS LOCATION
FIRE EXTINGUISHER BRACKET
FIRE EXTINGUISHER CABINET
FIRE BLANKET CABINET
EMERGENCY RESPONSE REFERENCE
CONTROLLED ACCESS - ALWAYS
UNLOCKED IN DIRECTION OF EGRESS
DELAYED EGRESS W/ ALARM
EXISTING EXIT (LEVEL 1 ONLY)
EXISTING EXIT (TYPICAL ALL LEVELS)
CA
DE
XXX
XXX
FEB
FEC
FBC
CAPACITYCLR
EXTERIOR
EXIT
XX" ###
EXIT
IDENTIFICATION
EGRESS CLEAR
WIDTH
EGRESS
CAPACITY
1. TWO ELEVATORS SHALL REMAIN IN-SERVICE AT
ALL TIMES.
2. REFER TO SHEET G-101 FOR ICRA
REQUIREMENTS, DETAILS, AND SCHEDULES.
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
JOHN D. DINGELL
VA MEDICAL
CENTER
35 % SCHEMATIC DESIGN SUBMISSION 1 12/23/2020
65% DESIGN DESIGN SUBMISSION 2 04/02/2021
65% DESIGN DEVELOPMENT RE-SUBMISSION3 05/28/2021
95% CONSTRUCTION DOCUMENTS SUBMISSION4 08/23/2021
BID DOCUMENTS5 02/16/2022
/2
/2
:4
:3
A
M
G-102
INFECTION CONTROL RISK
ASSESSMENT (ICRA) PHASE ONE
PLANS
4 11CDC
REPLACE/ADD PARKING
STRUCTURE ELEVATORS
VAMC DETROIT 4646 JOHN R. ST.
DETROIT, MI 48201
FEBRUARY 16, 2022
BID DOCUMENTS
553-19-10118-319
101 & 102
MJC
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
BLUE
RED
Scale: 1/16" = 1'-0"
LEVEL 5 ICRA PHASE ONE PLAN - BLDG 101 (BLDG 102 OPP)
Scale: 3/16" = 1'-0"
ENGLARGED LEVEL 5 ICRA PHASE ONE PLAN - BLDG 101 (BLDG 102 OPP)
N O
R T H
0 8 16 32
N O
R T H
0 42 8
Scale: 3/16" = 1'-0"
ENLARGED LEVEL 4 ICRA PHASE 1 PLAN - BLDG 101 (BLDG 102 OPP)
N O
R T H
0 42 8
1301078103
RENEE M.
CLARKE
UP
ND-A
31ND-.9ND-1ND-2 ND-1.6ND-1.9 ND-1.8ND-2.3ND-2.8 ND-2.7
ND-B
ND-AA
ND-BB
ND-CC
ND-DD
ND-A.9
ELEV
102-3
ELEV
102-2
FUTURE
ELEVATOR
102-1
STAIR #1
NPS301
ELEVATOR
LOBBY
NP301
UNASSIGNED
NP302
D000
FROM OBSTRUCTIONS
6'-0" MIN. CLEAR
G-101
DEDUCT ALTERNATE1
1. TWO ELEVATORS SHALL REMAIN IN-SERVICE AT
ALL TIMES.
2. REFER TO SHEET G-101 FOR ICRA
REQUIREMENTS, DETAILS, AND SCHEDULES.
SD-.9 SD-1 SD-2 SD-2.8
SD-DD
SD-EE
SD-AA
SD-A
SD-B
SD-A.9
1 SD-2.7SD-1.6 SD-1.9
SD-CC
SD-2.3
STAIR #1
SPS301
UNASSIGNED
SP302
ELEV
101-1
ELEV
101-2
FUTURE
ELEV
101-3
SD-BB
D000
FROM OBSTRUCTIONS
6'-0" MIN. CLEAR
G-101
DEDUCT ALTERNATE2
SD-2.1
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
JOHN D. DINGELL
VA MEDICAL
CENTER
35 % SCHEMATIC DESIGN SUBMISSION 1 12/23/2020
65% DESIGN DESIGN SUBMISSION 2 04/02/2021
65% DESIGN DEVELOPMENT RE-SUBMISSION3 05/28/2021
95% CONSTRUCTION DOCUMENTS SUBMISSION4 08/23/2021
BID DOCUMENTS5 02/16/2022
/2
/2
:4
:3
A
M
G-103
INFECTION CONTROL RISK
ASSESSMENT (ICRA) PHASE TWO
PLANS
5 11CDC
REPLACE/ADD PARKING
STRUCTURE ELEVATORS
VAMC DETROIT 4646 JOHN R. ST.
DETROIT, MI 48201
FEBRUARY 16, 2022
BID DOCUMENTS
553-19-10118-319
101 & 102
MJC
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
BLUE
RED
Scale: 1/4" = 1'-0"
TYPICAL FLOOR ICRA PHASE TWO PLAN - BLDG 102
Scale: 1/4" = 1'-0"
TYPICAL FLOOR ICRA PHASE TWO PLAN - BLDG 101
N O
R T H
0 2 4 8
N O
R T H
0 2 4 8
1 CONSTRUCT TEMPORARY FIRE/SMOKE
BARRIER - SEE SHEET G-101
2 BUILD WALLS BETWEEN ALL DIVIDER BEAMS
AT ALL FLOORS, LEAVE TOP AND BOTTOM OF
PIT OPEN
3 CLEAR FLOOR SPACE, CLEAR WIDTH OF
DOOR OPENING
4 RELOCATE EXISTING PARKING LEVEL
REMINDER SIGN
5 EXISTING CALL BUTTONS, OUTSIDE OF
BARRIER
(ALL FLOORS) (ALL FLOORS)
1301078103
RENEE M.
CLARKE
ND-A
31ND-.9ND-1ND-2 ND-1.6ND-1.9 ND-1.8ND-2.3ND-2.8 ND-2.7
ND-B
ND-AA
ND-BB
ND-CC
ND-DD
ND-A.9
ELEVATOR
LOBBY
NP301
STAIR #1
NPS301
UNASSIGNED
NP302
ELEV
102-3
ELEV
102-2
FUTURE
ELEVATOR
102-1
D000
FROM OBSTRUCTIONS
6'-0" MIN. CLEAR
G-101
DEDUCT ALTERNATE1
A-402 35
SD-.9 SD-1 SD-2 SD-2.8
SD-DD
SD-EE
SD-AA
SD-A
SD-B
SD-A.9
1 SD-2.7SD-1.6 SD-1.9
SD-CC
SD-2.3
STAIR #1
SPS301
UNASSIGNED
SP302
ELEV
101-1
ELEV
101-2
FUTURE
ELEV
101-3
SD-BB
D000
FROM OBSTRUCTIONS
6'-0" MIN. CLEAR
G-101
DEDUCT ALTERNATE2
SD-2.1
1. TWO ELEVATORS SHALL REMAIN IN-SERVICE AT
ALL TIMES.
2. REFER TO SHEET G-101 FOR ICRA
REQUIREMENTS, DETAILS, AND SCHEDULES.
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
JOHN D. DINGELL
VA MEDICAL
CENTER
35 % SCHEMATIC DESIGN SUBMISSION 1 12/23/2020
65% DESIGN DESIGN SUBMISSION 2 04/02/2021
65% DESIGN DEVELOPMENT RE-SUBMISSION3 05/28/2021
95% CONSTRUCTION DOCUMENTS SUBMISSION4 08/23/2021
BID DOCUMENTS5 02/16/2022
/2
/2
:4
:3
A
M
G-104
INFECTION CONTROL RISK
ASSESSMENT (ICRA) PHASE THREE
PLANS
6 11CDC
REPLACE/ADD PARKING
STRUCTURE ELEVATORS
VAMC DETROIT 4646 JOHN R. ST.
DETROIT, MI 48201
FEBRUARY 16, 2022
BID DOCUMENTS
553-19-10118-319
101 & 102
MJC
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
BLUE
RED
Scale: 1/4" = 1'-0"
TYPICAL FLOOR ICRA PHASE THREE PLAN - BLDG 102
Scale: 1/4" = 1'-0"
TYPICAL FLOOR ICRA PHASE THREE PLAN - BLDG 101
1 CONSTRUCT TEMPORARY FIRE/SMOKE
BARRIER - SEE SHEET G-101
2 EXISTING CALL BUTTONS, OUTSIDE OF
BARRIER
3 NEW CALL BUTTONS, OUTSIDE OF BARRIER
4 BUILD WALLS BETWEEN ALL DIVIDER BEAMS
AT ALL FLOORS, LEAVE TOP AND BOTTOM OF
PIT OPEN
5 HOISTWAY DIVIDER WALL FROM PREVIOUS
PHASE TO REMAIN
6 RE-INSTALL EXISTING PARKING LEVEL
REMINDER SIGN IN EXISTING LOCATION
7 TEMPORARY PARKING LEVEL REMINDER
SIGN, MATCH EXISTING
8 TEMPORARY SIGN, "ADDITIONAL ELEVATOR
LOCATED ON OPPOSITE SIDE OF
CONSTRUCTION ENCLOSURE"
N O
R T H
0 2 4 8
N O
R T H
0 2 4 8(ALL FLOORS) (ALL FLOORS)
1301078103
RENEE M.
CLARKE
SD-.9 SD-1 SD-2 SD-2.8
SD-DD
SD-EE
SD-AA
SD-A
SD-B
SD-A.9
1 SD-2.7SD-1.6 SD-1.9
SD-CC
SD-2.3
STAIR #1
SPS301
UNASSIGNED
SP302
ELEV
101-1
ELEV
101-2
FUTURE
ELEV
101-3
SD-BB
DEDUCT ALTERNATE2
D000
FROM OBSTRUCTIONS
6'-0" MIN. CLEAR 3
SD-2.1
ND-A
31ND-.9ND-1ND-2 ND-1.6ND-1.9 ND-1.8ND-2.3ND-2.8 ND-2.7
ND-B
ND-AA
ND-BB
ND-CC
ND-DD
ND-A.9
ELEVATOR
LOBBY
NP301
STAIR #1
NPS301
UNASSIGNED
NP302
ELEV
102-3
ELEV
102-2
FUTURE
ELEVATOR
102-1
DEDUCT ALTERNATE1
D000
FROM OBSTRUCTIONS
6'-0" MIN. CLEAR
A-402 35
1. TWO ELEVATORS SHALL REMAIN IN-SERVICE AT
ALL TIMES.
2. REFER TO SHEET G-101 FOR ICRA
REQUIREMENTS, DETAILS, AND SCHEDULES.
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
JOHN D. DINGELL
VA MEDICAL
CENTER
35 % SCHEMATIC DESIGN SUBMISSION 1 12/23/2020
65% DESIGN DESIGN SUBMISSION 2 04/02/2021
65% DESIGN DEVELOPMENT RE-SUBMISSION3 05/28/2021
95% CONSTRUCTION DOCUMENTS SUBMISSION4 08/23/2021
BID DOCUMENTS5 02/16/2022
/2
/2
:4
:3
A
M
G-105
INFECTION CONTROL RISK
ASSESSMENT (ICRA) PHASE FOUR
PLANS
7 11CDC
REPLACE/ADD PARKING
STRUCTURE ELEVATORS
VAMC DETROIT 4646 JOHN R. ST.
DETROIT, MI 48201
FEBRUARY 16, 2022
BID DOCUMENTS
553-19-10118-319
101 & 102
MJC
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
BLUE
RED
Scale: 1/4" = 1'-0"
TYPICAL FLOOR ICRA PHASE FOUR PLAN - BLDG 101
Scale: 1/4" = 1'-0"
TYPICAL FLOOR ICRA PHASE FOUR PLAN - BLDG 102
1 CONSTRUCT TEMPORARY FIRE/SMOKE
BARRIER - SEE SHEET G-101
2 NEW CALL BUTTONS FROM PHASE 2
3 HOISTWAY DIVIDER WALLS TO REMAIN
PERMANENTLY
4 EXISTING PULLS AND SWITCHES
N O
R T H
0 2 4 8
N O
R T H
0 2 4 8(ALL FLOORS) (ALL FLOORS)
1301078103
RENEE M.
CLARKE
ELEVATOR
#3
E03
ELEVATOR
#2
E02
ELEVATOR
#1
E01
STAIR 02
S202
STAIR 03
S203
STAIR 04
S204
UP
UP
UP
DN
UP
DN
SD-1 SD-2 SD-3
SD-A
SD-B
1 SD-2.3
SD-BB
SD-FF
SD-3.3 SD-3.6 SD-4
O V
E R
A
LL
D
IA
G O
N A
L
'-1
/4
/3 O
V E
R A
L L
D
IA
G O
N A
L
T R
A V
E L D
IS
T
A N
C E
T R
A V
E L D
IS
T
A N
C E
TRAVEL DISTANCE = 211'-9"
T R
A V
E L D
IS
T
A N
C E
N
P.4
SD-2.1
EGRESS PATH
EGRESS PATH TAG
EGRESS PATH TAG - COMMON PATH
EGRESS IDENTIFICATION
AREA OF REFUGE
HAZARDOUS LOCATION
FIRE EXTINGUISHER BRACKET
FIRE EXTINGUISHER CABINET
FIRE BLANKET CABINET
EMERGENCY RESPONSE REFERENCE
CONTROLLED ACCESS - ALWAYS
UNLOCKED IN DIRECTION OF EGRESS
DELAYED EGRESS W/ ALARM
EXISTING EXIT (LEVEL 1 ONLY)
EXISTING EXIT (TYPICAL ALL LEVELS)
CA
DE
XXX
XXX
FEB
FEC
FBC
CAPACITYCLR
EXTERIOR
EXIT
XX" ###
EXIT
IDENTIFICATION
EGRESS CLEAR
WIDTH
EGRESS
CAPACITY
A. SEE SHEETS G-100 & A-001 FOR SYMBOLS AND
ABBREVIATIONS.
