This file provides details on a cancelled federal contract opportunity for construction services. The Solicitation Number 36C77623B0049 was issued by the Department of Veterans Affairs Technology Acquisition Center Austin for a parking expansion project at the Joliet Community Based Outpatient Clinic. The opportunity was for construction work to expand parking capacity at the Joliet CBOC facility but has since been cancelled as indicated by the "Y" designation in the solicitation name. No information is provided on the specific requirements, response dates, or reasons for cancellation.

View the file

Other files

File Type Posted
HCA Signed PCAC S30 - Cancellation of Bids - IFB - J.pdf PDF
S30 - Attachment - Abstract of Bids - Joliet.pdf PDF
Attachment 8 - Joliet Roof Report.pdf PDF
Attachment 6 - Joliet CBOC Elect. Add. 2 230726.pdf PDF
Attachment 2 - 09 06 00 Schedule for Finishes.pdf PDF
36C77623B0049 0005 - Joliet CBOC - RFIs-Wage Rates-Bid Opening.pdf PDF
Attachment 3 - AHU Heat Pipe Design Basis.pdf PDF
Attachment 4 - Joliet CBOC Arch RCPs Add. 2 230726.pdf PDF
Attachment 5 - Joliet CBOC Ceiling Diagrams 230726.pdf PDF
Attachment 7 - M601 - MECHANICAL SCHEDULES.pdf PDF
Attachment 1 - Technical Questions - Part 2.pdf PDF
Attachment 9 - Updated Wage Rates - Will County.pdf PDF
Attachment 1 - Technical Questions - Part 1.pdf PDF
Attachment 4 - Joliet Arch RCP.pdf PDF
36C77623B0049 0004 - Joliet CBOC - Extension and RFIs.pdf PDF
Attachment 5 - Joliet CBOC Laydown Areas.pdf PDF
Attachment 3 - Joliet CBOC Geotech Proposed Parking.pdf PDF
Attachment 2 - Infection Control Risk Assessment.pdf PDF
36C77623B0049 0003 - Joliet CBOC - Second Site Visit Sign-In.pdf PDF
Pre-Bid Site Visit 2 Sign-in 578-371.pdf PDF
36C77623B0049 0002 - Second Site Visit and RFI Extension.pdf PDF
36C77623B0049 0001 - Joliet CBOC - Site Visit Sign In.pdf PDF
Pre-Bid Site Sign-in 578-371.pdf PDF
S02 - ATCH 30 - Joliet_CBOC_Issued_for_Bid_A1_Struct_Part_8.pdf PDF
S02 - ATCH 32 - Contractor Safety - Environmental Form.pdf PDF
S02 - ATCH 8 - 7) Above Ceiling Entry and Wall Const Permits.pdf PDF
S02 - ATCH 14 - 13) 578-371 Phasing Plan.pdf PDF
S02 - ATCH 33 - Wage Rates - Will County 5.12.2.pdf PDF
S02 - ATCH 27 - Joliet_CBOC_Issued_for_Bid_A1_Arch_Part_5.pdf PDF
S02 - ATCH 16 - 15) No Smoking Policy 10-1-19.pdf PDF
S02 - ATCH 23 - Joliet_CBOC_Issued_for_Bid_A1_Arch_Part_1.pdf PDF
S02 - ATCH 4 - 3) Pre-Con Checklist Rev 07.27.21.pdf PDF
S02 - ATCH 15 - 14) 578-371 Specifications Book.pdf PDF
S02 - ATCH 2 - 1) Joliet CBOC Aerial Site Plan.pdf PDF
S02 - ATCH 34 - Site Visit Instructions.pdf PDF
S02 - ATCH 7 - 6) Dig Permit SOP Form.pdf PDF
S02 - ATCH 26 - Joliet_CBOC_Issued_for_Bid_A1_Arch_Part_4.pdf PDF
S02 - ATCH 25 - Joliet_CBOC_Issued_for_Bid_A1_Arch_Part_3.pdf PDF
S02 - ATCH 31 - Limitations on Subcontracting - Construction.pdf PDF
S02 - ATCH 11 - 10) Interim Life Safety Measures (ILSM).pdf PDF
S02 - ATCH 24 - Joliet_CBOC_Issued_for_Bid_A1_Arch_Part_2.pdf PDF
S02 - ATCH 17 - 16) Infection Control Barrier Sample.pdf PDF
S02 - ATCH 1 - 578-371 Construction SOW Final.pdf PDF
S02 - ATCH 6 - 5) Cutting Welding and Other Hot Work.pdf PDF
S02 - ATCH 13 - 12) OIT Horizontal Cable Requirements.pdf PDF
S02 - ATCH 18 - 17) Hines COVID-19 Guidelines.pdf PDF
S02 - ATCH 12 -11) Contractor PIV Instructions and Form.pdf PDF
S02 - ATCH 9 - 8) Pre-Construction Risk Assessment.pdf PDF
S02 - ATCH 21 - Joliet_CBOC_Project_Manual_Issued_for_Bid.pdf PDF
S02 - ATCH 10 - 9) Infection Control Risk Assessment.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABBREVIATIONS

ADJ ADJUSTABLE

AFF ABOVE FINISHED FLOOR

AL ALUMINUM

ALT ALTERNATE

AP ACCESS PANEL

APD AIR PRESSURE DROP

BAS BUILDING AUTOMATION SYSTEM

BHP BRAKE HORSEPOWER

BLDG BUILDING

BOD BOTTOM OF DUCT

BOP BOTTOM OF PIPE

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNITS PER HOUR

BYP BYPASS

CA COMBUSTION AIR

CAV CONSTANT AIR VOLUME

CFM CUBIC FEET PER MINUTE

CHW CHILLED WATER

CL CENTERLINE

CLG CEILING

CONC CONCRETE

COND CONDENSATE

COP COEFFICIENT OF PERFORMANCE

CNDW CONDENSER WATER

CPD CONDENSATE PUMP DISCHARGE

DB DRY BULB

DCW DOMESTIC COLD WATER

DDC DIRECT DIGITAL CONTROL

DEG DEGREE

DP DIFFERENTIAL PRESSURE

DX DIRECT EXPANSION

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EC ELECTRICAL CONTRACTOR

ECON ECONOMIZER

EER ENERGY EFFICIENCY RATIO

EFF EFFICIENCY

EL ELEVATION

ELEC ELECTRIC/ELECTRONIC

ENGR ENGINEER

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER TEMPERATURE

EX EXISTING

EXH EXHAUST

EXP EXPANSION

FA FIELD ADJUSTABLE

FC FAIL CLOSED

FE FUME HOOD EXHAUST

FLA FULL LOAD AMPS

FLR FLOOR

FO FAIL OPEN

FOF FUEL OIL FILL

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOV FUEL OIL VENT

FPI FINS PER INCH

FPM FEET PER MINUTE

FPS FEET PER SECOND

GA GAUGE

GAL GALLONS

GALV GALVANIZED

GC GENERAL CONTRACTOR

GE GENERAL EXHAUST

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

HHW HEATING HOT WATER

HOA HAND-OFF-AUTOMATIC

HP HORSE POWER

HPC HIGH PRESSURE CONDENSATE

HPS HIGH PRESSURE STEAM

HW HOT WATER

HZ HERTZ

IA INSTRUMENT AIR

KE KITCHEN EXHAUST

KEF KITCHEN EXHAUST FAN

KW KILOWATT

LAT LEAVING AIR TEMPERATURE

LPC LOW PRESSURE CONDENSATE

LPS LOW PRESSURE STEAM

LRA LOCKED ROTOR AMPS

LWT LEAVING WATER TEMPERATURE

MBH THOUSANDS OF BTU PER HOUR

MC MECHANICAL CONTRACTOR

MCA MINIMUM CIRCUIT AMPS

MEP MECHANICAL, ELECTRICAL AND PIPING

MER MECHANICAL EQUIPMENT ROOM

MIN MINIMUM

MOCP MAXIMUM OVERCURRENT PROTECTION

NA NOT APPLICABLE

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NTS NOT TO SCALE

OA OUTSIDE AIR

OC ON CENTER

OV OUTLET VELOCITY

PC PLUMBING CONTRACTOR

PD PRESSURE DROP

PH PHASE

PP POLYPROPYLENE

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH ABSOLUTE

PSIG POUNDS PER SQUARE INCH GAUGE

R RETURN

RA RETURN AIR

RH RELATIVE HUMIDITY

RPM REVOLUTIONS PER MINUTE

S SUPPLY

SA SUPPLY AIR

SCH SCHEDULE

SF SQUARE FOOT

SP STATIC PRESSURE

SS STAINLESS STEEL

TA TRANSFER AIR

TDH TOTAL DYNAMIC HEAD

TP TOTAL PRESSURE

TSP TOTAL STATIC PRESSURE

TYP TYPICAL

UC UNDERCUT

UV ULTRAVIOLET

V VOLTS

VAV VARIABLE AIR VOLUME

VP VELOCITY PRESSURE

VTR VENT THRU ROOF

WB WET BULB

WC WATER COLUMN

WG WATER GAUGE

AO ANALOG OUTPUT (CONTROLS)

AI ANALOG INPUT (CONTROLS)

DI DIGITAL INPUT (CONTROLS)

DO DIGITAL OUTPUT (CONTROLS)

EQUIPMENT ABBREVIATIONS

AAV AUTOMATIC AIR VENT

AC AIR CONDITIONING

ACC AIR COOLED CONDENSER

ACCU AIR COOLED CONDENSING UNIT

ACU AIR CONDITIONING UNIT

AHU AIR HANDLING UNIT

CC COOLING COIL

CH CHILLER

CP CONDENSATE PUMP/CONTROL PANEL

CT COOLING TOWER

CUH CABINET UNIT HEATER

CV CONVERTOR

AS AIR SEPARATOR

AT AIR TERMINAL DEVICE

B BOILER

BBS BOILER BLOWDOWN SEPARATOR

BDD BACKDRAFT DAMPER

BFP BACKFLOW PREVENTER

BFS BOILER FEEDWATER SYSTEM

BH BOOSTER HUMIDIFIER

D DAMPER

DOAS DEDICATED OUTDOOR AIR SYSTEM

EF EXHAUST FAN

EH EXHAUST HOOD

EBH ELECTRIC BASEBOARD HEATER

ERU ENERGY RECOVERY UNIT

ERV ENERGY RECOVERY VENTILATOR

ET EXPANSION TANK

EUH ELECTRIC UNIT HEATER

EV EXHAUST VALVE

EVAP EVAPORATOR

F FILTER

FACP FIRE ALARM CONTROL PANEL

FCU FAN COIL UNIT

FD FLOOR DRAIN

FOP FUEL OIL PUMP

FOT FUEL OIL TANK

FPB FAN POWERED BOX

FT FLASH TANK

FTR FIN TUBE RADIATION

GEN GENERATOR

H HUMIDIFIER

HC HEATING COIL

HP HEAT PUMP

HRC HEAT RECOVERY COIL

HT HEAT TRACE

HX HEAT EXCHANGER

IH INTAKE HOOD

MAU MAKEUP AIR UNIT

MCC MOTOR CONTROL CENTER

P PUMP

PHC PREHEAT COIL

PRV PRESSURE REDUCING VALVE

PTAC PACKAGED TERMINAL AIR CONDITIONER

RCP RADIANT CEILING PANEL

RF RETURN FAN

RH RELIEF HOOD

RHC REHEAT COIL

RTU ROOFTOP UNIT

SAD SOUND ATTENUATING DEVICE

SD SMOKE DETECTOR

SF SUPPLY FAN

SRV SAFETY RELIEF VALVE

ST STORAGE TANK

T TANK

UH UNIT HEATER

UV UNIT VENTILATOR

V VALVE

VAV VARIABLE AIR TERMINAL DEVICE

VFD VARIABLE FREQUENCY DRIVE

WCC WATER COOLED CONDENSER

WF WATER FILTER

DAMPERS AND ACTUATORS

MANUAL BALANCING DAMPER

CONTROL DAMPER (MOTORIZED)

M

BACKDRAFT DAMPER

BD

1 1/2 HOUR RATED FIRE DAMPER

F2

3 HOUR RATED FIRE DAMPER

F3

1 1/2 HOUR RATED FIRE/SMOKE DAMPER

FS

OPPOSED BLADE DAMPER

PARALLEL BLADE DAMPER

MANUAL ACTUATOR

MOTORIZED ACTUATOR

M

SOLENOID ACTUATOR

S

DUCT SYMBOLS

SUPPLY DIFFUSER ANNOTATION

DUCT SIZE (INCHES)

∅ INDICATES ROUND

SUPPLY AIR

DUCT (SA)

AIR QUANTITY

(CFM)

SUPPLY

DIFFUSERS (S)

EXISTING

S-1

4508"Ø SA

RETURN/EXHAUST GRILLE ANNOTATION

RETURN AIR DUCT

(RA)

DUCT SIZES

IN INCHES

AIR QUANTITY

(CFM)

RETURN

GRILLE (R)

EXISTING

R-1

25010x10 RA

EXHAUST AIR DUCT

(EA)

DUCT SIZES

IN INCHES

AIR QUANTITY

(CFM)

EXHAUST

GRILLE (E)

EXISTING

E-1

25010"Ø EA

(X)SNEW

(X)RNEW

(X)EEXISTING

DUCTWORK

SINGLE LINE

EXISTING DUCT TO BE REMOVED

DOUBLE LINE

EXISTING DUCT TO REMAIN

FLOW DIRECTION DESIGNATION

DUCT CONTINUATION BREAK

SUPPLY AIR (SA) OR

OUTDOOR AIR (OA) DUCT

EXHAUST AIR (EA) DUCT

RETURN AIR (RA), RELIEF AIR,

OR TRANSFER AIR (TA) DUCT

GENERAL SYMBOLS

EQUIPMENT TAG

KEYNOTE

POINT OF NEW CONNECTION TO EXISTING

WHEN ON DEMO SHEET: END POINT OF DEMO

DETAIL REFERENCE (TOP=DETAIL NUMBER,

BOTTOM=DRAWING NUMBER)

M-1

PLAN CONTINUATION REFERENCE

(BOTTOM=DRAWING NUMBER)

REFER

M-1

SECTION DESIGNATION (TOP=SECTION

NUMBER, BOTTOM=DRAWING NUMBER)

M-1

PIPING

SINGLE LINE

EXISTING PIPING TO BE REMOVED

DOUBLE LINE

EXISTING PIPING TO REMAIN

FLOW DIRECTION DESIGNATION

PIPE CONTINUATION BREAK

ELBOW DOWN

ELBOW UP

BOTTOM CONNECTION

TOP CONNECTION

PIPE TEE

PIPING ANNOTATION

CHILLED WATER SUPPLY/RETURNCHWS/R

CONDENSER WATER SUPPLY/RETURNCWS/R

HEATING HOT WATER SUPPLY/RETURNHWS/R

HEAT RECLAIM WATER SUPPLY/RETURNHRWS/R

LOW PRESSURE STEAM (<15 PSI)LPS

LOW PRESSURE CONDENSATELPC

HIGH PRESSURE STEAM (XX=PRESSURE)HPS (XX)

HIGH PRESSURE COND. (XX=PRESSURE)HPC (XX)

PROCESS CHILLED WATER SUPPLY/RETURNPCHWS/R

REFRIGERANT LIQUIDRL

REFRIGERANT SUCTIONRS

NATURAL GASNG

PIPING SPECIALTIES

GENERAL PIPELINE STRAINER WITHOUT DRAIN

GENERAL PIPELINE STRAINER WITH DRAIN

BASKET STRAINER

FLANGE

UNION

CAP

THERMOMETER

PRESSURE GAUGE

MANUAL AIR VENT

TEST PORT (PRESSURE/TEMP.)

PIPING VALVES

BUTTERFLY VALVE

GATE VALVE

GLOBE VALVE

BALL VALVE

BALANCING VALVE

AUTO FLOW BALANCING VALVE

CHECK VALVE

SOLENOID VALVE

S

STEAM PRESSURE REDUCING VALVE (PRV)

2-WAY CONTROL VALVE

3-WAY MIXING VALVE

3-WAY DIVERTING VALVE

DRAIN VALVE WITH CAP

GAS PRESSURE REGULATOR

GAS SHUTOFF VALVE

REDUCED PRESSURE

BACKFLOW PREVENTER (RPP)

PRESSURE RELIEF VALVE (RV)

OR SAFETY VALVE (SV)

VACUUM RELIEF/VACUUM BREAKER

GENERAL MECHANICAL NOTES

1. THE CONTRACTORS WORK SHALL CONFORM TO ALL VA

POLICIES ON CONSTRUCTION PROCEDURES AND SHALL

COMPLY WITH ALL LOCAL CODES AND VA STANDARDS.

2. COORDINATE WITH THE VA FOR ANY EQUIPMENT

REMOVED THAT NEEDS TO BE RETURNED TO THE

OWNER.

3. COORDINATE WITH VA FOR TEMPORARY SYSTEM

SHUTDOWN PER REQUIREMENTS IN THE

SPECIFICATIONS.

4. ALL DUCTWORK SHALL BE FABRICATED OF SHEET METAL

IN ACCORDANCE WITH SMACNA STANDARDS.

5. RE-INSULATE AND PATCH EXISTING DUCTWORK AS

REQUIRED AFTER INSTALLATION OF NEW DUCTWORK OR

OTHER DEMOLITION THAT DISTURBS EXISTING

DUCTWORK AND INSULATION.

6. PROVIDE LOCKING TYPE BALANCING DAMPER AT EACH

DIFFUSER, GRILLE, AND BRANCH TAKE-OFF IN ALL

SUPPLY, RETURN, AND EXHAUST DUCTWORK. LOCATE

BALANCING DAMPER AS CLOSE TO THE BRANCH

TAKEOFF AS POSSIBLE.

7. DUCT SIZE TO DIFFUSERS, REGISTERS, AND GRILLES

SHALL BE SAME AS NECK SIZE UNLESS OTHERWISE

NOTED.

8. DUCT SIZE TO AIR TERMINAL DEVICES SHALL BE SAME AS

INLET SIZE UNLESS OTHERWISE NOTED.

9. COORDINATE DIFFUSER, REGISTER, AND GRILLE

LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING

PLAN AND ALL OTHER CEILING DEVICES.

10. PROVIDE FLEXIBLE DUCTWORK FOR DIFFUSERS,

REGISTERS, AND GRILLES. FLEXIBLE DUCT SIZE SHALL BE

SAME AS NECK SIZE OF DIFFUSER OR GRILLE AND SHALL

HAVE MAXIMUM LENGTH OF 5'-0". REFER TO

SPECIFICATIONS FOR REQUIREMENTS.

11. LOCATE AIR TERMINAL DEVICES TO ALLOW ACCESS TO

AIR TERMINAL DEVICE CONTROLLERS. ACCESS

CLEARANCE IS SHOWN ON PLANS.

12. ALL EXISTING STEAM AND CONDENSATE PIPING IN THE

BUILDING WILL BE OBSOLETE AS A RESULT OF THIS

PROJECT AND IS REQUIRED TO BE REMOVED

COMPLETELY. NO ABANDONED STEAM OR CONDENSATE

PIPING WILL BE ALLOWED.

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Drawing No.

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

© 2020 Virtual Energy Solutions, INC.

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

-J o lie t C

B O

C P a rk in g

E x p a n s io n M

E C

H

.r v t

/2

/2

:3

:1

P M

M001

MECHANICAL SYMBOLS AND

ABBREVIATIONS

PARKING EXPANSION AT

JOLIET CBOC

04/21/2023

EPTHEP

Revisions Date

ISSUED FOR 60% DD 12/30/2022

ISSUED FOR 90% CD 02/10/2023

ISSUED FOR 100% CD 03/07/2023

ISSUED FOR BID 03/24/2023

Dx

Ex

Gx

Hx

Jx

Kx

K'x

Lx

1x 4x 6x 9x 12x 13x 14x

Cx

Bx

Ax

3x 5x 5.8x 8x 10x6.1x

Fx

A.E

15x

15y

15z 15aa

15bb

15cc

15dd

15ee

15ff

15gg15hh

15ii

9.5x1.2x

A

1 2

B

AHU-1

EXIST.

AHU-2

EXIST.

AHU-3

EXIST.

AHU-4

EXIST.

T

T

EXISTING STEAM

RADIATION TO BE REMOVED

T

T

T

T

TT

T

T T

2 2 2

EXISTING EF-4

TO BE REMOVED

LOCATION OF

EXISTING BAS

CONTROL PANELS

AND JACE

EXISTING

DEMOLITION

NEW

PHASE LEGEND

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Drawing No.

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

© 2020 Virtual Energy Solutions, INC.

N

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

-J o lie t C

B O

C P a rk in g

E x p a n s io n M

E C

H

.r v t

/2

/2

:3

:3

P M

MD100-N

BASEMENT LEVEL -

MECHANICAL DEMOLITION PLAN

- NORTH

PARKING EXPANSION AT

JOLIET CBOC

04/21/2023

EPEPEP

1/8" = 1'-0"

1 BASEMENT LEVEL - MECHANICAL DEMOLITION PLAN - NORTH

0 4' 8' 16'

MECHANICAL DEMOLITION KEYNOTES

NUMBER KEYNOTE

1 EXISTING DDC THERMOSTAT/SENSOR TO BE REMOVED.

2 EXISTING AIR TERMINAL UNIT INCLUDING STEAM REHEAT COIL

AND ACCESSORIES TO BE REMOVED AS SHOWN. IF APPLICABLE,

LEAVE DUCTWORK CONNECTIONS FOR INSTALLATION OF NEW

VAV TERMINAL UNITS.

3 REMOVE EXISTING AIR HANDLING UNIT INCLUDING ALL

ASSOCIATED PIPING, ACCESSORIES, AND DUCTWORK

CONNECTIONS TO BOTH AHU AND ASSOCIATED RETURN/EXHAUST

FAN. REMOVE OUTDOOR AIR DUCTWORK BACK TO AREA WELL

AND CAP OPENING.

4 REMOVE EXISTING CHILLED WATER PUMP, ACCESSORIES, AND

ASSOCIATED PIPING TO ROOF MOUNTED CHILLERS.

5 REMOVE ALL EXISTING DUCTWORK AS SHOWN ON PLANS. THIS

SHALL INCLUDE HANGERS AND OTHER ACCESSORIES RELATED TO

THE DUCTWORK SYSTEM.

6 EXISTING STEAM UNIT HEATER TO BE REMOVED INCLUDING

ASSOCIATED THERMOSTAT, STEAM AND CONDENSATE PIPING

BACK TO MAINS, AND ANY ACCESSORIES AND HANGERS.

7 ALL BOOSTER COILS, DUCTWORK AND ASSOCIATED

GRILLES/DIFFUSERS ORIGIONATING FROM THIS DUCT RISER TO BE

REMOVED, INCLUDING TSTATS

8 REMOVE EXISTING STEAM CONDENSATE RECEIVER AND PUMP

SYSTEM.

9 REMOVE EXISTING STEAM BOILER INCLUDING STEAM AND

FEEDWATER PIPING, CONTROLS, FLUE THROUGH ROOF, AND ALL

OTHER ACCESSORIES AND STEAM/CONDENSATE PIPING IN BOILER

PLANT.

10 REMOVE EXISTING BOILER FEEDWATER UNIT INCLUDING PIPING

TO BOILERS, CONTROLS, AND OTHER ACCESSORIES. LEAVE

MAKEUP WATER CONNECTION AT DISCHARGE OF RPZ FOR

EXTENSION TO NEW GLYCOL FILL SYSTEM BY MECHANICAL

CONTRACTOR.

11 REMOVE EXISTING ROOF EXHAUST FAN AND PATCH ROOF

OPENING.

12 REMOVE EXISTING CHILLED WATER PIPING FROM CHILLERS DOWN

TO BASEMENT PUMPS. PATCH ROOF OPENINGS AFTER

DEMOLITION OF PIPES.

13 REMOVE EXISTING RELIEF AIR DUCT IN BASEMENT UP TO FLOOR

LEVEL OF FIRST FLOOR AND CAP BASE OF DUCT. SEE MH101-S

FOR NEW WORK SCOPE FOR THIS DUCT.

IMPORTANT PIPING DEMOLITION NOTES TO

CONTRACTOR:

THIS BUILDING HAS AN EXISTING SYSTEM OF

STEAM PIPING AND CONDENSATE RETURN

THAT SERVES AIR HANDLING UNITS, AIR

TERMINAL REHEAT COILS AND OTHER

HEATING DEVICES THROUGHOUT THE ENTIRE

BUILDING.

THIS STEAM AND CONDENSATE SYSTEM SHALL

REMAIN ACTIVE DURING PORTIONS OF THE

PROJECT AS DEFINED BY THE PHASING PLANS

TO SERVE BUILDING HEATING AND

VENTILATION NEEDS WHILE THE NEW HEATING

SYSTEM IS BEING INSTALLED AND

COMMISSIONED.

THE END RESULT OF THIS PROJECT IS THAT

ALL EXISTING STEAM AND CONDENSATE

PIPING, AS WELL AS ASSOCIATED

ACCESSORIES AND EQUIPMENT, WILL BE

REMOVED FROM THE BUILDING ENTIRELY

AFTER THE NEW HEATING HOT WATER BOILER

PLANT IS FULLY OPERATIONAL AND

COMMISSIONED.

ONCE THE STEAM AND CONDENSATE PIPING

ARE NO LONGER NECESSARY IN AN AREA,

THEY SHALL BE DEMOLISHED COMPLETELY IN

SEQUENCE WITH THE OVERALL

CONSTRUCTION SCHEDULE. ABANDONED

PIPING OR ASSOCIATED ITEMS IS NOT

ACCEPTABLE AND CONTRACTOR WILL BE

REQUIRED TO INCLUDE IN THEIR BID A

COMPLETE DEMOLITION SCOPE OF ALL SUCH

PIPING AND ASSOCIATED ITEMS FROM THE

BUILDING, WHETHER EXPLICITLY SHOWN ON

DRAWINGS OR NOT.

IMPORTANT VENTILATION DEMOLITION NOTES TO CONTRACTOR:

THE DEMOLITION INTENT OF THIS PROJECT IS FOR THE REMOVAL OF EXISTING

BASEMENT AIR HANDLING UNITS, ASSOCIATED RETURN/EXHAUST FANS,

DUCTWORK ASSOCIATED WITH DEMOLISHED EQUIPMENT AND PORTIONS OF THE

EXISTING DUCTWORK (AS SHOWN ON PLANS), DIFFUSERS, AIR TERMINAL UNITS,

BOOSTER COILS, CONTROLS, AND ASSOCIATED DUCTWORK HANGERS AND

ACCESSORIES, IN SEQUENCE WITH THE PHASING OF THE WORK AS DEFINED BY

PHASING PLANS AND THE PROPOSED SCHEDULE.

NOT ALL DUCTWORK OR DEVICES THAT ARE TO BE REMOVED ARE SHOWN ON

THIS SHEET IN THEIR ENTIRETY, HOWEVER THIS DOES NOT ABSOLVE

CONTRACTOR OF COMPLETING THE REQUIRED SCOPE OF WORK AS DESCRIBED

ABOVE. NO DUCTWORK OR ASSOCIATED ITEMS SHALL REMAIN ABANDONED IN

PLACE BY COMPLETION OF PROJECT.

Revisions Date

ISSUED FOR 60% DD 12/30/2022

ISSUED FOR 90% CD 02/10/2023

F

F

F2

F2

F

F

F2

1x 4x 6x 9x 12x 13x 14x

Ax

A1x

B1x

C1x

D1x

E1x

3x 5x

A.E

15x1.2x

AHU-7

EXIST.

AHU-6

EXIST.

AHU-5

EXIST.

T

T

T

T

T

T T

T

T

T

2 2

18x14 EA

18x10 RA

48x22 RA

30x18 SA

32x24 SA x S

A x E

A

T

T

T

T T

T

1 1

T

EXISTING

DEMOLITION

NEW

PHASE LEGEND

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Drawing No.

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

© 2020 Virtual Energy Solutions, INC.

S

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

-J o lie t C

B O

C P a rk in g

E x p a n s io n M

E C

H

.r v t

/2

/2

:3

:4

P M

MD100-S

BASEMENT LEVEL -

MECHANICAL DEMOLITION PLAN

- SOUTH

PARKING EXPANSION AT

JOLIET CBOC

04/21/2023

EPEPEP

1/8" = 1'-0"

1 BASEMENT LEVEL - MECHANICAL DEMOLITION PLAN - SOUTH

0 4' 8' 16'

MECHANICAL DEMOLITION KEYNOTES

NUMBER KEYNOTE

1 EXISTING DDC THERMOSTAT/SENSOR TO BE REMOVED.

2 EXISTING AIR TERMINAL UNIT INCLUDING STEAM REHEAT COIL

AND ACCESSORIES TO BE REMOVED AS SHOWN. IF APPLICABLE,

LEAVE DUCTWORK CONNECTIONS FOR INSTALLATION OF NEW

VAV TERMINAL UNITS.

3 REMOVE EXISTING AIR HANDLING UNIT INCLUDING ALL

ASSOCIATED PIPING, ACCESSORIES, AND DUCTWORK

CONNECTIONS TO BOTH AHU AND ASSOCIATED RETURN/EXHAUST

FAN. REMOVE OUTDOOR AIR DUCTWORK BACK TO AREA WELL

AND CAP OPENING.

4 REMOVE EXISTING CHILLED WATER PUMP, ACCESSORIES, AND

ASSOCIATED PIPING TO ROOF MOUNTED CHILLERS.

5 REMOVE ALL EXISTING DUCTWORK AS SHOWN ON PLANS. THIS

SHALL INCLUDE HANGERS AND OTHER ACCESSORIES RELATED TO

THE DUCTWORK SYSTEM.

6 EXISTING STEAM UNIT HEATER TO BE REMOVED INCLUDING

ASSOCIATED THERMOSTAT, STEAM AND CONDENSATE PIPING

BACK TO MAINS, AND ANY ACCESSORIES AND HANGERS.

7 ALL BOOSTER COILS, DUCTWORK AND ASSOCIATED

GRILLES/DIFFUSERS ORIGIONATING FROM THIS DUCT RISER TO BE

REMOVED, INCLUDING TSTATS

8 REMOVE EXISTING STEAM CONDENSATE RECEIVER AND PUMP

SYSTEM.

9 REMOVE EXISTING STEAM BOILER INCLUDING STEAM AND

FEEDWATER PIPING, CONTROLS, FLUE THROUGH ROOF, AND ALL

OTHER ACCESSORIES AND STEAM/CONDENSATE PIPING IN BOILER

PLANT.

10 REMOVE EXISTING BOILER FEEDWATER UNIT INCLUDING PIPING

TO BOILERS, CONTROLS, AND OTHER ACCESSORIES. LEAVE

MAKEUP WATER CONNECTION AT DISCHARGE OF RPZ FOR

EXTENSION TO NEW GLYCOL FILL SYSTEM BY MECHANICAL

CONTRACTOR.

11 REMOVE EXISTING ROOF EXHAUST FAN AND PATCH ROOF

OPENING.

12 REMOVE EXISTING CHILLED WATER PIPING FROM CHILLERS DOWN

TO BASEMENT PUMPS. PATCH ROOF OPENINGS AFTER

DEMOLITION OF PIPES.

13 REMOVE EXISTING RELIEF AIR DUCT IN BASEMENT UP TO FLOOR

LEVEL OF FIRST FLOOR AND CAP BASE OF DUCT. SEE MH101-S

FOR NEW WORK SCOPE FOR THIS DUCT.

IMPORTANT DEMOLITION NOTES TO

CONTRACTOR:

THIS BUILDING HAS AN EXISTING SYSTEM OF

STEAM PIPING AND CONDENSATE RETURN

THAT SERVES AIR HANDLING UNITS, AIR

TERMINAL REHEAT COILS AND OTHER

HEATING DEVICES THROUGHOUT THE ENTIRE

BUILDING.

THIS STEAM AND CONDENSATE SYSTEM SHALL

REMAIN ACTIVE DURING PORTIONS OF THE

PROJECT AS DEFINED BY THE PHASING PLANS

TO SERVE BUILDING HEATING AND

VENTILATION NEEDS WHILE THE NEW HEATING

SYSTEM IS BEING INSTALLED AND

COMMISSIONED.

THE END RESULT OF THIS PROJECT IS THAT

ALL EXISTING STEAM AND CONDENSATE

PIPING, AS WELL AS ASSOCIATED

ACCESSORIES AND EQUIPMENT, WILL BE

REMOVED FROM THE BUILDING ENTIRELY

AFTER THE NEW HEATING HOT WATER BOILER

PLANT IS FULLY OPERATIONAL AND

COMMISSIONED.

ONCE THE STEAM AND CONDENSATE PIPING

ARE NO LONGER NECESSARY IN AN AREA,

THEY SHALL BE DEMOLISHED COMPLETELY IN

SEQUENCE WITH THE OVERALL

CONSTRUCTION SCHEDULE. ABANDONED

PIPING OR ASSOCIATED ITEMS IS NOT

ACCEPTABLE AND CONTRACTOR WILL BE

REQUIRED TO INCLUDE IN THEIR BID A

COMPLETE DEMOLITION SCOPE OF ALL SUCH

PIPING AND ASSOCIATED ITEMS FROM THE

BUILDING, WHETHER EXPLICITLY SHOWN ON

DRAWINGS OR NOT.

IMPORTANT VENTILATION DEMOLITION NOTES TO CONTRACTOR:

THE DEMOLITION INTENT OF THIS PROJECT IS FOR THE REMOVAL OF EXISTING

BASEMENT AIR HANDLING UNITS, ASSOCIATED RETURN/EXHAUST FANS,

DUCTWORK ASSOCIATED WITH DEMOLISHED EQUIPMENT AND PORTIONS OF THE

EXISTING DUCTWORK (AS SHOWN ON PLANS), DIFFUSERS, AIR TERMINAL UNITS,

BOOSTER COILS, CONTROLS, AND ASSOCIATED DUCTWORK HANGERS AND

ACCESSORIES, IN SEQUENCE WITH THE PHASING OF THE WORK AS DEFINED BY

PHASING PLANS AND THE PROPOSED SCHEDULE.

EXHAUST SYSTEMS FOR TOILET ROOMS, SOILED HOLDING, ETC. ARE

CONSIDERED EXISTING TO REMAIN AND SHALL NOT BE DEMOLISHED.

NOT ALL DUCTWORK OR DEVICES THAT ARE TO BE REMOVED ARE SHOWN ON

THIS SHEET IN THEIR ENTIRETY, HOWEVER THIS DOES NOT ABSOLVE

CONTRACTOR OF COMPLETING THE REQUIRED SCOPE OF WORK AS DESCRIBED

ABOVE. NO DUCTWORK OR ASSOCIATED ITEMS SHALL REMAIN ABANDONED IN

PLACE BY COMPLETION OF PROJECT.

Revisions Date

ISSUED FOR 60% DD 12/30/2022

ISSUED FOR 90% CD 02/10/2023

F2

Ex

Gx

Hx

Jx

Kx

K'x

Lx

1x 4x 6x 9x 12x 13x 14x

Cx

Bx

Ax

3x 5x 5.8x 8x 10x6.1x

Fx

A.E

15x

15y

15z 15aa

15bb

15cc

15dd

15ee

15ff

15gg15hh

15ii

9.5x1.2x

A

1 2

B

T

T

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

TT

T T

T

T

T

T

T T

T

EXISTING GRILLES SERVING

AUDITORY AND CONTROL

ROOMS TO REMAIN (TYP)

9 9 910

1 1

EXISTING PACKAGED HVAC

UNIT TO REMAIN TO SERVE

BOILER PLANT

EXISTING PACKAGED HVAC

UNIT TO REMAIN TO SERVE

BOILER PLANT

EXISTING

DEMOLITION

NEW

PHASE LEGEND

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Drawing No.

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

© 2020 Virtual Energy Solutions, INC.

N

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

-J o lie t C

B O

C P a rk in g

E x p a n s io n M

E C

H

.r v t

/2

/2

:3

:5

P M

MD101-N

FIRST FLOOR - MECHANICAL

DEMOLITION PLAN - NORTH

PARKING EXPANSION AT

JOLIET CBOC

04/21/2023

EPBBEP

1/8" = 1'-0"

1 FIRST FLOOR - MECHANICAL DEMOLITION PLAN - NORTH

0 4' 8' 16'

MECHANICAL DEMOLITION KEYNOTES

NUMBER KEYNOTE

1 EXISTING DDC THERMOSTAT/SENSOR TO BE REMOVED.

2 EXISTING AIR TERMINAL UNIT INCLUDING STEAM REHEAT COIL

AND ACCESSORIES TO BE REMOVED AS SHOWN. IF APPLICABLE,

LEAVE DUCTWORK CONNECTIONS FOR INSTALLATION OF NEW

VAV TERMINAL UNITS.

3 REMOVE EXISTING AIR HANDLING UNIT INCLUDING ALL

ASSOCIATED PIPING, ACCESSORIES, AND DUCTWORK

CONNECTIONS TO BOTH AHU AND ASSOCIATED RETURN/EXHAUST

FAN. REMOVE OUTDOOR AIR DUCTWORK BACK TO AREA WELL

AND CAP OPENING.

4 REMOVE EXISTING CHILLED WATER PUMP, ACCESSORIES, AND

ASSOCIATED PIPING TO ROOF MOUNTED CHILLERS.

5 REMOVE ALL EXISTING DUCTWORK AS SHOWN ON PLANS. THIS

SHALL INCLUDE HANGERS AND OTHER ACCESSORIES RELATED TO

THE DUCTWORK SYSTEM.

6 EXISTING STEAM UNIT HEATER TO BE REMOVED INCLUDING

ASSOCIATED THERMOSTAT, STEAM AND CONDENSATE PIPING

BACK TO MAINS, AND ANY ACCESSORIES AND HANGERS.

7 ALL BOOSTER COILS, DUCTWORK AND ASSOCIATED

GRILLES/DIFFUSERS ORIGIONATING FROM THIS DUCT RISER TO BE

REMOVED, INCLUDING TSTATS

8 REMOVE EXISTING STEAM CONDENSATE RECEIVER AND PUMP

SYSTEM.

9 REMOVE EXISTING STEAM BOILER INCLUDING STEAM AND

FEEDWATER PIPING, CONTROLS, FLUE THROUGH ROOF, AND ALL

OTHER ACCESSORIES AND STEAM/CONDENSATE PIPING IN BOILER

PLANT.

10 REMOVE EXISTING BOILER FEEDWATER UNIT INCLUDING PIPING

TO BOILERS, CONTROLS, AND OTHER ACCESSORIES. LEAVE

MAKEUP WATER CONNECTION AT DISCHARGE OF RPZ FOR

EXTENSION TO NEW GLYCOL FILL SYSTEM BY MECHANICAL

CONTRACTOR.

11 REMOVE EXISTING ROOF EXHAUST FAN AND PATCH ROOF

OPENING.

12 REMOVE EXISTING CHILLED WATER PIPING FROM CHILLERS DOWN

TO BASEMENT PUMPS. PATCH ROOF OPENINGS AFTER

DEMOLITION OF PIPES.

13 REMOVE EXISTING RELIEF AIR DUCT IN BASEMENT UP TO FLOOR

LEVEL OF FIRST FLOOR AND CAP BASE OF DUCT. SEE MH101-S

FOR NEW WORK SCOPE FOR THIS DUCT.

IMPORTANT PIPING DEMOLITION NOTES TO

CONTRACTOR:

THIS BUILDING HAS AN EXISTING SYSTEM OF

STEAM PIPING AND CONDENSATE RETURN

THAT SERVES AIR HANDLING UNITS, AIR

TERMINAL REHEAT COILS AND OTHER

HEATING DEVICES THROUGHOUT THE ENTIRE

BUILDING.

THIS STEAM AND CONDENSATE SYSTEM SHALL

REMAIN ACTIVE DURING PORTIONS OF THE

PROJECT AS DEFINED BY THE PHASING PLANS

TO SERVE BUILDING HEATING AND

VENTILATION NEEDS WHILE THE NEW HEATING

SYSTEM IS BEING INSTALLED AND

COMMISSIONED.

THE END RESULT OF THIS PROJECT IS THAT

ALL EXISTING STEAM AND CONDENSATE

PIPING, AS WELL AS ASSOCIATED

ACCESSORIES AND EQUIPMENT, WILL BE

REMOVED FROM THE BUILDING ENTIRELY

AFTER THE NEW HEATING HOT WATER BOILER

PLANT IS FULLY OPERATIONAL AND

COMMISSIONED.

ONCE THE STEAM AND CONDENSATE PIPING

ARE NO LONGER NECESSARY IN AN AREA,

THEY SHALL BE DEMOLISHED COMPLETELY IN

SEQUENCE WITH THE OVERALL

CONSTRUCTION SCHEDULE. ABANDONED

PIPING OR ASSOCIATED ITEMS IS NOT

ACCEPTABLE AND CONTRACTOR WILL BE

REQUIRED TO INCLUDE IN THEIR BID A

COMPLETE DEMOLITION SCOPE OF ALL SUCH

PIPING AND ASSOCIATED ITEMS FROM THE

BUILDING, WHETHER EXPLICITLY SHOWN ON

DRAWINGS OR NOT.

IMPORTANT VENTILATION DEMOLITION NOTES TO CONTRACTOR:

THE INTENT OF THIS PROJECT FOR THE NORTH HALF OF THE FIRST FLOOR (AREA

SHOWN BY THIS SHEET) IS FOR ALL SUPPLY AND RETURN DUCTWORK, DIFFUSERS,

BOOSTER COILS, CONTROLS, AND ASSOCIATED DUCTWORK HANGERS AND

ACCESSORIES TO BE REMOVED ENTIRELY, IN SEQUENCE WITH THE PHASING OF THE

WORK AS DEFINED BY PHASING PLANS AND THE PROPOSED SCHEDULE.

THE ONLY SYSTEMS THAT ARE EXISTING TO REMAIN IN THE NORTH HALF OF THE

BUILDING ARE EXHAUST SYSTEMS FOR TOILET ROOMS AND SOILED HOLDING.

NOT ALL DUCTWORK OR DEVICES THAT ARE TO BE REMOVED ARE SHOWN ON THIS

SHEET IN THEIR ENTIRETY, HOWEVER THIS DOES NOT ABSOLVE CONTRACTOR OF

COMPLETING THE REQUIRED SCOPE OF WORK AS DESCRIBED ABOVE. NO SUPPLY OR

RETURN DUCTWORK OR ASSOCIATED ITEMS SHALL REMAIN ABANDONED IN PLACE BY

COMPLETION OF PROJECT.

Revisions Date

ISSUED FOR 60% DD 12/30/2022

ISSUED FOR 90% CD 02/10/2023

ISSUED FOR 100% CD 03/07/2023

ISSSUED FOR BID ADDENDUM 1 04/21/2023

1x 4x 6x 9x 12x 13x 14x

Bx

Ax

A1x

B1x

C1x

D1x

E1x

3x 5x

A.E

15x1.2x

T

T

T

T

T

T

T

T

T

T

T T T T

T T

T

T

TTT T

T

T

T

T

T T

T

T

T

T

T

T T

T

T T

T

T

T

T

T

T

T

1 1 15

1 1

1 1

5 5 5

2 2

2 2

EXISTING

DEMOLITION

NEW

PHASE LEGEND

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Drawing No.

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

© 2020 Virtual Energy Solutions, INC.

S

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

-J o lie t C

B O

C P a rk in g

E x p a n s io n M

E C

H

.r v t

/2

/2

:3

:0

P M

MD101-S

FIRST FLOOR - MECHANICAL

DEMOLITION PLAN - SOUTH

PARKING EXPANSION AT

JOLIET CBOC

04/21/2023

EPTHEP

1/8" = 1'-0"

1 FIRST FLOOR - MECHANICAL DEMOLITION PLAN - SOUTH

0 4' 8' 16'

MECHANICAL DEMOLITION KEYNOTES

NUMBER KEYNOTE

1 EXISTING DDC THERMOSTAT/SENSOR TO BE REMOVED.

2 EXISTING AIR TERMINAL UNIT INCLUDING STEAM REHEAT COIL

AND ACCESSORIES TO BE REMOVED AS SHOWN. IF APPLICABLE,

LEAVE DUCTWORK CONNECTIONS FOR INSTALLATION OF NEW

VAV TERMINAL UNITS.

3 REMOVE EXISTING AIR HANDLING UNIT INCLUDING ALL

ASSOCIATED PIPING, ACCESSORIES, AND DUCTWORK

CONNECTIONS TO BOTH AHU AND ASSOCIATED RETURN/EXHAUST

FAN. REMOVE OUTDOOR AIR DUCTWORK BACK TO AREA WELL

AND CAP OPENING.

4 REMOVE EXISTING CHILLED WATER PUMP, ACCESSORIES, AND

ASSOCIATED PIPING TO ROOF MOUNTED CHILLERS.

5 REMOVE ALL EXISTING DUCTWORK AS SHOWN ON PLANS. THIS

SHALL INCLUDE HANGERS AND OTHER ACCESSORIES RELATED TO

THE DUCTWORK SYSTEM.

6 EXISTING STEAM UNIT HEATER TO BE REMOVED INCLUDING

ASSOCIATED THERMOSTAT, STEAM AND CONDENSATE PIPING

BACK TO MAINS, AND ANY ACCESSORIES AND HANGERS.

7 ALL BOOSTER COILS, DUCTWORK AND ASSOCIATED

GRILLES/DIFFUSERS ORIGIONATING FROM THIS DUCT RISER TO BE

REMOVED, INCLUDING TSTATS

8 REMOVE EXISTING STEAM CONDENSATE RECEIVER AND PUMP

SYSTEM.

9 REMOVE EXISTING STEAM BOILER INCLUDING STEAM AND

FEEDWATER PIPING, CONTROLS, FLUE THROUGH ROOF, AND ALL

OTHER ACCESSORIES AND STEAM/CONDENSATE PIPING IN BOILER

PLANT.

10 REMOVE EXISTING BOILER FEEDWATER UNIT INCLUDING PIPING

TO BOILERS, CONTROLS, AND OTHER ACCESSORIES. LEAVE

MAKEUP WATER CONNECTION AT DISCHARGE OF RPZ FOR

EXTENSION TO NEW GLYCOL FILL SYSTEM BY MECHANICAL

CONTRACTOR.

11 REMOVE EXISTING ROOF EXHAUST FAN AND PATCH ROOF

OPENING.

12 REMOVE EXISTING CHILLED WATER PIPING FROM CHILLERS DOWN

TO BASEMENT PUMPS. PATCH ROOF OPENINGS AFTER

DEMOLITION OF PIPES.

13 REMOVE EXISTING RELIEF AIR DUCT IN BASEMENT UP TO FLOOR

LEVEL OF FIRST FLOOR AND CAP BASE OF DUCT. SEE MH101-S

FOR NEW WORK SCOPE FOR THIS DUCT.

IMPORTANT DEMOLITION NOTES TO

CONTRACTOR:

THIS BUILDING HAS AN EXISTING SYSTEM OF

STEAM PIPING AND CONDENSATE RETURN

THAT SERVES AIR HANDLING UNITS, AIR

TERMINAL REHEAT COILS AND OTHER

HEATING DEVICES THROUGHOUT THE ENTIRE

BUILDING.

THIS STEAM AND CONDENSATE SYSTEM SHALL

REMAIN ACTIVE DURING PORTIONS OF THE

PROJECT AS DEFINED BY THE PHASING PLANS

TO SERVE BUILDING HEATING AND

VENTILATION NEEDS WHILE THE NEW HEATING

SYSTEM IS BEING INSTALLED AND

COMMISSIONED.

THE END RESULT OF THIS PROJECT IS THAT

ALL EXISTING STEAM AND CONDENSATE

PIPING, AS WELL AS ASSOCIATED

ACCESSORIES AND EQUIPMENT, WILL BE

REMOVED FROM THE BUILDING ENTIRELY

AFTER THE NEW HEATING HOT WATER BOILER

PLANT IS FULLY OPERATIONAL AND

COMMISSIONED.

ONCE THE STEAM AND CONDENSATE PIPING

ARE NO LONGER NECESSARY IN AN AREA,

THEY SHALL BE DEMOLISHED COMPLETELY IN

SEQUENCE WITH THE OVERALL

CONSTRUCTION SCHEDULE. ABANDONED

PIPING OR ASSOCIATED ITEMS IS NOT

ACCEPTABLE AND CONTRACTOR WILL BE

REQUIRED TO INCLUDE IN THEIR BID A

COMPLETE DEMOLITION SCOPE OF ALL SUCH

PIPING AND ASSOCIATED ITEMS FROM THE

BUILDING, WHETHER EXPLICITLY SHOWN ON

DRAWINGS OR NOT.

IMPORTANT VENTILATION DEMOLITION

NOTES TO CONTRACTOR:

THE INTENT OF THIS PROJECT FOR THE

SOUTH HALF OF THE FIRST FLOOR (AREA

SHOWN BY THIS SHEET) IS TO RETAIN A

MAJORITY OF THE EXISTING DUCTWORK

AND DIFFUSERS (OTHER THAN THOSE

SHOWN TO BE DEMOLISHED ON THIS

SHEET) WHILE REMOVING AND REPLACING

THE EXISTING AIR TERMINAL UNITS AND

ASSOCIATED CONTROLS, IN SEQUENCE

WITH THE PHASING OF THE WORK AS

DEFINED BY PHASING PLANS AND THE

PROPOSED SCHEDULE.

THE NEW AIR TERMINAL UNITS WITH HOT

WATER REHEAT ARE INTENDED TO

REPLACE EXISTING AIR TERMINAL UNITS

WITH STEAM REHEAT IN GENERALLY THE

SAME LOCATION UNLESS PLANS SHOW

OTHERWISE.

THE EXISTING DUCT RISERS FROM THE

BASEMENT ARE BEING REMOVED AS PART

OF THE PROJECT AND NEW DUCTWORK

MAINS FROM THE ROOF ARE BEING

PROVIDED TO CONNECT TO EXISTING

DUCT MAINS JUST OUTSIDE THE EXISTING

SHAFT AS SHOWN.

EXHAUST SYSTEMS FOR TOILET ROOMS,

SOILED HOLDING, ETC. ARE CONSIDERED

EXISTING TO REMAIN AND SHALL NOT BE

DEMOLISHED.

NOT ALL DUCTWORK OR DEVICES THAT

ARE TO BE REMOVED ARE SHOWN ON THIS

SHEET IN THEIR ENTIRETY, HOWEVER THIS

DOES NOT ABSOLVE CONTRACTOR OF

COMPLETING THE REQUIRED SCOPE OF

WORK AS DESCRIBED ABOVE. NO

DUCTWORK OR ASSOCIATED ITEMS SHALL

REMAIN ABANDONED IN PLACE BY

COMPLETION OF PROJECT.

Revisions Date

ISSUED FOR 60% DD 12/30/2022

ISSUED FOR 90% CD 02/10/2023

Gx

Hx

Jx

Kx

K'x

Lx

1x 4x 6x 9x 12x 13x 14x

Cx

Bx

Ax

3x 5x 5.8x 8x 10x6.1x

Fx

A.E

15x

15y

15z 15aa

15bb

15cc

15dd

15ee

15ff

15gg15hh

15ii

9.5x1.2x

A

1 2

B

EXISTING

EXHAUST FAN

EXISTING

EXHAUST FAN

EXISTING

EXHAUST FAN

EXISTING

EXHAUST FAN

EXISTING

DEMOLITION

NEW

PHASE LEGEND

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Drawing No.

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

© 2020 Virtual Energy Solutions, INC.

N

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

-J o lie t C

B O

C P a rk in g

E x p a n s io n M

E C

H

.r v t

/2

/2

:3

:1

P M

MD102-N

ROOF NORTH - MECHANICAL

DEMOLITION PLAN

PARKING EXPANSION AT

JOLIET CBOC

04/21/2023

EPTHEP

1/8" = 1'-0"

1 ROOF - MECHANICAL DEMOLITON PLAN - NORTH

0 4' 8' 16'

MECHANICAL DEMOLITION KEYNOTES

NUMBER KEYNOTE

1 EXISTING DDC THERMOSTAT/SENSOR TO BE REMOVED.

2 EXISTING AIR TERMINAL UNIT INCLUDING STEAM REHEAT COIL

AND ACCESSORIES TO BE REMOVED AS SHOWN. IF APPLICABLE,

LEAVE DUCTWORK CONNECTIONS FOR INSTALLATION OF NEW

VAV TERMINAL UNITS.

3 REMOVE EXISTING AIR HANDLING UNIT INCLUDING ALL

ASSOCIATED PIPING, ACCESSORIES, AND DUCTWORK

CONNECTIONS TO BOTH AHU AND ASSOCIATED RETURN/EXHAUST

FAN. REMOVE OUTDOOR AIR DUCTWORK BACK TO AREA WELL

AND CAP OPENING.

4 REMOVE EXISTING CHILLED WATER PUMP, ACCESSORIES, AND

ASSOCIATED PIPING TO ROOF MOUNTED CHILLERS.

5 REMOVE ALL EXISTING DUCTWORK AS SHOWN ON PLANS. THIS

SHALL INCLUDE HANGERS AND OTHER ACCESSORIES RELATED TO

THE DUCTWORK SYSTEM.

6 EXISTING STEAM UNIT HEATER TO BE REMOVED INCLUDING

ASSOCIATED THERMOSTAT, STEAM AND CONDENSATE PIPING

BACK TO MAINS, AND ANY ACCESSORIES AND HANGERS.

7 ALL BOOSTER COILS, DUCTWORK AND ASSOCIATED

GRILLES/DIFFUSERS ORIGIONATING FROM THIS DUCT RISER TO BE

REMOVED, INCLUDING TSTATS

8 REMOVE EXISTING STEAM CONDENSATE RECEIVER AND PUMP

SYSTEM.

9 REMOVE EXISTING STEAM BOILER INCLUDING STEAM AND

FEEDWATER PIPING, CONTROLS, FLUE THROUGH ROOF, AND ALL

OTHER ACCESSORIES AND STEAM/CONDENSATE PIPING IN BOILER

PLANT.

10 REMOVE EXISTING BOILER FEEDWATER UNIT INCLUDING PIPING

TO BOILERS, CONTROLS, AND OTHER ACCESSORIES. LEAVE

MAKEUP WATER CONNECTION AT DISCHARGE OF RPZ FOR

EXTENSION TO NEW GLYCOL FILL SYSTEM BY MECHANICAL

CONTRACTOR.

11 REMOVE EXISTING ROOF EXHAUST FAN AND PATCH ROOF

OPENING.

12 REMOVE EXISTING CHILLED WATER PIPING FROM CHILLERS DOWN

TO BASEMENT PUMPS. PATCH ROOF OPENINGS AFTER

DEMOLITION OF PIPES.

13 REMOVE EXISTING RELIEF AIR DUCT IN BASEMENT UP TO FLOOR

LEVEL OF FIRST FLOOR AND CAP BASE OF DUCT. SEE MH101-S

FOR NEW WORK SCOPE FOR THIS DUCT.

Revisions Date

ISSUED FOR 60% DD 12/30/2022

ISSUED FOR 90% CD 02/10/2023

1x 4x 6x 9x 12x 13x 14x

Bx

Ax

A1x

B1x

C1x

D1x

E1x

3x 5x

A.E

15x1.2x

EXISTING IT ROOM

AC CONDENSING

UNIT TO REMAIN

EXISTING AIR

COOLED CHILLER

TO REMAIN

EXISTING EXHAUST FAN

EXISTING EXHAUST FAN

EXISTING EXHAUST FAN

EXISTING

DEMOLITION

NEW

PHASE LEGEND

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Drawing No.

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

© 2020 Virtual Energy Solutions, INC.

S

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

-J o lie t C

B O

C P a rk in g

E x p a n s io n M

E C

H

.r v t

/2

/2

:3

:1

P M

MD102-S

ROOF SOUTH - MECHANICAL

DEMOLITION PLAN

PARKING EXPANSION AT

JOLIET CBOC

04/21/2023

EPTHEP

0 4' 8' 16'

1/8" = 1'-0"

1 ROOF - MECHANICAL DEMOLITON PLAN - SOUTH

MECHANICAL DEMOLITION KEYNOTES

NUMBER KEYNOTE

1 EXISTING DDC THERMOSTAT/SENSOR TO BE REMOVED.

2 EXISTING AIR TERMINAL UNIT INCLUDING STEAM REHEAT COIL

AND ACCESSORIES TO BE REMOVED AS SHOWN. IF APPLICABLE,

LEAVE DUCTWORK CONNECTIONS FOR INSTALLATION OF NEW

VAV TERMINAL UNITS.

3 REMOVE EXISTING AIR HANDLING UNIT INCLUDING ALL

ASSOCIATED PIPING, ACCESSORIES, AND DUCTWORK

CONNECTIONS TO BOTH AHU AND ASSOCIATED RETURN/EXHAUST

FAN. REMOVE OUTDOOR AIR DUCTWORK BACK TO AREA WELL

AND CAP OPENING.

4 REMOVE EXISTING CHILLED WATER PUMP, ACCESSORIES, AND

ASSOCIATED PIPING TO ROOF MOUNTED CHILLERS.

5 REMOVE ALL EXISTING DUCTWORK AS SHOWN ON PLANS. THIS

SHALL INCLUDE HANGERS AND OTHER ACCESSORIES RELATED TO

THE DUCTWORK SYSTEM.

6 EXISTING STEAM UNIT HEATER TO BE REMOVED INCLUDING

ASSOCIATED THERMOSTAT, STEAM AND CONDENSATE PIPING

BACK TO MAINS, AND ANY ACCESSORIES AND HANGERS.

7 ALL BOOSTER COILS, DUCTWORK AND ASSOCIATED

GRILLES/DIFFUSERS ORIGIONATING FROM THIS DUCT RISER TO BE

REMOVED, INCLUDING TSTATS

8 REMOVE EXISTING STEAM CONDENSATE RECEIVER AND PUMP

SYSTEM.

9 REMOVE EXISTING STEAM BOILER INCLUDING STEAM AND

FEEDWATER PIPING, CONTROLS, FLUE THROUGH ROOF, AND ALL

OTHER ACCESSORIES AND STEAM/CONDENSATE PIPING IN BOILER

PLANT.

10 REMOVE EXISTING BOILER FEEDWATER UNIT INCLUDING PIPING

TO BOILERS, CONTROLS, AND OTHER ACCESSORIES. LEAVE

MAKEUP WATER CONNECTION AT DISCHARGE OF RPZ FOR

EXTENSION TO NEW GLYCOL FILL SYSTEM BY MECHANICAL

CONTRACTOR.

11 REMOVE EXISTING ROOF EXHAUST FAN AND PATCH ROOF

OPENING.

12 REMOVE EXISTING CHILLED WATER PIPING FROM CHILLERS DOWN

TO BASEMENT PUMPS. PATCH ROOF OPENINGS AFTER

DEMOLITION OF PIPES.

13 REMOVE EXISTING RELIEF AIR DUCT IN BASEMENT UP TO FLOOR

LEVEL OF FIRST FLOOR AND CAP BASE OF DUCT. SEE MH101-S

FOR NEW WORK SCOPE FOR THIS DUCT.

Revisions Date

ISSUED FOR 60% DD 12/30/2022

ISSUED FOR 90% CD 02/10/2023

F2

F

F

F2

F

F2F2

F2

Elev. Equip.

B003

Badge

B004

Phone

B002C

Home Based Primary

Care

B002

Stair #2

S-2

Comm.

B005

Reception

B001

Women's Restroom

B006

Men's Restroom

B011

HAC

B007

Copy Room

B009

Phone

B002A

Phone

B002B

Phone

B017

Phone

B016

A.O.

B015

Clinical Nurse Manager

B014

Chief Medical Director

B013

Patient Education/Group

Room

B011

Patient

Education/Exercise

B022

Store

B012

Corridor

C0-2

Corridor

C0-3

Corridor

C0-4

Corridor

C0-1

Mech.

B018

Elec.

B019

Gen Room

B020

PAS Call Center

B024

Education Storage

B022

Nutrition Services

B021

Main Conference Room

B023

Mech.

B025

Elevator

EL-1

New North Vestibule

Elec.

B026B

Lobby

Storage

002A

S-1

200 CFM

S-1

100 CFM

CUH

12x10 SA

VAV

Dx

Ex

Gx

Hx

Jx

Kx

K'x

Lx

1x 4x 6x 9x 12x 13x 14x

Cx

Bx

Ax

3x 5x 5.8x 8x 10x6.1x

Fx

A.E

15x

15y

15z 15aa

15bb

15cc

15dd

15ee

15ff

15gg15hh

15ii

9.5x1.2x

A

1 2

B

UH

003A

UH

B003

UH

B018A

UH

B018B

UH

B019

UH

B020

Mach. Room

003A

Elevator-2

E-2-2

T

VAV

B015

T

T

VAV

B013

VAV

B002

T

VAV

B001

T

T

T

T

T

T

T

E-1

350 CFM

E-1

300 CFM

S-1

250 CFM

S-1

200 CFM

S-1

315 CFM

S-1

315 CFM

(X)S

150 CFM

(X)S

150 CFM

(X)S

150 CFM

(X)S

50 CFM

(X)R

50 CFM

R-1

450 CFM

(X)S

50 CFM

S-1

50 CFM(X)S

50 CFM

(X)S

75 CFM

(X)S

90 CFM

(X)S

125 CFM

(X)S

50 CFM

(X)R

75 CFM

(X)R

90 CFM

(X)R

50 CFM

x R

A

28x14 SA x S

A

26x14 SA x R

A

22x14 SA

28x12 RA

S-3

260 CFM8x8 SA x S

A x S

A

T

T

T

T

T

TT

VAV

B022D

VAV

B022C

VAV

B011B

VAV

B011A

VAV

B022A

VAV

B022B

26x14 RA

(X)R

50 CFM

(X)R

50 CFM

(X)R

50 CFM

(X)S

125 CFM

(X)S

125 CFM

(X)S

125 CFM

(X)S

125 CFM

(X)R

250 CFM

(X)R

250 CFM

(X)S

200 CFM

(X)S

200 CFM

(X)R

400 CFM

(X)S

200 CFM

(X)S

200 CFM

(X)S

200 CFM

(X)R

400 CFM

(X)S

200 CFM

(X)S

200 CFM

(X)S

200 CFM

(X)R

400 CFM

(X)R

125 CFM

R-1

450 CFM

(X)R

400 CFM

12x10 SA

20x10 SA

S-3

800 CFM

S-3

800 CFM

VAV

C0-1

VAV

B023A

VAV

B023B

16x12 SA

16x12 SA

T

T

(X)S

175 CFM

(X)S

175 CFM

(X)S

150 CFM

(X)S

175 CFM

(X)R

200 CFM

(X)S

200 CFM

(X)S

100 CFM

(X)R

100 CFM

(X)S

150 CFM (X)S

175 CFM

(X)S

175 CFM

(X)S

125 CFM

(X)S

175 CFM

(X)S

175 CFM

(X)S

175 CFM

(X)S

175 CFM

(X)R

667 CFM (X)R

667 CFM

(X)R

667 CFM

(X)S

150 CFM

TYP. 8

FT

S-2 T

R-3

700 CFM

TYP. 4

x S

A x S

A

S-3

350 CFM

S-3

350 CFM

S-3

350 CFM

S-3

350 CFM

S-3

350 CFM

S-3

350 CFM

S-3

350 CFM

S-3

350 CFM

VAV

B018A

VAV

B018B

T

T

S-3

250 CFM

VAV

B003

S-3

250 CFM

12x8 SA

VAV

B003A x S

A

12x10 RA 12x10 RA

R-1

600 CFM

R-1

600 CFM

28x14 SA 28x12 RA

26x14 RA

36x16 RA

26x14 SA

SD

SD

SD

EXISTING

DEMOLITION

NEW

PHASE LEGEND

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Drawing No.

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

© 2020 Virtual Energy Solutions, INC.

N

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

-J o lie t C

B O

C P a rk in g

E x p a n s io n M

E C

H

.r v t

/2

/2

:3

:2

P M

MH100-N

BASEMENT LEVEL -

MECHANICAL VENTILATION

PLAN - NORTH

PARKING EXPANSION AT

JOLIET CBOC

04/21/2023

EPTHEP

1/8" = 1'-0"

1 BASEMENT LEVEL - MECHANICAL VENTILATION PLAN - NORTH

0 4' 8' 16'

Revisions Date

ISSUED FOR 60% DD 12/30/2022

ISSUED FOR 90% CD 02/10/2023

ISSUED FOR 100% CD 03/07/2023

F

F2

F2

F2

F2

F

F

F2

F2

F2

F2

F2

F2 F2

F2

Mech.

B025

Patient Education/Group

Room

B033

Patient Education/Group

Room

B032

Patient Ed/Internet Cafe

B031

Corridor

C0-6

Corridor

C0-8

Corridor

C0-7

Room

B042

Men's Staff Locker

B036

Women's Staff Locker

B034

Mech.

Corridor

C0-9

Corridor

B047

Mech.

B026 Elec.

B029

Elec.

B028

Comm

B030

Facility Storage

B041

EMS

B038

Biomed

B039

FMS

B040

Stair #1

S-1

1x 4x 6x 9x 12x 13x 14x

Ax

A1x

B1x

C1x

D1x

E1x

3x 5x

A.E

15x1.2x

CUH

S-1

T

T

T

T

T T

T

T

VAV

B038

VAV

B040

VAV

B039

VAV

B041A

VAV

B041C

VAV

B041B

S-3

380 CFM

S-3

380 CFM

S-3

370 CFM

S-3

370 CFM

S-3

370 CFM

S-3

370 CFM

(X)S

225 CFM

(X)S

225 CFM

(X)S

255 CFM

(X)R

255 CFM

(X)R

450 CFM

(X)S

175 CFM

(X)S

200 CFM

(X)S

200 CFM

(X)R

575 CFM

T

T

T

VAV

B034

VAV

B042

VAV

B036

(X)S

210 CFM

(X)S

215 CFM

(X)S

210 CFM

R-1

635 CFM(X)S

225 CFM

(X)S

225 CFM

(X)E

450 CFM

(X)E

150 CFM

(X)E

100 CFM

(X)E

150 CFM

(X)E

780 CFM (X)S

390 CFM

(X)S

390 CFM

24x24 SA

VAV

B026A

T T

T

(X)S

115 CFM

(X)S

120 CFM

(X)S

120 CFM

(X)S

120 CFM

(X)R

475 CFM

VAV

B032

VAV

B033

(X)S

100 CFM

(X)S

100 CFM

(X)S

105 CFM

(X)S

105 CFM

(X)S

135 CFM

(X)S

135 CFM

(X)R

270 CFM

VAV

B031

VAV

B028A

VAV

B028B

VAV

C0-6

T

(X)S

110 CFM

(X)S

105 CFM S-1

105 CFM

x S

A x R

A x R

A

T

T

(X)R

405 CFM

24x12 SA x S

A x S

A

S-3

555 CFM

S-3

555 CFM

S-3

555 CFM

S-3

555 CFM

S-3

450 CFM

S-3

450 CFM

S-3

445 CFM

S-3

445 CFM

20x12 SA x S

A x S

A

VAV

B026B

TT

S-3

800 CFM

S-3

800 CFM

S-1

125 CFM

S-1

125 CFM

S-1

125 CFM

8x8 SA

6x6 SA

VAV

B047

T

(X)R

667 CFM (X)R

667 CFM

(X)R

667 CFM

(X)S

200 CFM

(X)S

200 CFM

(X)S

110 CFM

x S

A 12x10 SA

VAV

C0-8

PROPOSED LOCATION

OF NEW JACE FOR

CONTROL SYSTEM

R-3

560 CFM

R-3

560 CFM

R-3

560 CFM

R-3

560 CFM

18x10 RA

18x10 RA R-3

710 CFM

R-3

700 CFM

R-3

650 CFM

R-3

650 CFM

R-3

650 CFM

R-3

650 CFM

R-3

800 CFM

R-3

800 CFM

30x22 RA

30x22 RA

30x22 SA

26x18 RA x R

A

18x10 RA

48x22 RA x R

A

26x24 SA

30x20 RA

12x10 SA

SD

SD

EXISTING

DEMOLITION

NEW

PHASE LEGEND

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Drawing No.

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

© 2020 Virtual Energy Solutions, INC.

S

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

-J o lie t C

B O

C P a rk in g

E x p a n s io n M

E C

H

.r v t

/2

/2

:3

:3

P M

MH100-S

BASEMENT LEVEL -

MECHANICAL VENTILATION

PLAN - SOUTH

PARKING EXPANSION AT

JOLIET CBOC

04/21/2023

EPTHEP

1/8" = 1'-0"

1 BASEMENT LEVEL - MECHANICAL VENTILATION PLAN - SOUTH

0 4' 8' 16'

Revisions Date

ISSUED FOR 60% DD 12/30/2022

ISSUED FOR 90% CD 02/10/2023

ISSUED FOR 100% CD 03/07/2023

F

F

F

F 2 F

F

F

F

F

F2

F2 F2

F2F2

F2F2

F2

Boiler Plant

Sound Booth

Control

Sound Booth

FMS

Elevator

EL-1 EXISTING STAIR

S-2

Corridor

C1-15

Rad Control

Dispensary

Storage

1116A

Diagnostic

Marco

Rad Room

Corridor

C1-13

Corridor

C1-15A

Corridor

C1-11

Toilet

Toilet

HAC

Toilet

1112E

Soiled Utility

1112A Storage

1112B

PM&R

Treatment

1112D

Eye Tech

Visual Fields

Treatment

1112C

Toilet

Toilet

1102A

Eye

Blood Draw

1114D

Eye

Blood Draw

1114C

Draw Analysis

1114E

Toilet

1114F

Blood Draw

1114B

Eye

Eye

Women Health Exam 21

Women Health Exam 20

Mobile Port Waiting

Toilet

1068A

Toilet

1031A

Pharm. D

Pharm. D

Nutritionist

Teleretinal

Cardio/Pod Shared

Office

Soiled Utility

Clean Utility

Social Worker

Shell Space

Corridor

C1-10

Podiatry Exam

Podiatry Exam

Tech Work Room

Audiology Exam

Cast Room

Podiatry Exam

Audiology Exam

Oxygen Evaluation

Pulminary Fuction

Arterial Blood Gas

Clean Utility

Soiled Utility

Control

Stor.

Corridor

C1-12

Corridor

C1-9 Corridor

Ambulance Bay

C1-36

Corridor

C1-8--

1065B

Elec. Clos.

1089A

Scale Alcove

PAS

Elec.

1114 --

1114A

Lobby

Elevator-1

E-2-1

Office

Vestibule

Dx

Ex

Gx

Hx

Jx

Kx

K'x

Lx

1x 4x 6x 9x 12x 13x 14x

Cx

Bx

Ax

3x 5x 5.8x 8x 10x6.1x

Fx

A.E

15x

15y

15z 15aa

15bb

15cc

15dd

15ee

15ff

15gg15hh

15ii

9.5x1.2x

A

1 2

B

B

B

B

T

30x16 SA x S

A x S

A x S

A

20x12 SA x S

A

28x16 SA 26x14 SA x S

A x S

A

S-1

135 CFM

S-1

135 CFM

S-1

140 CFM

S-1

135 CFM

VAV

1114E

S-1

135 CFMS-1

135 CFMS-1

135 CFM

S-1

135 CFM

VAV

1114D

S-1

130 CFM

VAV

S-1

160 CFM

VAV

C1-11B S-1

195 CFM

S-1

195 CFM

S-1

160 CFM

S-1

150 CFM

10x10 SA

VAV

S-1

80 CFM

S-1

85 CFM

S-1

140 CFM

S-1

110 CFM

VAV

S-1

165 CFM

S-1

275 CFM

VAV

S-1

105 CFM

S-1

120 CFM

S-1

165 CFM

S-1

110 CFM

VAV

S-1

230 CFM

S-1

225 CFM

VAV

C1-15B

S-1

180 CFM

VAV

S-1

180 CFM

S-1

180 CFM

S-1

180 CFM

S-1

180 CFM

S-1

180 CFM

x S

A x S

A x S

A

S-1

55 CFM

S-1

75 CFM

VAV

S-1

195 CFM

S-1

130 CFM

VAV

C1-15A

S-1

130 CFM

S-1

130 CFM

VAV

1112D

S-1

135 CFM

S-1

210 CFM

S-1

135 CFM

S-1

140 CFM

14x10 SA x S

A

VAV

C1-11A

S-1

145 CFM

S-1

100 CFM

S-1

145 CFM

10x10 SA x S

A x S

A

12x10 SA

VAV

VAV

S-1

145 CFM

S-1

145 CFM

S-1

130 CFM

S-1

130 CFM

VAV

VAV

C1-15

S-1

155 CFM

S-1

230 CFM S-1

45 CFM

S-1

200 CFM

S-1

200 CFM

VAV

S-1

135 CFM

S-1

135 CFM

S-1

100 CFM

VAV

S-1

140 CFM

S-1

250 CFM

10x10 SA x S

A

8x8 SA x S

A x S

A 8 x S

A x S

A x S

A

8x6 SA10x8 SA8x8 SA

12x10 SA x S

A

8x8 SA x S

A

12x10 SA x S

A x S

A

12x10 SA x S

A x S

A x S

A 10x10 SA10x8 SA8x8 SA

12x10 SA

10x10 SA8x8 SA x S

A x S

A

10x10 SA

VAV

1077S-1

110 CFM

S-1

105 CFM

S-1

200 CFM

10x10 SA8x8 SA

S-1

150 CFM

12x10 SA

S-1

140 CFM

x S

A

S-1

140 CFM

S-1

95 CFM

VAV

S-1

165 CFM

S-1

170 CFM

S-1

125 CFM

S-1

125 CFM

x S

A x S

A x S

A

VAV

C1-10

S-1

210 CFM

T

T

T

TT

T

T

T

T

T

T

T

T

VAV

T

T

T

T

T

T

T

T

T

R-1

410 CFM

R-1

405 CFM

R-1

135 CFM

R-1

135 CFM

R-1

160 CFM

R-1

130 CFM

R-1

150 CFM

R-1

390 CFM

R-1

250 CFM

R-1

165 CFM

R-1

220 CFM

R-1

140 CFM

R-1

85 CFM

R-1

95 CFM

R-1

125 CFM

10x8 RA

R-1

140 CFM

R-1

150 CFM

R-1

140 CFM

R-1

170 CFM

12x10 RA

R-1

165 CFM

R-1

435 CFM

R-1

125 CFM

R-1

455 CFM

CUH

R-1

310 CFM R-1

120 CFM

R-1

165 CFM

R-1

105 CFM

R-1

80 CFM

R-1

290 CFM

R-1

160 CFM

R-1

135 CFM

R-1

210 CFM

x R

A

R-1

105 CFM

28x12 RA 38x14 RA

18x12 RA x R

A

CUH

R-1

100 CFM R-1

250 CFM

R-1

140 CFM

R-1

200 CFM

14x10 RA 10x10 RA

R-1

270 CFM

R-1

200 CFM

R-1

230 CFM

12x10 RA 14x10 RA

R-1

155 CFM

R-1

45 CFM R-1

165 CFM

R-1

290 CFM

R-1

390 CFM

R-1

195 CFM

R-1

160 CFM

R-1

160 CFM

R-1

165 CFM

R-1

260 CFM

R-1

140 CFM

R-1

135 CFM

R-1

55 CFM

R-1

555 CFM

(TYP OF 2)

26x16 RA x R

A

10x8 RA x R

A

34x14 RA

T

S-1

255 CFM S-1

135 CFM

x S

A6x6 SA 6x6 SA

S-1

60 CFM

(X)S

160 CFM

S-4

50 CFM

S-4

50 CFM

S-4

50 CFM

S-4

75 CFM

S-4

50 CFM

S-4

50 CFM

10x8 SA x S

A

S-4

50 CFM

S-4

75 CFM

S-4

50 CFM

S-4

50 CFM

S-4

50 CFM

S-4

50 CFM

10x8 SA x S

A x S

A

(X)E

75 CFM

EXISTING PACKAGED HVAC

UNIT TO REMAIN TO SERVE

BOILER PLANT

EXISTING PACKAGED HVAC

UNIT TO REMAIN TO SERVE

BOILER PLANT

EF

14x14 SA

VAV

C1-36A

VAV

C1-36B

S-2

50 CFM

R-1

100 CFM

UP TO

EXISTING

EF

S-3

1160 CFM

S-3

1160 CFM

(X)E

70 CFM

(X)E

70 CFM

(X)E

70 CFM

(X)E

70 CFM

(X)E

70 CFM

T

T

GMU

18x14 SA

ET

AS

P

HW-1

P

HW-2

P

HW-3

8x8 SA

6x6 SA

UP TO

EXISTING

EF

(X)E

100 CFM

T

(X)S

50 CFM

(X)S

50 CFM

(X)S

50 CFM

(X)S

50 CFM

x R

A

18x10 RA

18x12 RA

24x12 RA

14x10 RA x R

A

26x14 RA DN 36x24 RA UP

26x14 SA DN 36x20 SA UP

28x12 RA DN 36x22 RA UP

12x12 RA10x10 RA

16x12 SA26x16 SA DN 36x20 SA UP

36x16 RA DN 40x20 RA UP

28x14 SA DN 36x24 SA UP

8ø SA

SD

SD

SD

EXISTING

DEMOLITION

NEW

PHASE LEGEND

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Drawing No.

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

© 2020 Virtual Energy Solutions, INC.

N

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

-J o lie t C

B O

C P a rk in g

E x p a n s io n M

E C

H

.r v t

/2

/2

:3

:4

P M

MH101-N

FIRST FLOOR - MECHANICAL

VENTILATION PLAN - NORTH

PARKING EXPANSION AT

JOLIET CBOC

04/21/2023

EPBBEP

1/8" = 1'-0"

1 FIRST FLOOR - MECHANICAL VENTILATION PLAN - NORTH

0 4' 8' 16'

Revisions Date

ISSUED FOR 60% DD 12/30/2022

ISSUED FOR 90% CD 02/10/2023

ISSUED FOR 100% CD 03/07/2023

F2

F2

F

F

F2

Blood Draw

1114B

Eye

Eye

1-On-1 Room

1017C

Work Room

1017B

Supervisor Office

1017A Nurse Triage

Exam 1

Exam 2

Nurse Triage

Women Health Exam 3

IT-1

1014-1

Telemed

Telemed

Closet

Telemed

1009Telemed

Toilet

1043A

Telemed

Telemed

Exam 17

Exam 16

PACT 2

PACT 1

Exam 15

Exam 14

Exam 12

Exam 13

Exam 5

Women Health Exam 4

Toilet

1045 Toilet

1047A

Men's Restroom

Women's Restroom

Treatment Room

Toilet

Treatment Room

CWT

CWT

Security

Wheelchair Storage

Group Treatment

Treatment Room

Group Treatment

Treatment Room

Treatment Room

Treatment Room

Treatment Room

Soiled Utility

Exam 6

Exam 7

Exam 8

Exam 9

Clean Storage

Room

B131

Exam10

Procedure 1 Shared

Gyno

Toilet

1059B Toilet

Closet

1059A

Procedure 2

Exam 11

Exam 19

1066 Exam 18

PACT

PACT 4

Women Health Exam 21

Women Health Exam 20

Corridor

C1-3

Telemed

HAC

Stair #1

S-1

Mobile Port Waiting

Toilet

1068A

Toilet

1031A

Pharm. D

Social Worker

Corridor

C1-5

Corridor

C1-7

Corridor

C1-6

Corridor

C1-4

Corridor

C1-8

Corridor

C1-1

General Waiting

Corridor

C1-2

Photo Alcove

Reception

Equipment Alcove

Nourishment Alcove

Scale Alcove

1040 Meds

1065C

1065B

1065A

1114 --

1114A

1x 4x

6x 9x 12x 13x 14x

Bx

Ax

A1x

B1x

C1x

D1x

E1x

3x 5x

A.E

15x

1.2x

IT

T

T

T

T

T

T

T

T

T T T

T T

T

T

TTTT

T

T

T

T

T

T

T

T

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

S-1

135 CFMS-1

135 CFMS-1

135 CFM

S-1

150 CFMS-1

85 CFM

S-1

140 CFMS-1

165 CFM

T

T

CUH

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

C1-6

VAV

VAV

C1-5

VAV

VAV

1017C

VAV

1017A

VAV

1003N

VAV

1003S

VAV

VAV

C1-2

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

1065B

VAV

VAV

VAV

VAV

VAV

VAV

S-1

280 CFM 12x8 SA

S-1

145 CFM

S-1

145 CFM

S-1

145 CFM

S-1

145 CFM

S-1

145 CFM

S-1

340 CFM

(X)S

120 CFM

(X)R

120 CFM

(X)S

120 CFM

(X)R

120 CFM

(X)R

120 CFM

(X)R

120 CFM

T

VAV

T

R-1

135 CFM

R-1

390 CFM

R-1

165 CFM

R-1

220 CFM

R-1

140 CFM

R-1

85 CFM

18x12 RA

(X)S

120 CFM

(X)R

120 CFM

(X)S

120 CFM(X)R

120 CFM

S-1

340 CFM

(X)R

340 CFM

S-1

270 CFM

(X)R

270 CFM

S-1

370 CFM

(X)R

520 CFM

S-1

150 CFM

S-1

255 CFM S-1

135 CFM

(X)R

390 CFM

(X)S

120 CFM

(X)R

120 CFM

(X)S

130 CFM

(X)S

130 CFM

(X)R

45 CFM

(X)R

45 CFM

S-1

120 CFM

S-1

120 CFM

(X)R

120 CFM

(X)S

90 CFM(X)S

90 CFM

(X)R

90 CFM (X)R

90 CFM

R-1

325 CFM

S-1

325 CFM

(X)S

90 CFM

(X)R

90 CFM (X)S

325 CFM

(X)S

325 CFM(X)R

350 CFM

(X)R

300 CFM

(X)S

90 CFM

(X)R

90 CFM

(X)S

150 CFM

(X)R

150 CFM

(X)R

105 CFM

(X)S

105 CFM

(X)R

105 CFM

(X)S

105 CFM

(X)R

155 CFM

(X)S

75 CFM

(X)R

75 CFM

(X)S

100 CFM

(X)R

100 CFM

(X)S

100 CFM

(X)R

100 CFM

(X)S

100 CFM

(X)R

100 CFM

(X)S

140 CFM

(X)R

140 CFM

(X)S

280 CFM

(X)S

260 CFM

(X)S

280 CFM

(X)R

280 CFM

(X)R

260 CFM

(X)R

280 CFM

(X)S

240 CFM

(X)R

240 CFM

(X)S

130 CFM

S-1

130 CFM

(X)S

125 CFM

S-1

255 CFM

(X)R

255 CFM

S-1

160 CFM

(X)R

160 CFM

S-1

240 CFM

(X)R

240 CFM

(X)R

385 CFM

(X)R

160 CFM

S-1

160 CFM

(X)S

215 CFM

(X)R

140 CFM

(X)S-4

225 CFM

(X)S-4

225 CFM

(X)S-4

225 CFM

(X)S-4

225 CFM

(X)S-4

225 CFM

(X)S-4

225 CFM

(X)S-4

225 CFM

(X)S-4

125 CFM

x S

A

(X)R

500 CFM

12x10 SA

S-4

225 CFM

S-4

225 CFM

S-1

225 CFM

12x10 SA

(X)S-4

225 CFM

(X)S-4

225 CFM

(X)S

160 CFM

(X)R

160 CFM

(X)R

145 CFM

(X)S

145 CFM

(X)S

140 CFM

(X)R

140 CFM

(X)R

90 CFM

(X)R

500 CFM

(TYP OF 3)

(X)S

75 CFM

(X)R

75 CFM

(X)S

75 CFM

(X)R

75 CFM

(X)R

75 CFM

(X)S

75 CFM

(X)S

75 CFM

(X)R

75 CFM

(X)R

75 CFM

(X)S

75 CFM

(X)S

230 CFM

(X)E

75 CFM

(X)E

60 CFM

(X)E

60 CFM

(X)E

330 CFM

E-1

360 CFM

(X)S

260 CFM

(X)R

340 CFM

(X)R

280 CFM

(X)S

120 CFM

(X)R

120 CFM

(X)S

120 CFM

(X)R

120 CFM

(X)R

120 CFM

16x10 SA x S

A

(X)R

120 CFM

(X)S

120 CFM

S-1

200 CFM

(X)R

200 CFM (X)R

250 CFM

S-1

250 CFM

(X)R

250 CFM

S-1

250 CFM

(X)R

250 CFM

S-1

250 CFM

(X)R

250 CFM

S-1

250 CFM

(X)R

285 CFM

(X)R

450 CFM

(X)S

140 CFM

(X)S

140 CFM

(X)S

140 CFM

S-1

140 CFM

(X)S

140 CFM

x S

A x S

A x S

A

12x10 SA

(X)R

500 CFM

(TYP OF 4)

190 CFM

X(S)

190 CFM

X(S) 190 CFM

X(S)

(X)E

65 CFM

(X)E

75 CFM

(X)E

65 CFM

(X)E

75 CFM

S-3

600 CFM

x S

A x S

A x S

A

12x10 SA

12x10 SA

12x10 SA x S

A x S

A x S

A

12x10 SA

12x8 SA

18x14 SA

10x10 SA x S

A x S

A x S

A x S

A

12x10 SA

12x10 SA

T

(X)S

120 CFM (X)S

120 CFM

T

(X)S

210 CFM

(X)S

210 CFM

S-1

210 CFM

(X)S

190 CFM

T

(X)S

50 CFM

40x22 SA

48x22 SA

12x10 SA

30x22 SA DN 52x24 SA UP

26x24 SA DN 52x24 SA UP ø

S A

8ø SA

(X)S

250 CFM

30x20 RA DN 44x24 RA UP

12x12 RA10x10 RA

30x22 RA DN 40x24 RA UP

(X)R

125 CFM

30x20 RA UP

SD

SD

SD

EXISTING

DEMOLITION

NEW

PHASE LEGEND

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Drawing No.

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

© 2020 Virtual Energy Solutions, INC.

S

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

-J o lie t C

B O

C P a rk in g

E x p a n s io n M

E C

H

.r v t

/2

/2

:4

:0

P M

MH101-S

FIRST FLOOR - MECHANICAL

VENTILATION PLAN - SOUTH

PARKING EXPANSION AT

JOLIET CBOC

04/21/2023

EPTHEP

1/8" = 1'-0"

1 FIRST FLOOR - MECHANICAL VENTILATION PLAN - SOUTH

0 4' 8' 16'

MECHANICAL KEYNOTES

NUMBER KEYNOTE

1 CONDENSATE DRAIN FROM AHU DOWN TO ROOF DRAIN

BELOW AT AMBULANCE BAY ROOF. PROVIDE DRAIN TRAP

AT AHU PER DETAILS.

2 PROVIDE DRAIN COOLER FOR ALL STEAM CONDENSATE

DRAINAGE FROM HUMIDIFIER AND PIPE DISCHARGE OF

CONDENSATE COOLER TO ROOF DRAIN BELOW.

3 PROVIDE ACID NEUTRALIZATION BASIN AT REAR OF EACH

BOILER TO ACCEPT ALL FLUE CONDENSATE AND ROUTE

DISCHARGE OF ACID NEUTRALIZATION BASINS TO

EXISTING FLOOR DRAIN IN BOILER ROOM.

4 MECHANICAL CONTRACTOR TO PIPE FROM EXISTING

PLUMBING WATER RPZ TO MAKEUP WATER FILL

CONNECTOR ON GLYCOL MAKEUP UNIT. PIPE THE

PUMPED DISCHARGE FROM GMU TO THE FILL

CONNECTION ON THE SYSTEM PER DETAILS ON M703.

5 MANUAL DAMPER (NORMALLY OPEN)

6 NEW UNDERGROUND HEATING WATER SUPPLY AND

RETURN SHALL BE INSTALLED ALONGSIDE EXISTING

STEAM AND CONDENATE PIPES UNDERGROUND TO

ALLOW FOR STEAM SYSTEM TO BE IN OPERATION UNTIL

LATER PHASES OF PROJECT. COORDINATE ROUTING OF

NEW HEATING WATER…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .