S02 - ATCH 23 - Joliet_CBOC_Issued_for_Bid_A1_Arch_Part_1.pdf
PDF 9 MB Posted
- Solicitation number
- 36C77623B0049
About this file
This is a solicitation for a construction project to expand parking at the Joliet Community Based Outpatient Clinic located in Joliet, Illinois. The scope of work involves demolishing an existing remnant structure and site work, replacing the existing roof system, constructing a new ambulance bay and mechanical penthouse, and installing new ceilings. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The anticipated award date is not provided. Offerors are required to visit the site and verify all dimensions before submitting bids. The construction work must be performed in accordance with all applicable federal, state and local codes and regulations.
View the file
Other files
Show 40 more
Latest 50 of 57 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SITE
444 W. Lake St. Suite 1700 Chicago, IL 60606
312.583.7023 www.virtualenergysolutions.com
Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432
Drawing No.
Scale:
Date:
Checked By:Drawn By:Designed By:
Drawing Title:
Contract No.
File No.Building No.
Client Project No.
Project Title:Approved: Chief, failites Management Services
Approved: Medical Center Director
Approved:
Approved: Location:
VES Project Number: 191006
AS NOTED
VA JOLIET CBOC
JOLIET, ILLINOIS
578-371 36C25219D0020
N O
T F
O R
C O
N S
T R
U C
T
IO
N
© 2020 Virtual Energy Solutions, INC.
N
04/21/2023
B
IM
/2
-M
A T
O C
-P a rk in g E x p a n s io n a t J o lie t C
B O
C
-3
/2
J o lie t
C B
O C
P a rk in g E x p a n s io n V
E S
A rc h
.r v t
-0
-0
:0 :0
A
M
GI 001
COVER SHEET
PARKING EXPANSION AT
JOLIET CBOC
GCGIDGID
6" = 1'-0"
LOCATION MAP - VA JOLIET CBOC
PARKING EXPANSION AT JOLIET CBOC
1201 EAGLE STREET
JOLIET, ILLINOIS 60432
PROJECT NUMBER 578-371
AREA OF WORK
SILVER CROSS
HOSPITAL (SCH) REMNANT
STRUCTURE TO BE
REMOVED
CBOC
AREA OF NEW
NORTH PARKING LOT
ARCHITECTURAL SHEET INDEX
Sheet Number Sheet Name
Revision
Number Issue Date Issued For
GI 001 COVER SHEET 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
GI 002 CODE ANALYSIS, ACCESSIBILITY, & GENERAL NOTES 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
GI 003 ARCHITECTURAL SYMBOLS & ABBREVIATIONS 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
GI 004 LIFE SAFETY PLANS 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
GC 001 GENERAL AREAS OF WORK - ARCHITECTURAL DEMOLITION 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
GC 002 GENERAL AREAS OF WORK - ARCHITECTURAL NEW WORK 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
GC 003 PROPOSED PROJECT SCHEDULE WITH PHASING 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
GC 004 BASEMENT LEVEL PLAN-DEMOLITION PHASING 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
GC 005 FIRST FLOOR LEVEL PLAN-DEMOLITION PHASING 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
GC 006 ROOF LEVEL PLAN-DEMOLITION PHASING 14 03/24/2023 ISSUED FOR BID
GC 007 BASEMENT LEVEL PLAN-NEW CONSTRUCTION PHASING 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
GC 008 FIRST FLOOR LEVEL PLAN-NEW CONSTRUCTION PHASING 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
GC 009 FIRST FLOOR LEVEL PLAN-NEW CONSTRUCTION PHASING 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
GC 010 ROOF LEVEL PLAN-NEW CONSTRUCTION PHASING 14 03/24/2023 ISSUED FOR BID
GC 011 SITE WORK PLAN - NEW CONSTRUCTION PHASING 14 03/24/2023 ISSUED FOR BID
AD 100 BASEMENT DEMOLITION PLAN REMNANT STRUCTURE & N.E. VESTIBULE 14 03/24/2023 ISSUED FOR BID
AD 101 FIRST FLOOR DEMOLITION PLAN REMNANT STRUCTURE & N.E. VESTIBULE 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
AD 102 ROOF DEMOLITION PARTIAL PLAN REMNANT STRUCTURE & N.E. VESTIBULE 14 03/24/2023 ISSUED FOR BID
AD 103 FIRST FLOOR DEMOLITION PLAN - AMBULANCE BAY 14 03/24/2023 ISSUED FOR BID
AD 104 MISCELLANEOUS DEMOLITION BASEMENT LEVEL 14 03/24/2023 ISSUED FOR BID
AD 105 MISCELLANEOUS DEMOLITION FIRST FLOOR & ROOF LEVEL 14 03/24/2023 ISSUED FOR BID
AD 301 DEMOLITION WALL SECTION & DETAILS AT REMNANT STRUCTURE 14 03/24/2023 ISSUED FOR BID
AE 100F EXISTING FOUNDATIONS, PARTIAL PLAN 14 03/24/2023 ISSUED FOR BID
AD 110N DEMOLITION REFLECTED CEILING PLAN-BASEMENT NORTH 14 03/24/2023 ISSUED FOR BID
AD 110S DEMOLITION REFLECTED CEILING PLAN-BASEMENT SOUTH 14 03/24/2023 ISSUED FOR BID
AD 111N DEMOLITION REFLECTED CEILING PLAN-1ST FLOOR NORTH 14 03/24/2023 ISSUED FOR BID
AD 111S DEMOLITION REFLECTED CEILING PLAN-1ST FLOOR SOUTH 14 03/24/2023 ISSUED FOR BID
AE 100N BASEMENT LEVEL PLAN NORTH 14 03/24/2023 ISSUED FOR BID
AE 101N FIRST FLOOR PLAN NORTH 14 03/24/2023 ISSUED FOR BID
AE 102N ROOF PLAN - NORTH PORTION 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
AE 102S ROOF PLAN - SOUTH PORTION 14 03/24/2023 ISSUED FOR BID
AE 103 MISCELLANEOUS NEW WORK BASEMENT LEVEL 14 03/24/2023 ISSUED FOR BID
AE 104 MISCELLANEOUS NEW WORK FIRST FLOOR LEVEL 14 03/24/2023 ISSUED FOR BID
AC 100N REFLECTED CEILING PLAN - BASEMENT NORTH 14 03/24/2023 ISSUED FOR BID
AC 100S REFLECTED CEILING PLAN - BASEMENT SOUTH 14 03/24/2023 ISSUED FOR BID
AC 101N REFLECTED CEILING PLAN - 1ST FLOOR NORTH 14 03/24/2023 ISSUED FOR BID
AC 101S REFLECTED CEILING PLAN - 1ST FLOOR SOUTH 14 03/24/2023 ISSUED FOR BID
AC 400 REFLECTED CEILING ENLARGED PLANS-BASEMENT LEVEL 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
AC 401 REFLECTED CEILING ENLARGED PLAN FIRST FLOOR LEVEL 14 03/24/2023 ISSUED FOR BID
AC 402 FIRST FLOOR & PENTHOUSE LEVEL REFLECTED CEILING PLANS 14 03/24/2023 ISSUED FOR BID
AC 403 ENLARGED CEILING PLANS AND DETAILS 14 03/24/2023 ISSUED FOR BID
AC 501 DETAILS - CEILINGS 14 03/24/2023 ISSUED FOR BID
AE 201 ELEVATIONS 14 03/24/2023 ISSUED FOR BID
AE 202 ELEVATIONS 14 03/24/2023 ISSUED FOR BID
AE 203 ELEVATIONS - AHU PENTHOUSE NORTH & SOUTH 14 03/24/2023 ISSUED FOR BID
AE 204 ELEVATIONS - AHU PENTHOUSE EAST & WEST 14 03/24/2023 ISSUED FOR BID
AE 205 INTERIOR ELEVATIONS - BASEMENT LEVEL 14 03/24/2023 ISSUED FOR BID
AE 206 INTERIOR ELEVATIONS - BASEMENT LEVEL 14 03/24/2023 ISSUED FOR BID
AE 207 INTERIOR ELEVATIONS - FIRST FLOOR LEVEL 14 03/24/2023 ISSUED FOR BID
AE 208 INTERIOR ELEVATIONS - FIRST FLOOR LEVEL 14 03/24/2023 ISSUED FOR BID
AE 301 BUILDING SECTIONS 14 03/24/2023 ISSUED FOR BID
AE 302 BUILDING SECTIONS 14 03/24/2023 ISSUED FOR BID
AE 303 WALL SECTIONS 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
AE 304 WALL SECTIONS 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
AE 305 WALL SECTIONS NORTH VESTIBULE 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
AE 306 WALL SECTIONS NORTH VESTIBULE 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
AE 307 AHU PENTHOUSE SECTIONS 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
AE 308 AHU PENTHOUSE SECTIONS AT STAIR S-4 & DETAIL COLUMN SECTION 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
AE 309 AHU PENTHOUSE WALL SECTIONS 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
AE 310 AHU PENTHOUSE WALL SECTIONS 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
AE 400 ENLARGED PLAN - BASEMENT LEVEL 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
AE 401 ENLARGED PLAN - FIRST FLOOR LEVEL 14 03/24/2023 ISSUED FOR BID
AE 402 FIRST FLOOR LEVEL AMBULANCE BAY PLAN & DETAILS 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
AE 403 AHU PENTHOUSE LEVEL PLAN & DETAILS 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
AE 404 AHU PENTHOUSE ROOF LEVEL PLAN & DETAILS 14 03/24/2023 ISSUED FOR BID
AE 405 AHU PENTHOUSE ACCESS STAIR PLANS & DETAILS 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
AE 406 ENLARGED PLAN - AMBULANCE BAY ROOF 14 03/24/2023 ISSUED FOR BID
AE 407 NORTH ROOF ACCESS STAIR PLAN & DETAILS 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
AE 501 INTERIOR PARTITION TYPES & DETAILS 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
AE 502 DETAILS - EXTERIOR 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
AE 601 DOOR SCHEDULE & DETAILS 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
AE 602 WINDOW & STOREFRONT SCHEDULE, ELEVATIONS & DETAILS 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
AE 603 WINDOW DETAILS 15 04/21/2023 ISSUED FOR BID ADDENDUM 1
AI 601 FINISH PLANS & FINISH SCHEDULE 14 03/24/2023 ISSUED FOR BID
Grand total: 74
3" = 1'-0"
SITE MAP
PROJECT NORTH
TRUE NORTH
PROJECT NORTH
TRUE NORTH
MECHANICAL SHEET INDEX
Sheet Number Sheet Name
Revision
Number Issue Date Issued For
M001 MECHANICAL SYMBOLS AND ABBREVIATIONS 4 03/24/2023 ISSUED FOR BID
MD100-N BASEMENT LEVEL - MECHANICAL DEMOLITION PLAN - NORTH 4 03/24/2023 ISSUED FOR BID
MD100-S BASEMENT LEVEL - MECHANICAL DEMOLITION PLAN - SOUTH 4 03/24/2023 ISSUED FOR BID
MD101-N FIRST FLOOR - MECHANICAL DEMOLITION PLAN - NORTH 5 04/21/2023 ISSSUED FOR BID ADDENDUM 1
MD101-S FIRST FLOOR - MECHANICAL DEMOLITION PLAN - SOUTH 4 03/24/2023 ISSUED FOR BID
MD102-N ROOF NORTH - MECHANICAL DEMOLITION PLAN 4 03/24/2023 ISSUED FOR BID
MD102-S ROOF SOUTH - MECHANICAL DEMOLITION PLAN 4 03/24/2023 ISSUED FOR BID
MH100-N BASEMENT LEVEL - MECHANICAL VENTILATION PLAN - NORTH 5 04/21/2023 ISSSUED FOR BID ADDENDUM 1
MH100-S BASEMENT LEVEL - MECHANICAL VENTILATION PLAN - SOUTH 5 04/21/2023 ISSSUED FOR BID ADDENDUM 1
MH101-N FIRST FLOOR - MECHANICAL VENTILATION PLAN - NORTH 5 04/21/2023 ISSSUED FOR BID ADDENDUM 1
MH101-S FIRST FLOOR - MECHANICAL VENTILATION PLAN - SOUTH 5 04/21/2023 ISSSUED FOR BID ADDENDUM 1
MH102-N ROOF NORTH - MECHANICAL VENTILATION PLAN 4 03/24/2023 ISSUED FOR BID
MH102-S ROOF SOUTH - MECHANICAL VENTILATION PLAN 4 03/24/2023 ISSUED FOR BID
MP100-N BASEMENT LEVEL - MECHANICAL PIPING PLAN - NORTH 4 03/24/2023 ISSUED FOR BID
MP100-S BASEMENT LEVEL - MECHANICAL PIPING PLAN - SOUTH 4 03/24/2023 ISSUED FOR BID
MP101-N FIRST FLOOR - MECHANICAL PIPING PLAN - NORTH 4 03/24/2023 ISSUED FOR BID
MP101-S FIRST FLOOR - MECHANICAL PIPING PLAN - SOUTH 4 03/24/2023 ISSUED FOR BID
MP102-N ROOF NORTH - MECHANICAL PIPING PLAN 4 03/24/2023 ISSUED FOR BID
MP102-S ROOF SOUTH - MECHANICAL PIPING PLAN 4 03/24/2023 ISSUED FOR BID
M501 MECHANICAL DETAILS 4 03/24/2023 ISSUED FOR BID
M702 AIR HANDLING UNIT PIPING AND CONTROL DIAGRAMS 4 03/24/2023 ISSUED FOR BID
M502 MECHANICAL DETAILS 4 03/24/2023 ISSUED FOR BID
M503 MECHANICAL DETAILS 4 03/24/2023 ISSUED FOR BID
M504 MECHANICAL DETAILS 4 03/24/2023 ISSUED FOR BID
M601 MECHANICAL SCHEDULES 4 03/24/2023 ISSUED FOR BID
M602 MECHANICAL SCHEDULES 4 03/24/2023 ISSUED FOR BID
M603 MECHANICAL SCHEDULES 4 03/24/2023 ISSUED FOR BID
M604 MECHANICAL SCHEDULES 4 03/24/2023 ISSUED FOR BID
M605 MECHANICAL SCHEDULES 4 03/24/2023 ISSUED FOR BID
M701 MECHANICAL PIPING AND CONTROL DIAGRAMS 4 03/24/2023 ISSUED FOR BID
M703 BOILER PLANT PIPING AND CONTROL DIAGRAMS 4 03/24/2023 ISSUED FOR BID
M704 MECHANICAL PIPING AND CONTROL DIAGRAMS 4 03/24/2023 ISSUED FOR BID
Grand total: 32
ELECTRICAL SHEET INDEX
Sheet Number Sheet Name
Revision
Number Issue Date Issued For
E001 ELECTRICAL SYMBOLS AND ABBREVIATIONS 5 Date 5 ISSUED FOR BID ADDENDUM 1
ED100-N BASEMENT LEVEL - ELECTRICAL DEMOLITION PLAN - NORTH 5 Date 5 ISSUED FOR BID ADDENDUM 1
ED100-S BASEMENT LEVEL - ELECTRICAL DEMOLITION PLAN - SOUTH 5 Date 5 ISSUED FOR BID ADDENDUM 1
ED101-N FIRST FLOOR - ELECTRICAL DEMOLITION PLAN - NORTH 5 Date 5 ISSUED FOR BID ADDENDUM 1
ED101-S FIRST FLOOR - ELECTRICAL DEMOLITION PLAN - SOUTH 5 Date 5 ISSUED FOR BID ADDENDUM 1
EL100-N BASEMENT LEVEL - ELECTRICAL LIGHTING PLAN - NORTH 5 Date 5 ISSUED FOR BID ADDENDUM 1
EL100-S BASEMENT LEVEL - ELECTRICAL LIGHTING PLAN - SOUTH 5 Date 5 ISSUED FOR BID ADDENDUM 1
EL101-N FIRST FLOOR - ELECTRICAL LIGHTING PLAN - NORTH 5 Date 5 ISSUED FOR BID ADDENDUM 1
EL101-S FIRST FLOOR - ELECTRICAL LIGHTING PLAN - SOUTH 5 Date 5 ISSUED FOR BID ADDENDUM 1
EL102-N ROOF - ELECTRICAL POWER PLAN - NORTH 5 Date 5 ISSUED FOR BID ADDENDUM 1
EP100-N BASEMENT LEVEL - ELECTRICAL POWER PLAN - NORTH 5 Date 5 ISSUED FOR BID ADDENDUM 1
EP100-S BASEMENT LEVEL - ELECTRICAL POWER PLAN - SOUTH 5 Date 5 ISSUED FOR BID ADDENDUM 1
EP101-N FIRST FLOOR - ELECTRICAL POWER PLAN - NORTH 5 Date 5 ISSUED FOR BID ADDENDUM 1
EP101-S FIRST FLOOR - ELECTRICAL POWER PLAN - SOUTH 5 Date 5 ISSUED FOR BID ADDENDUM 1
EP102-N ROOF NORTH - ELECTRICAL POWER PLAN 5 Date 5 ISSUED FOR BID ADDENDUM 1
EP102-S ROOF SOUTH - ELECTRICAL POWER PLAN 5 Date 5 ISSUED FOR BID ADDENDUM 1
ES101 ELECTRICAL SITE PLAN 5 Date 5 ISSUED FOR BID ADDENDUM 1
ESD101 ELECTRICAL DEMOLITION SITE PLAN 5 Date 5 ISSUED FOR BID ADDENDUM 1
E501 ELECTRICAL DETAILS 5 Date 5 ISSUED FOR BID ADDENDUM 1
E502 ELECTRICAL DETAILS 5 Date 5 ISSUED FOR BID ADDENDUM 1
E503 ELECTRICAL DETAILS 5 Date 5 ISSUED FOR BID ADDENDUM 1
E504 ELECTRICAL DETAILS 5 Date 5 ISSUED FOR BID ADDENDUM 1
E505 ELECTRICAL DETAILS 5 Date 5 ISSUED FOR BID ADDENDUM 1
E506 CARD READER - REFERENCE DETAILS 5 Date 5 ISSUED FOR BID ADDENDUM 1
E507 NURSE CALL RISER - REFERENCE RISER 5 Date 5 ISSUED FOR BID ADDENDUM 1
E601 ELECTRICAL SCHEDULES 5 Date 5 ISSUED FOR BID ADDENDUM 1
E602 ELECTRICAL SCHEDULES 5 Date 5 ISSUED FOR BID ADDENDUM 1
E603 LIGHITNG CONTROLS RISER 5 Date 5 ISSUED FOR BID ADDENDUM 1
Grand total: 28
PLUMBING & FIRE PROTECTION SHEET INDEX
Sheet Number Sheet Name
Revision
Number Issue Date Issued For
P001 PLUMBING SYMBOLS, ABBREVIATIONS & SCHEDULES 5 03/24/2023 ISSUED FOR BID
PD101-N FIRST FLOOR - PLUMBING DEMOLITION PLAN - NORTH 5 03/24/2023 ISSUED FOR BID
PD101-S FIRST FLOOR - PLUMBING DEMOLITION PLAN - SOUTH 5 03/24/2023 ISSUED FOR BID
PD102-N ROOF - PLUMBING DEMOLITION PLAN - NORTH 5 03/24/2023 ISSUED FOR BID
P100-N BASEMENT LEVEL - PLUMBING WASTE & VENT PLAN - NORTH 5 03/24/2023 ISSUED FOR BID
P101-N FIRST FLOOR - PLUMBING PLAN - NORTH 5 03/24/2023 ISSUED FOR BID
P101-S FIRST FLOOR - PLUMBING PLAN - SOUTH 5 03/24/2023 ISSUED FOR BID
P102-N ROOF - PLUMBING PLAN-NORTH 5 03/24/2023 ISSUED FOR BID
FP001 FIRE PROTECTION SYMBOLS AND ABBREVIATIONS 6 04/21/2023 ISSUED FOR BID ADDENDUM 1
FP100-N BASEMENT LEVEL - FIRE PROTECTION PLAN - NORTH 6 04/21/2023 ISSUED FOR BID ADDENDUM 1
FP101-N FIRST FLOOR - FIRE PROTECTION PLAN - NORTH 6 04/21/2023 ISSUED FOR BID ADDENDUM 1
FP102-N ROOF - FIRE PROTECTION PLAN - NORTH 5 03/24/2023 ISSUED FOR BID
FP501 FIRE PROTECTION DETAILS 6 04/21/2023 ISSUED FOR BID ADDENDUM 1
Grand total: 13
STRUCTURAL SHEET INDEX - NORTH VESTIBULE
Sheet Number Sheet Name
Revision
Number Issue Date Issued For
S 001 GENERAL NOTES
S 002 GENERAL NOTES
S 010 TYPICAL DETAILS
S 011 TYPICAL DETAILS
S 012 TYPICAL DETAILS
S 100 ENLARGED STRUCTURAL PLANS
S 102 ENLARGED STRUCTURAL PLANS
S 103 PARKING EXPANSION RETAINING WALL PLAN
S 200 CONCRETE SCHEDULES AND DETAILS
S 201 CONCRETE SECTIONS AND DETAILS
S 300 STEEL SECTIONS AND DETAILS
Grand total: 11
CIVIL SHEET INDEX
Sheet Number Sheet Name
Revision
Number Issue Date Issued For
C2.1 AMBULANCE BAY DEMOLITION PLAN 14 03/24/2023 ISSUED FOR BID
C3.1 AMBULANCE BAY SITE PLAN 14 03/24/2023 ISSUED FOR BID
C1.0 GENERAL NOTES 14 03/24/2023 ISSUED FOR BID
C1.1 TOPOGRAPHIC SURVEY 14 03/24/2023 ISSUED FOR BID
C2.0 DEMOLITION PLAN 14 03/24/2023 ISSUED FOR BID
C3.0 SITE PLAN 14 03/24/2023 ISSUED FOR BID
C4.0 GRADING PLAN 14 03/24/2023 ISSUED FOR BID
C4.1 DRIVEWAY GRADING PLAN & STORMWATER EXCAVATION 14 03/24/2023 ISSUED FOR BID
C5.0 UTILITY PLAN 14 03/24/2023 ISSUED FOR BID
C5.1 STORMTRAP DETAILS 14 03/24/2023 ISSUED FOR BID
C5.2 STORMTRAP DETAILS 14 03/24/2023 ISSUED FOR BID
C5.3 STORMTRAP DETAILS 14 03/24/2023 ISSUED FOR BID
C6.0 EROSION CONTROL/SWPPP PLAN 14 03/24/2023 ISSUED FOR BID
C6.1 EROSION CONTROL/SWPPP DETAILS 14 03/24/2023 ISSUED FOR BID
C6.2 EROSION CONTROL/SWPPP NOTES 14 03/24/2023 ISSUED FOR BID
C6.3 EROSION CONTROL/SWPPP NOTES 14 03/24/2023 ISSUED FOR BID
C7.0 DETAILS 14 03/24/2023 ISSUED FOR BID
C7.1 DETAILS 14 03/24/2023 ISSUED FOR BID
C7.2 DETAILS 14 03/24/2023 ISSUED FOR BID
C8.0 TRAFFIC CONTROL DETAILS 14 03/24/2023 ISSUED FOR BID
Grand total: 20
LANDSCAPE SHEET INDEX
Sheet Number Sheet Name
Revision
Number Issue Date Issued For
AS 102 PARKING LOT STRIPING PLAN 14 03/24/2023 ISSUED FOR BID
LS 101 LANDSCAPE & PLANTING PLAN 14 03/24/2023 ISSUED FOR BID
LS-102 LANDSCAPE AND PLANTING DETAILS 14 03/24/2023 ISSUED FOR BID
LS-103 LANDSCAPE AND PLANTING DETAILS 14 03/24/2023 ISSUED FOR BID
Grand total: 4
CIVIL & STRUCTURAL ENGINEERING
STRUCTURAL ENGINEERING
LANDSCAPE
ARCHITECTURE
COST ESTIMATOR
MECHANICAL SYSTEMS CONSULTANT
ARCHITECTURE & MECHANICAL,
ELECTRICAL, PLUMBING, &
FIRE PROTECTION ENGINEERING
03/07/2023 ISSUED FOR BID
STRUCTURAL SHEET INDEX - AHU PENTHOUSE
Sheet Number Sheet Name
Revision
Number Issue Date Issued For
S001 STRUCTURAL GENERAL NOTES 14 03/24/2023 ISSUED FOR BID
S010 STRUCTURAL SCHEDULES 14 03/24/2023 ISSUED FOR BID
SB101 FOUNDATION PLAN 14 03/24/2023 ISSUED FOR BID
SF101 AHU PLATFORM FRAMING PLAN 14 03/24/2023 ISSUED FOR BID
SF102 ROOF FRAMING PLAN 14 03/24/2023 ISSUED FOR BID
S401 FOUNDATION DETAILS AND SECTIONS 14 03/24/2023 ISSUED FOR BID
S501 FRAMING DETAILS AND SECTIONS 14 03/24/2023 ISSUED FOR BID
S502 FRAMING DETAILS AND SECTIONS 14 03/24/2023 ISSUED FOR BID
S503 FRAMING DETAILS AND SECTIONS 14 03/24/2023 ISSUED FOR BID
S504 FRAMING DETAILS AND SECTIONS 14 03/24/2023 ISSUED FOR BID
Grand total: 10
03/07/2023 ISSUED FOR BID
03/07/2023 ISSUED FOR BID
03/07/2023 ISSUED FOR BID
03/07/2023 ISSUED FOR BID
03/07/2023 ISSUED FOR BID
03/07/2023 ISSUED FOR BID
03/07/2023 ISSUED FOR BID
03/07/2023 ISSUED FOR BID
03/07/2023 ISSUED FOR BID
03/07/2023 ISSUED FOR BID
Revisions Date
ISSUED FOR 60% DD 12/30/2022
ISSUED FOR 90% PRICING 02/02/2023
ISSUED FOR 90% CD 02/10/2023
ISSUED FOR 100% CD 03/07/2023
ISSUED FOR BID 03/24/2023
ISSUED FOR BID ADDENDUM 1 04/21/2023
i_dic Snapshot
Toe Clearance T his Drawing Produced by the U.S. A ccess Board
17-25
6 max m in
(a) elevation
(b) plan
Knee Clearance T his Drawing Produc ed by the U.S. Acc ess Board
11 min m in
8 min
9 min
(a) elevation
(b) plan m in
25 max
LC
Figure 703.4.2 Location of Tactile Signs at Doors
T his Dr aw in g P ro du ce d by th e U. S. Ac ce ss B oa rd
18 min
18 min
45° centered on tactile characters
Vertical Change in Level
T his Drawing Produced by the U.S. Access Board
¼ max
Beveled Change in Level
T his Drawing Produced by the U.S. Access Board
¼
¼
½
CL
S
IG
N A
G E
O R
P L A
Q U
E W
T
A C
T
IL
E C
H A
R A
C T
E R
B L D
G E
N T
R A
N C
E S
Y M
B O
L O
F A
C C
E S
S I B
IL
IT
Y
IN
T
E R
IO
R
W A
L L M
T D
R O
O M
S
IG
N A
G E to c e n te rl in e o f s ig n CL
S A
F E
T Y
S W
IT
C
H
M O
T O
R S
T A
R T
E R
S
F
IR
E A
L A
R M
P U
L L S
T A
T
IO
N
W A
L L
A N
D A
L L
E M
E R
G E
N C
Y P
H O
N E
S
E L E
C T
R
IC
O
U T
L E
T T
E L E
P H
O N
E O
R C
A B
L E
J A
C K
S W
IT
C
H O
R W
A L L O
U T
L E
T A
B O
V E
C O
U N
T E
R
P U
S H
B U
T T
O N to c e n te rl in e o f s ig n
CL
CL
CL
Circular Turning Space Circular Turning Space Bariatric
Figure 308.2.1 Unobstructed
Forward Reach
T his Drawing Pro duced by the U. S. Access Board
Figure 308.2.2 Obstructed High Forward Reach
T his Drawing Produced by the U.S. Access Board
Maneuvering Clearance at Manual Swinging Doors and Gates
T his Dr aw in g P ro du ce d by th e U. S. Ac ce ss B oa rd
Maneuvering Clearance at Manual Swinging Doors and Gates
T his Dr aw in g P ro du ce d by th e U. S. Ac ce ss B oa rd
T-Shaped Turning Space T his Drawing Produced by the U.S. A ccess Board
Clear Floor or Ground Space
T his Drawing Produced by the U.S. A ccess Board
66 min 72" min m in m a x m a x m a x
>20-25 max 510-635
20 max
(a) (b) m in
18 min
(a) front approach, pull side m in12 min
(c) front approach, push side, door provided with both closer and latch m in
24 min m in
36 min
12 min 12 min
60 min base a rm a rm
52 min m in m in
9"
GENERAL NOTES
1. THE TERM "WORK" AS USED IN THESE NOTES SHALL INCLUDE ALL REVISIONS AS DRAWN OR SPECIFIED IN THESE DOCUMENTS AS WELL AS ALL OTHER PROVISIONS SPECIFICALLY INCLUDED BY
THE COR IN THE FORM OF DRAWINGS, SPECIFICATIONS, AND WRITTEN INSTRUCTIONS.
2. IT IS HIGHLY RECOMMENDED THAT GC, CM AND SUBCONTRACTORS SHALL VISIT JOB SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONS BEFORE SUBMITTING BIDS. ANY DISCREPANCIES WITHIN THESE DRAWINGS AND/OR BETWEEN THESE DRAWINGS AND EXISTING CONDITIONS SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE COR & ARCHITECT PRIOR TO SUBMITTING BIDS AND
THE START OF ANY WORK.
3. IT IS RECOMMENDED THAT GC & SUBCONTRACTORS FIELD VERIFY ALL DIMENSIONS PRIOR TO
CONSTRUCTION. IF THE CONTRACT DRAWINGS APPEAR TO BE UNCLEAR, AMBIGUOUS, OR
CONTRADICTORY, THE GC AND SUBCONTRACTORS MUST REQUEST CLARIFICATION FROM THE
ARCHITECT IN WRITING BEFORE SUBMITTING BIDS AND PROCEEDING WITH THAT PART OF THE WORK.
IN CASE OF ANY APPARENT DISCREPANCIES OR CONFLICTS, GC MUST NOTIFY COR & ARCHITECT
IMMEDIATELY BEFORE SUBMITTING BIDS AND PROCEEDING WITH ANY WORK.
4. GENERAL CONTRACTOR SHALL BECOME FAMILIAR WITH THE COR & VA REQUIREMENTS PRIOR TO
BIDDING AND SHALL BE RESPONSIBLE FOR COMPLIANCE WITH THESE REQUIREMENTS.
5. ALL WORK SHALL BE PERFORMED AS TO COMPLY WITH ALL GOVERNING STATUTES,
ORDINANCES, GOVERNMENTAL AND JURISDICTIONAL PERMITS AND APPROVALS AS
OBTAINED. CONTRACTORS SHALL NOT SUBMIT A BID FOR THIS WORK UNLESS THEY ARE FULLY
QUALIFIED AND LICENSED BY THE JURISDICTION IN WHICH THE WORK IS TO BE PERFORMED.
6. ALL WORK SHALL BE PERFORMED IN A PROFESSIONAL MANNER AND SHALL BE IN GOOD AND USABLE
CONDITION AT THE DATE OF COMPLETION THEREOF.
7. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR REVIEWING APPROVED
PLANS AS APPROVED AND FOR ALL REVISIONS AND OTHER CHANGES. NO WORK SHALL BEGIN
PRIOR TO RECEIPT OF COR APPROVAL.
8. DIMENSIONS ARE BASED ON THE FOLLOWING CRITERIA:
A. GRID DIMENSIONS ARE TO CENTERLINE OF STRUCTURAL GRID LINE UNLESS
OTHERWISE NOTED.
B. DIMENSIONS ARE TO FACE OF FINISHED WALL.
C. DO NOT SCALE DRAWINGS. IF DIMENSIONS ARE NOT SHOWN AND CANNOT BE
DETERMINED, CONTACT THE ARCHITECT FOR CLARIFICATION.
D. DIMENSIONING LAYOUT BEGINS WHERE THE START POINT IS INDICATED ON THE
DRAWINGS
E. WHERE A DIMENSION IS NOTED AS "HOLD" THIS DIMENSION SHALL INDICATE
CLEARANCES AT COMPLETED CONDITIONS, TAKING FINISH MATERIALS INTO
ACCOUNT.
F. DIMENSIONS ARE BASED UPON SPECIFIED MATERIALS AND EQUIPMENT.
SUBSTITUTIONS MAY AFFECT DIMENSIONS. SUBSTITUTION REQUESTS SHALL
INDICATE THE IMPACT OF THE SUBSTITUTIONS UPON DIMENSIONS AND
CLEARANCES.
9. PROVIDE BACKING AND BLOCKING FOR WALL MOUNTED ELEMENTS AS REQUIRED FOR
ATTACHMENT AND BRACING OF NON-STRUCTURAL ELEMENTS.
10. IF MATERIALS SUSPECTED OF CONTAINING HAZARDOUS MATERIALS ARE ENCOUNTERED, DO NOT DISTURB; IMMEDIATELY NOTIFY ARCHITECT AND COR. HAZARDOUS MATERIALS WILL BE REMOVED BY
VA UNDER A SEPARATE CONTRACT.
11. THE CONTRACTOR SHALL, UPON RECEIPT, CAREFULLY REVIEW ALL OF THE CONTRACT
DOCUMENTS AND SHALL IMMEDIATELY NOTIFY THE ARCHITECT REGARDING ANY APPARENT ERRORS, INCONSISTENCIES, OR OMISSIONS DISCOVERED.
12. THE CONTRACT DOCUMENTS ARE CONSIDERED A WHOLE AND AS SUCH, THE GENERAL CONTRACTOR
AND SUB-CONTRACTORS MUST COORDINATE ALL INTERRELATED WORK.
13. WHERE NEW CONSTRUCTION ABUTS EXISTING CONSTRUCTION TO REMAIN, OR WORK DONE UNDER
SEPARATE CONTRACT, ALL CONDITIONS AFFECTING WORK PROGRESS AND CONFORMANCE TO
PLANS AND SPECIFICATIONS SHALL BE VERIFIED BY CONTRACTOR PRIOR TO START OF ANY WORK.
14. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH CURRENT RULES AND
REGULATIONS OF FEDERAL, STATE, AND LOCAL CODES, LAWS, ORDINANCES, STATUES, AND
REGULATIONS. NOTHING IN THE CONTRACT DOCUMENTS SHALL BE CONSTRUED AS REQUIRING OR
AUTHORIZING WORK CONTRARY TO THESE RULES, REGULATIONS, AND CODES.
15. THE DRAWINGS INDICATE LOCATIONS, DIMENSIONS AND TYPICAL DETAILS OF CONSTRUCTION. THE DRAWINGS DO NOT ILLUSTRATE EVERY CONDITION; WORK NOT EXPRESSLY DETAILED SHALL BE OF CONSTRUCTION SIMILAR TO PARTS THAT ARE DETAILED. WHERE APPARENT DISCREPANCIES OCCUR, THEY SHALL BE REPORTED TO THE ARCHITECT IMMEDIATELY FOR RESOLUTION BEFORE
PROCEEDING WITH THE WORK.
16. THE CONTRACTOR SHALL EXAMINE WORK IN PLACE ON WHICH ADDITIONAL SPECIFIED
CONSTRUCTION IS TO BE APPLIED TO ENSURE THAT SUBSTRATE CONDITIONS ARE
SATISFACTORY FOR THE INSTALLATION OF SPECIFIED FINISH MATERIALS. VERIFY THAT
SUBSTRATES, APPURTENANCES, AND OTHER ACCESSORIES ARE IN PLACE AS REQUIRED BY
FINISH MATERIALS. REPORT IN WRITING TO THE COR ANY DEFECTS, OR CONDITIONS WHICH MAY
DELAY COMPLETION OF PERFORMANCE OF SPECIFIED FINISH WORK. FAILURE OF SUCH
NOTIFICATION WILL BE CONSTRUED AS ACCEPTANCE OF SUBSTRATES AND WORK IN PLACE.
CORRECTIVE WORK REQUIRED BY ARCHITECT OR COR DUE TO CONTRACTOR'S ACCEPTANCE OF
UNSATISFACTORY SUBSTRATE AND WORK IN PLACE CONDITIONS SHALL BE MADE AT NO ADDITIONAL
COST TO THE VA.
17. SEPARATE CONTRACTS: THE CONTRACTOR SHALL COORDINATE AND COOPERATE WITH THE WORK
OF SEPARATE CONTRACTS.
18. FINISH PROTECTION: THE CONTRACTOR SHALL PROTECT NEW FINISHES INSTALLED UNDER THIS CONTRACT AND SHALL REPAIR AND REPLACE OR REPAIR ANY DAMAGED FINISHES AT NO ADDITIONAL
COST TO THE VA UNTIL COR'S FINAL ACCEPTANCE OF FINISHES AT CONCLUSION OF WORK.
19. FIRESTOPPING AND FIRE RATED PENETRATIONS REQUIRED AT ALL FIRE RATED WALLS & FLOORS
SHALL COMPLY WITH ALL APPLICABLE CODES. CONTRACTOR SHALL SUBMIT MANUFACTURER'S
LITERATURE INCLUDING DATA FOR MATERIALS AND PREFABRICATED DEVICES, UNDERWRITER'S
LABORATORY APPROVAL NUMBERS FOR REQUIRED FIRE RATINGS, SHOP DRAWINGS FOR
MANUFACTURER'S INSTALLATION DETAILS AND CERTIFICATES OF COMPLIANCE SHOWING MATERIAL OR COMBINATION OF MATERIALS USED MEETS REQUIREMENTS SPECIFIED FOR FIRE RESISTANCE.
20. ACTIVE HEALTHCARE ENVIRONMENT: GENERAL CONTRACTOR & SUBCONTRACTORS SHALL BE
FAMILIAR WITH ALL VA WORKING REQUIREMENTS IN THE FACILITY INCLUDING BUT NOT LIMITED TO
HOURS OF WORK, MOVEMENT, MATERIAL STORAGE AND HANDLING. GC SHALL OBTAIN THE
APPROVAL OF COR PRIOR TO BEGINNING ANY WORK.
1. THE GENERAL CONTRACTOR SHALL VISIT THE SITE AND BE KNOWLEDGEABLE OF CONDITIONS THEREOF. HE SHALL INVESTIGATE, VERIFY AND BE RESPONSIBLE FOR ALL CONDITIONS OF THE PROJECT AND SHALL NOTIFY THE ARCHITECT AND COR IMMEDIATELY OF ANY INCONSISTENCIES OR
DISCREPANCIES WITH THE PLANS IN RELATION TO THE EXISTING FIELD CONDITIONS OR ANY
CONDITIONS REQUIRING MODIFICATION BEFORE PROCEEDING WITH THE WORK. COMMENCEMENT
OF WORK SHALL CONSTITUTE ACCEPTANCE OF EXISTING CONDITIONS.
2. SURVEY THE CONDITION OF THE BUILDING TO DETERMINE WHETHER REMOVING ANY ELEMENT MIGHT RESULT IN A STRUCTURAL DEFICIENCY OR UNPLANNED COLLAPSE OF ANY PORTION OF THE
STRUCTURE OR ADJACENT STRUCTURES DURING DEMOLITION AND NOTIFY COR & ARCHITECT
BEFORE PROCEEDING. DAILY SURVEYS ARE REQUIRED DURING DEMOLITION AT THE NORTH WALL
AND WEEKLY THERE AFTER.
3. CONTRACTOR TO COORDINATE & REVIEW ALL CONSTRUCTION DOCUMENTS, AS A WHOLE, TO
DETERMINE THE EXTENT OF DEMOLITION WORK, RELATION TO NEW WORK, & BECOME FAMILIAR
WITH THEM THOROUGHLY BEFORE PERFORMING ANY DEMOLITION WORK. BY THE ACT OF
SUBMITTING A BID, THE CONTRACTOR WILL BE DEEMED TO HAVE COMPLIED WITH THE FOREGOING
TO HAVE ACCEPTED SUCH CONDITIONS AND TO HAVE MADE ALLOWANCES THEREFORE IN
PREPARING HIS BID.
4. PLANS SHOW GENERAL DEMOLITION WORK TO BE PERFORMED AND DOES NOT RELIEVE THE
CONTRACTOR FROM OTHER DEMOLITION WORK REQUIRED TO PRODUCE THE BUILDING
MODIFICATIONS SHOWN ON THE REMAINING CONTRACT DOCUMENTS, INCLUDING ANY ENGINEERING
DRAWINGS. WORK INCLUDES REMOVAL AND LEGAL DISPOSAL OF ALL EXISTING CONSTRUCTION
ITEMS THAT ARE NOT UTILIZED IN THE FINISHED PROJECT. REMOVE ALL ITEMS SPECIFICALLY INDICATED IN THE DRAWINGS AND ITEMS WHICH ARE NECESSARY TO BE REMOVED IN ORDER TO
FACILITATE THE FINISHED PROJECT.
5. FIELD VERIFY ALL DIMENSIONS AND BRING ANY DISCREPANCIES TO THE ATTENTION OF THE
COR & ARCHITECT. DO NOT SCALE DRAWINGS. ALL DIMENSIONS LOCATING WALLS ARE TAKEN
FROM OUTSIDE FINISHED FACE OF EXISTING PARTITIONS UNLESS OTHERWISE INDICATED.
6. COMPLY WITH GOVERNING VA REGULATIONS BEFORE STARTING DEMOLITION. COMPLY WITH
HAULING AND DISPOSAL REGULATIONS OF AUTHORITIES HAVING JURISDICTION. REMOVE AND
LEGALLY DISPOSE OF ITEMS EXCEPT THOSE INDICATED TO BE REINSTALLED, SALVAGED, OR TO
REMAIN THE VA'S PROPERTY.
7. EXCEPT FOR ITEMS OR MATERIALS INDICATED TO BE REUSED, SALVAGED, OR DETERMINED BY COR
TO REMAIN THE VA'S PROPERTY, DEMOLISHED MATERIALS SHALL BECOME THE CONTRACTOR'S
PROPERTY AND SHALL BE REMOVED FROM THE SITE. PROMPTLY DISPOSE OF DEMOLISHED
MATERIALS. DO NOT ALLOW DEMOLISHED MATERIALS TO ACCUMULATE ON SITE. TRANSPORT
DEMOLISHED MATERIALS OFF VA'S PROPERTY AND LEGALLY DISPOSE OF THEM TO ENSURE MINIMAL INTERFERENCE WITH ROADS, STREETS, WALKS, AND OTHER ADJACENT OCCUPIED AREAS. REMOVE & TRANSPORT DEBRIS IN A MANNER THAT WILL PREVENT SPILLAGE ON ADJACENT SURFACES AND
AREAS.
8. STORAGE OR SALE OF REMOVED ITEMS OR MATERIALS ON-SITE IS NOT PERMITTED.
9. EXECUTE THE WORK IN A CAREFUL AND ORDERLY MANNER. COORDINATE ALL WORK WITH THE
COR TO VERIFY USE OF POWER, TEMPORARY STORAGE, SITE ACCESS, HOURS OF WORK ETC..
10. SUBMIT WRITTEN REQUEST TO COR IN ADVANCE OF CUTTING OR ALTERING ELEMENTS WHICH
AFFECT:
a. STRUCTURAL INTEGRITY OF ELEMENT
b. INTEGRITY OF WEATHER EXPOSED OR MOISTURE RESISTANT ELEMENTS.
11. PROVIDE TEMPORARY BRACING AND SHORING WITH CONNECTIONS OF SUFFICIENT STRENGTH TO BEAR IMPOSED LOADS, AND TO PROTECT ALL PERSONS AND PROPERTY, AND TO ENSURE PROPER ALIGNMENT. COMPLY WITH ALL STATE, O.S.H.A., VA REQUIREMENTS, AND LOCAL CODES. THE
CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR PROVIDING ADEQUATE BRACING OF WALLS
DURING DEMOLITION. CONTRACTOR SHALL ASSUME ALL RESPONSIBILITY FOR DAMAGE DUE TO HIS
FAILURE TO TAKE SUCH PRECAUTIONS.
12. SURVEY THE CONDITION OF THE BUILDING TO DETERMINE WHETHER REMOVING ANY ELEMENT MIGHT RESULT IN STRUCTURAL DEFICIENCY OR UNPLANNED COLLAPSE OF ANY PORTION OF THE
STRUCTURE OR ADJACENT STRUCTURES DURING DEMOLITION.
13. REMOVE & REINSTALL ITEMS INDICATED; CLEAN, SERVICE, AND OTHERWISE PREPARE THEM FOR REUSE; STORE AND PROTECT AGAINST DAMAGE. REINSTALL ITEMS IN LOCATIONS APPROVED, IN
ADVANCE, BY THE COR.
14. THE CONTRACTOR SHALL PROTECT ALL UNALTERED PORTIONS OF THE EXISTING CONDITIONS, AS
NECESSARY. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGE TO EXISTING WORK AND
WORK BY OTHERS.
15. MAINTAIN EXISTING UTILITIES WHERE APPLICABLE TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE DURING SELECTIVE DEMOLITION OPERATIONS. VERIFY THAT SERVICE IS NOT
DISCONNECTED IN OTHER ADJACENT SPACES DURING DEMOLITION.
16. PROTECT WALLS, FLOORS AND OTHER EXISTING FINISH WORK THAT ARE TO REMAIN AND ARE
EXPOSED DURING SELECTIVE DEMOLITION OPERATIONS. GENERAL CONTRACTOR TO REVIEW
CONDITION OF CONCRETE SLABS WITH COR AFTER DEMOLITION OF EXISTING WALLS, FLOORS, &
CEILINGS IS COMPLETE. GENERAL CONTRACTOR TO REVIEW PATCH LOCATIONS & COLOR FOR:
LOCATIONS NON-COMPLIANT CODE CONDITIONS; AND SIGNIFICANT COSMETIC DEFECTS WITH COR & ARCHITECT OF RECORD. ANY EXISTING FINISHED SURFACES TO REMAIN THAT ARE AFFECTED BY SELECTIVE DEMOLITION SHALL BE PATCHED TO MATCH EXISTING ADJACENT SURFACES & FINISHES
UNLESS CONCEALED BY NEW CONSTRUCTION.
17. WHERE NEW WORK ADJOINS EXISTING WORK, THE CONTRACTOR SHALL DO ALL NECESSARY
CUTTING, PATCHING AND FITTING. JUNCTURES OF NEW AND EXISTING OR OTHER WORK SHALL BE REPAIRED AND PATCHED TO MATCH ADJACENT EXISTING SURFACES. EXISTING WALLS REQUIRING MODIFICATION OF ANY KIND SHALL BE REFINISHED TO THE NEAREST OUTSIDE OR INSIDE CORNER.
18. DISCONNECT AND REMOVE AND/OR CAP ALL EXISTING UTILITIES (ELECTRIC) WHERE SCHEDULED
NOT TO BE REUSED, IN ACCORDANCE WITH AHJ AND GOVERNING CODE.
19. PROVIDE TEMPORARY LIGHTING/POWER AS REQUIRED, DURING AND AFTER DEMOLITION FOR ALL
AREAS WITHIN LIMITS OF THIS CONTRACT. GC SHALL OBTAIN APPROVAL FROM COR PRIOR TO
CONNECTING TO PANELS.
20. ALL EXISTING CONDUIT AND WIRE INTERFERING WITH THE NEW WORK SHALL BE REROUTED &
CONCEALED IN THE NEW CONSTRUCTION AND MUST BE COORDINATED WITH THE COR.
21. UPON COMPLETION OF THE NEW INSTALLATION WORK, DISCONNECT, REMOVE, AND PROPERLY
DISPOSE OF ALL TEMPORARY LIGHTING, POWER, AND WIRING.
22. CLEAN ALL SURFACES OF ACCUMULATED DUST AND DEBRIS. SWEEP THE AREA BROOM CLEAN
ON COMPLETION OF DEMOLITION OPERATION.
23. G.C. SHALL COORDINATE WORK WITH COR TO INSURE MINIMAL DISRUPTION TO FACILITY
OPERATIONS AND ADJACENT USERS. G.C. TO REUSE ANY EXISTING IMPROVEMENTS, EQUIPMENT
AND UTILITY SYSTEMS, PROVIDED THEY ACKNOWLEDGE RESPONSIBILITY FOR THE REPAIR,
REPLACEMENT OR UPGRADE OF SUCH IF DETERMINED TO BE NON COMPLAINT WITH LATEST CODE, NOT DESIGNED OR APPLICABLE FOR PROPOSED APPLICATION, DAMAGED OR NON OPERATIONAL.
24. HAZARDOUS MATERIALS: CONTRACTOR SHALL IMMEDIATELY INFORM THE COR IF ANY SUSPECTED
HAZARDOUS MATERIALS ARE ENCOUNTERED DURING DEMOLITION WORK. ANY REQUIRED
ABATEMENT SHALL BE APPROVED BY COR AND PERFORMED BY A LICENSED ABATEMENT
SPECIALIST.
DEMOLITION GENERAL NOTES
CODES & STANDARDS:
BUILDING CODE: 2021 INTERNATIONAL BUILDING CODE
FIRE CODE: 2021 INTERNATIONAL FIRE CODE
LIFE SAFETY: 2021 NFPA 101 LIFESAFETY CODE
ELECTRICAL CODE: 2020 NATIONAL ELECTRIC CODE (NFPA 70)
PLUMBING CODE: 2021 INTERNATIONAL PLUMING CODE
MECHANICAL CODE: 2021 INTERNATIONAL MECHANICAL CODE
FUEL GAS CODE: 2021 INTERNATIONAL FUEL GAS CODE
ENERGY CODE: 2018 INTERNATIONAL ENERGY CONSERVATION CODE WITH ILLINOIS AMENDMENTS ACCESSIBILITY: ARCHITECTURAL BARRIERS ACT STANDARDS 2015 (ABAAS) & VA BARRIER FREE DESIGN
STANDARD 2017 (PG-18-13)
VETERANS ADMINISTRATION DESIGN MANUALS
VA PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL (APRIL 1,2021)
GENERAL PROJECT DESCRIPTION: DEMOLITION OF AN EXISTING REMNANT STRUCTURE, PARTIAL RENOVATION &
SITE PARKING EXPANSION OF AN EXISTING AMBULATORY CLINIC
CONSTRUCTION TYPE: TYPE I-B (PER IBC CHAPTER 6)
TYPE II (222) (PER NFPA 220)
FIRE RESISTIVE RATINGS (TABLE 7.2.1.1 NFPA 5000)
EXTERIOR BEARING WALLS
SUPPORTING ONE FLOOR ONLY: 2 HOUR
SUPPORTING ROOFS ONLY: 2 HOUR
INTERIOR BEARING WALLS
SUPPORTING ONE FLOOR ONLY: 2 HOUR
SUPPORTING ROOFS ONLY: 1 HOUR
COLUMNS
SUPPORTING ONE FLOOR ONLY: 2 HOUR
SUPPORTING ROOFS ONLY: 1 HOUR
BEAMS, GIRDERS, & TRUSSES
SUPPORTING ONE FLOOR ONLY: 2 HOUR
SUPPORTING ROOFS ONLY: 1 HOUR
FLOOR/CEILING ASSEMBLIES: 2 HOUR
ROOF/CEILING ASSEMBLIES: 1 HOUR
OCCUPANCY CLASSIFICATION (NFPA 101): AMBULATORY HEALTH CARE, EXISTING
FULLY SPRINKLED BUILDING: YES (NFPA 13 COMPLIANT, EXISTING & NEW)
FIRE ALARM SYSTEM: EXISTING & NEW WORK (NFPA 72 COMPLIANT)
GROSS AREA OF CLINIC (EXISTING + NEW WORK):
BASEMENT: 32,170.62 GSF
FIRST FLOOR: 35,077.01 GSF
AHU PENTHOUSE: 3,398.78 GSF
GRAND TOTAL: 70,646.78 GSF
OCCUPANCY LOAD: UNCHANGED
EXIT ACCESS TRAVEL DISTANCE: MAXIMUM - 300'
FINISHES:
WALL AND CEILING: CLASS 2 26 TO 75 FLAME SPREAD RATING, 0-450 SMOKE DEVELOPED
FLOOR COVERINGS: CLASS A
DECORATIVE TRIM: CLASS 1
PENETRATIONS: ALL PENETRATIONS THROUGH RATED ASSEMBLIES AND SMOKE BARRIERS SHALL
BE PROTECTED EQUAL TO THE ASSEMBLY WITH FIRESTOPPING OR
FIRESTOPPING SYSTEM.
PROJECT CODE INFORMATION
CODE ANALYSIS
444 W. Lake St. Suite 1700 Chicago, IL 60606
312.583.7023 www.virtualenergysolutions.com
Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432
Drawing No.
Scale:
Date:
Checked By:Drawn By:Designed By:
Drawing Title:
Contract No.
File No.Building No.
Client Project No.
Project Title:Approved: Chief, failites Management Services
Approved: Medical Center Director
Approved:
Approved: Location:
VES Project Number: 191006
AS NOTED
VA JOLIET CBOC
JOLIET, ILLINOIS
578-371 36C25219D0020
N O
T F
O R
C O
N S
T R
U C
T
IO
N
© 2020 Virtual Energy Solutions, INC.
04/21/2023
B
IM
/2
-M
A T
O C
-P a rk in g E x p a n s io n a t J o lie t C
B O
C
-3
/2
J o lie t
C B
O C
P a rk in g E x p a n s io n V
E S
A rc h
.r v t
-0
-2
:1
:2
P M
GI 002
CODE ANALYSIS,
ACCESSIBILITY, & GENERAL
NOTES
PARKING EXPANSION AT
JOLIET CBOC
GCGIDGID
12" = 1'-0"
5 ACCESSIBILITY DIAGRAMS
ACCESSIBILITY GENERAL NOTES:
1. ARCHITECTURAL BARRIERS ACT STANDARDS 2015 (ABAAS) & VA BARRIER
FREE DESIGN STANDARD 2017 (PG-18-13) SHALL GOVERN.
2. ALL DIMENSIONS NOTED ON THIS SHEET ARE FROM FACE OF FINISHES
UNLESS NOTED OTHERWISE.
3. SOME SHEET DETAILS MAY NOT NECESSARILY APPLY TO THIS PROJECT
4. A LEVEL LANDING ON BOTH SIDES OF EXIT DOORS, NOT EXCEEDING 1/2" IN
LEVEL CHANGE, SHALL BE PROVIDED.
5. LANDING(S) AT STAIRS SHALL BE NO LESS THAN THE WIDTH, IN EACH
DIRECTION, OF NOT LESS THAT THE WIDTH OF THE STAIR ITSELF.
6. ALL EXPOSED LAVATORY/SINK DRAINS SHALL BE PROVIDED WITH INSULATION
OR PROTECTION TO PREVENT DIRECT CONTACT WITH DRAIN PIPE.
7. ANY APPARENT DISCREPANCY BETWEEN THESE DETAILS AND THOSE SHOWN
IN THE DRAWING SET SHALL BE REPORTED TO THE ARCHITECT.
8. THESE DETAILS AND DIMENSIONS SHALL GOVERN.
DOOR HARDWARE NOTES:
1. DOOR HARDWARE SHALL BE CAPABLE OF OPERATION WITH THE USE OF ONE (1)
HAND AND SHALL NOT REQUIRE TIGHT PINCHING, TIGHT GRASPING OR TWISTING
OF THE WRIST TO OPERATE.
2. THUMB TURN DEADBOLTS ARE PROHIBITED; LEVER OR PADDLE DEADBOLT
RELEASES ARE ACCEPTABLE.
3. DOOR CLOSERS SHALL HAVE A MAXIMUM OPENING FORCE OF: 5 lbs MAXIMUM FOR INTERIOR DOORS AND 8.5lbs FOR EXTERIOR DOORS
Revisions Date
ISSUED FOR 30% SD 10/07/2022
ISSUED FOR 60% DD 12/30/2022
ISSUED FOR 90% PRICING 02/02/2023
ISSUED FOR 90% CD 02/10/2023
ISSUED FOR 100% CD 03/07/2023
ISSUED FOR BID 03/24/2023
ISSUED FOR BID ADDENDUM 1 04/21/2023
A101
SIM
Name Elevation
Room name
A101
SIM
A101
View Name 1/8" = 1'-0"
1i
NORTH ARROW
FLOOR/LEVEL ELEVATION
SPOT FLOOR/ROOF ELEVATION
VIEW NAME TAG & SCALE
ENLARGED PLAN CALL-OUT
SECTION MARK
ELEVATION TAG
KEYNOTE
PARTITION TYPE TAG
1 Ref
R e f
1 Ref
R e f
ARCHITECTURAL GENERAL SYMBOLS LEGEND
X
PLAN
NORTH
1i
FURNITURE, FIXTURE, & EQUIPMENT
INDICATOR
4'0 8' 16'
GRAPHIC SCALE (1/8" = 1'-0")
CENTERLINE
SIMILAR (SIM) OR OPPOSITE HAND (OH)
A101
SIM
DETAIL CALL-OUT
SIMILAR (SIM) OR OPPOSITE HAND (OH)
ROOM NAME/NUMBER
P3
NEW CONSTRUCTION
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE DEMOLISHED
0X
1i
STOREFRONT / WINDOW TAG: SEE SHEET AE 602,
WINDOW & STOREFRONT SCHEDULE & DETAILS
FOR SPECIFIC INFORMATION
OH
OH
SIMILAR (SIM) OR OPPOSITE HAND (OH)
OH
NEW COLUMN
GRID LINE
EXISTING COLUMN
GRID LINE
FLOOR
CEILING
BASE
N1
S1
W1 E1
ROOM FINISHES SEE SHEET AI 601 FINISH PLANS
AND FINISH SCHEDULES
PHOTOGRAPHY TAG (POSITION OF CAMERA &
ANGLE)1
CEILING TYPE &
CEILING ELEVATION8'-0" AFF
ACT1
EARTH / BACK FILL
GRANULAR FILL
CONCRETE
CONCRETE MASONRY UNITS (CMU)
BRICK / BRICK VENEER
STEEL
STONE VENEER
RIGID INSULATION
BATT INSULATION
GYPSUM BOARD
EXISTING DOOR TO BE DEMOLISHED
EXISTING DOOR TO REMAIN
NEW DOOR SEE PLANS AND SHEET AE 601, DOOR
SCHEDULE & DETAILS SHEET FOR SPECIFIC DOOR
TYPES
DOOR TAG: SEE SHEET AE 601, DOOR
SCHEDULE & DETAILS SHEET FOR SPECIFIC
DOOR INFORMATION
PLYWOOD (FIRE RESISTANT TREATED)
2X4 LED TROFFER LIGHT TO BE
REMOVED
EXISTING LAY-IN ACOUSTICAL
CEILING TILE TO BE REMOVED,
UNLESS NOTED OTHERWISE
CAN LIGHT TO BE REMOVED
2X2 LED TROFFER LIGHT TO BE
REMOVED
CEILING MOUNTED EXIT SIGN TO BE
REMOVED
F2 2X4 LED TROFFER LIGHT
F3 2X2 LED TROFFER LIGHT
F1 2X4 LED TROFFER LIGHT,
SUSPENDED
D1 WATERPROOF LED CAN LIGHT
EC1: EXPOSED CONSTRUCTION
F1
F2
F3
D1
EXISTING 2X4 LED TROFFER LIGHTEX
GB1: EXISTING GYPSUM BOARD CEILING
OR SOFFIT.
D2 LED CAN LIGHTD2
LED EXIT SIGN
LED TRACK LIGHTTL
LED EMERGENCY LIGHT W/90 BATTERY
BACKUP
EM1
EX1
LED WALL MOUNTED SCONCE LIGHT
S1
S2
LED WALL MOUNTED UPLIGHT LIGHT,
SMALL
C
LED DECORATIVE CEILING MOUNTED
FIXTURE
LED DECORATIVE CEILING MOUNTED
FIXTURE
R
LIGHTINGCEILING TYPES
S3
LED WALL MOUNTED UPLIGHT LIGHT,
LARGE
ALUMINUM
EXISTING ASPHALT PAVEMENT TO BE REMOVED
EXISTING ASPHALT PAVEMENT TO REMAIN
EXISTING NORTHEAST VESTIBULE FLOOR
OR COMPOSITE ROOF DECK TO BE REMOVED
ASPHALT PAVING
SHEET NUMBER
VIEW NUMBER
SHEET NUMBER
VIEW NUMBER
VIEW NUMBER
SHEET NUMBER
SHEET NUMBER
ROOFING SYSTEM
1 HOUR RATED FIRE WALL
2 HOUR RATED FIRE WALL
SMOKE BARRIER WALLS, 1 HOUR CONSTRUCTION
FE
EXISTING FIRE EXTINGUISHER
NEW FIRE EXTINGUISHER
PL1
LED ELEVATOR PIT LIGHT
LVT FLOORING
WOOD 2x, PRESSURE TREATED
PORCELAIN TILE
ACT 1: NEW 2X2 LAY-IN
ACOUSTICAL CEILING TILE.
EXISTING GRID AND EDGE TRIM TO
REMAIN.
ACT 3: NEW 2X2 LAY-IN CLEAN ROOM
ACOUSTICAL CEILING TILE. PROVIDE
NEW GRID AND EDGE TRIM
ACT 2: NEW 2X2 LAY-IN
ACOUSTICAL CEILING TILE.
NEW GRID AND EDGE TRIM
FINISH TAG: SEE SHEET
AI 601, FINISH PLANS & FINISH SCHEDULE
FOR DETAILED FINISHES INFORMATION
B2 EXTERIOR FINISH TAG
THIN STONE VENEER (TSV)
BRICK VENEER, RUNNING
BOND
BRICK VENEER, STACKED
BOND
E TEMPORARY EXIT SIGN
ARCHITECTURAL ABBREVIATIONS
ABA ARCHITECTURAL BARRIERS ACT
A/E ARCHITECT/ENGINEER
ACT ACOUSTICAL CEILING TILE
ADMIN ADMINISTRATION
AFF ABOVE FINISHED FLOOR
AHJ AUTHORITY HAVING JURISDICTION
AIA AMERICAN INSTITUTE OF ARCHITECTS
ALUM ALUMINUM
APPROX APPROXIMATE
AOR ARCHITECT OF RECORD
ARCH ARCHITECT
B LABEL CLASS B DOOR
BHMA BUILDER'S HARDWARE
MANUFACTURER'S ASSOCIATION
BLDG BUILDING
BOT BOTTOM
BSMT BASEMENT
CCTV CLOSED CIRCUIT TELEVISION
CD CONSTRUCTION DOCUMENTS OR
CONTRACT DOCUMENTS
CL CENTER LINE
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONT CONTINUE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIM DIMENSION
DIV DIVIDE OR DIVISION
DWG DRAWING
E EAST
ENGR ENGINEER
EQ EQUAL
EQUIP EQUIPMENT
ETC AND SO FORTH OR ET CETERA
EXIST EXISTING
EXT GR EXTERIOR GRADE
F FAHRENHEIT OR FEMALE
FA FIRE ALARM
GC GENERAL CONTRACTOR
GWB GYPSUM WALL BOARD
GYP GYPSUM
HM HOLLOW METAL
J-BOX JUNCTION BOX
MC METAL COPING
NA NOT APPLICABLE
NIC NOT IN CONTRACT
N NORTH
OC ON CENTER
OH OPPOSITE HAND
PLAM PLASTIC LAMINATE
PTU PACKAGE TRANSFER UNIT
R RADIUS OR RISER
RCP REFLECTED CEILING PLAN
RO ROUGH OPENING
SPEC SPECIFICATION
S SOUTH
TYP TYPICAL
UL UNDERWRITERS LABORATORIES
VIF VERIFY IN FIELD
W WEST
W/ WITH
W/O WITHOUT
444 W. Lake St. Suite 1700 Chicago, IL 60606
312.583.7023 www.virtualenergysolutions.com
Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432
Drawing No.
Scale:
Date:
Checked By:Drawn By:Designed By:
Drawing Title:
Contract No.
File No.Building No.
Client Project No.
Project Title:Approved: Chief, failites Management Services
Approved: Medical Center Director
Approved:
Approved: Location:
VES Project Number: 191006
AS NOTED
VA JOLIET CBOC
JOLIET, ILLINOIS
578-371 36C25219D0020
N O
T F
O R
C O
N S
T R
U C
T
IO
N
© 2020 Virtual Energy Solutions, INC.
04/21/2023
B
IM
/2
-M
A T
O C
-P a rk in g E x p a n s io n a t J o lie t C
B O
C
-3
/2
J o lie t
C B
O C
P a rk in g E x p a n s io n V
E S
A rc h
.r v t
-0
-2
:1
:2
P M
GI 003
ARCHITECTURAL SYMBOLS &
ABBREVIATIONS
PARKING EXPANSION AT
JOLIET CBOC
GCGIDGID
Revisions Date
ISSUED FOR 90% CD 02/10/2023
ISSUED FOR 100% CD 03/07/2023
UP
New North
Vestibule
Lobby 002 Elevator
E-2
Engineering
Space
Mach.
Room
003A
E X
IS
T
IN
G
S M
O K
E C
O M
P A
R T
M E
N T
B A
S E
M E
N T
S O
U T
H
,6
S
F E
X
IS
T
IN
G S
M O
K E
C O
M P
A R
T M
E N
T B
A S
E M
E N
T N
O R
T H
,5
S
F
EXIT
EXISTING STAIRS TO 1ST FLOOR LEVEL
EXISTING STAIRS TO 1ST FLOOR LEVEL
Corridor C1-15A
Lobby
Elevator E-2
Alcove
102A
Office
Vestibule
E X
IS
T
IN
G
S M
O K
E C
O M
P A
R T
M E
N T
F
IR
S T
F L O
O R
N O
R T
H
,9
S
F E
X
IS
T
IN
G S
M O
K E
C O
M P
A R
T M
E N
T F
IR
S
T F
L O
O R
S O
U T
H
,1
S
F
EXIT
EXIT
EXIT
EXIT
EXIT
NEW 1-HOUR
SHAFT WALL
NEW 1-HOUR
SHAFT WALL
NEW 1-HOUR
SHAFT WALL
Elev. Equip.
B003
Badge B004
Phone
B002C
Home
Based
Primary
Care
B002
Stair #2 S-2
Comm.
B005
Reception
B001
Women's
Restroom
B006
Men's
Restroom
B008
HAC
B007 Copy Room
B009
Phone
B002A
Phone
B002B
Phone
B017
Phone
B016
A.O.
B015
Clinical
Nurse
Manager
B014
Chief
Medical
Director B013
Patient
Education/Group
Room
B011
Patient
Education/Exercise
B010
Corridor
C0-2
Corridor
C0-3
Corridor
C0-4
Corridor
C0-1
Mech.
B018
Elec.
B019
Gen Room B020
PAS Call
Center
B024
Education
Storage
B022
Nutrition
Services
B021
Main
Conference
Room
B023
Mech.
B025
Patient
Education/Group
Room
B033
Patient
Education/Group
Room
B032
Patient
Ed/Internet
Cafe
B031
Corridor
C0-6
Corridor C0-8
Corridor C0-7
Staff
Lounge
B042
Men's Staff
Locker
B036
Women's
Staff Locker
B034
Mech.
Corridor
C0-9
Corridor
C0-5
Mech.
B026
Elec.
B029
Elec.
B028
Comm B030
Facility
Storage
B041
EMS
B038
Building
Operator
B039
FMS
B040
Stair #1 S-1
Elevator
EL-1
Vending
Cooking
Classroom
0023A
FMS
Elevator
EL-1
Stair #2
S-2
Corridor
C1-15
Rad Control
Dispensary
Storage 1116A
Diagnostic
Marco
Rad Room
Corridor C1-13
Corridor C1-14
Corridor
C1-11
Toilet
Toilet
HAC
Toilet 1112E
Soiled
Utility
1112A
Storage
1112B
PM&R
Treatment
1112D
Eye Tech
Visual
Fields
Treatment
1112C
Toilet
Toilet
1102A
Eye
Blood Draw 1114D
Eye
Blood Draw 1114C
Draw
Analysis
1114E
Toilet
1114F
Blood Draw
1114B
Eye
Eye
1-On-1
Room
1017C
Work Room
1017B Supervisor
Office
1017A
Nurse
Triage
Exam 1
Exam 2
Nurse
Triage
Women
Health
Exam 3
IT
Telemed
Telemed
Closet
Telemed
Telemed
Toilet
1043ATelemed
Telemed
Exam 17
Exam 16
PACT 2
PACT 1
Exam 15
Exam 14
Exam 12
Exam 13
Exam 5
Women
Health
Exam 4
Toilet
Toilet 1047A
Men's
Restroom
Women's
Restroom
Treatment
Room
Toilet
Treatment
Room
CWT
CWT
Security
Wheelchair
Storage
Group
Treatment
Treatment
Room
Group
Treatment
Treatment
Room
Treatment
Room
Treatment
Room
Treatment
Room
Soiled
Utility
Exam 6
Exam 7
Exam 8
Exam 9
Clean
Storage
Room B131
Exam10
Procedure 1
Shared
Gyno
Toilet 1059B
Toilet
Closet
1059A
Procedure 2
Exam 11
1065 Exam 19
Exam 18
PACT
PACT 4
Women
Health
Exam 21
Women
Health
Exam 20
Corridor C1-3
Telemed
HAC
Stair #1 S-1
Mobile Port
Waiting
Toilet
1068A
Toilet
1031A
Pharm. D
Pharm. D
Nutritionist
Teleretinal
Cardio/Pod
Shared
Office
Soiled
Utility
Clean Utility
Social
Worker
Shell Space
Corridor C1-10
Podiatry
Exam
Podiatry
Exam
Tech Work
Room
Audiology
Exam
Cast Room
Podiatry
Exam
Audiology
Exam
Oxygen
Evaluation
PFT Blood
Gas
Clean Utility
Soiled
Utility
Control
Sound
Booth
Control
Sound
Booth
1084Stor.
Corridor
C1-12
Corridor
C1-9
Corridor
Ambulance
Bay
C1-36
Corridor
C1-5
Corridor
C1-5
Corridor
C1-7
Corridor
C1-6
Corridor
C1-6
Corridor
C1-4
Corridor
C1-8
Corridor
C1-1
General
Waiting
Corridor
C1-2
Photo
Alcove
Reception
Equipment
Alcove
Nourishment
Alcove
Scale
Alcove
Meds
1065C
1065B
1065A
Elec. Clos.
1089A
Scale
Alcove
PAS
Elec.
1114 -- 1114A
Boiler Plant
1 HOUR RATED FIRE WALL
SYMBOLS LEGEND
2 HOUR RATED FIRE WALL
SMOKE BARRIER WALLS, 1 HOUR CONSTRUCTION
PATH OF EGRESS
FE
EXISTING FIRE EXTINGUISHER
Room name
NEW FIRE EXTINGUISHER
ROOM NAME/NUMBER
Not Enclosed
AHU PENTHOUSE
CODES & STANDARDS:
BUILDING CODE: 2021 INTERNATIONAL BUILDING CODE
FIRE CODE: 2021 INTERNATIONAL FIRE CODE
LIFE SAFETY: 2021 NFPA 101 LIFESAFETY CODE
ELECTRICAL CODE: 2020 NATIONAL ELECTRIC CODE (NFPA 70)
PLUMBING CODE: 2021 INTERNATIONAL PLUMING CODE
MECHANICAL CODE: 2021 INTERNATIONAL MECHANICAL CODE
FUEL GAS CODE: 2021 INTERNATIONAL FUEL GAS CODE
ENERGY CODE: 2018 INTERNATIONAL ENERGY CONSERVATION CODE WITH ILLINOIS AMENDMENTS ACCESSIBILITY: ARCHITECTURAL BARRIERS ACT STANDARDS 2015 (ABAAS) & VA BARRIER FREE DESIGN
STANDARD 2017 (PG-18-13)
VETERANS ADMINISTRATION DESIGN MANUALS
VA PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL (APRIL 1,2021)
GENERAL PROJECT DESCRIPTION: DEMOLITION OF AN EXISTING REMNANT STRUCTURE, PARTIAL RENOVATION &
SITE PARKING EXPANSION OF AN EXISTING AMBULATORY CLINIC
CONSTRUCTION TYPE: TYPE I-B (PER IBC CHAPTER 6)
TYPE II (222) (PER NFPA 220)
FIRE RESISTIVE RATINGS (TABLE 7.2.1.1 NFPA 5000)
EXTERIOR BEARING WALLS
SUPPORTING ONE FLOOR ONLY: 2 HOUR
SUPPORTING ROOFS ONLY: 2 HOUR
INTERIOR BEARING WALLS
SUPPORTING ONE FLOOR ONLY: 2 HOUR
SUPPORTING ROOFS ONLY: 1 HOUR
COLUMNS
SUPPORTING ONE FLOOR ONLY: 2 HOUR
SUPPORTING ROOFS ONLY: 1 HOUR
BEAMS, GIRDERS, & TRUSSES
SUPPORTING ONE FLOOR ONLY: 2 HOUR
SUPPORTING ROOFS ONLY: 1 HOUR
FLOOR/CEILING ASSEMBLIES: 2 HOUR
ROOF/CEILING ASSEMBLIES: 1 HOUR
OCCUPANCY CLASSIFICATION (NFPA 101): AMBULATORY HEALTH CARE, EXISTING
FULLY SPRINKLED BUILDING: YES (NFPA 13 COMPLIANT, EXISTING & NEW)
FIRE ALARM SYSTEM: EXISTING & NEW WORK (NFPA 72 COMPLIANT)
GROSS AREA OF CLINIC (EXISTING + NEW WORK):
BASEMENT: 32,170.62 GSF
FIRST FLOOR: 35,077.01 GSF
AHU PENTHOUSE: 3,398.78 GSF
GRAND TOTAL: 70,646.78 GSF
OCCUPANCY LOAD: UNCHANGED
EXIT ACCESS TRAVEL DISTANCE: MAXIMUM - 300'
FINISHES:
WALL AND CEILING: CLASS 2 26 TO 75 FLAME SPREAD RATING, 0-450 SMOKE DEVELOPED
FLOOR COVERINGS: CLASS A
DECORATIVE TRIM: CLASS 1
PENETRATIONS: ALL PENETRATIONS THROUGH RATED ASSEMBLIES AND SMOKE BARRIERS SHALL
BE PROTECTED EQUAL TO THE ASSEMBLY WITH FIRESTOPPING OR
FIRESTOPPING SYSTEM.
PROJECT CODE INFORMATION
CODE ANALYSIS
GENERAL REQUIREMENTS:
ELEVATOR MUST COMPLY WITH THE REQUIREMENTS OF NFPA13, NFPA 70, NFPA 72, NFPA 101, AND ASME 17.1
PROVIDE SMOKE DETECTION FOR EMERGENCY RECALL OPERATION
ELEVATOR MAIN LINE POWER SHUT DOWN (SHUNT TRIP) IS REQUIRED
NEW ELEVATOR E-2 LIFESAFETY INFORMATION
1. THE GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY BARRICADE PARTITIONS AS REQUIRED TO ISOLATE CONSTRUCTION AREAS
FROM AREAS TO REMAIN UNDISTURBED, AND SHALL COORDINATE THEIR EXACT LOCATION WITH THE COR. ADDITIONAL TEMPORARY
BARRICADE PARTITIONS OTHER THAN THOSE INDICATED ON THE PLANS SHALL BE REQUIRED AS NECESSARY TO ACCOMPLISH THE
CONSTRUCTION PROCESS, AND WHERE APPLICABLE, TO ISOLATE DIFFERENT PHASES OF THE WORK.
2. TEMPORARY BARRICADE PARTITIONS SHALL BE PROVIDED AROUND ANY AREA OF WORK CONSIDERED TO BE HAZARDOUS OR WHERE
THE SPRINKLER SYSTEM IS RENDERED INEFFECTIVE BY THE REMOVAL OF THE CEILING SYSTEM FOR MORE THAN A WORK SHIFT AT A
TIME.
3. MEANS OF EGRESS SHALL BE MAINTAINED FOR THE PUBLIC, STAFF, AND CONTRACTOR EMPLOYEES AT ALL TIMES.
4. ALL TEMPORARY BARRICADE PARTITIONS SHALL BE DUST PROOF AND SEALED AT ALL JUNCTIONS OF DISSIMILAR MATERIALS USING
GASKETING MATERIAL. ADEQUATE PRECAUTIONS SHALL ALSO BE TAKEN TO PREVENT DUST AND NOXIOUS VAPORS FROM ENTERING THE
RETURN AIR DUCTWORK IN THE AREAS OF CONSTRUCTION.
5. EXISTING WALLS UTILIZED AS PART OF THE CONSTRUCTION BARRIER MUST EXTEND TO THE DECK ABOVE AND ALL PENETRATIONS MUST
BE FIRESTOPPED.
TEMPORARY CONSTRUCTION BARRICADES
444 W. Lake St. Suite 1700 Chicago, IL 60606
312.583.7023 www.virtualenergysolutions.com
Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432
Drawing No.
Scale:
Date:
Checked By:Drawn By:Designed By:
Drawing Title:
Contract No.
File No.Building No.
Client Project No.
Project Title:Approved: Chief, failites Management Services
Approved: Medical Center Director
Approved:
Approved: Location:
VES Project Number: 191006
AS NOTED
VA JOLIET CBOC
JOLIET, ILLINOIS
578-371 36C25219D0020
N O
T F
O R
C O
N S
T R
U C
T
IO
N
© 2020 Virtual Energy Solutions, INC.
04/21/2023
B
IM
/2
-M
A T
O C
-P a rk in g E x p a n s io n a t J o lie t C
B O
C
-3
/2
J o lie t
C B
O C
P a rk in g E x p a n s io n V
E S
A rc h
.r v t
-0
-2
:1
:2
P M
GI 004
LIFE SAFETY PLANS
PARKING EXPANSION AT
JOLIET CBOC
GCGIDGID
1/16" = 1'-0"
BASEMENT LEVEL LIFE SAFETY PLAN
1/16" = 1'-0"
FIRST FLOOR LEVEL LIFE SAFETY PLAN
0 8' 16' 32' 0 8' 16' 32'
1/16" = 1'-0"
3 AHU PENTHOUSE LEVEL LIFE SAFETY PLAN
0 8' 16' 32'
FE
FE
FE
FE
FE
Revisions Date
ISSUED FOR 30% SD 10/07/2022
ISSUED FOR 60% DD 12/30/2022
ISSUED FOR 90% PRICING 02/02/2023
ISSUED FOR 90% CD 02/10/2023
ISSUED FOR 100% CD 03/07/2023
Ex
Gx
Hx
Jx
Kx
K'x
Lx
1x 6x
12x 13x 14x
Cx
Bx
Ax
A1x
B1x
C1x
D1x
E1x
5.8x 8x
10x6.1x 15x9.5x1.2x
AD 104
REMNANT STRUCTURE
TO BE DEMOLISHED-
SEE SHEET AD 100
NORTH PORTION
SOUTH PORTION
AD 100
EXISTING LOUVERS
TO BE REMOVED.
SEE SHEET AD 104
Ex
Hx
Jx
Kx
K'x
Lx
1x 13x 14x
Cx
Bx
Ax
A1x
B1x
C1x
D1x
E1x
5.8x 8x 10x6.1x
Fx
REMNANT STRUCTURE
TO BE DEMOLISHED-
SEE SHEET AD 101
NORTH PORTION
SOUTH PORTION
AD 101
AD 105
AD 105
AD 103
EXISTING 2-HOUR
WALL TO BE REMOVED.
SEE SHEET AD 105
EXISTING 2-HOUR
SHAFT WALLS TO
BE REMOVED FOR
DUCT WORK
INSTALLATION.
SEE SHEET AD 105
PAVEMENT, CURBS, &
WALKWAYS TO BE REMOVED
AT EXISTING AMBULANCE BAY
FOR INSTALLATION OF
NEW AHU PENTHOUSE
STRUCTURE. SEE SHEET AD 103
Ex
Gx
Hx
Jx
Kx
K'x
Lx
1x
4x
6x 9x 12x
13x
14x
Cx
Bx
Ax
A1x
B1x
C1x
D1x
E1x
3x
5x
5.8x
8x 10x
6.1x
Fx
15x
9.5x
1.2x
EXISTING ROOF SYSTEM INCLUDING
INSULATION, METAL COPING, & MEMBRANE
TO BE REMOVED. PREP EXISTING ROOF DECK
TO RECEIVE NEW ROOFING SYSTEM.
SEE SHEET AE 102N
EXISTING ROOF SYSTEM INCLUDING
INSULATION, METAL COPING, & MEMBRANE
TO BE REMOVED. PREP EXISTING ROOF DECK
TO RECEIVE NEW ROOFING SYSTEM.
SEE SHEET AE 102S
NORTH PORTION
SOUTH PORTION
AD 102
REMNANT STRUCTURE
TO BE DEMOLISHED-
SEE SHEET AD 102
REMOVE PORTION OF
ROOF FOR NEW ROOF
ACCESS STAIR
REMOVE PORTION OF
ROOF FOR NEW
DUCTWORK
REMOVE PORTION OF
ROOF FOR NEW
DUCTWORK
AD 105
AD 105
Elev. Equip.
B003
Badge B004
Phone B002C
Home
Based
Primary
Care
B002
Stair #2 S-2
Comm.
B005
Reception
B001 Women's
Restroom
B006
Men's
Restroom
B008
HAC
B007
Copy Room B009
Phone B002A
Phone B002B
Phone B017
Phone B016
A.O.
B015
Clinical
Nurse
Manager B014
Chief
Medical
Director B013
Patient
Education/Group
Room B011
Patient
Education/Exercise
B010
Corridor
C0-2
Corridor
C0-3
Corridor C0-4
Corridor C0-1
Mech.
B018
Elec.
B019
Gen Room
B020
PAS Call
Center
B024
Education
Storage
B022
Nutrition
Services
B021
Main
Conference
Room
B023
Mech.
B025
Patient
Education/Group
Room
B033
Patient
Education/Group
Room
B032
Patient
Ed/Internet
Cafe
B031
Corridor
C0-6
Corridor C0-8
Corridor
C0-7
Staff
Lounge
B042
Men's Staff
Locker
B036
Women's
Staff Locker
B034
Mech.
Corridor
C0-9
Corridor
C0-5
Mech.
B026
Elec.
B029
Elec.
B028
Comm
B030
Facility
Storage
B041
EMS
B038
Building
Operator
B039
FMS
B040
Stair #1 S-1
Elevator
EL-1
Vending
Cooking
Classroom
0023A
FMS
Elevator
EL-1
Stair #2
S-2
Corridor
C1-15
Rad Control
Dispensary
Storage 1116A
Diagnostic
Marco
Rad Room
Corridor C1-13
Corridor C1-14
Corridor
C1-11
Toilet
Toilet
HAC
Toilet
1112E
Soiled
Utility
1112A Storage
1112B
PM&R
Treatment
1112D
Eye Tech
Visual
Fields
Treatment
1112C
Toilet
Toilet
1102A
Eye
Blood Draw 1114D
Eye
Blood Draw 1114C
Draw
Analysis
1114E
Toilet
1114F
Blood Draw
11…
This is the start of the file's text. The full file is on GovTribe.