B. SEE STRUCTURAL DRAWINGS FOR FRAMING
INFORMATION AND DIMENSIONS. ALL DIMENSIONS
ARE FOR REFERENCE ONLY - VERIFY ALL FRAMING
WITH STRUCTURAL DRAWINGS.
C. REFER TO PLUMBING DRAWINGS FOR
INFORMATION CONCERNING PLUMBING SYSTEM(S).
D. REFER TO MECHANICAL DRAWINGS FOR
INFORMATION CONCERNING MECHANICAL
SYSTEM(S).
E. REFER TO ELECTRICAL DRAWINGS FOR
INFORMATION CONCERNING POWER, LIGHTING AND
COMMUNICATION SYSTEM(S).
F. CONTRACTOR TO PROVIDE ALL ADDITIONAL
FRAMING NECESSARY FOR ALL OPENINGS AND
SUPPLEMENTAL FRAMING ABOVE PARTITIONS.
G. EXTEND ANY FIRE RATED PARTITIONS, BARRIERS,
AND OTHER SEPARATIONS TO BOTTOM OF
ROOF/FLOOR DECK ABOVE (OR AS DIRECTED BY UL
ASSEMBLY) AND TO EXTERIOR WALL. SEAL JOINT
BETWEEN EDGES OF PARTITION WITH FIRE RATED
SEALANT AND/OR INTUMESCENT ASSEMBLY.
H. ANY PENETRATIONS OF FIRE-RATED ASSEMBLIES
SHALL BE FIRE-SEALED IN ACCORDANCE WITH
APPROVED MANUFACTURER'S DETAIL FOR
LOCATION, TYPE OF CONSTRUCTION, PENETRATING
ITEM AND RATING REQUIRED.
I. ANY DUCTWORK, DIFFUSERS AND GRILLES
PENETRATING FIRE-RATED WALLS, CEILINGS AND
FLOORS SHALL HAVE THE APPROPRIATE TYPE OF
FIRE/SMOKE DAMPER IN ACCORDANCE WITH THE
TYPE OF CONSTRUCTION BEING PENETRATED AND
THE FIRE/SMOKE RATING REQUIRED.
J. ANY LIGHT FIXTURES AND ELECTRICAL DEVICES
PENETRATING FIRE-RATED ASSEMBLIES SHALL BE
UL-LISTED FOR INSTALLATION IN THE ASSEMBLY OR
SHALL BE INSTALLED SUCH THAT THE FIRE-RATING
IS NOT COMPROMISED.
K. SMOKE RESISTANT CONSTRUCTION SHALL MEET
THE REQUIREMENTS OF ALL APPLICABLE CODES.
AREA SHALL BE SEPARATED FROM THE REMAINDER
OF THE BUILDING BE CONSTRUCTION CAPABLE OF
RESISTING THE PASSAGE OF SMOKE. THE
PARTITIONS SHALL EXTEND FROM THE FLOOR TO
THE UNDERSIDE OF THE FLOOR OR ROOF
ASSEMBLY ABOVE. DOORS SHALL BE SELF OR
AUTOMATIC CLOSING. DOORS SHALL NOT HAVE AIR
TRANSFER OPENINGS AND SHALL NOT BE
UNDERCUT IN EXCESS OF CLEARANCE PERMITTED
WITH ACCORDANCE TO NFPA 80.
L. STORAGE OF ANY FLAMMABLE OR COMBUSTIBLE
LIQUIDS IS UNDERSTOOD TO NOT BE WITHIN THE
BUILDING. STORAGE OF ANY MATERIAL SHALL BE
IN COMPLIANCE WITH ALL APPLICABLE CODES AND
AUTHORITIES HAVING JURISDICTION.
SD-.9 SD-1 SD-2 SD-2.8
SD-DD
SD-EE
SD-AA
SD-A
SD-B
SD-A.9
1 SD-2.7SD-1.6 SD-1.9
SD-CC
SD-2.3
SD-BB
STAIR #1
SPS701
ELEV
MACHINE
ROOM
SP701
T R
A V
E L D
IS
T
A N
C E
ELEVATOR
MACHINE
ELEVATOR
MACHINE
ELEVATOR
MACHINE
C O
N T
R O
L S
C O
N T
R O
L S
C O
N T
R O
L S
SD-2.1
AREA AND HEIGHT REQUIREMENTS:
AGGREGATE FLOOR AREAS (per TABLE 503):
FLOOR EXISTING NEW TOTAL
FIRST
SECOND
THIRD
FOURTH
FIFTH
PENTHOUSE
53,447 SF
53,447 SF
53,447 SF
53,447 SF
53,447 SF
327 SF
0 SF
0 SF
0 SF
0 SF
0 SF
276 SF
AREA ALLOWED = 53,447 SF Per Story
AREA TOTAL = 53,447 SF
ALLOWABLE HEIGHT = 160 FEET
BUILDING HEIGHT = 86'-2"
ALLOWABLE NO. OF STORIES = 6
EGRESS INFORMATION
GROSS BUILDING AREA
(OUTSIDE FACE WALLS)
GROSS MEASURED AREA
(INTERIOR FACE WALLS)
OCCUPANT LOAD
(per IBC TABLE 1004.1)
EGRESS WIDTH
(per IBC 1005.1)
59,835 SF
58,248 SF
1ST = 53,447/200 = 267 PPL
200 SF/OCC.
2ND = 53,447/200 = 267 PPL
200 SF/OCC.
3RD = 53,447/200 = 267 PPL
200 SF/OCC.
5TH = 53,447/200 = 267 PPL
200 SF/OCC.
PH = 603/200 = 3 PPL
200 SF/OCC.
4TH = 53,447/200 = 267 PPL
200 SF/OCC.
EXIT DOORS = 35' (0.20) =
175 PPL
COMMON PATH OF
TRAVEL
(per IBC Chapter 10)
75' (W/O SF.)
EXIT ACCESS TRAVEL
(per IBC TABLE 1016.1)
300'-0" MAXIMUM
DISTANCE, WITH 1017.2.2
EXCEPTIONS
DEAD-END CORRIDOR
(per IBC Table 1020.4)
50'-0" MAXIMUM
1 EXIT REQUIRED IF
UNDER 49 TOTAL
OCCUPANTS
REQUIRED #OF EXITS
(per IBC Table 1018.2)
200'-0" MAXIMUMREQUIRED DISTANCE
BETWEEN EXITS
(pre IBC Table 1029.7)
CALCULATED AREA FOR EGRESS TABLE
BUILDING 101
53,447 SF
53,447 SF
53,447 SF
53,447 SF
53,447 SF
603 SF
(EXCLUDE VERTICAL
CHASES INCLUDING
STAIRS)
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
JOHN D. DINGELL
VA MEDICAL
CENTER
35 % SCHEMATIC DESIGN SUBMISSION 1 12/23/2020
65% DESIGN DESIGN SUBMISSION 2 04/02/2021
65% DESIGN DEVELOPMENT RE-SUBMISSION3 05/28/2021
95% CONSTRUCTION DOCUMENTS SUBMISSION4 08/23/2021
BID DOCUMENTS5 02/16/2022
/2
/2
:4
:4
A
M
GL101
LIFE SAFETY PLANS - BUILDING 101
8 11DGC
REPLACE/ADD PARKING
STRUCTURE ELEVATORS
VAMC DETROIT 4646 JOHN R. ST.
DETROIT, MI 48201
FEBRUARY 16, 2022
BID DOCUMENTS
553-19-10118-319
101 & 102
LCW
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
BLUE
RED
Scale: 1/16" = 1'-0"
FIRST LEVEL LIFE SAFETY PLAN (OTHER FLOORS SIMILAR) - BLDG 101
N O
R T H
0 8 16 32
Scale: 1/4" = 1'-0"
NEW PENTHOUSE FLOOR PLAN - BDLG 101
N O
R T H
0 2 4 8
1 NEW FIRE EXTINGUISHER BRACKET WITH
SENSOR - SEE SPEC
PROPOSED USE:
OWNED BY: FEDERAL GOVERNMENT
CODE ENFORCEMENT JURISDICTION: FEDERAL
GOVERNMENT
APPLICABLE CODES:
GENERAL CODE INFORMATION:
RENOVATION (EXISTING BUILDING - LOBBY AND
PENTHOUSE ONLY)
CONSTRUCTION TYPE:
PRIMARY OCCUPANCY:
SECONDARY OCCUPANCY:
PROJECT NAME:
PROJECT ADDRESS:
OWNER OR AGENT:
NON-SPRINKLERED STANDPIPE PROTECTED
PARKING STRUCTURE
Parking Garage: Type IB, Lobby:
Type IIB
Warehouse-Storage S-2 (Public Parking Garage)
None
2021 International Building Code
2018 International Mechanical Code
2018 ADA Code
2017 NFPA 70 National Electrical Code
2021 NFPA 101 Life Safety Code
VA Design Guide Architectural Manual 2014 August 01 2018 NFPA 101 Life Safety Code
2015 Archtitecture Barriers Act
REPLACE/ADD PARKING STRUCTURE
ELEVATORS
VAMC DETROIT 4646 JOHN R. ST.
DETROIT, MI 48201
DEPARTMENT OF VETERANS
AFFAIRS
CODE INFORMATION
1301078103
RENEE M.
CLARKE
ELEVATOR
#3
E03
ELEVATOR
#2
E02
FUTURE
ELEVATOR
E01
STAIR 04
S204
STAIR 03
S203
STAIR 02
S202
UP
UP
UP
UP
ND-A
31ND-1ND-2ND-3ND-4ND-6
ND-B
M
ND-3.3ND-3.6
2' 8 1/4"
1/3 O
V E
R A
LL D
IA
G O
N A
L
O V
E R
A L L D
IM
E
N S
IO
N
T R
A V
E L D
IS
T
A N
C E
T R
A V
E L D
IS
T
A N
C E
TRAVEL DISTANCE = 211'-9"
T R
A V
E L D
IS
T
A N
C E
A. SEE SHEETS G-100 & A-001 FOR SYMBOLS AND
ABBREVIATIONS.
B. SEE STRUCTURAL DRAWINGS FOR FRAMING
INFORMATION AND DIMENSIONS. ALL DIMENSIONS
ARE FOR REFERENCE ONLY - VERIFY ALL FRAMING
WITH STRUCTURAL DRAWINGS.
C. REFER TO PLUMBING DRAWINGS FOR
INFORMATION CONCERNING PLUMBING SYSTEM(S).
D. REFER TO MECHANICAL DRAWINGS FOR
INFORMATION CONCERNING MECHANICAL
SYSTEM(S).
E. REFER TO ELECTRICAL DRAWINGS FOR
INFORMATION CONCERNING POWER, LIGHTING AND
COMMUNICATION SYSTEM(S).
F. CONTRACTOR TO PROVIDE ALL ADDITIONAL
FRAMING NECESSARY FOR ALL OPENINGS AND
SUPPLEMENTAL FRAMING ABOVE PARTITIONS.
G. EXTEND ANY FIRE RATED PARTITIONS, BARRIERS,
AND OTHER SEPARATIONS TO BOTTOM OF
ROOF/FLOOR DECK ABOVE (OR AS DIRECTED BY UL
ASSEMBLY) AND TO EXTERIOR WALL. SEAL JOINT
BETWEEN EDGES OF PARTITION WITH FIRE RATED
SEALANT AND/OR INTUMESCENT ASSEMBLY.
H. ANY PENETRATIONS OF FIRE-RATED ASSEMBLIES
SHALL BE FIRE-SEALED IN ACCORDANCE WITH
APPROVED MANUFACTURER'S DETAIL FOR
LOCATION, TYPE OF CONSTRUCTION, PENETRATING
ITEM AND RATING REQUIRED.
I. ANY DUCTWORK, DIFFUSERS AND GRILLES
PENETRATING FIRE-RATED WALLS, CEILINGS AND
FLOORS SHALL HAVE THE APPROPRIATE TYPE OF
FIRE/SMOKE DAMPER IN ACCORDANCE WITH THE
TYPE OF CONSTRUCTION BEING PENETRATED AND
THE FIRE/SMOKE RATING REQUIRED.
J. ANY LIGHT FIXTURES AND ELECTRICAL DEVICES
PENETRATING FIRE-RATED ASSEMBLIES SHALL BE
UL-LISTED…