Z1DA--Replace Parking Structures Elevators 553-19-101 Federal contract opportunity
Solicitation number
36C25022B0071
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document contains a federal contract opportunity announcement and related pre-solicitation file. The Department of Veterans Affairs intends to issue an invitation for bid to replace parking structure elevators at the John D. Dingell VA Medical Center in Detroit, Michigan. The project scope includes furnishing all labor, materials, equipment, and supervision to complete elevator modernization in compliance with applicable codes. The estimated cost range is $5-10 million. The NAICS code is 238990 and the small business size standard is $16.5 million. The acquisition is reserved for qualified Service-Disabled Veteran Owned Small Businesses. The eventual contract will be a firm-fixed-price award. The pre-solicitation notice instructs interested offerors to monitor the System for Award Management website for issuance of the solicitation on or around September 9, 2022, which will include further details and dates.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Replace Parking Structures Elevators 553-19-101, newest first.
File Type Posted
C08 - Revised Notice of Award- 553-19-101 - signed.pdf PDF
C08 Notice of Award - 553-19-101 - KO Signed.pdf PDF
S06 OA intake hood attached to the stanchions.pdf PDF
S06 Sump Pump location.pdf PDF
S06 36C25022B0071 0004.pdf PDF
S06 Specification14 21 10 Modern. Traction Elev.pdf PDF
S06 Addendum1.pdf PDF
S06 FA001 Drawing.pdf PDF
S06 36C25022B0071 0003 - 553-19-101.pdf PDF
S06 36C25022B0071 0002.pdf PDF
S06 Pre-Bid Site Visit Attendance Log 553-19-101.pdf PDF
S06 - Pre-Bid Site Visit Agenda - 553-19-101.pdf PDF
S06 J-A - Yale door locks and latch sets - 553-19-101 - KO Signed.pdf PDF
S06 J-A - Siemens HVAC and BMS Components - 553-19-01 - KO Signed.pdf PDF
S06 36C25022B0071 0001 - 553-19-101.pdf PDF
S06 J-A - Simplex Fire Protection System - 553-19-101 - KO Signed.pdf PDF
S06 J-A - Siemens Electrical Systems Components - 553-19-101 - KO Signed.pdf PDF
S06 J-A - Security 2000 card readers - 553-19-101 - KO Signed.pdf PDF
S06 J-A - Hilti Firestopping system - 553-19-101 - KO Signed.pdf PDF
S06 J-A - En-Gauge Fire Extinguisher Monitoring system - 553-19-101 - KO Signed.pdf PDF
S02 Contractor EMR Certification Form - 553-19-101.docx DOCX document
S02 Drawings 1 of 2 - 553-19-101.pdf PDF
S02 36C25022B0071_1 - 553-19-101.pdf PDF
S02 RFI Form - 553-19-101.doc DOC document
S02 Wage Determination - MI20220101 - 09-16-22 - 553-19-101.pdf PDF
S02 Drawings 2 of 2 - 553-19-101.pdf PDF
S02 Project Specifications - 553-19-101.pdf PDF
36C25022B0071.docx DOCX document
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25022B0071 0005 – Replace Parking Structure Elevators – 553-19-101 – VAMC Detroit, MI

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 5

12-12-2022

553-23-1-3508-0003

553-19-101

Department of Veterans Affairs

Network Contracting Office (NCO) 10

24 Frank Lloyd Wright Dr.

Lobby M, Suite M2200

Ann Arbor MI 48105

Same as Block 6

To all Offerors/Bidders

36C25022B0071

12-12-2022

X

X X

Date and Hour of Receipt of Offers is December 15, 2022 at 1:00 PM EDT

The purpose of this Amendment is to:

1. Extend the Date and Hour of Receipt of Offers to Thursday December 15, 2022 at 1:00 PM

2. Provide answers to additional RFI Questions

End of Amendment 0005

RICHMOND MCCLOUD

Contract Specialist

SF 30 CONTINUATION PAGE 36C25022B0071

AMENDMENT 0005

THE FOLLOWING ANSWERS TO REQUESTS FOR INFORMATION QUESTIONS ARE HEREBY

PROVIDED TO CLARIFY, UPDATE, REVISE, OR CORRECT CONTRACT SPECIFICATIONS AND/OR

DRAWINGS.

QUESTION AND ANSWER 1

Q1: We note that there are two (2) alternates to be quoted. Please issue an alternate proposal form indicating the list of deductive proposals and how they are to be quoted. We assume that there will be three (3) total prices to be quoted in the order of the deductive alternates to be considered if the budget is exceeded.

A2: There are NOT two (2) alternates to be quoted. Page 1 of the Solicitation states as follows:

The drawings and specifications for this project may contain references to deducted work. All references to deducted work are to be ignored.

QUESTION AND ANSWER 2

Q2: We note that there is a Signage specification, but we cannot find a signage schedule on the drawings. What new signage is required as part of this project?

A2: See detail 12/A-401 for the required signage.

QUESTION AND ANSWER 3

Q3: Is the only Fire Suppression Work the Stand-Pipe Extensions shown on the drawings.?

A3: Yes, the only Fire Protection SOW associated with this project concerns the extension of the standpipe as shown on the drawing.

QUESTION AND ANSWER 4

Q4: Keynote #1 on drawing P-101 indicates to utilize the existing sump for the new sump pump installation. The elevator pit was not accessible during the pre-bid site walk to verify the existing sump size. The new pump will need to pump 150 GPM making it a sizable pump, or (2) pumps at 75 GPM will need to be installed requiring an additional sump. Also, no sump pump schedule was found. Please provide the size of the existing sump Please provide a schedule for the sump pump or make, model if preferred.?

A4: The new sump pump(s) need to have the capacity to remove 50 GPM per elevator car. A single, 150 GPM pump can be used if the sump pit is continuous across the full elevator shaft (3 elevator cars). If the sump is not continuous across the elevator shaft, then multiple sump pumps shall be installed to meet the ASME A17.1 requirement (50 GPM per elevator car). The sump pump schedule is provided on P-001.

QUESTION AND ANSWER 5

Q5: Spec. section 22 14 29 - 4 - 2.1 – H calls for a control to be installed to prevent oil from being pumped. The new elevators are friction type. Please confirm if an oil control is still required for this application.

A5: No, the oil sensing/control is not required for these traction elevators.

QUESTION AND ANSWER 6

Q6: Keynote #1 on drawing PD111 indicates the removal of (2) sump pumps, motors, and related piping. During the pre-bid site walk, there were no sump pumps observed in this area. Should key not #1 be referencing the (2) hydraulic oil pumps serving the elevators? If this is the case, whose scope does the demolition fall under and to what extent, cut/cap, cut/cap/drop to floor, or full demolition to dumpster?

A6: There are (2) existing sump pumps serving the lower level near the Red Elevators shaft (see attached photo). The Plumbing Contractor is responsible for demolition of this existing equipment, per the construction documents. The Electrical Contractor shall coordinate their work with the Plumbing Contractor.

QUESTION AND ANSWER 7

Q7: Keynote #2 on M-103 and Keynote #1 on M-113 call for new sheet metal installed atop existing hood support stanchions. Can a detail be provided for this note as the intent is unclear?

A7: Please reference the attached photo taken within the existing 5th floor lobby for the Blue Elevators (Bldg. 101). The image shows the existing OA intake hood attached to the stanchions above the roof opening. The VA would like the sheet metal to block the view of the new intake hoods. Please paint with flat black finish.

QUESTION AND ANSWER 8

Q8: Keynote #1 on MD113 calls for wire mesh screen to be installed over the (2) intake openings after removal of the existing hoods. Please clarify if this screen is to be rated for fall protection.

A8: Yes, to prevent personnel from fall injury during demolition/construction, this wire mesh/fencing shall be rated for fall protection.

QUESTION AND ANSWER 9

Q9: Regarding the cab interior decoration can we get clarification on what exact finish is being specified when the drawings say SS-1 (solid surface material) and RP-1 (decorative resin material)?

A9: Forms and Surfaces are our basis of design, Solid surface is Wislonart and RFP-1 is back painted glass panel

QUESTION AND ANSWER 10

Q10: We can provide an alternate type of elevator – machine room less gearless traction elevators – where the hoisting machine is contained inside of the hoist way (mounted to a guide rail) and the new controllers can be located inside of the existing hydraulic elevator machine room. Is this an acceptable alternate?

- This type of equipment would eliminate the need for an overhead machine room.

- The elevators could be rated for speeds of 350 FPM if the pits are deepened to 5’-6” or 200 FPM if the existing 5’-0” deep pits are kept.

- All units would be rated for 3500# capacity.

- Existing entrances for the existing elevators can be retained and reused

A10: MBA recognizes that MRL type elevator would be an alternate approach to achieving this project, however the VA Design guidelines do not allow the installation of MRL's in their manual.

Provide overhead traction elevators as specified and designed. See below from Design Guideline: PG 18-10 – ELEVATOR DESIGN MANUAL October 1, 2022

1. GENERAL REQUIREMENTS

A. An elevator machine room shall be provided for each individual elevator or group of elevators.

The elevator drive machine and elevator controller shall be in the same code approved machine room.

I. Traction elevators: Overhead geared or gearless traction machines for elevators in buildings with a minimum rise of 12.2 m (40 ft) or more. The placing of traction machines in basement machine rooms or in machine rooms adjacent to the hoist way shall be limited to conditions that do not accommodate the installation of overhead machines. Utilize minimum .50"x8x19 or .50"x8x25 preformed traction steel hoist ropes or metric equivalent.

A.1 ADDITIONAL ATTACHMENTS

See attached document: S06 Sump Pump location.

See attached document: S06 OA intake hood attached to the stanchions.