S02 Drawings 1 of 2 - 553-19-101.pdf

PDF 22 MB Posted

Attached to
Z1DA--Replace Parking Structures Elevators 553-19-101 Federal contract opportunity
Solicitation number
36C25022B0071
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This pre-solicitation notice announces the Department of Veterans Affairs' intent to issue an invitation for bids to replace parking structure elevators at the John D. Dingell Veterans Administration Medical Center in Detroit, Michigan. The project entails furnishing all necessary labor, materials, equipment, and supervision to complete the work according to drawings and specifications. The magnitude of cost is estimated between $5 million and $10 million. The solicitation will be available for download on September 9, 2022 from SAM.gov and only offers from verified Service-Disabled Veteran Owned Small Businesses registered in Vendor Information Pages will be considered for this 100% set-aside acquisition. The contract type will be firm-fixed-price with an anticipated award within 120 days of bid opening. All questions must be submitted in writing to the specified contracting officer by email.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Replace Parking Structures Elevators 553-19-101, newest first.
File Type Posted
C08 - Revised Notice of Award- 553-19-101 - signed.pdf PDF
C08 Notice of Award - 553-19-101 - KO Signed.pdf PDF
S06 OA intake hood attached to the stanchions.pdf PDF
S06 Sump Pump location.pdf PDF
S06 36C25022B0071 0005 - 553-19-101.pdf PDF
S06 36C25022B0071 0004.pdf PDF
S06 Specification14 21 10 Modern. Traction Elev.pdf PDF
S06 FA001 Drawing.pdf PDF
S06 Addendum1.pdf PDF
S06 36C25022B0071 0003 - 553-19-101.pdf PDF
S06 36C25022B0071 0002.pdf PDF
S06 Pre-Bid Site Visit Attendance Log 553-19-101.pdf PDF
S06 J-A - Siemens HVAC and BMS Components - 553-19-01 - KO Signed.pdf PDF
S06 36C25022B0071 0001 - 553-19-101.pdf PDF
S06 J-A - Simplex Fire Protection System - 553-19-101 - KO Signed.pdf PDF
S06 - Pre-Bid Site Visit Agenda - 553-19-101.pdf PDF
S06 J-A - Yale door locks and latch sets - 553-19-101 - KO Signed.pdf PDF
S06 J-A - Siemens Electrical Systems Components - 553-19-101 - KO Signed.pdf PDF
S06 J-A - Security 2000 card readers - 553-19-101 - KO Signed.pdf PDF
S06 J-A - Hilti Firestopping system - 553-19-101 - KO Signed.pdf PDF
S06 J-A - En-Gauge Fire Extinguisher Monitoring system - 553-19-101 - KO Signed.pdf PDF
S02 Contractor EMR Certification Form - 553-19-101.docx DOCX document
S02 RFI Form - 553-19-101.doc DOC document
S02 36C25022B0071_1 - 553-19-101.pdf PDF
S02 Wage Determination - MI20220101 - 09-16-22 - 553-19-101.pdf PDF
S02 Drawings 2 of 2 - 553-19-101.pdf PDF
S02 Project Specifications - 553-19-101.pdf PDF
36C25022B0071.docx DOCX document
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASSOCIATE MEDICAL CENTER DIRECTOR

DATE

DATE

MEDICAL CENTER DIRECTOR

VA APPROVAL

CHIEF, FACILITY MANAGEMENT SERVICES DATE

ASSISTANT CHIEF, FMS DATE

SAFETY AND OCCUPATIONAL HEALTH MANAGER DATE

ENERGY MANAGER DATE

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

BRAND ITEM SPECIFICATION SECTION NOTES

HILTI FS1-FIRESTOP 07 84 00 BOTH SIDES OF FIRE-RATED WALLS, SMOKE BARRIERS, AND

FLOORS REGARDLESS OF FIRE RATING

DIVISION 08 - OPENINGS

BRAND ITEM SPECIFICATION SECTION NOTES

YALE LOCKS & DOOR HARDWARE 08 71 00 LARGE FORMAT 7-PIN REMOVABLE CORE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

BRAND ITEM SPECIFICATION SECTION NOTES

SIEMENS HVAC CONTROLS 23 09 23

SIEMENS BUILDING MANAGEMENT SYSTEM (BMS)

DIVISION 26 - ELECTRICAL

BRAND ITEM SPECIFICATION SECTION NOTES

SIEMENS ELECTRICAL 26 22 00

26 24 16 26 29 11 26 29 21 26 43 13

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

BRAND ITEM SPECIFICATION SECTION NOTES

SECURITY 2000 PHYSICAL SECURITY 28 13 00

28 23 00

SIMPLEX FIRE ALARM SYSTEM / VENDOR 28 31 00

EN-GAUGE EN-VISION OBSTRUCTION SENSOR 28 31 00 VA SUPPLIED / CONTRACTOR INSTALLED

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP PROJECT LOCATION MAP

PROJECT IMAGE

JOHN D. DINGELL

VA MEDICAL

CENTER

35 % SCHEMATIC DESIGN SUBMISSION 1 12/23/2020

65% DESIGN DESIGN SUBMISSION 2 04/02/2021

65% DESIGN DEVELOPMENT RE-SUBMISSION3 05/28/2021

95% CONSTRUCTION DOCUMENTS SUBMISSION4 08/23/2021

BID DOCUMENTS5 02/16/2022

/2

/2

:5

:2

P

M

G-001

COVER

1 11CDC

REPLACE/ADD PARKING

STRUCTURE ELEVATORS

VAMC DETROIT 4646 JOHN R. ST.

DETROIT, MI 48201

FEBRUARY 16, 2022

BID DOCUMENTS

553-19-10118-319

101 & 102

REPLACE/ADD PARKING STRUCTURE

ELEVATORS

VAMC DETROIT 4646 JOHN R. ST.

DETROIT, MI 48201

VA PROJECT #: 553-19-101

MJC

DRAWING LIST

No. Description Dwg of Dwg

ELECTRICAL

E-001 ELECTRICAL AND TECHNOLOGY GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 20

ED101 ELECTRICAL DEMOLITION PLAN - BUILDING 101 2 20

ED102 ELECTRICAL DEMOLITION PLAN - BUILDING 102 3 20

EP101 ELECTRICAL POWER PLAN - BUILDING 101 4 20

EP102 ELECTRICAL POWER PLAN - BUILDING 102 5 20

EL101 ELECTRICAL LIGHTING PLANS - BUILDING 101 6 20

EL102 ELECTRICAL LIGHTING PLANS - BUILDING 102 7 20

EM101 ELECTRICAL MECHANICAL POWER PLAN - BUILDING 101 8 20

EM102 ELECTRICAL MECHANICAL POWER PLAN - BUILDING 102 9 20

ET101 ELEVATOR TECHNOLOGY PLAN 10 20

ET102 ELEVATOR TECHNOLOGY PLAN 11 20

ED301 ELECTRICAL ELEVATIONS DEMO WORK 12 20

E-301 ELECTRICAL ELEVATIONS NEW WORK 13 20

E-501 ELECTRICAL DETAILS 14 20

E-502 LIGHTNING PROTECTION DETAILS 15 20

E-601 ONE-LINE DIAGRAM 16 20

E-602 EXISTING ELECTRICAL PANEL SCHEDULES 17 20

E-603 NEW ELECTRICAL PANEL SCHEDULES 18 20

E-604 ELECTRICAL PANEL SCHEDULES 19 20

E-701 ELECTRICAL SCHEDULES 20 20

FIRE ALARM

FA001 FIRE ALARM GENERAL NOTES, SYMBOL LEGEND, AND RISER 1 3

FA101 FIRE ALARM PLANS - BUILDING 101 2 3

FA102 FIRE ALARM PLANS - BUILDING 102 3 3

DRAWING LIST

No. Description Dwg of Dwg

GENERAL

G-001 COVER 1 11

G-100 GENERAL INFORMATION 2 11

G-101 INFECTION CONTROL RISK ASSESSMENT (ICRA) 3 11

G-102 INFECTION CONTROL RISK ASSESSMENT (ICRA) PHASE ONE PLANS 4 11

G-103 INFECTION CONTROL RISK ASSESSMENT (ICRA) PHASE TWO PLANS 5 11

G-104 INFECTION CONTROL RISK ASSESSMENT (ICRA) PHASE THREE PLANS 6 11

G-105 INFECTION CONTROL RISK ASSESSMENT (ICRA) PHASE FOUR PLANS 7 11

GL101 LIFE SAFETY PLANS - BUILDING 101 8 11

GL102 LIFE SAFETY PLANS - BUILDING 102 9 11

GL103 LIFE SAFETY PLANS - BUILDING 101 10 11

GL104 LIFE SAFETY PLANS - BUILDING 102 11 11

STRUCTURAL

S-001 GENERAL NOTES & SCHEDULES 1 5

S-101 PLANS BUILDING 101 BLUE 2 5

S-102 PLANS BUILDING 102 RED 3 5

S-201 WALL SECTIONS 4 5

S-301 DETAILS 5 5

ARCHITECTURAL

A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 27

AD101 DEMOLITION PLANS - BUILDING 101 2 27

AD102 DEMOLITION PLANS - BUILDING 101 3 27

AD103 DEMOLITION PLANS - BUILDING 101 4 27

AD111 BASEMENT DEMOLITION PLAN - BUILDING 102 5 27

AD112 LOWER LEVEL DEMOLITION PLAN - BUILDING 102 6 27

AD113 DEMOLITION PLANS - BUILDING 102 7 27

AD114 DEMOLITION PLANS - BUILDING 102 8 27

A-101 ELEVATOR PIT AND LOWER LEVEL FLOOR PLANS - BUILDING 101 9 27

A-102 FIRST THROUGH FOURTH LEVEL FLOOR PLANS - BUILDING 101 10 27

A-103 FIFTH FLOOR AND LOBBY ROOF PLANS - BUILDING 101 11 27

A-104 PENTHOUSE FLOOR, ROOF PLAN, AND DOOR SCHEDULE - BUILDING 101 12 27

A-111 BASEMENT FLOOR PLAN - BUILDING 102 13 27

A-112 LOWER LEVEL FLOOR PLAN - BUILDING 102 14 27

A-113 FIRST THROUGH FOURTH LEVEL FLOOR PLANS - BUILDING 102 15 27

A-114 FIFTH FLOOR AND LOBBY ROOF PLANS - BUILDING 102 16 27

A-115 PENTHOUSE FLOOR, ROOF PLAN, AND DOOR SCHEDULE - BUILDING 102 17 27

A-201 EXTERIOR ELEVATIONS 18 27

A-301 BUILDING SECTIONS - BUILDING 101 19 27

A-302 BUILDING SECTIONS - BUILDING 102 20 27

A-303 PENTHOUSE SECTION 21 27

A-401 ELEVATOR HOISTWAY ENTRANCE ELEVATIONS AND DETAILS 22 27

A-402 PASSENGER ELEVATOR CAB, ELEVATIONS AND REFLECTED CEILING PLAN 23 27

A-501 EXTERIOR DETAILS 24 27

A-502 ROOFING DETAILS 25 27

A-701 ENLARGED STAIR PLANS AND SECTIONS - BLDG 101 26 27

A-702 ENLARGED STAIR PLANS AND SECTIONS - BLDG 102 27 27

FIRE SUPPRESSION

FX001 FIRE SUPPRESSION GENERAL INFORMATION 1 3

FX101 FIRE SUPPRESSION PLANS - BUILDING 101 2 3

FX111 FIRE SUPPRESSION PLANS - BUILDING 102 3 3

PLUMBING

P-001 PLUMBING GENERAL INFORMATION 1 12

PD103 5TH LEVEL PLUMBING DEMOLITION PLAN - BUILDING 101 2 12

PD111 BASEMENT PLUMBING DEMOLITION PLAN - BUILDING 102 3 12

PD113 5TH LEVEL PLUMBING DEMOLITION PLAN - BUILDING 102 4 12

P-101 ELEVATOR PIT AND LOWER LEVEL PLUMBING PLANS - BUILDING 101 5 12

P-103 5TH LEVEL AND LOBBY ROOF PLUMBING PLANS - BUILDING 101 6 12

P-104 NEW PENTHOUSE AND PENTHOUSE ROOF PLUMBING PLANS - BUILDING 101 7 12

P-111 BASEMENT PLUMBING PLAN - BLDG 102 8 12

P-113 5TH LEVEL AND LOBBY ROOF PLUMBING PLANS - BUILDING 102 9 12

P-114 NEW PENTHOUSE AND PENTHOUSE ROOF PLUMBING PLANS - BUILDING 102 10 12

P-501 PLUMBING DETAILS 11 12

P-901 STAIRWELL STORM DRAIN PIPING ISOMETRICS 12 12

MECHANICAL

M-001 MECHANICAL GENERAL INFORMATION 1 13

MD101 LOWER LEVEL MECHANICAL DEMOLITION PLAN - BUILDING 101 2 13

MD103 5TH LEVEL MECHANICAL DEMOLITION PLAN - BUILDING 101 3 13

MD111 LOWER LEVEL MECHANICAL DEMOLITION PLAN - BUILDING 102 4 13

MD113 5TH LEVEL MECHANICAL DEMOLITION PLAN - BUILDING 102 5 13

M-101 LOWER LEVEL MECHANICAL PLAN - BUILDING 101 6 13

M-103 5TH LEVEL MECHANICAL PLAN - BUILDING 101 7 13

M-104 NEW PENTHOUSE MECHANICAL PLAN - BUILDING 101 8 13

M-111 LOWER LEVEL MECHANICAL PLAN - BUILDING 102 9 13

M-113 5TH LEVEL MECHANICAL PLAN - BUILDING 102 10 13

M-114 NEW PENTHOUSE MECHANICAL PLAN - BUILDING 102 11 13

M-501 MECHANICAL DETAILS 12 13

M-601 MECHANICAL SCHEDULES AND CONTROLS 13 13

DETROIT VAMC

PROJECT SCOPE

5409 Rapidan Court Lothian, MD 20711 410.798.8504

SITE BOUNDARY

PROJECT SCOPE

PROJECT SCOPE

SOLE SOURCE LIST

Pamela J. Reeves 244478

Digitally signed by Pamela J.

Reeves 244478 Date: 2022.05.04 14:23:45 -04'00'

TIMOTHY SCHEID

Digitally signed by TIMOTHY

SCHEID

Date: 2022.05.04 10:00:23 -04'00'

CASEY P. THAYER

183619

Digitally signed by CASEY P.

THAYER 183619

Date: 2022.03.22 13:21:18 -04'00'

Robert D. Peters 471483

Digitally signed by Robert D.

Peters 471483 Date: 2022.03.23 09:15:50 -04'00'

JEFFREY EDGE

Digitally signed by JEFFREY

EDGE

Date: 2022.03.22 13:49:44 -04'00'

CEDRIC WHITNEY

Digitally signed by CEDRIC

WHITNEY

Date: 2022.03.23 07:38:28 -04'00'

WALL SECTION

SYMBOL INTERIOR ELEVATION

SYMBOL

NEW COLUMN GRID

ELEVATION SYMBOL

REVISION NOTE

ENLARGED DETAIL CALLOUT

ROOM DESIGNATION

SYMBOL

BREAK LINE

ROOF SLOPE

DIRECTION SYMBOL

TYPICAL GRAPHIC SCALE

DETAIL #

PAGE #

DETAIL #

PAGE #

VIEW NORTH ARROW

A8.1

EXTERIOR ELEVATION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

A8.1

BUILDING SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

DETAIL SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

WALL GRID

(REPRESENTS

FACE OF EXISTING

WALL)

XX.X

XX.X

ELEVATION

0'-0"

ROOM

NAME

101A

NORTHNORTH

0 4 8 16

XX.X EXISTING COLUMN GRID

REFERENCE SECTION 00 2113 AND 00 4100 OF THE PROJECT MANUAL FOR THE SCHEDULE OF BID ALTERNATES INCLUDED WITH THE BID PACKAGE

DEDUCT ALTERNATE #1: DO NOT PROVIDE AND INSTALL THE NEW TRACTION ELEVATOR 102-3 IN BUILDING 102. SECURE ELEVATOR DOORS ON ALL LEVELS AND LEAVE HOISTWAY EMPTY, BUT PREPARED, FOR NEW ELEVATOR INSTALLATION. ALL EXISTING ELEVATOR EQUIPMENT SHALL BE REMOVED, AND ALL SERVICES REQUIRED FOR A

NEW ELEVATOR INSTALL SHALL BE READILY AVAILABLE FOR FUTURE CONNECTION.

DEDUCT ALTERNATE #2: DO NOT PROVIDE AND INSTALL THE NEW TRACTION ELEVATOR 101-1 IN BUILDING 101. SECURE ELEVATOR DOORS ON ALL LEVELS AND LEAVE HOISTWAY EMPTY, BUT PREPARED, FOR NEW ELEVATOR INSTALLATION. ALL EXISTING ELEVATOR EQUIPMENT SHALL BE REMOVED, AND ALL SERVICES REQUIRED FOR A

NEW ELEVATOR INSTALL SHALL BE READILY AVAILABLE FOR FUTURE CONNECTION.

BUILDING LOCATION: DETROIT, MICHIGAN

CLIMATE ZONE: 5(A)

REFERENCE CODES:

ASHRAE 90.1 - 2019 EDITION

INTERNATIONAL ENERGY CONSERVATION CODE

BUILDING ENVELOPE REQUIREMENTS:

ROOFS: CODE REQUIRED: DESIGNED:

INSULATION ABOVE DECK R-30ci R-30ci

WALLS, ABOVE GRADE:

STEEL FRAMED R-13 + R-10ci R-19

FLOORS:

STEEL JOIST R-30 R-30

OPAQUE DOORS:

SWINGING U-0.370 U-0.370

DEFINITIONS

ci = CONTINUOUS INSULATION

NR = NO REQUIREMENT

1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND

CONTRACTOR BEFORE THE START OF THE WORK.

2. DRAWINGS ARE PREPARED USING PRODUCT DIMENSIONS AND DETAILS FROM BASIS OF DESIGN PRODUCT. PRODUCTS MAY CHANGE IN DIMENSION AND DETAIL BEFORE THEY ARE INCORPORATED INTO WORK. PRODUCTS FROM OTHER MANUFACTURER’S ARE ALSO ACCEPTABLE. DIMENSIONS AND DETAILS FOR ALTERNATE PRODUCTS MAY VARY FROM BASIS OF DESIGN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED INTO WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS REPONSIBLE FOR ACCOMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR

PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.

3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE.

THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED

WHOLE.

4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE

CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER QUANTITY OF WORK.

5. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE DRAWINGS AND SPECIFICATIONS.

6. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT, FOR EACH PHASE. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD CONDITIONS, NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.

7. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED

CONDITIONS. WRITTEN DIMENSIONS SHALL GOVERN.

8. PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN DIFFERENT MATERIALS.

9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.

10. REFER TO ALL OTHER TRADE DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION ON THIS PROJECT.

11. PROVIDE BLOCKING AT PARTITIONS AS REQUIRED FOR MOUNTING OF WALL-MOUNTED ITEMS: PROVIDE SUPPLEMENTAL FRAMING AT WALL OPENINGS INCLUDING KING

STUDS, JACK STUDS, AND CRIPPLE STUDS, AS REQUIRED FOR COMPLETION OF THE WORK.

12. DIMENSIONS SHOWN ARE TO FACE OF STUD FRAMING, FACE OF CONCRETE/MASONRY WALLS, OR FINISHED FACE OF EXISTING WALL SURFACE.

13. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED.

14. ALL REQUESTS FOR UTILITY SHUTDOWNS REQUIRE A (3) THREE-WEEK ADVANCE NOTICE TO THE GOVERNMENT.

1. TWO ELEVATOR CARS SHALL REMAIN FULLY OPERATIONAL AT ALL TIMES. THIS WILL RESULT IN A GRADUAL SWITCH-OVER FROM HYDRAULIC TO TRACTION ELEVATORS.

BOTH ELEVATOR SYSTEMS WILL BE RUNNING CONCURRENTLY UNTIL THE LAST HYDRAULIC ELEVATOR IS REMOVED FROM SERVICE.

2. CONSTRUCTION ACTIVITY FOR EACH ELEVATOR TOWER SHALL BE DIVIDED INTO FOUR CONSECUTIVE PROJECT PHASES AS FOLLOWS:

A. PHASE 1: CONSTRUCT NEW PENTHOUSE STRUCTURE ABOVE THE EXISTING LEVEL 5 STAIR & ELEVATOR LOBBY. CONSTRUCT STAIRS FROM LEVEL 5 TO LEVEL 6

PENTHOUSE. CREATE A WEATHER-TIGHT ENVIRONMENT ABOVE THE EXISTING STAIRS AND ELEVATOR HOISTWAYS. LEVEL 5 SHALL BE TEMPORARILY CLOSED TO THE

PUBLIC DURING PHASE 1.

B. PHASE 2: INSTALL NEW ELEVATOR IN EXISTING EMPTY HOISTWAY, INCLUDING INSTALLATION OF ALL EQUIPMENT AND SERVICES REQUIRED FOR FULL OPERATION.

a. ELEVATOR 101-3 AT BUILDING 101

b. ELEVATOR 102-1 AT BUILDING 102

c. EXISTING ROOF STRUCTURE SHALL BE REMOVED ABOVE THE PHASE 2 HOISTWAY ONLY.

C. PHASE 3: REMOVE EXISTING ELEVATOR AND EQUIPMENT, AND INSTALL NEW ELEVATOR IN EXISTING HOISTWAY, INCLUDING ALL EQUIPMENT AND SERVICES REQUIRED

FOR FULL OPERATION.

a. ELEVATOR 101-2 AT BUILDING 101

b. ELEVATOR 102-2 AT BUILDING 102

c. EXISTING ROOF STRUCTURE SHALL BE REMOVED ABOVE THE PHASE 3 HOISTWAY ONLY.

D. PHASE 4: REMOVE EXISTING ELEVATOR AND INSTALL NEW ELEVATOR IN EXISTING HOISTWAY, INCLUDING ALL EQUIPMENT AND SERVICES REQUIRED FOR FULL

OPERATION.

a. ELEVATOR 101-1 AT BUILDING 101

b. ELEVATOR 102-3 AT BUILDING 102

c. THE REMAINDER OF THE EXISTING ROOF STRUCTURE SHALL BE REMOVED ABOVE THE PHASE 3 HOISTWAY.

3. PHASE 2 SHALL NOT BEGIN UNTIL A WEATHER-TIGHT ENCLOSURE IS CONSTRUCTED ABOVE THE EXISTING ELEVATOR AND STAIR SHAFTS.

AFF ABOVE FINISHED FLOOR

ACP/APC ACOUSTIC CEILING PANEL/

ACOUSTIC PANEL CEILING

ACT ACOUSTIC(AL) TILE

ADJ ADJUSTABLE

ADT'L ADDITIONAL

AGG AGGREGATE

ALT ALTERNATE

AL ALUMINUM

APPROX APPROXIMATE(LY)

ASPH ASPHALT

AUTO AUTOMATIC

B/O BOTTOM OF

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BOT BOTTOM

BRG BEARING

CENTERLINE

C/C CENTER TO CENTER

CJ CONTROL JOINT

CLL CONTRACT LIMIT LINE

CEM CEMENT(ITIOUS)

CMU CONCRETE MASONRY UNIT

CLG CEILING

CLR CLEAR

COL COLUMN

CONC CONCRETE

CONST CONSTRUCTION

CONT CONTINUOUS

CPT CARPET

CT CERAMIC TILE

CTR CENTER(ED)

DS DOWNSPOUT

DBL DOUBLE

DEG DEGREE

DEMO DEMOLITION

DET/DTL DETAIL

DIA DIAMETER

DIM DIMENSION

DN DOWN

DWG(S) DRAWING(S)

E EAST

EC ELECTRICAL CONTRACTOR

EHO ELECTRICAL HOLD OPEN

EJ EXPANSION JOINT

EW EACH WAY

EA EACH

EL ELEVATION

ELEC ELECTRIC(AL)

ELEV ELEVATOR

EMER EMERGENCY

EQ EQUAL

EQUIP EQUIPMENT

EXIST EXISTING

EXT EXTERIOR

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FFE FINISH FLOOR ELEVATION

FV FIELD VERIFY

FEC FIRE EXTINGUISHER CABINET

FDN FOUNDATION

FIN FINISH

FLSHG FLASHING

FLR FLOOR

FRMG FRAMING

FT FOOT/FEET

FTG FOOTING

GC GENERAL CONTRACTOR

GA GAUGE

GALV GALVANIZED

GEN GENERAL

GYP GYPSUM

HM HOLLOW METAL

HDWR HARDWARE

HOL HOLLOW

HOR HORIZONTAL

HT HEIGHT

HVAC HEATING/VENTILATION/AIR

CONDITIONING

ID INSIDE DIAMETER

IN INCH

INCL INCLUDING

INSUL INSULATION

INT INTERIOR

JAN JANITOR

JT JOINT

LB(S) POUND(S)

L/S LANDSCAPE

LT LIGHT

MO MASONRY OPENING

MAS MASONRY

MAT'L MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MTD MOUNTED

MTL METAL

N NORTH

NIC NOT IN CONTRACT

NTS NOT TO SCALE

NOM NOMINAL

OC ON CENTER

OD OUTSIDE DIAMETER

O TO O OUT TO OUT

OPNG OPENING

OPP OPPOSITE

OVHD OVERHEAD

PJF PREFORMED JOINT FILLER

PT PRESSURE TREATED

PERIM PERIMETER

PL PLATE

PLAM PLASTIC LAMINATE

PLBG PLUMBING

PLYWD PLYWOOD

PNT PAINT

PR PAIR

PTD PAINTED

PWR POWER

RB RUBBER BASE

RD ROOF DRAIN

RO ROUGH OPENING

RAD RADIUS

REC RECESSED

REINF REINFORCED

REQ'D REQUIRED

REV REVISED (REVISION)

RM ROOM

S SOUTH

SB SPLASH BLOCK

SF SQUARE FEET

SS STAINLESS STEEL

SIM SIMILAR

SPEC SPECIFICATIONS

SQ SQUARE

STD STANDARD

STL STEEL

STOR STORAGE

STRUCT STRUCTURAL

SUSP SUSPENDED

T&G TONGUE AND GROOVE

T/O TOP OF

TELE TELEPHONE

TRTD TREATED

TS TUBE STEEL

TYP TYPICAL

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

VCT VINYL COMPOSITION TILE

VIF VERIFY IN FIELD

VERT VERTICAL

W WEST

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WWF WELDED WIRE FABRIC

WD WOOD

WH WATER HEATER

WT WEIGHT

CL

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

JOHN D. DINGELL

VA MEDICAL

CENTER

35 % SCHEMATIC DESIGN SUBMISSION 1 12/23/2020

65% DESIGN DESIGN SUBMISSION 2 04/02/2021

65% DESIGN DEVELOPMENT RE-SUBMISSION3 05/28/2021

95% CONSTRUCTION DOCUMENTS SUBMISSION4 08/23/2021

BID DOCUMENTS5 02/16/2022

/2

/2

:4

:2

A

M

G-100

GENERAL INFORMATION

2 11CDC

REPLACE/ADD PARKING

STRUCTURE ELEVATORS

VAMC DETROIT 4646 JOHN R. ST.

DETROIT, MI 48201

FEBRUARY 16, 2022

BID DOCUMENTS

553-19-10118-319

101 & 102

MJC

GENERAL SYMBOL LEGEND

DEDUCT ALTERNATES

ENERGY REQUIREMENTS

GENERAL NOTES

DEDUCT ALTERNATE#

PHASING NOTES

GENERAL ABBREVIATIONS

1301078103

RENEE M.

CLARKE

DocuSign Envelope ID: A2E84575-819A-4324-B109-CAAD6666B90C

3/25/2022

NEGATIVE AIR UNIT

WITH FILTER

FINISHED FLOORING SHALL BE KEPT

CLEAN. FLOORS NOT BEING REPLACED

SHALL BE PROTECTED. COVER WITH

CONSTRUCTION GRADE TEMPORARY

FLOOR PROTECTION.

C L

E A

R T

O P

O F

E L

E V

A T

O R

E D

O O

R H

E

IG

H T

M

IN

IM

U M

RUN EXHAUST AIR TO EXTERIOR

THROUGH HOISTWAY ROOF

RATED WALL DAMPER REQUIRED -

MATCH WALL RATING

EXISTING CEILING VERIFY

HEIGHT

BARRIER WALL & CEILING

PAINT

EXISTING FLOOR

UNDERSIDE OF EXISTING

CEILING

LOBBYELEVATOR

FIRE RESISTANT

SEALANT

TOP OF ELEVATOR

DOOR OPENING

WALL ASSEMBLY - UL U423*

2-HOUR FIRE-RESISTANCE-RATED

-(2) LAYERS 5/8" TYPE 'X' GYP BD

-3-5/8" STEEL STUDS

-(2) LAYERS 5/8" TYPE X GYP BD

NON-LOAD-BEARING CEILING ASSEMBLY - UL I503*

2-HOUR FIRE-RESISTANCE-RATED

-(2) LAYERS 5/8" TYPE 'X' GYP BD

-6" STEEL STUDS

-(2) LAYERS 5/8" TYPE X GYP BD

FIRE RESISTANT

SEALANT

*ASSEMBLIES SHALL MEET UL ASSEMBLY DESIGN.

CONFIGURATION SHOWN AS BASIS-OF-DESIGN.

OTHER COMPLYING CONFIGURATIONS ACCEPTABLE.

NOTE: WALL ASSEMBLY MAY TERMINATE AT RATED

CEILING ABOVE IN LIEU OF CONSTRUCTING

TEMPORARY CEILING ASSEMBLY

ICRA, ILSM, FIRE

WATCH AND

MISC. FORMS

PAPER CADDY

ILSM SIGNAGE

INTERIM LIFE SAFETY MEASURES IN EFFECT

FOR RENOVATION BUILDING 1,

SECOND FLOOR, 2E AT UD

THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA.

PLEASE USE ALL ALTERNATE EXITS AS MARKED.

1' - 5"

1/2"1/2"

/2

/2

/2

/2

/2

/2

EQ.EQ.

ILSM TEMPORARY BARRIER TAG

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

A P

P R

O X

A .F

.F

POST ICRA, ILSM, FIRE

INSPECTION SHEETS

VISIBLE TO PUBLIC

D000

FIRE EXTINGUISHER ON

PORTABLE FLOOR

BRACKET (ILSM MAY

REQUIRE MORE THAN

ONE).

PROVIDE STICKY MATS

(CHANGED END OF SHIFT OR

MORE IF NECESSARY TO

MAINTAIN CLEANLINESS).

NEGATIVE AIR UNIT W/ FILTER

EXHAUSTING THROUGH HOISTWAY

ROOF. ENTIRE ELEVATOR SHALL BE

UNDER NEGATIVE PRESSURE.

LOCATION OF AIR UNIT BY

CONTRACTOR. SEE GENERAL

NOTES.

SEAL & CAP SUPPLY,

RETURN TRANSFER, &

EXHAUST DUCTS WITH

MATERIAL MATCHING

DUCT CONSTRUCTION

MATERIAL

BARRIER WALL

F L E

X D

U C

T

POST ICRA, ILSM, FIRE

INSPECTION SHEETS

VISIBLE TO PUBLIC

EXIST WALL

EXISTING HOISTWAY

OPENING

D000

M A

N U

F A

C T

U R

A B

IL

IT

Y

A S

D E

T E

R M

IN

E

D F

O R

G-101

TEMPORARY GUARD

FOR FALL PROTECTION

A. CONTRACTOR SHALL VISIT ALL AREAS OF WORK, INCLUDING WALKING THE SITE, FIELD

VERIFY EXISTING DIMENSIONS AND OBSERVING EXISTING CONDITIONS BEFORE BEGINNING

WORK, ORDERING MATERIALS, OR STARTING ANY CONSTRUCTION.

B. CONTRACTOR SHALL RECYCLE REMOVED MATERIALS WHENEVER POSSIBLE. SEE DIVISION 1

SPECIFICATIONS

C. CONTRACTOR SHALL PROTECT AREA ADJACENT TO SELECTIVE DEMOLITION AND NEW

CONSTRUCTION WORK TO PREVENT DAMAGES. (IF DAMAGED, REPAIR, PATCH, REPLACE, OR

SAND SMOOTH AND TO MATCH EXISTING ADJACENT MATERIALS.)

D. CONTRACTOR SHALL INSTALL TEMPORARY DIGITAL MANOMETER TO MONITOR AND ENSURE

PRESSURE LEVEL TO MEET VA GUIDELINE WITHIN CONSTRUCTION AREA. CONTRACTOR TO

VERIFY LOCATIONS WITH VA COR PRIOR TO INSTALLATION.

E. CONTRACTOR SHALL MAINTAIN NEGATIVE PRESSURE WITHIN THE ICRA BOUNDARY. A SINGLE

AIR FILTER UNIT MAY BE USED FOR AN ENTIRE HOISTWAY, OR MULTIPLE UNITS AS NEEDED.

F. CONTRACTOR SHALL PROVIDE EXHAUST EQUIPMENT CAPABLE OF EXHAUSTING

APPROXIMATELY 500 CFM (2 ACH) OF AIR FROM EACH HOISTWAY DURING CONSTRUCTION

FOR DUST CONTROL & MITIGATION. EXHAUST AIR SHALL BE DUCTED THROUGH THE ROOF OF

EACH HOISTWAY AND MAY NOT BE EXHAUSTED WITHIN THE BUILDING. A FILTER SHALL BE

USED TO CATCH DUST PARTICLES AND PREVENT DUST ACCUMULATION ON ROOF.

A. SEE SPECIFICATIONS FOR BADGING REQUIREMENTS.

B. NO MAJOR EQUIPMENT ACCESS THROUGH THE BUILDING BETWEEN 7 AM TO 5PM.

CONTRACTOR TO COORDINATE WITH COR.

C. ALL LOBBY-SIDE WORK THAT IS NOT CONTAINED WITHIN THE ICRA BARRIERS SHALL BE

COMPLETED DURING AFTER HOURS 4:00 PM TO 11:00 PM.

D. WHERE HOISTWAY DOORS ARE TO REMAIN REMOVED OR OPEN FOR AN EXTENDED PERIOD OF

TIME, PROVIDE RATED ICRA ENCLOSURE WITH MATCHING FIRE RATING, MAIN ACCESS -

GROUND FLOOR, COORDINATE WITH COR.

E. WHERE HOISTWAY DOORS ARE NOT REMAINING OPEN FOR AN EXTENDED PERIOD OF TIME,

PROVIDE NON-RATED ICRA ENCLOSURE. BASIS OF DESIGN, EDGEGUARD SYSTEM OR STARC.

SUBMITTAL REQUIRED.

F. HOISTWAY DOORS SHALL BE BARRICADED AT EACH LANDING WHEN HOISTWAY DOORS ARE

OPEN.

IF APPLICABLE:

A. HOT WORK PERMITS. HOT WORK PERMITS ARE ONLY VALID FOR A LENGTH OF ONE DAY.

PERMITS SHALL BE OBTAINED AT LEAST 24 HOURS PRIOR TO COMMENCEMENT OF WORK,

WHENEVER POSSIBLE. ORIGINAL PERMIT SHALL BE POSTED WHERE WORK IS BEING

PERFORMED; CONTRACTOR SHALL RETURN PERMIT TO SAFETY OFFICE WHEN WORK IS

COMPLETED.

B. FIRE WATCH. CONTRACTOR SHALL INITIAL, DATE AND TIME EVERY 30 MINUTES AFTER HOT

WORK HAS STARTED.

C. CONTRACTOR TO PROVIDE WARNING SIGNAGE AND DIRECTIONAL SIGNAGE THAT SHALL BE

POSTED IN CONSTRUCTION AREA WHILE WORK IS PERFORMED.

D. CONFINED SPACE. CONTRACTOR TO OBTAIN CONFINED SPACE PERMIT PRIOR TO ENTRY INTO

MECHANICAL CHASE. ENSURE IT IS APPROVED BY VA SAFETY DEPARTMENT AND COR.

GENERAL NOTES:

INFECTION CONTROL RISK ASSESSMENT NOTES:

INTERIM LIFE SAFETY MEASURES NOTES (ILSM):

ABBREVIATIONS

(E) EXISTING

(N) NEW

NIC NOT IN CONTRACT

ETS EXPOSED TO STRUCTURE

NTS NOT TO SCALE

SIM SIMILAR

BLDG BUILDING

PH PHONE

INC INCORPORATED

S SOUTH

DL DEAD LEG

GPM GALLONS PER MINUTE

OC ON CENTER

ICRA GENERAL NOTES:

COR CONTRACTING OFFICER REPRESENTATIVE

PAMNS PUBLIC ADDRESS MASS NOTIFICATION SYSTEM

IT INFORMATION TECHNOLOGY

FO FIBER OPTIC

SM SINGLE MODE

MM MULTIMODE

DR DRIVE

ST STREET

CMU CONCRETE MASONRY UNITS

EQ EQUAL

STL STAINLESS

NR NOT RATED

AFF ABOVE FINISHED FLOOR

QRS QUICK RELEASE SPRINKLER

A. * OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.

B. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE

CONSTRUCTION BEGINS.

C. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.

D. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY

THE COR'S SAFETY/ IP AND FACILITIES MANAGEMENT DEPARTMENT, AND AFTER

PROFESSIONAL CLEAN BY GENERAL CONTRACTOR.

E. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

F. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS. WET MOP AREA WITH DISINFECTANT.

G. COVER ALL RETURNS AND SUPPLY DUCTS AT THE GRATE/DIFFUSES WITH FILTER MEDIA OR

BLANK OFF ENTIRELY. RESTORE NORMAL HVAC OPERATION IN IMPACTED AREA AFTER

ENCLOSURE IS REMOVED.

H. KEEP CONSTRUCTION SITE CLEAN & NEAT AT ALL TIMES.

I. CONTRACTOR SHALL CLEAN THE CONSTRUCTION AREA, AND PREPARE FOR SAFETY AND

INFECTION CONTROL'S INSPECTION AND FINAL CLEANING BY VA ECM STAFF.

J. VA INFECTION CONTROL STAFF SHALL PERFORM FINAL VERIFICATION OF CLEANING AND

SANITATION.

43.1.1 CLASSIFICATION OF REHABILITATION WORK -

RENOVATION

43.4.2 CAPACITY OF MEANS OF EGRESS. THIS PROJECT

DOES NOT CHANGE OR ALTER EXISTING

OCCUPANT LOAD OR MEANS OF EGRESS. THE

EGRESS CAPACITY SHALL HAVE BEEN

PREVIOUSLY APPROVED AS BEING ADEQUATE.

NFPA 101 - CHAPTER 43

BUILDING REHABILITATION

2"

SEE SCHEDULE

2"

TYPE A TYPE 1

HARDWARE SET 1

MANUFACTURERS:

CORBIN RUSSWIN

McKINNEY

YALE

ROCKWOOD

PEMKO

CO

MK

YA

RO

PE

HARDWARE MANUFACTURER'S LISTED AS BASIS OF DESIGN.

ALTERNATE MANUFACTURERS ACCEPTABLE, SUBJECT TO

REVIEW BY ARCHITECT AND COR FOR EQUAL QUALITY

COMPLIANCE

LATCH SET TO SUPPORT YALE CORES

NOTE:

3 HINGES

1 LATCH SET

1 DOOR CLOSER

1 KICK PLATE

1 GASKETING

TA2714

VA SPEC F07

DC6210xA11

K1050F

S888 x HEAD & JAMBS

26D

32D

MK

YA

CO

RO

PE

TEMPORARY ICRA DOOR AND FRAME SCHEDULE

DOOR INFORMATION FRAME INFORMATION MISCELLANEOUS

NO.

D000

WIDTH

3'-0"

HEIGHT

7'-0"

THICK.

1 3/4"

TYPE

TYPE A

MAT'L

HM

TYPE

TYPE 1

MAT'L

GHM

DEPTH

5 1/4"

RATING

90 MIN.

HRDWR. REMARKS

SET 1 FIELD VERIFY HEAD CONDITION FOR FRAME HEIGHT AT HEAD

NOTE: DOOR AND FRAME SCHEDULE FOR RATED ICRA ENCLOSURES ONLY

A

A

OMIT PARTITION ABOVE

TOP DIVIDER BEAM

OMIT PARTITION BELOW

BOTTOM DIVIDER BEAM

EXISTING DIVIDER BEAM

J-RUNNER

J-RUNNER

1" GYP SHAFT LINER

2-1/2" CT STUD

SECTION A-A

EXIST CMU WALL

EXIST DIVIDER BEAM (BEYOND)

J-RUNNER

1" GYP SHAFT LINER

2-1/2" CT STUD

PLAN VIEW

1. Remove barrier material carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering unless solid lid.

4. Vacuum work area with HEPA filtered vacuums.

5. Wet mop area with disinfectant.

6. Remove or isolation of HVAC system in areas where work was being performed.

1. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.

2. Complete all critical barriers i.e. gypsum board assemblies, plywood, plastic, to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.

3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration unit.

4. Seal holes, pipes, conduits, and punctures appropriately.

5. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.

6. All personnel entering work site are required to wear shoe covers. Shoe covers shall be changed each time the worker exits the work area.

7. Do not remove barriers from work area until completed project is inspected by the owner's Safety Department and Infection Control Department and thoroughly cleaned by the owner's Environmental Services Department.

1. Do not remove barriers from work area until completed project is inspected by the owner's Safety Department and Infection Control Department and thoroughly cleaned by the owner's Environmental Services Department.

2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

3. Vacuum work area with HEPA filtered vacuums.

4. Wet mop area with disinfectant

5. Remove isolation of HVAC system in areas where work is being performed.

1. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

2. Complete all critical barriers i.e. gypsum board assemblies, plywood, plastic to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.

3. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units if indicated.

4. Contain construction waste before transport in tightly covered containers.

5. Cover transport receptacles or carts. Tape covers.

1. Provide active means to prevent airborne dust from dispersing into atmosphere.

2. Water mist work surfaces to control dust while cutting.

3. Seal unused doors with duct tape.

4. Block off and seal air vents.

5. Place dust mat at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.

6. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

1. Wipe work surfaces with disinfectant.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.

4. Remove isolation of HVAC system in areas where work is being performed.

1. Execute work by methods to minimize raising dust from construction operations.

2. Immediately replace a ceiling tile displaced for visual inspection.

Inspection and Non-Invasive Activities

Includes, but is not limited to:

- removal of ceiling tiles for visual inspection limited to 1 tile per 50 square feet

- painting (but not sanding)

- wall covering, electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection

Small scale, short duration activities which create minimal dust

Includes, but is not limited to:

- installation of telephone and computer cabling

- access to chase spaces

- cutting of walls or ceiling where dust migration can be controlled

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies

Includes, but is not limited to:

- sanding of walls for painting or wall covering

- removal of floor coverings, ceiling tiles and casework

- new wall construction

- minor duct work or electrical work above ceilings

- major cabling activities

- any activity which cannot be completed within a single work shift

Major demolition and construction projects

Includes, but is not limited to:

- activities which require consecutive work shifts

- requires heavy demolition or removal of a complete cabling system

- new construction

• Cardiology

• Echocardiography

• Endoscopy

• Nuclear Medicine

• Physical Therapy

• Radiology / MRI

• Respiratory Therapy

• CCU

• Emergency Room

• Labor & Delivery

• Laboratories (specimen)

• Newborn Nursery

• Outpatient Surgery

• Pediatrics

• Pharmacy

• Post Anesthesia Care Unit

• Surgical Units

• Any area caring for immunocompromised patients

• Burn Unit

• Cardiac Cath Lab

• Central Sterile Supply

• Intensive Care Units

• Medical Unit

• Negative pressure isolation rooms

• Oncology

• Operation rooms including C-section rooms

• Office Spaces

C L

A S

S I V

C L

A S

S I

II

C L

A S

S I I

C L

A S

S

I

PATIENT RISK GROUPS

LOW Risk Group

MEDIUM Risk Group

HIGH Risk Group

HIGHEST Risk Group

TYPE A TYPE B TYPE C TYPE D

I II II III/IV

I II III IV

I II III/IV IV

II III/IV I/IV IV

During Construction Project: Upon Completion of Project:

TYPE D

TYPE C

TYPE B

TYPE A

Group 1 Low Risk

Group 2 Medium Risk

Group 3 High Risk

Group 4 Highest Risk

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction Project any Patient Risk

Construction Project Type

Note: Infection Control approval shall be required when the Construction Activity and Risk Level indicated that Class III or Class IV Control procedures are necessary.

It's the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

Type of Construction Project activity (Type A-D)

INFECTION CONTROL RISK ASSESSMENT MATRIX OF PRECAUTIONS FOR

CONSTRUCTION AND RENOVATION

SEE ICRA CONDITION SCHEDULE PER ELEVATOR, PER FLOOR

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

JOHN D. DINGELL

VA MEDICAL

CENTER

35 % SCHEMATIC DESIGN SUBMISSION 1 12/23/2020

65% DESIGN DESIGN SUBMISSION 2 04/02/2021

65% DESIGN DEVELOPMENT RE-SUBMISSION3 05/28/2021

95% CONSTRUCTION DOCUMENTS SUBMISSION4 08/23/2021

BID DOCUMENTS5 02/16/2022

/2

/2

:4

:2

A

M

G-101

INFECTION CONTROL RISK

ASSESSMENT (ICRA)

3 11CDC

REPLACE/ADD PARKING

STRUCTURE ELEVATORS

VAMC DETROIT 4646 JOHN R. ST.

DETROIT, MI 48201

FEBRUARY 16, 2022

BID DOCUMENTS

553-19-10118-319

101 & 102

MJC

Scale: 1/2" = 1'-0"

ICRA ENCLOSURE CROSS SECTION

Scale: 3/4" = 1'-0"

ICRA TEMPORARY BARRIER WALL DETAIL

Scale: 3" = 1'-0"

ILSM SIGNAGE

ILSM TEMPORARY BARRIER TAG

Scale: 1/2" = 1'-0"

EXTERIOR ICRA ENCLOSURE ELEVATION

Scale: 1/2" = 1'-0"

TYPICAL ICRA RATED ENCLOSURE

Scale: 1 1/2" = 1'-0"

HOISTWAY SEPARATION WALL

1301078103

RENEE M.

CLARKE

DN

ELEVATOR

LOBBY

SP601

STAIR 01

SPS601

ELEVATOR

#1

E01

STAIR 02

S602

STAIR 03

S603

STAIR 04

S604

ELECTRICAL

SP604

DN

DN

DN

UP

SD-3

SD-EE

SD-A

SD-B

1 SD-2.7SD-1.6 SD-1.9 SD-2.3

SD-BB

SD-3.3 SD-3.6 SD-4

N

P.4

G-102

RESTRICT PUBLIC ACCESS

WITH BARRIER

RESTRICT PUBLIC ACCESS WITH

TEMPORARY CONSTRUCTION

FENCING AND SIGNAGE

CONSTRUCTION

LAYDOWN ZONE

TRAVEL DISTANCE = 99'-0"

T R

A V

E L D

IS

T

A N

C E

TRAVEL DISTANCE = 212-0"

T R

A V

E L D

IS

T

A N

C E

TRAVEL DISTANCE = 99'-0"

SD-2.1

G-102

SIM

SD-.9 SD-1 SD-2 SD-2.8

SD-DD

SD-EE

SD-AA

SD-A

SD-B

SD-A.9

1 SD-2.7SD-1.6 SD-1.9

SD-CC

SD-2.3

SD-BB

PROVIDE TEMPORARY

CONSTRUCTION DOOR &

LOCKING HARDWARE

SIGN, "EXIT TEMPORARILY

CLOSED, PLEASE USE

ALTERNATE MARKED EXITS

IN PARKING RAMP"

SD-2.1

ELEVATOR

LOBBY

SP601

STAIR #1

SPS601

ELEV

101-1

ELEV

101-2

FUTURE

ELEV

101-3

UNASSIGNED

SP602

SD-.9 SD-1 SD-2 SD-2.8

SD-DD

SD-EE

SD-AA

SD-A

SD-B

SD-A.9

1 SD-2.7SD-1.6 SD-1.9

SD-CC

SD-2.3

SD-BB

TEMPORARY CHAIN LINK FENCE

ENCLOSURE WITH LOCKABLE

GATE TO RESTRICT ACCESS

SIGN, "RESTRICTED.

CONSTRUCTION ACCESS ONLY"

SD-2.1

ELEVATOR

LOBBY

SP501

ELEV

101-2

ELEV

101-1

FUTURE

ELEV

101-3

UNASSIGNED

STAIR #1

4" MAX.

EGRESS PATH

EGRESS PATH TAG

EGRESS PATH TAG - COMMON PATH

EGRESS IDENTIFICATION

AREA OF REFUGE

HAZARDOUS LOCATION

FIRE EXTINGUISHER BRACKET

FIRE EXTINGUISHER CABINET

FIRE BLANKET CABINET

EMERGENCY RESPONSE REFERENCE

CONTROLLED ACCESS - ALWAYS

UNLOCKED IN DIRECTION OF EGRESS

DELAYED EGRESS W/ ALARM

EXISTING EXIT (LEVEL 1 ONLY)

EXISTING EXIT (TYPICAL ALL LEVELS)

CA

DE

XXX

XXX

FEB

FEC

FBC

CAPACITYCLR

EXTERIOR

EXIT

XX" ###

EXIT

IDENTIFICATION

EGRESS CLEAR

WIDTH

EGRESS

CAPACITY

1. TWO ELEVATORS SHALL REMAIN IN-SERVICE AT

ALL TIMES.

2. REFER TO SHEET G-101 FOR ICRA

REQUIREMENTS, DETAILS, AND SCHEDULES.

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

JOHN D. DINGELL

VA MEDICAL

CENTER

35 % SCHEMATIC DESIGN SUBMISSION 1 12/23/2020

65% DESIGN DESIGN SUBMISSION 2 04/02/2021

65% DESIGN DEVELOPMENT RE-SUBMISSION3 05/28/2021

95% CONSTRUCTION DOCUMENTS SUBMISSION4 08/23/2021

BID DOCUMENTS5 02/16/2022

/2

/2

:4

:3

A

M

G-102

INFECTION CONTROL RISK

ASSESSMENT (ICRA) PHASE ONE

PLANS

4 11CDC

REPLACE/ADD PARKING

STRUCTURE ELEVATORS

VAMC DETROIT 4646 JOHN R. ST.

DETROIT, MI 48201

FEBRUARY 16, 2022

BID DOCUMENTS

553-19-10118-319

101 & 102

MJC

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

BLUE

RED

Scale: 1/16" = 1'-0"

LEVEL 5 ICRA PHASE ONE PLAN - BLDG 101 (BLDG 102 OPP)

Scale: 3/16" = 1'-0"

ENGLARGED LEVEL 5 ICRA PHASE ONE PLAN - BLDG 101 (BLDG 102 OPP)

N O

R T H

0 8 16 32

N O

R T H

0 42 8

Scale: 3/16" = 1'-0"

ENLARGED LEVEL 4 ICRA PHASE 1 PLAN - BLDG 101 (BLDG 102 OPP)

N O

R T H

0 42 8

1301078103

RENEE M.

CLARKE

UP

ND-A

31ND-.9ND-1ND-2 ND-1.6ND-1.9 ND-1.8ND-2.3ND-2.8 ND-2.7

ND-B

ND-AA

ND-BB

ND-CC

ND-DD

ND-A.9

ELEV

102-3

ELEV

102-2

FUTURE

ELEVATOR

102-1

STAIR #1

NPS301

ELEVATOR

LOBBY

NP301

UNASSIGNED

NP302

D000

FROM OBSTRUCTIONS

6'-0" MIN. CLEAR

G-101

DEDUCT ALTERNATE1

1. TWO ELEVATORS SHALL REMAIN IN-SERVICE AT

ALL TIMES.

2. REFER TO SHEET G-101 FOR ICRA

REQUIREMENTS, DETAILS, AND SCHEDULES.

SD-.9 SD-1 SD-2 SD-2.8

SD-DD

SD-EE

SD-AA

SD-A

SD-B

SD-A.9

1 SD-2.7SD-1.6 SD-1.9

SD-CC

SD-2.3

STAIR #1

SPS301

UNASSIGNED

SP302

ELEV

101-1

ELEV

101-2

FUTURE

ELEV

101-3

SD-BB

D000

FROM OBSTRUCTIONS

6'-0" MIN. CLEAR

G-101

DEDUCT ALTERNATE2

SD-2.1

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

JOHN D. DINGELL

VA MEDICAL

CENTER

35 % SCHEMATIC DESIGN SUBMISSION 1 12/23/2020

65% DESIGN DESIGN SUBMISSION 2 04/02/2021

65% DESIGN DEVELOPMENT RE-SUBMISSION3 05/28/2021

95% CONSTRUCTION DOCUMENTS SUBMISSION4 08/23/2021

BID DOCUMENTS5 02/16/2022

/2

/2

:4

:3

A

M

G-103

INFECTION CONTROL RISK

ASSESSMENT (ICRA) PHASE TWO

PLANS

5 11CDC

REPLACE/ADD PARKING

STRUCTURE ELEVATORS

VAMC DETROIT 4646 JOHN R. ST.

DETROIT, MI 48201

FEBRUARY 16, 2022

BID DOCUMENTS

553-19-10118-319

101 & 102

MJC

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

BLUE

RED

Scale: 1/4" = 1'-0"

TYPICAL FLOOR ICRA PHASE TWO PLAN - BLDG 102

Scale: 1/4" = 1'-0"

TYPICAL FLOOR ICRA PHASE TWO PLAN - BLDG 101

N O

R T H

0 2 4 8

N O

R T H

0 2 4 8

1 CONSTRUCT TEMPORARY FIRE/SMOKE

BARRIER - SEE SHEET G-101

2 BUILD WALLS BETWEEN ALL DIVIDER BEAMS

AT ALL FLOORS, LEAVE TOP AND BOTTOM OF

PIT OPEN

3 CLEAR FLOOR SPACE, CLEAR WIDTH OF

DOOR OPENING

4 RELOCATE EXISTING PARKING LEVEL

REMINDER SIGN

5 EXISTING CALL BUTTONS, OUTSIDE OF

BARRIER

(ALL FLOORS) (ALL FLOORS)

1301078103

RENEE M.

CLARKE

ND-A

31ND-.9ND-1ND-2 ND-1.6ND-1.9 ND-1.8ND-2.3ND-2.8 ND-2.7

ND-B

ND-AA

ND-BB

ND-CC

ND-DD

ND-A.9

ELEVATOR

LOBBY

NP301

STAIR #1

NPS301

UNASSIGNED

NP302

ELEV

102-3

ELEV

102-2

FUTURE

ELEVATOR

102-1

D000

FROM OBSTRUCTIONS

6'-0" MIN. CLEAR

G-101

DEDUCT ALTERNATE1

A-402 35

SD-.9 SD-1 SD-2 SD-2.8

SD-DD

SD-EE

SD-AA

SD-A

SD-B

SD-A.9

1 SD-2.7SD-1.6 SD-1.9

SD-CC

SD-2.3

STAIR #1

SPS301

UNASSIGNED

SP302

ELEV

101-1

ELEV

101-2

FUTURE

ELEV

101-3

SD-BB

D000

FROM OBSTRUCTIONS

6'-0" MIN. CLEAR

G-101

DEDUCT ALTERNATE2

SD-2.1

1. TWO ELEVATORS SHALL REMAIN IN-SERVICE AT

ALL TIMES.

2. REFER TO SHEET G-101 FOR ICRA

REQUIREMENTS, DETAILS, AND SCHEDULES.

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

JOHN D. DINGELL

VA MEDICAL

CENTER

35 % SCHEMATIC DESIGN SUBMISSION 1 12/23/2020

65% DESIGN DESIGN SUBMISSION 2 04/02/2021

65% DESIGN DEVELOPMENT RE-SUBMISSION3 05/28/2021

95% CONSTRUCTION DOCUMENTS SUBMISSION4 08/23/2021

BID DOCUMENTS5 02/16/2022

/2

/2

:4

:3

A

M

G-104

INFECTION CONTROL RISK

ASSESSMENT (ICRA) PHASE THREE

PLANS

6 11CDC

REPLACE/ADD PARKING

STRUCTURE ELEVATORS

VAMC DETROIT 4646 JOHN R. ST.

DETROIT, MI 48201

FEBRUARY 16, 2022

BID DOCUMENTS

553-19-10118-319

101 & 102

MJC

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

BLUE

RED

Scale: 1/4" = 1'-0"

TYPICAL FLOOR ICRA PHASE THREE PLAN - BLDG 102

Scale: 1/4" = 1'-0"

TYPICAL FLOOR ICRA PHASE THREE PLAN - BLDG 101

1 CONSTRUCT TEMPORARY FIRE/SMOKE

BARRIER - SEE SHEET G-101

2 EXISTING CALL BUTTONS, OUTSIDE OF

BARRIER

3 NEW CALL BUTTONS, OUTSIDE OF BARRIER

4 BUILD WALLS BETWEEN ALL DIVIDER BEAMS

AT ALL FLOORS, LEAVE TOP AND BOTTOM OF

PIT OPEN

5 HOISTWAY DIVIDER WALL FROM PREVIOUS

PHASE TO REMAIN

6 RE-INSTALL EXISTING PARKING LEVEL

REMINDER SIGN IN EXISTING LOCATION

7 TEMPORARY PARKING LEVEL REMINDER

SIGN, MATCH EXISTING

8 TEMPORARY SIGN, "ADDITIONAL ELEVATOR

LOCATED ON OPPOSITE SIDE OF

CONSTRUCTION ENCLOSURE"

N O

R T H

0 2 4 8

N O

R T H

0 2 4 8(ALL FLOORS) (ALL FLOORS)

1301078103

RENEE M.

CLARKE

SD-.9 SD-1 SD-2 SD-2.8

SD-DD

SD-EE

SD-AA

SD-A

SD-B

SD-A.9

1 SD-2.7SD-1.6 SD-1.9

SD-CC

SD-2.3

STAIR #1

SPS301

UNASSIGNED

SP302

ELEV

101-1

ELEV

101-2

FUTURE

ELEV

101-3

SD-BB

DEDUCT ALTERNATE2

D000

FROM OBSTRUCTIONS

6'-0" MIN. CLEAR 3

SD-2.1

ND-A

31ND-.9ND-1ND-2 ND-1.6ND-1.9 ND-1.8ND-2.3ND-2.8 ND-2.7

ND-B

ND-AA

ND-BB

ND-CC

ND-DD

ND-A.9

ELEVATOR

LOBBY

NP301

STAIR #1

NPS301

UNASSIGNED

NP302

ELEV

102-3

ELEV

102-2

FUTURE

ELEVATOR

102-1

DEDUCT ALTERNATE1

D000

FROM OBSTRUCTIONS

6'-0" MIN. CLEAR

A-402 35

1. TWO ELEVATORS SHALL REMAIN IN-SERVICE AT

ALL TIMES.

2. REFER TO SHEET G-101 FOR ICRA

REQUIREMENTS, DETAILS, AND SCHEDULES.

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

JOHN D. DINGELL

VA MEDICAL

CENTER

35 % SCHEMATIC DESIGN SUBMISSION 1 12/23/2020

65% DESIGN DESIGN SUBMISSION 2 04/02/2021

65% DESIGN DEVELOPMENT RE-SUBMISSION3 05/28/2021

95% CONSTRUCTION DOCUMENTS SUBMISSION4 08/23/2021

BID DOCUMENTS5 02/16/2022

/2

/2

:4

:3

A

M

G-105

INFECTION CONTROL RISK

ASSESSMENT (ICRA) PHASE FOUR

PLANS

7 11CDC

REPLACE/ADD PARKING

STRUCTURE ELEVATORS

VAMC DETROIT 4646 JOHN R. ST.

DETROIT, MI 48201

FEBRUARY 16, 2022

BID DOCUMENTS

553-19-10118-319

101 & 102

MJC

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

BLUE

RED

Scale: 1/4" = 1'-0"

TYPICAL FLOOR ICRA PHASE FOUR PLAN - BLDG 101

Scale: 1/4" = 1'-0"

TYPICAL FLOOR ICRA PHASE FOUR PLAN - BLDG 102

1 CONSTRUCT TEMPORARY FIRE/SMOKE

BARRIER - SEE SHEET G-101

2 NEW CALL BUTTONS FROM PHASE 2

3 HOISTWAY DIVIDER WALLS TO REMAIN

PERMANENTLY

4 EXISTING PULLS AND SWITCHES

N O

R T H

0 2 4 8

N O

R T H

0 2 4 8(ALL FLOORS) (ALL FLOORS)

1301078103

RENEE M.

CLARKE

ELEVATOR

#3

E03

ELEVATOR

#2

E02

ELEVATOR

#1

E01

STAIR 02

S202

STAIR 03

S203

STAIR 04

S204

UP

UP

UP

DN

UP

DN

SD-1 SD-2 SD-3

SD-A

SD-B

1 SD-2.3

SD-BB

SD-FF

SD-3.3 SD-3.6 SD-4

O V

E R

A

LL

D

IA

G O

N A

L

'-1

/4

/3 O

V E

R A

L L

D

IA

G O

N A

L

T R

A V

E L D

IS

T

A N

C E

T R

A V

E L D

IS

T

A N

C E

TRAVEL DISTANCE = 211'-9"

T R

A V

E L D

IS

T

A N

C E

N

P.4

SD-2.1

EGRESS PATH

EGRESS PATH TAG

EGRESS PATH TAG - COMMON PATH

EGRESS IDENTIFICATION

AREA OF REFUGE

HAZARDOUS LOCATION

FIRE EXTINGUISHER BRACKET

FIRE EXTINGUISHER CABINET

FIRE BLANKET CABINET

EMERGENCY RESPONSE REFERENCE

CONTROLLED ACCESS - ALWAYS

UNLOCKED IN DIRECTION OF EGRESS

DELAYED EGRESS W/ ALARM

EXISTING EXIT (LEVEL 1 ONLY)

EXISTING EXIT (TYPICAL ALL LEVELS)

CA

DE

XXX

XXX

FEB

FEC

FBC

CAPACITYCLR

EXTERIOR

EXIT

XX" ###

EXIT

IDENTIFICATION

EGRESS CLEAR

WIDTH

EGRESS

CAPACITY

A. SEE SHEETS G-100 & A-001 FOR SYMBOLS AND

ABBREVIATIONS.

B. SEE STRUCTURAL DRAWINGS FOR FRAMING

INFORMATION AND DIMENSIONS. ALL DIMENSIONS

ARE FOR REFERENCE ONLY - VERIFY ALL FRAMING

WITH STRUCTURAL DRAWINGS.

C. REFER TO PLUMBING DRAWINGS FOR

INFORMATION CONCERNING PLUMBING SYSTEM(S).

D. REFER TO MECHANICAL DRAWINGS FOR

INFORMATION CONCERNING MECHANICAL

SYSTEM(S).

E. REFER TO ELECTRICAL DRAWINGS FOR

INFORMATION CONCERNING POWER, LIGHTING AND

COMMUNICATION SYSTEM(S).

F. CONTRACTOR TO PROVIDE ALL ADDITIONAL

FRAMING NECESSARY FOR ALL OPENINGS AND

SUPPLEMENTAL FRAMING ABOVE PARTITIONS.

G. EXTEND ANY FIRE RATED PARTITIONS, BARRIERS,

AND OTHER SEPARATIONS TO BOTTOM OF

ROOF/FLOOR DECK ABOVE (OR AS DIRECTED BY UL

ASSEMBLY) AND TO EXTERIOR WALL. SEAL JOINT

BETWEEN EDGES OF PARTITION WITH FIRE RATED

SEALANT AND/OR INTUMESCENT ASSEMBLY.

H. ANY PENETRATIONS OF FIRE-RATED ASSEMBLIES

SHALL BE FIRE-SEALED IN ACCORDANCE WITH

APPROVED MANUFACTURER'S DETAIL FOR

LOCATION, TYPE OF CONSTRUCTION, PENETRATING

ITEM AND RATING REQUIRED.

I. ANY DUCTWORK, DIFFUSERS AND GRILLES

PENETRATING FIRE-RATED WALLS, CEILINGS AND

FLOORS SHALL HAVE THE APPROPRIATE TYPE OF

FIRE/SMOKE DAMPER IN ACCORDANCE WITH THE

TYPE OF CONSTRUCTION BEING PENETRATED AND

THE FIRE/SMOKE RATING REQUIRED.

J. ANY LIGHT FIXTURES AND ELECTRICAL DEVICES

PENETRATING FIRE-RATED ASSEMBLIES SHALL BE

UL-LISTED FOR INSTALLATION IN THE ASSEMBLY OR

SHALL BE INSTALLED SUCH THAT THE FIRE-RATING

IS NOT COMPROMISED.

K. SMOKE RESISTANT CONSTRUCTION SHALL MEET

THE REQUIREMENTS OF ALL APPLICABLE CODES.

AREA SHALL BE SEPARATED FROM THE REMAINDER

OF THE BUILDING BE CONSTRUCTION CAPABLE OF

RESISTING THE PASSAGE OF SMOKE. THE

PARTITIONS SHALL EXTEND FROM THE FLOOR TO

THE UNDERSIDE OF THE FLOOR OR ROOF

ASSEMBLY ABOVE. DOORS SHALL BE SELF OR

AUTOMATIC CLOSING. DOORS SHALL NOT HAVE AIR

TRANSFER OPENINGS AND SHALL NOT BE

UNDERCUT IN EXCESS OF CLEARANCE PERMITTED

WITH ACCORDANCE TO NFPA 80.

L. STORAGE OF ANY FLAMMABLE OR COMBUSTIBLE

LIQUIDS IS UNDERSTOOD TO NOT BE WITHIN THE

BUILDING. STORAGE OF ANY MATERIAL SHALL BE

IN COMPLIANCE WITH ALL APPLICABLE CODES AND

AUTHORITIES HAVING JURISDICTION.

SD-.9 SD-1 SD-2 SD-2.8

SD-DD

SD-EE

SD-AA

SD-A

SD-B

SD-A.9

1 SD-2.7SD-1.6 SD-1.9

SD-CC

SD-2.3

SD-BB

STAIR #1

SPS701

ELEV

MACHINE

ROOM

SP701

T R

A V

E L D

IS

T

A N

C E

ELEVATOR

MACHINE

ELEVATOR

MACHINE

ELEVATOR

MACHINE

C O

N T

R O

L S

C O

N T

R O

L S

C O

N T

R O

L S

SD-2.1

AREA AND HEIGHT REQUIREMENTS:

AGGREGATE FLOOR AREAS (per TABLE 503):

FLOOR EXISTING NEW TOTAL

FIRST

SECOND

THIRD

FOURTH

FIFTH

PENTHOUSE

53,447 SF

53,447 SF

53,447 SF

53,447 SF

53,447 SF

327 SF

0 SF

0 SF

0 SF

0 SF

0 SF

276 SF

AREA ALLOWED = 53,447 SF Per Story

AREA TOTAL = 53,447 SF

ALLOWABLE HEIGHT = 160 FEET

BUILDING HEIGHT = 86'-2"

ALLOWABLE NO. OF STORIES = 6

EGRESS INFORMATION

GROSS BUILDING AREA

(OUTSIDE FACE WALLS)

GROSS MEASURED AREA

(INTERIOR FACE WALLS)

OCCUPANT LOAD

(per IBC TABLE 1004.1)

EGRESS WIDTH

(per IBC 1005.1)

59,835 SF

58,248 SF

1ST = 53,447/200 = 267 PPL

200 SF/OCC.

2ND = 53,447/200 = 267 PPL

200 SF/OCC.

3RD = 53,447/200 = 267 PPL

200 SF/OCC.

5TH = 53,447/200 = 267 PPL

200 SF/OCC.

PH = 603/200 = 3 PPL

200 SF/OCC.

4TH = 53,447/200 = 267 PPL

200 SF/OCC.

EXIT DOORS = 35' (0.20) =

175 PPL

COMMON PATH OF

TRAVEL

(per IBC Chapter 10)

75' (W/O SF.)

EXIT ACCESS TRAVEL

(per IBC TABLE 1016.1)

300'-0" MAXIMUM

DISTANCE, WITH 1017.2.2

EXCEPTIONS

DEAD-END CORRIDOR

(per IBC Table 1020.4)

50'-0" MAXIMUM

1 EXIT REQUIRED IF

UNDER 49 TOTAL

OCCUPANTS

REQUIRED #OF EXITS

(per IBC Table 1018.2)

200'-0" MAXIMUMREQUIRED DISTANCE

BETWEEN EXITS

(pre IBC Table 1029.7)

CALCULATED AREA FOR EGRESS TABLE

BUILDING 101

53,447 SF

53,447 SF

53,447 SF

53,447 SF

53,447 SF

603 SF

(EXCLUDE VERTICAL

CHASES INCLUDING

STAIRS)

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

JOHN D. DINGELL

VA MEDICAL

CENTER

35 % SCHEMATIC DESIGN SUBMISSION 1 12/23/2020

65% DESIGN DESIGN SUBMISSION 2 04/02/2021

65% DESIGN DEVELOPMENT RE-SUBMISSION3 05/28/2021

95% CONSTRUCTION DOCUMENTS SUBMISSION4 08/23/2021

BID DOCUMENTS5 02/16/2022

/2

/2

:4

:4

A

M

GL101

LIFE SAFETY PLANS - BUILDING 101

8 11DGC

REPLACE/ADD PARKING

STRUCTURE ELEVATORS

VAMC DETROIT 4646 JOHN R. ST.

DETROIT, MI 48201

FEBRUARY 16, 2022

BID DOCUMENTS

553-19-10118-319

101 & 102

LCW

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

BLUE

RED

Scale: 1/16" = 1'-0"

FIRST LEVEL LIFE SAFETY PLAN (OTHER FLOORS SIMILAR) - BLDG 101

N O

R T H

0 8 16 32

Scale: 1/4" = 1'-0"

NEW PENTHOUSE FLOOR PLAN - BDLG 101

N O

R T H

0 2 4 8

1 NEW FIRE EXTINGUISHER BRACKET WITH

SENSOR - SEE SPEC

PROPOSED USE:

OWNED BY: FEDERAL GOVERNMENT

CODE ENFORCEMENT JURISDICTION: FEDERAL

GOVERNMENT

APPLICABLE CODES:

GENERAL CODE INFORMATION:

RENOVATION (EXISTING BUILDING - LOBBY AND

PENTHOUSE ONLY)

CONSTRUCTION TYPE:

PRIMARY OCCUPANCY:

SECONDARY OCCUPANCY:

PROJECT NAME:

PROJECT ADDRESS:

OWNER OR AGENT:

NON-SPRINKLERED STANDPIPE PROTECTED

PARKING STRUCTURE

Parking Garage: Type IB, Lobby:

Type IIB

Warehouse-Storage S-2 (Public Parking Garage)

None

2021 International Building Code

2018 International Mechanical Code

2018 ADA Code

2017 NFPA 70 National Electrical Code

2021 NFPA 101 Life Safety Code

VA Design Guide Architectural Manual 2014 August 01 2018 NFPA 101 Life Safety Code

2015 Archtitecture Barriers Act

REPLACE/ADD PARKING STRUCTURE

ELEVATORS

VAMC DETROIT 4646 JOHN R. ST.

DETROIT, MI 48201

DEPARTMENT OF VETERANS

AFFAIRS

CODE INFORMATION

1301078103

RENEE M.

CLARKE

ELEVATOR

#3

E03

ELEVATOR

#2

E02

FUTURE

ELEVATOR

E01

STAIR 04

S204

STAIR 03

S203

STAIR 02

S202

UP

UP

UP

UP

ND-A

31ND-1ND-2ND-3ND-4ND-6

ND-B

M

ND-3.3ND-3.6

2' 8 1/4"

1/3 O

V E

R A

LL D

IA

G O

N A

L

O V

E R

A L L D

IM

E

N S

IO

N

T R

A V

E L D

IS

T

A N

C E

T R

A V

E L D

IS

T

A N

C E

TRAVEL DISTANCE = 211'-9"

T R

A V

E L D

IS

T

A N

C E

A. SEE SHEETS G-100 & A-001 FOR SYMBOLS AND

ABBREVIATIONS.

B. SEE STRUCTURAL DRAWINGS FOR FRAMING

INFORMATION AND DIMENSIONS. ALL DIMENSIONS

ARE FOR REFERENCE ONLY - VERIFY ALL FRAMING

WITH STRUCTURAL DRAWINGS.

C. REFER TO PLUMBING DRAWINGS FOR

INFORMATION CONCERNING PLUMBING SYSTEM(S).

D. REFER TO MECHANICAL DRAWINGS FOR

INFORMATION CONCERNING MECHANICAL

SYSTEM(S).

E. REFER TO ELECTRICAL DRAWINGS FOR

INFORMATION CONCERNING POWER, LIGHTING AND

COMMUNICATION SYSTEM(S).

F. CONTRACTOR TO PROVIDE ALL ADDITIONAL

FRAMING NECESSARY FOR ALL OPENINGS AND

SUPPLEMENTAL FRAMING ABOVE PARTITIONS.

G. EXTEND ANY FIRE RATED PARTITIONS, BARRIERS,

AND OTHER SEPARATIONS TO BOTTOM OF

ROOF/FLOOR DECK ABOVE (OR AS DIRECTED BY UL

ASSEMBLY) AND TO EXTERIOR WALL. SEAL JOINT

BETWEEN EDGES OF PARTITION WITH FIRE RATED

SEALANT AND/OR INTUMESCENT ASSEMBLY.

H. ANY PENETRATIONS OF FIRE-RATED ASSEMBLIES

SHALL BE FIRE-SEALED IN ACCORDANCE WITH

APPROVED MANUFACTURER'S DETAIL FOR

LOCATION, TYPE OF CONSTRUCTION, PENETRATING

ITEM AND RATING REQUIRED.

I. ANY DUCTWORK, DIFFUSERS AND GRILLES

PENETRATING FIRE-RATED WALLS, CEILINGS AND

FLOORS SHALL HAVE THE APPROPRIATE TYPE OF

FIRE/SMOKE DAMPER IN ACCORDANCE WITH THE

TYPE OF CONSTRUCTION BEING PENETRATED AND

THE FIRE/SMOKE RATING REQUIRED.

J. ANY LIGHT FIXTURES AND ELECTRICAL DEVICES

PENETRATING FIRE-RATED ASSEMBLIES SHALL BE

UL-LISTED…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .