This document is a phasing plan related to a cancelled federal contract opportunity for construction services. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center Austin for a parking expansion project at the Joliet CBOC. The opportunity was for construction work to expand parking facilities at the Joliet Community Based Outpatient Clinic. The solicitation number was 36C77623B0049 and was titled "Cancelled: Y1LZ--578-371 Construction - Parking Expansion at Joliet CBOC." The type of opportunity was a solicitation. No information is provided on pricing terms, response dates, set asides, or incumbent contractors. The file appears to be an appendix containing a phasing plan for the parking expansion project.

View the file

Other files

File Type Posted
HCA Signed PCAC S30 - Cancellation of Bids - IFB - J.pdf PDF
S30 - Attachment - Abstract of Bids - Joliet.pdf PDF
Attachment 8 - Joliet Roof Report.pdf PDF
Attachment 6 - Joliet CBOC Elect. Add. 2 230726.pdf PDF
Attachment 2 - 09 06 00 Schedule for Finishes.pdf PDF
36C77623B0049 0005 - Joliet CBOC - RFIs-Wage Rates-Bid Opening.pdf PDF
Attachment 3 - AHU Heat Pipe Design Basis.pdf PDF
Attachment 4 - Joliet CBOC Arch RCPs Add. 2 230726.pdf PDF
Attachment 5 - Joliet CBOC Ceiling Diagrams 230726.pdf PDF
Attachment 7 - M601 - MECHANICAL SCHEDULES.pdf PDF
Attachment 1 - Technical Questions - Part 2.pdf PDF
Attachment 9 - Updated Wage Rates - Will County.pdf PDF
Attachment 1 - Technical Questions - Part 1.pdf PDF
Attachment 4 - Joliet Arch RCP.pdf PDF
36C77623B0049 0004 - Joliet CBOC - Extension and RFIs.pdf PDF
Attachment 5 - Joliet CBOC Laydown Areas.pdf PDF
Attachment 3 - Joliet CBOC Geotech Proposed Parking.pdf PDF
Attachment 2 - Infection Control Risk Assessment.pdf PDF
36C77623B0049 0003 - Joliet CBOC - Second Site Visit Sign-In.pdf PDF
Pre-Bid Site Visit 2 Sign-in 578-371.pdf PDF
36C77623B0049 0002 - Second Site Visit and RFI Extension.pdf PDF
36C77623B0049 0001 - Joliet CBOC - Site Visit Sign In.pdf PDF
Pre-Bid Site Sign-in 578-371.pdf PDF
S02 - ATCH 30 - Joliet_CBOC_Issued_for_Bid_A1_Struct_Part_8.pdf PDF
S02 - ATCH 32 - Contractor Safety - Environmental Form.pdf PDF
S02 - ATCH 8 - 7) Above Ceiling Entry and Wall Const Permits.pdf PDF
S02 - ATCH 33 - Wage Rates - Will County 5.12.2.pdf PDF
S02 - ATCH 27 - Joliet_CBOC_Issued_for_Bid_A1_Arch_Part_5.pdf PDF
S02 - ATCH 16 - 15) No Smoking Policy 10-1-19.pdf PDF
S02 - ATCH 23 - Joliet_CBOC_Issued_for_Bid_A1_Arch_Part_1.pdf PDF
S02 - ATCH 4 - 3) Pre-Con Checklist Rev 07.27.21.pdf PDF
S02 - ATCH 15 - 14) 578-371 Specifications Book.pdf PDF
S02 - ATCH 2 - 1) Joliet CBOC Aerial Site Plan.pdf PDF
S02 - ATCH 34 - Site Visit Instructions.pdf PDF
S02 - ATCH 7 - 6) Dig Permit SOP Form.pdf PDF
S02 - ATCH 26 - Joliet_CBOC_Issued_for_Bid_A1_Arch_Part_4.pdf PDF
S02 - ATCH 25 - Joliet_CBOC_Issued_for_Bid_A1_Arch_Part_3.pdf PDF
S02 - ATCH 31 - Limitations on Subcontracting - Construction.pdf PDF
S02 - ATCH 11 - 10) Interim Life Safety Measures (ILSM).pdf PDF
S02 - ATCH 24 - Joliet_CBOC_Issued_for_Bid_A1_Arch_Part_2.pdf PDF
S02 - ATCH 17 - 16) Infection Control Barrier Sample.pdf PDF
S02 - ATCH 1 - 578-371 Construction SOW Final.pdf PDF
S02 - ATCH 6 - 5) Cutting Welding and Other Hot Work.pdf PDF
S02 - ATCH 13 - 12) OIT Horizontal Cable Requirements.pdf PDF
S02 - ATCH 18 - 17) Hines COVID-19 Guidelines.pdf PDF
S02 - ATCH 12 -11) Contractor PIV Instructions and Form.pdf PDF
S02 - ATCH 9 - 8) Pre-Construction Risk Assessment.pdf PDF
S02 - ATCH 21 - Joliet_CBOC_Project_Manual_Issued_for_Bid.pdf PDF
S02 - ATCH 29 - Joliet_CBOC_Issued_for_Bid_A1_MEP_Part_7.pdf PDF
S02 - ATCH 10 - 9) Infection Control Risk Assessment.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

W E

E K

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Drawing No.

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

N O

T F

O R

C O

N S

T R

U C

T

IO

N

© 2020 Virtual Energy Solutions, INC.

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

J o lie t

C B

O C

P a rk in g E x p a n s io n V

E S

A rc h

.r v t

-0

-2

:4 :1

P

M PROPOSED PROJECT

SCHEDULE WITH PHASING

PARKING EXPANSION AT

JOLIET CBOC

GCGIDGID

Revisions Date

ISSUED FOR 90% PRICING 02/02/2023

i_dic Rectangle i_dic Rectangle i_dic Typewritten Text

EXTERIOR WORK

i_dic Typewritten Text

INTERIOR WORK

i_dic Typewritten Text

CLINIC FUNCTION IMPACTS:

Spaces & Functions Temporarily Unavailable i_dic Typewritten Text D1 i_dic Rectangle i_dic Typewritten Text D2 i_dic Rectangle i_dic Typewritten Text C1 i_dic Rectangle i_dic Typewritten Text C2 i_dic Rectangle i_dic Typewritten Text Site Work S1 i_dic Rectangle i_dic Typewritten Text C3 i_dic Rectangle i_dic Typewritten Text C4 i_dic Ellipse i_dic Rectangle i_dic Typewritten Text

CLOSE OUT

i_dic Rectangle i_dic Typewritten Text D3 i_dic Line i_dic Line i_dic Line i_dic Typewritten Text 02/23/2023 i_dic Line i_dic Line i_dic Typewritten Text

NORTH HALF OF BASEMENT

i_dic Rectangle i_dic Typewritten Text C7 i_dic Rectangle i_dic Typewritten Text

MOBILIZATION

EARLY SUBMITTALS

PROCUREMENT

RELOCATIONS

i_dic Line i_dic Snapshot i_dic Typewritten Text

AUDIOLOGY, RADIOLOGY,

MARCO, DIAGNOSTICS

i_dic Line i_dic Typewritten Text

NTP

i_dic Rectangle i_dic Typewritten Text

EYE, BLOOD DRAW, PM&R, RADIOLOGY,

MARCO, DIAGNOSTICS, & DISPENSARY

i_dic Rectangle i_dic Typewritten Text

AUDIOLOGY, PODIATRY,

CARDIOLOGY, NUTRITION

i_dic Typewritten Text

PODIATRY, CARDIOLOGY,

NUTRITION, SOCIAL WORK

i_dic Rectangle i_dic Typewritten Text

AIR HANDLING UNIT

i_dic Line i_dic Line i_dic Line i_dic Typewritten Text

DURING PHASES D1 & C1

i_dic Typewritten Text

DURING PHASE D1

i_dic Typewritten Text

DURING PHASE C6E

i_dic Typewritten Text

DURING PHASE C6W

i_dic Typewritten Text

DURING PHASE C2

i_dic Typewritten Text

SUMMARY OF PHASES:

PHASING - MAIN DEMOLITION WORK:

D1: Demolish Remnant Structure and Existing Northeast Vestibule D2: Remove portions of Existing Foundation Walls at North for New Window & Door Openings D3: Remove Existing Air Handling Units from Basement i_dic Typewritten Text

PHASING - NEW CONSTRUCTION:

C1: Construct New North Vestibule, Elevator, New Northeast Vestibule, Refinish North Facade, Roof Access Stair C2: New Air Handling Unit Penthouse C3: Replace Existing Roofing System, Entire CBOC C4: Install New Over-Roof Ductwork & Roof Mounted Mechanical Equipment C5: Replace Existing Mechanical Equipment, Ceilings, & Lighting South Portion of CBOC C6E: Replace Existing Ductwork, Mechanical Equipment, Ceilings, Lighting, North Portion of CBOC - East Side C6W: Replace Existing Ductwork, Mechanical Equipment, Ceilings, Lighting, North Portion of CBOC - West Side C7: Infill Existing Duct Shaft Openings in Basement

S1: New North Parking Lot including Landscaping & Site Lighting S2: Seal Coat & Re-stripe Existing South Lots, New Lighting i_dic Typewritten Text CLOSE OUT Phase: Commissioning, Training, Punch List, & Final Clean i_dic Line i_dic Ellipse i_dic Typewritten Text

30 WEEKS

i_dic Typewritten Text

7 WEEKS

i_dic Typewritten Text

7 WEEKS

i_dic Typewritten Text

14 WEEKS

i_dic Typewritten Text

12 WEEKS

i_dic Typewritten Text

DURATIONS SHOWN ARE APPROXIMATE

i_dic Typewritten Text

DEMOLISH REMNANT STRUCTURE

EXISTING NORTHEAST VESTIBULE

i_dic Typewritten Text

OPENINGS IN FOUNDATION FOR NEW

WINDOWS AND DOOR

i_dic Line i_dic Typewritten Text

CONSTRUCT NEW NORTH & NORTHEAST

VESTIBULE

i_dic Line i_dic Typewritten Text

CONSTRUCT NEW AIR HANDLING UNIT

PENTHOUSE

i_dic Line i_dic Typewritten Text

REPLACE EXISTING ROOFING SYSTEM,

NEW ROOF OPENINGS FOR OVER-ROOF DUCTWORK

i_dic Line i_dic Line i_dic Typewritten Text

INSTALL OVER-ROOF DUCTWORK

i_dic Line i_dic Typewritten Text

S1: NEW NORTH PARKING LOT

S2: SEAL COAT & RE-STRIPE EXISTING SOUTH LOTS

i_dic Typewritten Text

REPLACE EXISTING DUCTWORK, MECHANICAL EQUIPMENT,

CEILINGS, LIGHTING: NORTH PORTION OF CBOC - EAST SIDE

i_dic Line i_dic Typewritten Text

REPLACE EXISTING DUCTWORK, MECHANICAL EQUIPMENT,

CEILINGS, LIGHTING: NORTH PORTION OF CBOC - WEST SIDE

i_dic Line i_dic Typewritten Text

INSTALL NEW MECHANICAL EQUIPMENT,

CEILINGS, LIGHTING: SOUTH PORTION OF CBOC

i_dic Line i_dic Typewritten Text

DEMOLISH EXISTING AIR HANDLING UNITS,

BASEMENT

i_dic Line i_dic Text Box

INFILL EXISTING DUCT SHAFT OPENINGS IN BASEMENT

i_dic Line i_dic Typewritten Text

COMMISSIONING, TRAINING,

PUNCH LIST, & FINAL CLEAN

i_dic Line i_dic Rectangle i_dic Typewritten Text

DIAGNOSTICS & DISPENSARY

i_dic Line i_dic Typewritten Text

DURING PHASE C1

i_dic Typewritten Text

12 WEEKS

i_dic Rectangle i_dic Typewritten Text C6E i_dic Rectangle i_dic Typewritten Text C6W i_dic Rectangle i_dic Typewritten Text C5 i_dic Line i_dic Rectangle i_dic Typewritten Text Site Work S2 i_dic Typewritten Text

UP

C Ex Gx Hx Jx Kx K'x Lx

1x

4x

6x

9x

12x

13x

14x

CxBxAxA1xB1xC1xD1xE1x

3x

5x

5.8x

8x

10x

6.1x

Fx A.E

15x

9.5x

1.2x

MECHANICAL/ELECTRICAL SPACE

SUPPORT

PATIENT EDUCATION

NUTRITION

CONFERENCE

STAFF

RESTROOMS

HOME BASED PRIMARY CARE

VERTICAL CIRCULATION

FUNCTIONS LEGEND

BASEMENT LEVEL

Elev. Equip.

B003

Badge B004

Phone B002C

Home Based Primary Care

B002

Stair #2 S-2

Comm.

B005

Reception B001

Women's Restroom

B006

Men's Restroom

B011

HAC

B007

Copy Room B009

Phone B002A

Phone B002B

Phone B017

Phone B016

A.O.

B015

Clinical Nurse Manager

B014

Chief Medical Director

B013

Patient Education/Group

Room B011

Patient Education/Exercise

B022

Store B012

Corridor C0-2

Corridor C0-3

Corridor C0-4

Corridor C0-1

Mech.

B018

Elec.

B019

Gen Room B020

PAS Call Center

B024

Education Storage

B022

Nutrition Services

B021

Main Conference

Room B023

Mech.

B025

Patient Education/Group

Room B033

Patient Education/Group

Room B032

Patient Ed/Internet

Cafe B031

Corridor C0-6

Corridor C0-8

Corridor C0-7

Staff Lounge B042

Men's Staff Locker

B036

Women's Staff Locker

B034

Mech.

Corridor C0-9

Corridor C0-5

Mech.

B026

Elec.

B029

Elec.

B028

Comm B030

Facility Storage

B041

EMS

B038

Biomed B039

FMS

B040

Stair #1 S-1

Corridor C0-1

Elevator

EL-1

Mech.

B018

Patient Education/Exercise

B022

Vending

Cooking Classroom

0023A

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

N O

T F

O R

C O

N S

T R

U C

T

IO

N

© 2020 Virtual Energy Solutions, INC.

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

J o lie t

C B

O C

P a rk in g E x p a n s io n V

E S

A rc h

.r v t

-0

-1

:5

:4

A

M DEMOLITION PHASING BASMENT

PARKING EXPANSION AT

JOLIET CBOC

Revisions Date

ISSUED FOR 90% CD 02/10/2023

3/32" = 1'-0"

1 BASEMENT LEVEL PLAN 0 8' 16' 32'

i_dic Polygon i_dic Callout

EXISTING REMNANT STRUCTURE & NORTHEAST VESTIBULE TO BE REMOVED

i_dic Typewritten Text

PHASE D1

i_dic Callout

EXISTING REMNANT STRUCTURE & NORTHEAST VESTIBULE TO BE REMOVED

i_dic PolyLine i_dic Rectangle i_dic Single Door i_dic Single Door i_dic Rectangle i_dic Single Door i_dic Single Door i_dic Polygon i_dic Typewritten Text

BASEMENT LEVEL: DEMOLITION / CLINIC FUNCTIONS

i_dic Polygon i_dic Typewritten Text

UNOCCUPIED

DURING

PHASE D1

i_dic PolyLine i_dic PolyLine i_dic Typewritten Text

PHASE D1

i_dic Callout

EXISTING REMNANT STRUCTURE & NORTHEAST VESTIBULE TO BE REMOVED

i_dic Typewritten Text

PHASE D1

i_dic Callout

RESTRICTED ACCESS: SOUTH PORTION, BASEMENT LEVEL

i_dic Callout

LIMITED ACCESS TO STAFF LOCKERS:

NO MORE THAN 49 OCCUPANTS

i_dic Typewritten Text 02/23/2023 i_dic Typewritten Text

PHASE D1

i_dic Typewritten Text

VHAHINWalshA

30 WEEKS

Ex Gx Hx Jx Kx K'x Lx

1x

4x

6x

9x

12x

13x

14x

CxBxAx

A1x

B1xC1xD1xE1x

3x

5x

5.8x

8x

10x

6.1x

Fx A.E

15x

9.5x

1.2x

MECHANICAL/ELECTRICAL SPACE

SUPPORT

SECURITY & SAFETY

STAFF

RESTROOMS

PRIMARY CARE

WOMEN'S HEALTH

RADIOLOGY

EYE CLINIC

PHYSICAL/OCCUPATIONAL THERAPY

PHARMACY

PODIATRY

AUDIOLOGY

RESPIRATORY

RECEPTION

LAB

VERTICAL CIRCULATION

FUNCTIONS LEGEND

FIRST FLOOR LEVEL

CARDIOLOGY

DRIVE THROUGH TESTING

FMS

Elevator

EL-1

Stair #2 S-2

Corridor C1-15

Rad Control

Dispensary

Storage 1116A

Diagnostic

Marco

Rad Room

Corridor C1-13

Corridor C1-14

Corridor C1-11

Toilet

Toilet

HAC

Toilet 1112E

Soiled Utility 1112A

Storage 1112B

PM&R

Treatment 1112D

Eye Tech

Visual Fields

Treatment 1112C

Toilet

Toilet 1102A

Eye

Blood Draw 1114D

Eye

Blood Draw 1114C

Draw Analysis

1114E

Toilet 1114F

Blood Draw 1114B

Eye

Eye

1-On-1 Room 1017C

Work Room 1017B

Supervisor Office

1017A

Nurse Triage

Exam 1

Exam 2

Nurse Triage

Women Health Exam

IT

Telemed

Telemed

Telemed

Closet

Telemed

Telemed

Toilet 1043A

Telemed

Telemed 1038Exam 17

Exam 16

PACT 2

PACT 1

Exam 15

Exam 14

Exam 12

Exam 13

Exam 5

Women Health Exam

Toilet

Toilet 1047A

Men's Restroom

Women's Restroom

Treatment Room

Toilet

Treatment Room

CWT

CWT

Security

Wheelchair Storage

Group

Treatment

Treatment Room

Group Treatment

Treatment Room

Treatment Room

Treatment Room

Treatment Room

Soiled Utility

Exam 6

Exam 7

Exam 8

Exam 9

Clean Storage

Room B131 Exam10

Procedure 1 Shared Gyno

Toilet 1059B

Toilet

Closet 1059A

Procedure 2

Exam 11

Exam 19

Exam 18

PACT

PACT 4

Women Health Exam

Women Health Exam

Corridor C1-3

Telemed

HAC

Stair #1 S-1

Mobile Port Waiting

Toilet 1068A

Toilet 1031A

Pharm. D

Pharm. D

Nutritionist

Teleretinal

Cardio/Pod Shared Office

Soiled Utility

Clean Utility

Social Worker

Shell Space

Corridor C1-10

Podiatry Exam

Podiatry Exam

Tech Work Room

Audiology Exam

Cast Room

Podiatry Exam

Audiology Exam

Oxygen Evaluation

PFT Blood Gas

Clean Utility

Soiled Utility

Control

Sound Booth

Control

Sound Booth

Stor.

Corridor C1-12

Corridor C1-9

Corridor

Ambulance Bay C1-36

Corridor C1-5

Corridor C1-5

Corridor C1-7

Corridor C1-6

Corridor C1-6

Corridor C1-4

Corridor C1-8

Corridor C1-1

General Waiting

Corridor C1-2

Photo Alcove

Reception

Equipment Alcove

Nourishment Alcove

Scale Alcove

Meds

1065C

1065B

1065A

Elec. Clos.

1089A

Scale Alcove

PAS

Elec.

1114A

Boiler Plant

Egress

Corridor

Exit

Vestibule

Storage

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

N O

T F

O R

C O

N S

T R

U C

T

IO

N

© 2020 Virtual Energy Solutions, INC.

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

J o lie t

C B

O C

P a rk in g E x p a n s io n V

E S

A rc h

.r v t

-0

-1

:5

:5

A

M DEMOLITION PHASING FIRST

FLOOR LEVEL

PARKING EXPANSION AT

JOLIET CBOC

Revisions Date

ISSUED FOR 90% CD 02/10/2023

3/32" = 1'-0"

FIRST FLOOR LEVEL

0 8' 16' 32' i_dic Polygon i_dic Callout

EXISTING REMNANT STRUCTURE & NORTHEAST VESTIBULE TO BE REMOVED

i_dic Callout

EXISTING REMNANT STRUCTURE & NORTHEAST VESTIBULE TO BE REMOVED

i_dic PolyLine i_dic Typewritten Text

FIRST FLOOR LEVEL: DEMOLITION / CLINIC FUNCTIONS

i_dic Polygon i_dic Typewritten Text

UNOCCUPIED

DURING

PHASE D1

i_dic Single Door i_dic Rectangle i_dic Rectangle i_dic Rectangle i_dic Rectangle i_dic Callout

TEMPORARY EGRESS DOOR &

WALKWAY

i_dic PolyLine i_dic PolyLine i_dic Line i_dic Typewritten Text

PHASE D1

i_dic Typewritten Text

PHASE D1

i_dic Typewritten Text

PHASE D1

i_dic PolyLine i_dic Typewritten Text 02/23/2023 i_dic Typewritten Text

PHASE D1

i_dic Typewritten Text

VHAHINWalshA

14 WEEKS

C Ex Gx Hx Jx Kx K'x Lx

1x

4x

6x

9x

12x

13x

14x

CxBxAxA1xB1xC1xD1xE1x

3x

5x

5.8x

8x

10x

6.1x

Fx A.E

15x

9.5x

1.2x

A

B

Engineering

Space

Elevator E-2

Lobby

New North

Vestibule

Mach.

Room 003A

MECHANICAL/ELECTRICAL SPACE

SUPPORT

PATIENT EDUCATION

NUTRITION

CONFERENCE

STAFF

RESTROOMS

HOME BASED PRIMARY CARE

VERTICAL CIRCULATION

FUNCTIONS LEGEND

BASEMENT LEVEL

Elev. Equip.

B003

Badge B004

Phone B002C

Home Based Primary Care

B002

Stair #2 S-2

Comm.

B005

Reception B001

Women's Restroom

B006

Men's Restroom

B011

HAC

B007

Copy Room B009

Phone B002A

Phone B002B

Phone B017

Phone B016

A.O.

B015

Clinical Nurse Manager

B014

Chief Medical Director

B013

Patient Education/Group

Room B011

Patient Education/Exercise

B022

Store B012

Corridor C0-2

Corridor C0-3

Corridor C0-4

Corridor C0-1

Mech.

B018

Elec.

B019

Gen Room B020

PAS Call Center

B024

Education Storage

B022

Nutrition Services

B021

Main Conference

Room B023

Mech.

B025

Patient Education/Group

Room B033

Patient Education/Group

Room B032

Patient Ed/Internet

Cafe B031

Corridor C0-6

Corridor C0-8

Corridor C0-7

Staff Lounge B042

Men's Staff Locker

B036

Women's Staff Locker

B034

Mech.

Corridor C0-9

Corridor C0-5

Mech.

B026

Elec.

B029

Elec.

B028

Comm B030

Facility Storage

B041

EMS

B038

Biomed B039

FMS

B040

Stair #1 S-1

Corridor C0-1

Elevator

EL-1

Mech.

B018

Patient Education/Exercise

B022

Vending

Cooking Classroom

0023A

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

N O

T F

O R

C O

N S

T R

U C

T

IO

N

© 2020 Virtual Energy Solutions, INC.

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

J o lie t

C B

O C

P a rk in g E x p a n s io n V

E S

A rc h

.r v t

-0

-1

:5

:4

A

M NEW CONSTRUCTION PHASING

BASEMENT

PARKING EXPANSION AT

JOLIET CBOC

Revisions Date

ISSUED FOR 90% CD 02/10/2023

3/32" = 1'-0"

1 BASEMENT LEVEL PLAN

1/2" = 1'-0"

FUNCTIONS LEGEND BASEMENT

0 8' 16' 32' i_dic Polygon i_dic Polygon i_dic PolyLine i_dic PolyLine i_dic Rectangle i_dic Single Door i_dic Single Door i_dic Rectangle i_dic Single Door i_dic Single Door i_dic Rectangle i_dic Rectangle i_dic Rectangle i_dic Rectangle i_dic Rectangle i_dic Rectangle i_dic Rectangle i_dic Typewritten Text

UNOCCUPIED

DURING

PHASE D2

PHASE C1

i_dic Callout REMOVE PORTIONS OF EXISTING FOUNDATION WALL FOR NEW WINDOW OPENINGS (TYPICAL OF 6) i_dic Callout

REMOVE PORTION OF EXISTING FOUNDATION WALL FOR NEW DOOR OPENING

i_dic Polygon i_dic Callout

PHASE C1

i_dic Typewritten Text

PHASE D1

i_dic Typewritten Text

PHASE D2

i_dic Typewritten Text

PHASE D2

i_dic Typewritten Text

CONSTRUCT NEW NORTHEAST

VESTIBULE INCLUDING OFFICE,

ELEVATOR + LOBBY

i_dic PolyLine i_dic Typewritten Text

BASEMENT LEVEL: DEMOLITION / NEW CONSTRUCTION

CLINIC FUNCTIONS

i_dic Callout

RESTRICTED ACCESS: SOUTH PORTION, BASEMENT LEVEL

i_dic Callout

LIMITED ACCESS TO STAFF LOCKERS:

NO MORE THAN 49 OCCUPANTS

i_dic Typewritten Text 02/23/2023 i_dic Typewritten Text

PHASES D2 & C1

i_dic Typewritten Text

VHAHINWalshA

1x

4x

6x

9x

12x

13x

14x

CxBxAxA1xB1xC1xD1xE1x

3x

5x

5.8x

8x

10x

6.1x

Fx A.E

15x

9.5x

1.2x

A

B

Engineering

Space

Elevator E-2

Lobby

New North

Vestibule

Mach.

Room 003A

MECHANICAL/ELECTRICAL SPACE

SUPPORT

PATIENT EDUCATION

NUTRITION

CONFERENCE

STAFF

RESTROOMS

HOME BASED PRIMARY CARE

VERTICAL CIRCULATION

FUNCTIONS LEGEND

BASEMENT LEVEL

Elev. Equip.

B003

Badge B004

Phone B002C

Home Based Primary Care

B002

Stair #2 S-2

Comm.

B005

Reception B001

Women's Restroom

B006

Men's Restroom

B011

HAC

B007

Copy Room B009

Phone B002A

Phone B002B

Phone B017

Phone B016

A.O.

B015

Clinical Nurse Manager

B014

Chief Medical Director

B013

Patient Education/Group

Room B011

Patient Education/Exercise

B022

Store B012

Corridor C0-2

Corridor C0-3

Corridor C0-4

Corridor C0-1

Mech.

B018

Elec.

B019

Gen Room B020

PAS Call Center

B024

Education Storage

B022

Nutrition Services

B021

Main Conference

Room B023

Mech.

B025

Patient Education/Group

Room B033

Patient Education/Group

Room B032

Patient Ed/Internet

Cafe B031

Corridor C0-6

Corridor C0-8

Corridor C0-7

Staff Lounge B042

Men's Staff Locker

B036

Women's Staff Locker

B034

Mech.

Corridor C0-9

Corridor C0-5

Mech.

B026

Elec.

B029

Elec.

B028

Comm B030

Facility Storage

B041

EMS

B038

Biomed B039

FMS

B040

Stair #1 S-1

Corridor C0-1

Elevator

EL-1

Mech.

B018

Patient Education/Exercise

B022

Vending

Cooking Classroom

0023A

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

N O

T F

O R

C O

N S

T R

U C

T

IO

N

© 2020 Virtual Energy Solutions, INC.

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

J o lie t

C B

O C

P a rk in g E x p a n s io n V

E S

A rc h

.r v t

-0

-1

:5

:4

A

M NEW CONSTRUCTION PHASING

BASEMENT

PARKING EXPANSION AT

JOLIET CBOC

Revisions Date

ISSUED FOR 90% CD 02/10/2023

3/32" = 1'-0"

1 BASEMENT LEVEL PLAN

1/2" = 1'-0"

FUNCTIONS LEGEND BASEMENT

0 8' 16' 32' i_dic Callout

LIMITED ACCESS TO STAFF LOCKERS:

NO MORE THAN 49 OCCUPANTS

i_dic Polygon i_dic Polygon i_dic PolyLine i_dic PolyLine i_dic Callout

RESTRICTED ACCESS: SOUTH PORTION, BASEMENT LEVEL

i_dic Typewritten Text

UNOCCUPIED

DURING

PHASE C1

i_dic Polygon i_dic Rectangle i_dic Single Door i_dic Single Door i_dic Rectangle i_dic Single Door i_dic Single Door i_dic Polygon i_dic Callout

PHASE C1

i_dic Callout

PHASE C1

i_dic Typewritten Text

CONSTRUCT NEW NORTHEAST

VESTIBULE INCLUDING ENGINEERING

SPACE, MACHINE ROOM, &

ELEVATOR + LOBBY

i_dic Typewritten Text

CONSTRUCT NEW NORTH

FACADE COMPLETE WITH

INSULATION AND MASONRY

CLADDING

i_dic Callout

PHASE C1

i_dic Typewritten Text

CONSTRUCT NEW NORTH

VESTIBULE

i_dic PolyLine i_dic Typewritten Text

BASEMENT LEVEL: NEW CONSTRUCTION / CLINIC FUNCTIONS

i_dic Typewritten Text 02/23/2023 i_dic Typewritten Text

PHASE C1

i_dic Typewritten Text

VHAHINWalshA

C

Ex Gx Hx Jx Kx K'x Lx

1x

4x

6x

9x

12x

13x

14x

CxBxAx

A1x

B1xC1xD1xE1x

3x

5x

5.8x

8x

10x

6.1x

Fx A.E

15x

9.5x

1.2x

A

B

F

2.3

D

E

1.2

2.2

Office

Vestibule

Lobby

Elevator E-2

MECHANICAL/ELECTRICAL SPACE

SUPPORT

SECURITY & SAFETY

STAFF

RESTROOMS

PRIMARY CARE

WOMEN'S HEALTH

RADIOLOGY

EYE CLINIC

PHYSICAL/OCCUPATIONAL THERAPY

PHARMACY

PODIATRY

AUDIOLOGY

RESPIRATORY

RECEPTION

LAB

VERTICAL CIRCULATION

FUNCTIONS LEGEND

FIRST FLOOR LEVEL

CARDIOLOGY

DRIVE THROUGH TESTING

FMS

Elevator

EL-1

Stair #2 S-2

Corridor C1-15

Rad Control

Dispensary

Storage 1116A

Diagnostic

Marco

Rad Room

Corridor C1-13

Corridor C1-14

Corridor C1-11

Toilet

Toilet

HAC

Toilet 1112E

Soiled Utility 1112A

Storage 1112B

PM&R

Treatment 1112D

Eye Tech

Visual Fields

Treatment 1112C

Toilet

Toilet 1102A

Eye

Blood Draw 1114D

Eye

Blood Draw 1114C

Draw Analysis

1114E

Toilet 1114F

Blood Draw 1114B

Eye

Eye

1-On-1 Room 1017C

Work Room 1017B

Supervisor Office

1017A

Nurse Triage

Exam 1

Exam 2

Nurse Triage

Women Health Exam

IT

Telemed

Telemed

Telemed

Closet

Telemed

Telemed

Toilet 1043A

Telemed

Telemed 1038Exam 17

Exam 16

PACT 2

PACT 1

Exam 15

Exam 14

Exam 12

Exam 13

Exam 5

Women Health Exam

Toilet

Toilet 1047A

Men's Restroom

Women's Restroom

Treatment Room

Toilet

Treatment Room

CWT

CWT

Security

Wheelchair Storage

Group

Treatment

Treatment Room

Group Treatment

Treatment Room

Treatment Room

Treatment Room

Treatment Room

Soiled Utility

Exam 6

Exam 7

Exam 8

Exam 9

Clean Storage

Room B131 Exam10

Procedure 1 Shared Gyno

Toilet 1059B

Toilet

Closet 1059A

Procedure 2

Exam 11

Exam 19

Exam 18

PACT

PACT 4

Women Health Exam

Women Health Exam

Corridor C1-3

Telemed

HAC

Stair #1 S-1

Mobile Port Waiting

Toilet 1068A

Toilet 1031A

Pharm. D

Pharm. D

Nutritionist

Teleretinal

Cardio/Pod Shared Office

Soiled Utility

Clean Utility

Social Worker

Shell Space

Corridor C1-10

Podiatry Exam

Podiatry Exam

Tech Work Room

Audiology Exam

Cast Room

Podiatry Exam

Audiology Exam

Oxygen Evaluation

PFT Blood Gas

Clean Utility

Soiled Utility

Control

Sound Booth

Control

Sound Booth

Stor.

Corridor C1-12

Corridor C1-9

Corridor

Ambulance Bay C1-36

Corridor C1-5

Corridor C1-5

Corridor C1-7

Corridor C1-6

Corridor C1-6

Corridor C1-4

Corridor C1-8

Corridor C1-1

General Waiting

Corridor C1-2

Photo Alcove

Reception

Equipment Alcove

Nourishment Alcove

Scale Alcove

Meds

1065C

1065B

1065A

Elec. Clos.

1089A

Scale Alcove

PAS

Elec.

1114A

Boiler Plant

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

N O

T F

O R

C O

N S

T R

U C

T

IO

N

© 2020 Virtual Energy Solutions, INC.

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

J o lie t

C B

O C

P a rk in g E x p a n s io n V

E S

A rc h

.r v t

-0

-1

:5

:5

A

M NEW CONSTRUCTION PHASING

FIRST FLOOR LEVEL

PARKING EXPANSION AT

JOLIET CBOC

Revisions Date

3/32" = 1'-0"

FIRST FLOOR LEVEL

0 8' 16' 32' i_dic Polygon i_dic PolyLine i_dic Polygon i_dic Rectangle i_dic Callout

TEMPORARY EGRESS DOOR &

WALKWAY

i_dic Single Door i_dic Rectangle i_dic Rectangle i_dic Rectangle i_dic Callout

NEW AHU PENTHOUSE:

STRUCTURE, ENCLOSURE, AND MECHANICAL EQUIPMENT INSTALLATION

i_dic Callout

PHASE C2

i_dic Typewritten Text

CONSTRUCT NEW NORTHEAST

VESTIBULE INCLUDING OFFICE,

ELEVATOR + LOBBY

i_dic Polygon i_dic Callout

AREAS OF CONSTRUCTION WORK PHASE C1

i_dic Typewritten Text

CONSTRUCT NEW NORTH

FACADE COMPLETE WITH

INSULATION AND MASONRY

CLADDING

i_dic PolyLine i_dic Typewritten Text

FIRST FLOOR LEVEL: NEW CONSTRUCTION

i_dic PolyLine i_dic Typewritten Text 02/23/2023 i_dic Typewritten Text

PHASES C1 & C2

i_dic Callout

AREA OF CONSTRUCTION WORK

PHASE C2

i_dic Callout

AREAS OF CONSTRUCTION WORK PHASE C1

i_dic

Ex Gx Hx Jx Kx K'x Lx

1x

4x

6x

9x

12x

13x

14x

CxBxAx

A1x

B1xC1xD1xE1x

3x

5x

5.8x

8x

10x

6.1x

Fx A.E

15x

9.5x

1.2x

A

B

F

2.3

D

E

1.2

2.2

Office

Vestibule

Lobby

Elevator E-2

MECHANICAL/ELECTRICAL SPACE

SUPPORT

SECURITY & SAFETY

STAFF

RESTROOMS

PRIMARY CARE

WOMEN'S HEALTH

RADIOLOGY

EYE CLINIC

PHYSICAL/OCCUPATIONAL THERAPY

PHARMACY

PODIATRY

AUDIOLOGY

RESPIRATORY

RECEPTION

LAB

VERTICAL CIRCULATION

FUNCTIONS LEGEND

FIRST FLOOR LEVEL

CARDIOLOGY

DRIVE THROUGH TESTING

FMS

Elevator

EL-1

Stair #2 S-2

Corridor C1-15

Rad Control

Dispensary

Storage 1116A

Diagnostic

Marco

Rad Room

Corridor C1-13

Corridor C1-14

Corridor C1-11

Toilet

Toilet

HAC

Toilet 1112E

Soiled Utility 1112A

Storage 1112B

PM&R

Treatment 1112D

Eye Tech

Visual Fields

Treatment 1112C

Toilet

Toilet 1102A

Eye

Blood Draw 1114D

Eye

Blood Draw 1114C

Draw Analysis

1114E

Toilet 1114F

Blood Draw 1114B

Eye

Eye

1-On-1 Room 1017C

Work Room 1017B

Supervisor Office

1017A

Nurse Triage

Exam 1

Exam 2

Nurse Triage

Women Health Exam

IT

Telemed

Telemed

Telemed

Closet

Telemed

Telemed

Toilet 1043A

Telemed

Telemed 1038Exam 17

Exam 16

PACT 2

PACT 1

Exam 15

Exam 14

Exam 12

Exam 13

Exam 5

Women Health Exam

Toilet

Toilet 1047A

Men's Restroom

Women's Restroom

Treatment Room

Toilet

Treatment Room

CWT

CWT

Security

Wheelchair Storage

Group

Treatment

Treatment Room

Group Treatment

Treatment Room

Treatment Room

Treatment Room

Treatment Room

Soiled Utility

Exam 6

Exam 7

Exam 8

Exam 9

Clean Storage

Room B131 Exam10

Procedure 1 Shared Gyno

Toilet 1059B

Toilet

Closet 1059A

Procedure 2

Exam 11

Exam 19

Exam 18

PACT

PACT 4

Women Health Exam

Women Health Exam

Corridor C1-3

Telemed

HAC

Stair #1 S-1

Mobile Port Waiting

Toilet 1068A

Toilet 1031A

Pharm. D

Pharm. D

Nutritionist

Teleretinal

Cardio/Pod Shared Office

Soiled Utility

Clean Utility

Social Worker

Shell Space

Corridor C1-10

Podiatry Exam

Podiatry Exam

Tech Work Room

Audiology Exam

Cast Room

Podiatry Exam

Audiology Exam

Oxygen Evaluation

PFT Blood Gas

Clean Utility

Soiled Utility

Control

Sound Booth

Control

Sound Booth

Stor.

Corridor C1-12

Corridor C1-9

Corridor

Ambulance Bay C1-36

Corridor C1-5

Corridor C1-5

Corridor C1-7

Corridor C1-6

Corridor C1-6

Corridor C1-4

Corridor C1-8

Corridor C1-1

General Waiting

Corridor C1-2

Photo Alcove

Reception

Equipment Alcove

Nourishment Alcove

Scale Alcove

Meds

1065C

1065B

1065A

Elec. Clos.

1089A

Scale Alcove

PAS

Elec.

1114A

Boiler Plant

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

N O

T F

O R

C O

N S

T R

U C

T

IO

N

© 2020 Virtual Energy Solutions, INC.

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

J o lie t

C B

O C

P a rk in g E x p a n s io n V

E S

A rc h

.r v t

-0

-1

:5

:5

A

M NEW CONSTRUCTION PHASING

FIRST FLOOR LEVEL

PARKING EXPANSION AT

JOLIET CBOC

Revisions Date

3/32" = 1'-0"

FIRST FLOOR LEVEL

0 8' 16' 32' i_dic Rectangle i_dic Polygon i_dic PolyLine i_dic PolyLine i_dic Polygon i_dic Rectangle i_dic Callout

TEMPORARY EGRESS DOOR &

WALKWAY

i_dic Single Door i_dic Rectangle i_dic Rectangle i_dic Callout

PHASE C1

i_dic Callout

UNOCCUPIED DURING

PHASE C2

i_dic Callout

UNOCCUPIED DURING

PHASE C1

i_dic Typewritten Text

CONSTRUCT NEW NORTHEAST

VESTIBULE INCLUDING OFFICE,

ELEVATOR + LOBBY

i_dic Polygon i_dic Callout

PHASE C1

i_dic Typewritten Text

CONSTRUCT NEW NORTH

FACADE COMPLETE WITH

INSULATION AND MASONRY

CLADDING

i_dic PolyLine i_dic Callout

PHASE C2

i_dic Callout

NEW AHU PENTHOUSE:

STRUCTURE, ENCLOSURE, AND MECHANICAL EQUIPMENT INSTALLATION

i_dic Callout

PHASE C2

i_dic Typewritten Text

FIRST FLOOR LEVEL: CLINIC FUNCTIONS

i_dic Rectangle i_dic Typewritten Text 02/23/2023 i_dic Typewritten Text

PHASES C1 & C2

i_dic Typewritten Text

VHAHINWalshA Typewritten Text

12 WEEKS

VHAHINWalshA

12 WEEKS

WALK

CONCRETE

50.00'

N. ROW LINE EAGLE STREET

PER DOC. NO. R2010131260

AREA

PARKING

ASPHALT

P R O P O S E D

D R A I N A G E

E A S E M E N T

EAGLE

STREET

V A

C A

T E

D H

IG

H

VACATED EAGLE

STREETPER DOC. NO.

R2004-124843

W A

L N

U T

S T

R E

E T

(DEDICATED PER DOC. NO.

R2010131260)

A V

E N

U E

EAGLE

STREET

W A

L N

U T

S T

R E

E T

EAGLE

STREET

(DEDICATED PER DOC. NO.

R2010131260)

S2-HS

MH: 35

S3-HS

MH: 35

S3-HS

MH: 35

S2-HS

MH: 35

S3-HS

MH: 35

S3-HS

MH: 35

1 0 1 3

1 10

1 2 3 4 5

6 7 8 9

UP

UP

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Drawing No.

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

N O

T F

O R

C O

N S

T R

U C

T

IO

N

© 2020 Virtual Energy Solutions, INC.

03/07/2023

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

J o lie t

C B

O C

P a rk in g E x p a n s io n V

E S

A rc h

.r v t

-0

-2

:1

:4

P

M SITE WORK PLAN - NEW

CONSTRUCTION PHASING

PARKING EXPANSION AT

JOLIET CBOC

CheckerAuthorDesigner

Revisions Date

ISSUED FOR 100% CD 03/07/2023

1" = 30'-0"

SITE WORK PLAN - NEW CONSTRUCTION PHASING

i_dic Typewritten Text

SITE WORK: NEW CONSTRUCTION

i_dic Typewritten Text Site i_dic Typewritten Text

PHASES S1 & S2

i_dic Polygon i_dic Callout

PHASE S1

i_dic Typewritten Text New North Parking Lot including Landscaping & Site Lighting i_dic Callout

PHASE S1

i_dic Polygon i_dic Callout

PHASE S2

i_dic Polygon i_dic Callout

PHASE S2

i_dic Typewritten Text Seal Coat & Re-stripe Existing South Lots, New Lighting i_dic Callout

PHASE S2

i_dic Typewritten Text Seal Coat & Re-stripe Existing South Lots, New Lighting i_dic Callout

PHASE S2

i_dic Typewritten Text i_dic Snapshot

VHAHINWalshA

9 WEEKS

Ex Gx Hx Jx Kx K'x Lx

1x

4x

6x

9x

12x

13x

14x

CxBxAx

A1x

B1xC1xD1xE1x

3x

5x

5.8x

8x

10x

6.1x

Fx A.E

15x

9.5x

1.2x

A

B

F

2.3

D

E

1.2

2.2

Office

Vestibule

Lobby

Elevator E-2

MECHANICAL/ELECTRICAL SPACE

SUPPORT

SECURITY & SAFETY

STAFF

RESTROOMS

PRIMARY CARE

WOMEN'S HEALTH

RADIOLOGY

EYE CLINIC

PHYSICAL/OCCUPATIONAL THERAPY

PHARMACY

PODIATRY

AUDIOLOGY

RESPIRATORY

RECEPTION

LAB

VERTICAL CIRCULATION

FUNCTIONS LEGEND

FIRST FLOOR LEVEL

CARDIOLOGY

DRIVE THROUGH TESTING

FMS

Elevator

EL-1

Stair #2 S-2

Corridor C1-15

Rad Control

Dispensary

Storage 1116A

Diagnostic

Marco

Rad Room

Corridor C1-13

Corridor C1-14

Corridor C1-11

Toilet

Toilet

HAC

Toilet 1112E

Soiled Utility 1112A

Storage 1112B

PM&R

Treatment 1112D

Eye Tech

Visual Fields

Treatment 1112C

Toilet

Toilet 1102A

Eye

Blood Draw 1114D

Eye

Blood Draw 1114C

Draw Analysis

1114E

Toilet 1114F

Blood Draw 1114B

Eye

Eye

1-On-1 Room 1017C

Work Room 1017B

Supervisor Office

1017A

Nurse Triage

Exam 1

Exam 2

Nurse Triage

Women Health Exam

IT

Telemed

Telemed

Telemed

Closet

Telemed

Telemed

Toilet 1043A

Telemed

Telemed 1038Exam 17

Exam 16

PACT 2

PACT 1

Exam 15

Exam 14

Exam 12

Exam 13

Exam 5

Women Health Exam

Toilet

Toilet 1047A

Men's Restroom

Women's Restroom

Treatment Room

Toilet

Treatment Room

CWT

CWT

Security

Wheelchair Storage

Group

Treatment

Treatment Room

Group Treatment

Treatment Room

Treatment Room

Treatment Room

Treatment Room

Soiled Utility

Exam 6

Exam 7

Exam 8

Exam 9

Clean Storage

Room B131 Exam10

Procedure 1 Shared Gyno

Toilet 1059B

Toilet

Closet 1059A

Procedure 2

Exam 11

Exam 19

Exam 18

PACT

PACT 4

Women Health Exam

Women Health Exam

Corridor C1-3

Telemed

HAC

Stair #1 S-1

Mobile Port Waiting

Toilet 1068A

Toilet 1031A

Pharm. D

Pharm. D

Nutritionist

Teleretinal

Cardio/Pod Shared Office

Soiled Utility

Clean Utility

Social Worker

Shell Space

Corridor C1-10

Podiatry Exam

Podiatry Exam

Tech Work Room

Audiology Exam

Cast Room

Podiatry Exam

Audiology Exam

Oxygen Evaluation

PFT Blood Gas

Clean Utility

Soiled Utility

Control

Sound Booth

Control

Sound Booth

Stor.

Corridor C1-12

Corridor C1-9

Corridor

Ambulance Bay C1-36

Corridor C1-5

Corridor C1-5

Corridor C1-7

Corridor C1-6

Corridor C1-6

Corridor C1-4

Corridor C1-8

Corridor C1-1

General Waiting

Corridor C1-2

Photo Alcove

Reception

Equipment Alcove

Nourishment Alcove

Scale Alcove

Meds

1065C

1065B

1065A

Elec. Clos.

1089A

Scale Alcove

PAS

Elec.

1114A

Boiler Plant

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

N O

T F

O R

C O

N S

T R

U C

T

IO

N

© 2020 Virtual Energy Solutions, INC.

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

J o lie t

C B

O C

P a rk in g E x p a n s io n V

E S

A rc h

.r v t

-0

-1

:5

:5

A

M NEW CONSTRUCTION PHASING

FIRST FLOOR LEVEL

PARKING EXPANSION AT

JOLIET CBOC

Revisions Date

3/32" = 1'-0"

FIRST FLOOR LEVEL

0 8' 16' 32' i_dic PolyLine i_dic Polygon i_dic Callout

PHASE C5

i_dic Callout

NEW CEILING TILE AND MECHANICAL EQUIPMENT INSTALLATION

i_dic Callout

PHASE C5

i_dic Rectangle i_dic Callout

NEW ROOF OPENINGS

FOR DUCTWORK

i_dic Callout

PHASE C3

i_dic Typewritten Text

FIRST FLOOR LEVEL: NEW CONSTRUCTION

i_dic Callout

ROOM-BY-ROOM APPROACH

PHASE C5

CLOSE COORDINATION WITH END USERS REQUIRED

i_dic Typewritten Text 02/23/2023 i_dic Typewritten Text

PHASES C3 & C5

i_dic

Ex Gx Hx Jx Kx K'x Lx

1x

4x

6x

9x

12x

13x

14x

CxBxAx

A1x

B1xC1xD1xE1x

3x

5x

5.8x

8x

10x

6.1x

Fx A.E

15x

9.5x

1.2x

A

B

F

2.3

D

E

1.2

2.2

Office

Vestibule

Lobby

Elevator E-2

MECHANICAL/ELECTRICAL SPACE

SUPPORT

SECURITY & SAFETY

STAFF

RESTROOMS

PRIMARY CARE

WOMEN'S HEALTH

RADIOLOGY

EYE CLINIC

PHYSICAL/OCCUPATIONAL THERAPY

PHARMACY

PODIATRY

AUDIOLOGY

RESPIRATORY

RECEPTION

LAB

VERTICAL CIRCULATION

FUNCTIONS LEGEND

FIRST FLOOR LEVEL

CARDIOLOGY

DRIVE THROUGH TESTING

FMS

Elevator

EL-1

Stair #2 S-2

Corridor C1-15

Rad Control

Dispensary

Storage 1116A

Diagnostic

Marco

Rad Room

Corridor C1-13

Corridor C1-14

Corridor C1-11

Toilet

Toilet

HAC

Toilet 1112E

Soiled Utility 1112A

Storage 1112B

PM&R

Treatment 1112D

Eye Tech

Visual Fields

Treatment 1112C

Toilet

Toilet 1102A

Eye

Blood Draw 1114D

Eye

Blood Draw 1114C

Draw Analysis

1114E

Toilet 1114F

Blood Draw 1114B

Eye

Eye

1-On-1 Room 1017C

Work Room 1017B

Supervisor Office

1017A

Nurse Triage

Exam 1

Exam 2

Nurse Triage

Women Health Exam

IT

Telemed

Telemed

Telemed

Closet

Telemed

Telemed

Toilet 1043A

Telemed

Telemed 1038Exam 17

Exam 16

PACT 2

PACT 1

Exam 15

Exam 14

Exam 12

Exam 13

Exam 5

Women Health Exam

Toilet

Toilet 1047A

Men's Restroom

Women's Restroom

Treatment Room

Toilet

Treatment Room

CWT

CWT

Security

Wheelchair Storage

Group

Treatment

Treatment Room

Group Treatment

Treatment Room

Treatment Room

Treatment Room

Treatment Room

Soiled Utility

Exam 6

Exam 7

Exam 8

Exam 9

Clean Storage

Room B131 Exam10

Procedure 1 Shared Gyno

Toilet 1059B

Toilet

Closet 1059A

Procedure 2

Exam 11

Exam 19

Exam 18

PACT

PACT 4

Women Health Exam

Women Health Exam

Corridor C1-3

Telemed

HAC

Stair #1 S-1

Mobile Port Waiting

Toilet 1068A

Toilet 1031A

Pharm. D

Pharm. D

Nutritionist

Teleretinal

Cardio/Pod Shared Office

Soiled Utility

Clean Utility

Social Worker

Shell Space

Corridor C1-10

Podiatry Exam

Podiatry Exam

Tech Work Room

Audiology Exam

Cast Room

Podiatry Exam

Audiology Exam

Oxygen Evaluation

PFT Blood Gas

Clean Utility

Soiled Utility

Control

Sound Booth

Control

Sound Booth

Stor.

Corridor C1-12

Corridor C1-9

Corridor

Ambulance Bay C1-36

Corridor C1-5

Corridor C1-5

Corridor C1-7

Corridor C1-6

Corridor C1-6

Corridor C1-4

Corridor C1-8

Corridor C1-1

General Waiting

Corridor C1-2

Photo Alcove

Reception

Equipment Alcove

Nourishment Alcove

Scale Alcove

Meds

1065C

1065B

1065A

Elec. Clos.

1089A

Scale Alcove

PAS

Elec.

1114A

Boiler Plant

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

N O

T F

O R

C O

N S

T R

U C

T

IO

N

© 2020 Virtual Energy Solutions, INC.

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

J o lie t

C B

O C

P a rk in g E x p a n s io n V

E S

A rc h

.r v t

-0

-1

:5

:5

A

M NEW CONSTRUCTION PHASING

FIRST FLOOR LEVEL

PARKING EXPANSION AT

JOLIET CBOC

Revisions Date

3/32" = 1'-0"

FIRST FLOOR LEVEL

0 8' 16' 32' i_dic Polygon i_dic PolyLine i_dic Callout

PHASE C5

i_dic Polygon i_dic Callout

NEW CEILING TILE AND MECHANICAL EQUIPMENT INSTALLATION

i_dic Callout

PHASE C5

i_dic Callout

OFF-HOURS WORK

PHASE C5

i_dic Rectangle i_dic Callout

NEW ROOF OPENINGS

FOR DUCTWORK

i_dic Callout

PHASE C3

i_dic Typewritten Text

FIRST FLOOR LEVEL: CLINIC FUNCTIONS

i_dic Callout

ROOM-BY-ROOM APPROACH

PHASE C5

CLOSE COORDINATION WITH END USERS REQUIRED

i_dic Typewritten Text 02/23/2023 i_dic Typewritten Text

PHASES C3 & C5

i_dic Typewritten Text

VHAHINWalshA Typewritten Text

8 WEEKS - ROOM BY ROOM

VHAHINWalshA

1 WEEK

Ex Gx Hx Jx Kx K'x Lx

1x

4x

6x

9x

12x

13x

14x

CxBxAx

A1x

B1xC1xD1xE1x

3x

5x

5.8x

8x

10x

6.1x

Fx A.E

15x

9.5x

1.2x

A

B

F

2.3

D

E

1.2

2.2

Office

Vestibule

Lobby

Elevator E-2

MECHANICAL/ELECTRICAL SPACE

SUPPORT

SECURITY & SAFETY

STAFF

RESTROOMS

PRIMARY CARE

WOMEN'S HEALTH

RADIOLOGY

EYE CLINIC

PHYSICAL/OCCUPATIONAL THERAPY

PHARMACY

PODIATRY

AUDIOLOGY

RESPIRATORY

RECEPTION

LAB

VERTICAL CIRCULATION

FUNCTIONS LEGEND

FIRST FLOOR LEVEL

CARDIOLOGY

DRIVE THROUGH TESTING

FMS

Elevator

EL-1

Stair #2 S-2

Corridor C1-15

Rad Control

Dispensary

Storage 1116A

Diagnostic

Marco

Rad Room

Corridor C1-13

Corridor C1-14

Corridor C1-11

Toilet

Toilet

HAC

Toilet 1112E

Soiled Utility 1112A

Storage 1112B

PM&R

Treatment 1112D

Eye Tech

Visual Fields

Treatment 1112C

Toilet

Toilet 1102A

Eye

Blood Draw 1114D

Eye

Blood Draw 1114C

Draw Analysis

1114E

Toilet 1114F

Blood Draw 1114B

Eye

Eye

1-On-1 Room 1017C

Work Room 1017B

Supervisor Office

1017A

Nurse Triage

Exam 1

Exam 2

Nurse Triage

Women Health Exam

IT

Telemed

Telemed

Telemed

Closet

Telemed

Telemed

Toilet 1043A

Telemed

Telemed 1038Exam 17

Exam 16

PACT 2

PACT 1

Exam 15

Exam 14

Exam 12

Exam 13

Exam 5

Women Health Exam

Toilet

Toilet 1047A

Men's Restroom

Women's Restroom

Treatment Room

Toilet

Treatment Room

CWT

CWT

Security

Wheelchair Storage

Group

Treatment

Treatment Room

Group Treatment

Treatment Room

Treatment Room

Treatment Room

Treatment Room

Soiled Utility

Exam 6

Exam 7

Exam 8

Exam 9

Clean Storage

Room B131 Exam10

Procedure 1 Shared Gyno

Toilet 1059B

Toilet

Closet 1059A

Procedure 2

Exam 11

Exam 19

Exam 18

PACT

PACT 4

Women Health Exam

Women Health Exam

Corridor C1-3

Telemed

HAC

Stair #1 S-1

Mobile Port Waiting

Toilet 1068A

Toilet 1031A

Pharm. D

Pharm. D

Nutritionist

Teleretinal

Cardio/Pod Shared Office

Soiled Utility

Clean Utility

Social Worker

Shell Space

Corridor C1-10

Podiatry Exam

Podiatry Exam

Tech Work Room

Audiology Exam

Cast Room

Podiatry Exam

Audiology Exam

Oxygen Evaluation

PFT Blood Gas

Clean Utility

Soiled Utility

Control

Sound Booth

Control

Sound Booth

Stor.

Corridor C1-12

Corridor C1-9

Corridor

Ambulance Bay C1-36

Corridor C1-5

Corridor C1-5

Corridor C1-7

Corridor C1-6

Corridor C1-6

Corridor C1-4

Corridor C1-8

Corridor C1-1

General Waiting

Corridor C1-2

Photo Alcove

Reception

Equipment Alcove

Nourishment Alcove

Scale Alcove

Meds

1065C

1065B

1065A

Elec. Clos.

1089A

Scale Alcove

PAS

Elec.

1114A

Boiler Plant

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

N O

T F

O R

C O

N S

T R

U C

T

IO

N

© 2020 Virtual Energy Solutions, INC.

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

J o lie t

C B

O C

P a rk in g E x p a n s io n V

E S

A rc h

.r v t

-0

-1

:5

:5

A

M NEW CONSTRUCTION PHASING

FIRST FLOOR LEVEL

PARKING EXPANSION AT

JOLIET CBOC

Revisions Date

3/32" = 1'-0"

FIRST FLOOR LEVEL

0 8' 16' 32' i_dic Polygon i_dic Rectangle i_dic Typewritten Text

FIRST FLOOR LEVEL: NEW CONSTRUCTION

i_dic Callout

TEMPORARY EGRESS DOOR &

WALKWAY

i_dic Single Door i_dic Rectangle i_dic Rectangle i_dic PolyLine i_dic Line i_dic PolyLine i_dic Rectangle i_dic Callout

NEW ROOF OPENINGS

FOR DUCTWORK

i_dic Callout

PHASE C3

i_dic Typewritten Text 02/23/2023 i_dic Typewritten Text

PHASE C6E

i_dic Callout

AREA OF CONSTRUCTION WORK

PHASE C6E

i_dic

Ex Gx Hx Jx Kx K'x Lx

1x

4x

6x

9x

12x

13x

14x

CxBxAx

A1x

B1xC1xD1xE1x

3x

5x

5.8x

8x

10x

6.1x

Fx A.E

15x

9.5x

1.2x

A

B

F

2.3

D

E

1.2

2.2

Office

Vestibule

Lobby

Elevator E-2

MECHANICAL/ELECTRICAL SPACE

SUPPORT

SECURITY & SAFETY

STAFF

RESTROOMS

PRIMARY CARE

WOMEN'S HEALTH

RADIOLOGY

EYE CLINIC

PHYSICAL/OCCUPATIONAL THERAPY

PHARMACY

PODIATRY

AUDIOLOGY

RESPIRATORY

RECEPTION

LAB

VERTICAL CIRCULATION

FUNCTIONS LEGEND

FIRST FLOOR LEVEL

CARDIOLOGY

DRIVE THROUGH TESTING

FMS

Elevator

EL-1

Stair #2 S-2

Corridor C1-15

Rad Control

Dispensary

Storage 1116A

Diagnostic

Marco

Rad Room

Corridor C1-13

Corridor C1-14

Corridor C1-11

Toilet

Toilet

HAC

Toilet 1112E

Soiled Utility 1112A

Storage 1112B

PM&R

Treatment 1112D

Eye Tech

Visual Fields

Treatment 1112C

Toilet

Toilet 1102A

Eye

Blood Draw 1114D

Eye

Blood Draw 1114C

Draw Analysis

1114E

Toilet 1114F

Blood Draw 1114B

Eye

Eye

1-On-1 Room 1017C

Work Room 1017B

Supervisor Office

1017A

Nurse Triage

Exam 1

Exam 2

Nurse Triage

Women Health Exam

IT

Telemed

Telemed

Telemed

Closet

Telemed

Telemed

Toilet 1043A

Telemed

Telemed 1038Exam 17

Exam 16

PACT 2

PACT 1

Exam 15

Exam 14

Exam 12

Exam 13

Exam 5

Women Health Exam

Toilet

Toilet 1047A

Men's Restroom

Women's Restroom

Treatment Room

Toilet

Treatment Room

CWT

CWT

Security

Wheelchair Storage

Group

Treatment

Treatment Room

Group Treatment

Treatment Room

Treatment Room

Treatment Room

Treatment Room

Soiled Utility

Exam 6

Exam 7

Exam 8

Exam 9

Clean Storage

Room B131 Exam10

Procedure 1 Shared Gyno

Toilet 1059B

Toilet

Closet 1059A

Procedure 2

Exam 11

Exam 19

Exam 18

PACT

PACT 4

Women Health Exam

Women Health Exam

Corridor C1-3

Telemed

HAC

Stair #1 S-1

Mobile Port Waiting

Toilet 1068A

Toilet 1031A

Pharm. D

Pharm. D

Nutritionist

Teleretinal

Cardio/Pod Shared Office

Soiled Utility

Clean Utility

Social Worker

Shell Space

Corridor C1-10

Podiatry Exam

Podiatry Exam

Tech Work Room

Audiology Exam

Cast Room

Podiatry Exam

Audiology Exam

Oxygen Evaluation

PFT Blood Gas

Clean Utility

Soiled Utility

Control

Sound Booth

Control

Sound Booth

Stor.

Corridor C1-12

Corridor C1-9

Corridor

Ambulance Bay C1-36

Corridor C1-5

Corridor C1-5

Corridor C1-7

Corridor C1-6

Corridor C1-6

Corridor C1-4

Corridor C1-8

Corridor C1-1

General Waiting

Corridor C1-2

Photo Alcove

Reception

Equipment Alcove

Nourishment Alcove

Scale Alcove

Meds

1065C

1065B

1065A

Elec. Clos.

1089A

Scale Alcove

PAS

Elec.

1114A

Boiler Plant

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

N O

T F

O R

C O

N S

T R

U C

T

IO

N

© 2020 Virtual Energy Solutions, INC.

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

J o lie t

C B

O C

P a rk in g E x p a n s io n V

E S

A rc h

.r v t

-0

-1

:5

:5

A

M NEW CONSTRUCTION PHASING

FIRST FLOOR LEVEL

PARKING EXPANSION AT

JOLIET CBOC

Revisions Date

3/32" = 1'-0"

FIRST FLOOR LEVEL

0 8' 16' 32' i_dic Rectangle i_dic Callout

TEMPORARY EGRESS DOOR &

WALKWAY

i_dic Single Door i_dic Rectangle i_dic Rectangle i_dic Polygon i_dic PolyLine i_dic Line i_dic Typewritten Text

FIRST FLOOR LEVEL: CLINIC FUNCTIONS

i_dic Callout

UNOCCUPIED DURING

PHASE C6E

i_dic PolyLine i_dic Typewritten Text 02/23/2023 i_dic Typewritten Text

PHASE C6E

i_dic Typewritten Text

VHAHINWalshA

7 WEEKS

Ex Gx Hx Jx Kx K'x Lx

1x

4x

6x

9x

12x

13x

14x

CxBxAx

A1x

B1xC1xD1xE1x

3x

5x

5.8x

8x

10x

6.1x

Fx A.E

15x

9.5x

1.2x

A

B

F

2.3

D

E

1.2

2.2

Office

Vestibule

Lobby

Elevator E-2

MECHANICAL/ELECTRICAL SPACE

SUPPORT

SECURITY & SAFETY

STAFF

RESTROOMS

PRIMARY CARE

WOMEN'S HEALTH

RADIOLOGY

EYE CLINIC

PHYSICAL/OCCUPATIONAL THERAPY

PHARMACY

PODIATRY

AUDIOLOGY

RESPIRATORY

RECEPTION

LAB

VERTICAL CIRCULATION

FUNCTIONS LEGEND

FIRST FLOOR LEVEL

CARDIOLOGY

DRIVE THROUGH TESTING

FMS

Elevator

EL-1

Stair #2 S-2

Corridor C1-15

Rad Control

Dispensary

Storage 1116A

Diagnostic

Marco

Rad Room

Corridor C1-13

Corridor C1-14

Corridor C1-11

Toilet

Toilet

HAC

Toilet 1112E

Soiled Utility 1112A

Storage 1112B

PM&R

Treatment 1112D

Eye Tech

Visual Fields

Treatment 1112C

Toilet

Toilet 1102A

Eye

Blood Draw 1114D

Eye

Blood Draw 1114C

Draw Analysis

1114E

Toilet 1114F

Blood Draw 1114B

Eye

Eye

1-On-1 Room 1017C

Work Room 1017B

Supervisor Office

1017A

Nurse Triage

Exam 1

Exam 2

Nurse Triage

Women Health Exam

IT

Telemed

Telemed

Telemed

Closet

Telemed

Telemed

Toilet 1043A

Telemed

Telemed 1038Exam 17

Exam 16

PACT 2

PACT 1

Exam 15

Exam 14

Exam 12

Exam 13

Exam 5

Women Health Exam

Toilet

Toilet 1047A

Men's Restroom

Women's Restroom

Treatment Room

Toilet

Treatment Room

CWT

CWT

Security

Wheelchair Storage

Group

Treatment

Treatment Room

Group Treatment

Treatment Room

Treatment Room

Treatment Room

Treatment Room

Soiled Utility

Exam 6

Exam 7

Exam 8

Exam 9

Clean Storage

Room B131 Exam10

Procedure 1 Shared Gyno

Toilet 1059B

Toilet

Closet 1059A

Procedure 2

Exam 11

Exam 19

Exam 18

PACT

PACT 4

Women Health Exam

Women Health Exam

Corridor C1-3

Telemed

HAC

Stair #1 S-1

Mobile Port Waiting

Toilet 1068A

Toilet 1031A

Pharm. D

Pharm. D

Nutritionist

Teleretinal

Cardio/Pod Shared Office

Soiled Utility

Clean Utility

Social Worker

Shell Space

Corridor C1-10

Podiatry Exam

Podiatry Exam

Tech Work Room

Audiology Exam

Cast Room

Podiatry Exam

Audiology Exam

Oxygen Evaluation

PFT Blood Gas

Clean Utility

Soiled Utility

Control

Sound Booth

Control

Sound Booth

Stor.

Corridor C1-12

Corridor C1-9

Corridor

Ambulance Bay C1-36

Corridor C1-5

Corridor C1-5

Corridor C1-7

Corridor C1-6

Corridor C1-6

Corridor C1-4

Corridor C1-8

Corridor C1-1

General Waiting

Corridor C1-2

Photo Alcove

Reception

Equipment Alcove

Nourishment Alcove

Scale Alcove

Meds

1065C

1065B

1065A

Elec. Clos.

1089A

Scale Alcove

PAS

Elec.

1114A

Boiler Plant

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

N O

T F

O R

C O

N S

T R

U C

T

IO

N

© 2020 Virtual Energy Solutions, INC.

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

J o lie t

C B

O C

P a rk in g E x p a n s io n V

E S

A rc h

.r v t

-0

-1

:5

:5

A

M NEW CONSTRUCTION PHASING

FIRST FLOOR LEVEL

PARKING EXPANSION AT

JOLIET CBOC

Revisions Date

3/32" = 1'-0"

FIRST FLOOR LEVEL

0 8' 16' 32' i_dic Polygon i_dic PolyLine i_dic Callout

AREA OF CONSTRUCTION WORK

PHASE C6W

i_dic PolyLine i_dic Typewritten Text

FIRST FLOOR LEVEL: NEW CONSTRUCTION

i_dic PolyLine i_dic Typewritten Text 02/23/2023 i_dic Typewritten Text

PHASE C6W

i_dic PolyLine i_dic

Ex Gx Hx Jx Kx K'x Lx

1x

4x

6x

9x

12x

13x

14x

CxBxAx

A1x

B1xC1xD1xE1x

3x

5x

5.8x

8x

10x

6.1x

Fx A.E

15x

9.5x

1.2x

A

B

F

2.3

D

E

1.2

2.2

Office

Vestibule

Lobby

Elevator E-2

MECHANICAL/ELECTRICAL SPACE

SUPPORT

SECURITY & SAFETY

STAFF

RESTROOMS

PRIMARY CARE

WOMEN'S HEALTH

RADIOLOGY

EYE CLINIC

PHYSICAL/OCCUPATIONAL THERAPY

PHARMACY

PODIATRY

AUDIOLOGY

RESPIRATORY

RECEPTION

LAB

VERTICAL CIRCULATION

FUNCTIONS LEGEND

FIRST FLOOR LEVEL

CARDIOLOGY

DRIVE THROUGH TESTING

FMS

Elevator

EL-1

Stair #2 S-2

Corridor C1-15

Rad Control

Dispensary

Storage 1116A

Diagnostic

Marco

Rad Room

Corridor C1-13

Corridor C1-14

Corridor C1-11

Toilet

Toilet

HAC

Toilet 1112E

Soiled Utility 1112A

Storage 1112B

PM&R

Treatment 1112D

Eye Tech

Visual Fields

Treatment 1112C

Toilet

Toilet 1102A

Eye

Blood Draw 1114D

Eye

Blood Draw 1114C

Draw Analysis

1114E

Toilet 1114F

Blood Draw 1114B

Eye

Eye

1-On-1 Room 1017C

Work Room 1017B

Supervisor Office

1017A

Nurse Triage

Exam 1

Exam 2

Nurse Triage

Women Health Exam

IT

Telemed

Telemed

Telemed

Closet

Telemed

Telemed

Toilet 1043A

Telemed

Telemed 1038Exam 17

Exam 16

PACT 2

PACT 1

Exam 15

Exam 14

Exam 12

Exam 13

Exam 5

Women Health Exam

Toilet

Toilet 1047A

Men's Restroom

Women's Restroom

Treatment Room

Toilet

Treatment Room

CWT

CWT

Security

Wheelchair Storage

Group

Treatment

Treatment Room

Group Treatment

Treatment Room

Treatment Room

Treatment Room

Treatment Room

Soiled Utility

Exam 6

Exam 7

Exam 8

Exam 9

Clean Storage

Room B131 Exam10

Procedure 1 Shared Gyno

Toilet 1059B

Toilet

Closet 1059A

Procedure 2

Exam 11

Exam 19

Exam 18

PACT

PACT 4

Women Health Exam

Women Health Exam

Corridor C1-3

Telemed

HAC

Stair #1 S-1

Mobile Port Waiting

Toilet 1068A

Toilet 1031A

Pharm. D

Pharm. D

Nutritionist

Teleretinal

Cardio/Pod Shared Office

Soiled Utility

Clean Utility

Social Worker

Shell Space

Corridor C1-10

Podiatry Exam

Podiatry Exam

Tech Work Room

Audiology Exam

Cast Room

Podiatry Exam

Audiology Exam

Oxygen Evaluation

PFT Blood Gas

Clean Utility

Soiled Utility

Control

Sound Booth

Control

Sound Booth

Stor.

Corridor C1-12

Corridor C1-9

Corridor

Ambulance Bay C1-36

Corridor C1-5

Corridor C1-5

Corridor C1-7

Corridor C1-6

Corridor C1-6

Corridor C1-4

Corridor C1-8

Corridor C1-1

General Waiting

Corridor C1-2

Photo Alcove

Reception

Equipment Alcove

Nourishment Alcove

Scale Alcove

Meds

1065C

1065B

1065A

Elec. Clos.

1089A

Scale Alcove

PAS

Elec.

1114A

Boiler Plant

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

N O

T F

O R

C O

N S

T R

U C

T

IO

N

© 2020 Virtual Energy Solutions, INC.

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

J o lie t

C B

O C

P a rk in g E x p a n s io n V

E S

A rc h

.r v t

-0

-1

:5

:5

A

M NEW CONSTRUCTION PHASING

FIRST FLOOR LEVEL

PARKING EXPANSION AT

JOLIET CBOC

Revisions Date

3/32" = 1'-0"

FIRST FLOOR LEVEL

0 8' 16' 32' i_dic Polygon i_dic Callout

UNOCCUPIED DURING

PHASE C6W

i_dic PolyLine i_dic Typewritten Text

FIRST FLOOR LEVEL: CLINIC FUNCTIONS

i_dic Typewritten Text 02/23/2023 i_dic Typewritten Text

PHASE C6W

i_dic PolyLine i_dic PolyLine i_dic PolyLine i_dic Typewritten Text

VHAHINWalshA

7 WEEKS

Ex

Gx

Gx

Hx

Hx

Jx

Jx

Kx

Kx

K'x

K'x Lx

1x

4x

6x

9x

12x

13x

14x

CxBxAxA1xB1xC1xD1xE1x

3x

5x

5.8x

8x

10x

6.1x

Fx A.E

15x

9.5x

1.2x

A

B

F

2.3

DE

1.2

2.2

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

N O

T F

O R

C O

N S

T R

U C

T

IO

N

© 2020 Virtual Energy Solutions, INC.

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

J o lie t

C B

O C

P a rk in g E x p a n s io n V

E S

A rc h

.r v t

-0

-1

:5

:0

A

M NEW CONSTRUCTION PHASING

ROOF LEVEL

PARKING EXPANSION AT

JOLIET CBOC

GCGIDGID

Revisions Date

ISSUED FOR 90% CD 02/10/2023

3/32" = 1'-0"

1 ROOF LEVEL PLAN-NEW CONSTRUCTION PHASING ROOF

0 8' 16' 32' i_dic Polygon i_dic Typewritten Text

ROOF LEVEL: NEW CONSTRUCTION

i_dic PolyLine i_dic Callout

PHASE C2

i_dic Callout

NEW AHU PENTHOUSE:

STRUCTURE, ENCLOSURE, AND MECHANICAL EQUIPMENT INSTALLATION

i_dic Callout

PHASE C2

i_dic Rectangle i_dic Rectangle i_dic Callout

NEW ROOF OPENINGS

FOR OVER-ROOF DUCTWORK

i_dic Callout

PHASE C3

i_dic Callout

NEW ROOF OPENINGS

FOR OVER-ROOF DUCTWORK

i_dic Callout

PHASE C3

i_dic Callout

REMOVE & REPLACE EXISTING ROOFING SYSTEM

i_dic Callout

PHASE C3

i_dic Callout

PHASE C3

i_dic Callout

PHASE C3

i_dic Callout

PHASE C3

i_dic Callout

NEW OVER-ROOF

DUCTWORK, MECHANICAL EQUIPMENT, & PIPING

i_dic Callout

PHASE C4

i_dic Callout

NEW OVER-ROOF

DUCTWORK & MECHANICAL EQUIPMENT

i_dic Callout

PHASE C4

i_dic Callout

REMOVE & REPLACE EXISTING ROOFING SYSTEM

i_dic Callout

PHASE C3

i_dic Typewritten Text Roof i_dic Callout

NEW ROOF ACCESS STAIR &

ENCLOSURE

i_dic Callout

PHASE C1

i_dic Polygon i_dic Callout

PHASE C1

i_dic Polygon i_dic Typewritten Text

CONSTRUCT NEW NORTHEAST

VESTIBULE INCLUDING OFFICE,

ELEVATOR + LOBBY

i_dic Callout

PHASE C1

i_dic Typewritten Text

CONSTRUCT NEW NORTH

FACADE COMPLETE WITH

INSULATION AND MASONRY

CLADDING

i_dic Typewritten Text 02/23/2023…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .