This document outlines the phasing plan and expected clinic functions for a parking expansion project at the Joliet Community Based Outpatient Clinic. The project will be completed over 36 weeks in multiple phases to minimize disruptions to clinic operations. Phase D1 involves demolishing the remnant structure and northeast vestibule, with the basement and portions of the first floor closed. Phases C1 and C2 include constructing a new north vestibule, elevator, and air handling unit penthouse. Later phases will replace mechanical systems and renovate portions of the first floor and basement in sections to keep clinics operational. Signage and temporary exits will direct patients as areas are renovated. The solicitation was cancelled by the Department of Veterans Affairs Technology Acquisition Center for the construction work under number 36C77623B0049.
View the file
Other files
Show 40 more
Latest 50 of 57 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INTERIM LIFE SAFETY MEASURES
SOP-578-21-21-606
Edward Hines Jr. VA Hospital Hines, IL 60141 Signatory Authority:
Chief of Occupational Safety & Health Responsible Owner:
Fire Inspector
Service Line(s):
Occupational Safety & Health Services
Effective Date:
October 20, 2020
Recertification Date:
October 31, 2025
1. PURPOSE AND AUTHORITY
To establish specific procedures for implementing those provisions of the Hospital Fire Safety Management Plan pertaining to the use of interim life safety measures (ILSM).
2. PROCEDURES
a. The eleven interim life safety measures are a series of administrative actions required to temporarily compensate for significant hazards posed by existing Life Safety Code (LSC) deficiencies or construction activities.
b. The ILSM assessment will be completed before any constructions project is initiated.
c. Interim life safety measures will apply to appropriate personnel, including construction workers, will be implemented upon project development, and will be continuously enforced through project completion.
d. A fire watch is implemented on a "case-by-case" basis as determined by the fire watch decision grid. (Attachment E)
3. ASSIGNMENT OF RESPONSIBILITIES
a. The Safety Section is assigned overall responsibility for developing, implementing, enforcing and evaluating the effectiveness of the complete Interim Life Safety Measures Policy.
b. The Safety Section is responsible for:
(1) Evaluating specific LSC deficiencies and construction hazards to determine when and to what extent one or more of the listed ILSMs are applicable,
(2) Maintaining required ILSM records and for conducting required ILSM inspections, testing, training, and monitoring as required,
(3) The day to day enforcement of the ILSM plan, and
(4) For advising the Chief, Engineering, as to the effectiveness of the plan, and recommending plan improvements as necessary.
(5) Provide the appropriate training for all affected personnel if it is determined that
ILSM measures are to be implemented, and
(6) If appropriate based on the ILSM to be implemented, conduct addition fire drills.
c. The Chief, Project/Planning Section Engineering, the Chief, Maintenance and Operations Section Engineering, the Chief, Office of Information and Technology, and all other service/section chiefs who have program responsibility for construction projects and/or activities, including work/projects involving penetrations of walls and/or ceilings are responsible for:
October 20, 2020 SOP 578-21-21-606
(1) Ensuring the accurate preparation and timely submission of the ILSM Construction Project Evaluation Worksheet (Attachment B),
(2) Ensuring that an amended ILSM Construction Project Evaluation Worksheet for the project is promptly submitted to Safety if changes impacting ILSM occur after the construction phase of a project or construction activities begins, and
(3) Ensuring that the members of their respective staffs assigned project coordination duties know and understand the provisions of this plan, and monitor plan compliance within their respective work groups.
d. Police Service is responsible for:
(1) Conducting daily inspections of sites under ILSM during weekends and holidays.
(2) Documenting findings of daily inspections (Attachment D).
4. Other Paragraphs
a. The Chief of a service or section initiating a construction project to be accomplished by a contractor will ensure that requirements for full compliance with all applicable NFPA LSC Codes and Hines Hospital fire and safety policies are communicated to all parties involved.
b. A minimum of two weeks before the start of the construction phase of a project, the chief of the service or section responsible for the project will ensure that an ILSM Construction Project Evaluation Worksheet, describing the project and its potential impact on life safety, is accurately completed and submitted to Safety through the Chief, FMS. After the construction phase of a project begins, the responsible service or section chief will ensure that an amended ILSM Construction Project Evaluation Worksheet for the project is promptly submitted to Safety if changes impacting ILSM occur.
c. Safety staff will review the ILSM Construction Project Evaluation Worksheet submitted for each project, inspect the job site as necessary, obtain additional information as required, and complete an ILSM Occupant Impact Evaluation Worksheet (Attachment C).
d. If it is determined based on the evaluations conducted that ILSMs are not required for a project, Safety personnel will advise the responsible service/section chief accordingly.
e. Should it be determined that one or more ILSMs are required to be used during a given project, Safety personnel will explain the actions necessary to the responsible service/section chief and will ensure implementation of the ILSMs as appropriate.
ILSMs required for a project will be discussed in detail and noted in the minutes of each pre-construction meeting pertaining to that project.
f. When the construction phase of a project with required ILSMs begins, Safety will initiate daily inspection of the site to ensure that ILSMs are in effect, and for compliance with established safety codes and policies. These inspections will continue through project completion. Findings will be documented on the ILSM High Hazard Inspection Report (Attachment D).
g. Police Service will conduct daily inspections on weekends and holidays.
5. DEFINITIONS
None
6. REFERENCES
a. The Joint Commission (TJC), Environment of Care Standards.
b. NFPA Life Safety Code 101
7. REVIEW
This SOP will be reviewed upon change of positions included in SOP, at minimum at recertification, when there are changes to the governing document (for example, national policy or a health care accreditation body mandate), and any regulatory requirement for more frequent review
8. RECERTIFICATION
This SOP is scheduled for recertification on or before the last working day of October 2025. In the event of contradiction with national policy, the national policy supersedes and controls.
9. SIGNATORY AUTHORITY
Afif Marouf, M.D., M.P.H.
Chief of Occupational Safety & Health Date Approved:
NOTE: The signature remains valid until rescinded by an appropriate administrative action.
DISTRIBUTION: Hines Intranet Website and Service Chiefs/Service Line Managers via E-mail SOPs are available at http://vaww.hines.med.va.gov/hines/Policy/files.asp http://vaww.hines.med.va.gov/hines/Policy/files.asp
Attachment A
1. Ensuring free and unobstructed exits. Personnel in affected areas receive additional training when alternative exits are designated. Buildings or areas under construction must always maintain escape routes for construction workers. Means of exiting construction areas are inspected daily.
2. Ensuring free and unobstructed access to emergency services and for fire, police, and other emergency forces.
3. Ensuring fire alarm, detection, and suppression systems are in good working order. A temporary but equivalent system shall be provided when any fire system is impaired. Temporary systems must be inspected and tested monthly.
4. Ensuring temporary construction partitions are smoke-tight and built of noncombustible or limited combustible materials that will not contribute to the development or spread of fire.
5. Providing additional firefighting equipment and training personnel in its use.
6. Prohibiting smoking, according to the Joint Commission Environment of Care standards, throughout all buildings on the station as well as in and adjacent to construction areas.
7. Developing and enforcing storage, housekeeping, and debris removal practices that reduce the building’s flammable and combustible fire load to the lowest feasible level.
8. Conducting a minimum of two fire drills per shift per quarter.
9. Increasing hazard surveillance of buildings, grounds, and equipment with special attention to excavations, construction areas, construction storage, and field offices.
10. Training personnel to compensate for impaired structural or compartmentalization features of fire safety.
11. Conducting organization-wide safety education programs to promote awareness of Life
Safety Code deficiencies, construction hazards, and Interim Life Safety Measures.
Attachment B
EDWARD HINES JR. VA HOSPITAL
Engineering Service
CONSTRUCTION PROJECT EVALUATION WORKSHEET
PROJECT TITLE/NUMBER: 578-371 Parking Expansion at Joliet CBOC
BUILDING/ROOM NUMBER: Joliet CBOC
SERVICE/SECTION RESPONSIBLE: Engineering Service/Project Planning
EFFECTS ON LIFE SAFETY
Provide a brief description of the project and any effects it is likely to have on life safety. Examples include closing of an exit; use or storage of flammable materials on-site; installation of a dust barrier; blocking streets, driveways or access roads; impairment of fire detection and/or suppression systems; and removal of doors.
Project will demolish and remove the remnant structure left behind from the Silver Cross hospital demolition, repair the north wall and replace the roof, convert the existing boilers to a hot water system, relocate and upgrade the Air Handling Units (AHUs) from the basement mechanical room to a newly constructed penthouse above the ambulance bay, and to develop the surrounding land of the Joliet CBOC.
A detailed phasing plan has been created to relocate staff during construction phases and alternate points of egress have been added. This phasing plan will be attached to this ILSM and the contractor will provide their own plan once construction is awarded.
SPECIFIC SAFETY CONCERNS
Will any of the work to be performed during this project as currently planned compromise or impair the use of the critical elements of fire protection listed below?
1. FIRE ALARM SYSTEMS: YES ☒ NO ☐
If YES is checked above, provide additional details, including number of devices affected and length of time systems will be impaired, on a separate sheet.
2. AUTOMATIC FIRE SPRINKLER SYSTEMS: YES ☐ NO ☒
If YES is checked above, provide additional information including the size and occupancy of the area affected, and the anticipated duration of the impairment.
3. EXITS (STAIRWELLS, CORRIDORS & DOORS): YES ☒ NO ☐
If YES is checked above, provide additional information including the type, number, and location of exits, which will be obstructed, and the anticipated duration of the impairment.
Exit to the stairs will be closed temporarily. Appropriate signs will be posted to direct the people to nearest alternate exits.
4. ACCESS TO EMERGENCY VEHICLES & PERSONNEL: YES ☐ NO ☒
If YES is checked above, provide additional information including location of blockage, how access will be obstructed, and the anticipated duration of the impairment.
5. INTEGRITY OF SMOKE &/OR FIRE COMPARTMENTS: YES ☒ NO ☐
If YES is checked above, provide additional information including size, location, number, and purpose of penetrations, which will be made.
Person responsible for construction projects
And/or activities, including work/projects
Service/Section Chief
Attachment C
OCCUPANT IMPACT EVALUATION WORKSHEET
DESCRIPTION OF LSC DEFICIENCY OR CONSTRUCTION PROJECT:
SIGNAGE
1. Will the above described LSC deficiency or construction project hinder the occupants in the immediate area from effectively implementing RESCUE?
YES ☐ NO ☐
If YES is checked above, will the condition described exist for more than one working day?
If the condition will exist for more than one working day, signage must be prepared and posted informing the occupants of the compromise of safety and directing a higher level of awareness of fire hazards.
SIGNS POSTED BY: DATE:
2. Will the above described LSC deficiency or construction project hinder the occupants in the immediate area from effectively activating a pull station fire ALARM?
If YES is checked above after question 2, will the condition described exist for more than one working day?
informing the occupants that the fire alarm pull station is out of service and instructing the occupants to call the Hines Police Department by telephone at extension 22323 to report a fire.
3. Will the above described LSC deficiency or construction project hinder the ability of the occupants in the immediate area to CONFINE a fire?
informing the occupants of the condition and listing alternative actions to be taken until the condition is remediated.
4. Will the above described LSC deficiency or construction project reduce or hinder the ability of the occupants in the immediate area or the community Fire Department to EXTINGUISH a fire?
informing the occupants of the condition and listing alternative actions to be taken until the condition is remediated. Additionally, the community Fire Department will develop a contingency firefighting tactical plan for the area. In the case of construction projects, that contingency plan must be approved and in place prior to permitting any work to start at the job site.
5. Will the above described LSC deficiency or construction project hinder the occupants’ ability to EVACUATE the building or area?
advising the occupants of the condition and describing alternate routes of egress.
TRAINING
6. Does the ILSM signage pertaining to RESCUE provide enough information and instruction to ensure proper occupant response during an emergency incident?
If the signage is determined to be inadequate to ensure proper occupant response, Safety will provide the personnel affected with additional instruction and training as necessary. Such training will be documented.
TRAINING CONDUCTED BY: DATE:
7. Does the ILSM signage pertaining to ALARM provide enough information and instruction to ensure proper occupant response during an emergency incident?
provide the personnel affected with additional instruction and training as necessary. Such training will be documented.
8. Does the ILSM signage pertaining to CONFINE provide enough information and instruction to ensure proper occupant response during an emergency?
provide the personnel affected with additional instruction and training as necessary.
9. Does the ILSM signage pertaining to EVACUATE provide enough information and instruction to ensure proper occupant response during an emergency?
If the signage is determined to be inadequate to ensure proper occupant response, Project/Planning will provide the personnel affected with additional instruction and training as necessary. Such training will be documented.
FIRE DRILLS
10. Will the above described LSC deficiency or construction project necessitate altering staff response to RESCUE, ALARM, CONFINEMENT, EXTINGUISHMENT and/or
EVACUATION?
If YES is checked above, will condition exist for more than sixty days?
If staff response to Rescue, Alarm, Confinement, Extinguishment and/or Evacuation will be altered for more than sixty days, the Safety Section will increase the frequency of scheduled fire drills in the area affected to two per shift per quarter.
ADDITIONAL FIRE DRILLS SCHEDULED BY: DATE:
INSPECTION
If evaluation indicates that one or more ILSMs must be used for this deficiency or project, daily inspection of the site by Safety personnel will be required. Each inspection must be documented on the ILSM High Hazard Inspection Report.
INSPECTION REQUIRED: YES ☐ NO ☐
INSPECTION SCHEDULED BY: DATE:
EVALUATION COMPLETED BY:
SIGNATURE OF SAFETY STAFF DATE
Attachment D
HIGH HAZARD INSPECTION REPORT
LOCATION:
DESCRIPTION OF DEFICIENCY OR PROJECT:
ILSMs REQUIRED:
YES NO
1. Is the ability of the occupants to perform rescue impaired?
2. Is the ability of the occupants to activate an alarm impaired?
3. Is the ability of the occupants to confine a fire impaired?
4. Is the ability of the occupants to extinguish a fire impaired?
5. Is the ability of the occupant to perform evacuation impaired?
6. Is access to emergency vehicles/personnel impaired?
7. Is the automatic fire sprinkler system in operation?
8. Are the smoke detectors operating?
9. Are flammable or combustible materials stored in the area?
10. Is the area clear of storage, trash, waste and debris?
REMARKS/CORRECTION ACTION REQUIRED:
SIGNATURE OF INSPECTOR DATE
Attachment E
Fire Watch Decision Grid
Service Situation Fire Watch
Required?
ILSM Evaluation
Required?
A. Putting a shield over one smoke detector to prevent dust/false alarms for more than 4 hours
Rationale: Other features of fire protection are not compromised during the event, such as additional smoke detectors or sprinkler heads in the affected area.
B. Covering all smoke detectors during a controlled event, such as only during the time contractors are working in an affected area, although after hours the entire area is fully operational
Rationale: During a controlled event, the organization would be managing the deficiency. The area would be continually monitored, and ILSM should be implemented as per policy
C. Shutting off a zone valve to the sprinkler system or disabling a fire alarm zone for more than 4 hours
• Scheduled event (that is, working on, servicing, or upgrading fire alarm system or sprinkler system)
Rationale: During a controlled event, the organization would be managing the deficiency. The area would be continually monitored, and ILSM would be implemented as per policy.
• Unscheduled event (that is, shutting off a zone valve to the sprinkler system or disabling a smoke zone for more than 4 hours in response to a system failure)
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
W E
E K
444 W. Lake St. Suite 1700 Chicago, IL 60606
312.583.7023 www.virtualenergysolutions.com
Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432
Drawing No.
Scale:
Date:
Checked By:Drawn By:Designed By:
Drawing Title:
Contract No.
File No.Building No.
Client Project No.
Project Title:Approved: Chief, failites Management Services
Approved: Medical Center Director
Approved:
Approved: Location:
VES Project Number: 191006
AS NOTED
VA JOLIET CBOC
JOLIET, ILLINOIS
578-371 36C25219D0020
N O
T F
O R
C O
N S
T R
U C
T
IO
N
© 2020 Virtual Energy Solutions, INC.
B
IM
/2
-M
A T
O C
-P a rk in g E x p a n s io n a t J o lie t C
B O
C
-3
/2
J o lie t
C B
O C
P a rk in g E x p a n s io n V
E S
A rc h
.r v t
-0
-2
:4 :1
P
M PROPOSED PROJECT
SCHEDULE WITH PHASING
PARKING EXPANSION AT
JOLIET CBOC
GCGIDGID
Revisions Date
ISSUED FOR 90% PRICING 02/02/2023
i_dic Rectangle i_dic Rectangle i_dic Typewritten Text
EXTERIOR WORK
i_dic Typewritten Text
INTERIOR WORK
i_dic Typewritten Text
CLINIC FUNCTION IMPACTS:
Spaces & Functions Temporarily Unavailable i_dic Typewritten Text D1 i_dic Rectangle i_dic Typewritten Text D2 i_dic Rectangle i_dic Typewritten Text C1 i_dic Rectangle i_dic Typewritten Text C2 i_dic Rectangle i_dic Typewritten Text Site Work S1 i_dic Rectangle i_dic Typewritten Text C3 i_dic Rectangle i_dic Typewritten Text C4 i_dic Ellipse i_dic Rectangle i_dic Typewritten Text
CLOSE OUT
i_dic Rectangle i_dic Typewritten Text D3 i_dic Line i_dic Line i_dic Line i_dic Typewritten Text 02/23/2023 i_dic Line i_dic Line i_dic Typewritten Text
NORTH HALF OF BASEMENT
i_dic Rectangle i_dic Typewritten Text C7 i_dic Rectangle i_dic Typewritten Text
MOBILIZATION
EARLY SUBMITTALS
PROCUREMENT
RELOCATIONS
i_dic Line i_dic Snapshot i_dic Typewritten Text
AUDIOLOGY, RADIOLOGY,
MARCO, DIAGNOSTICS
i_dic Line i_dic Typewritten Text
NTP
i_dic Rectangle i_dic Typewritten Text
EYE, BLOOD DRAW, PM&R, RADIOLOGY,
MARCO, DIAGNOSTICS, & DISPENSARY
i_dic Rectangle i_dic Typewritten Text
AUDIOLOGY, PODIATRY,
CARDIOLOGY, NUTRITION
i_dic Typewritten Text
PODIATRY, CARDIOLOGY,
NUTRITION, SOCIAL WORK
i_dic Rectangle i_dic Typewritten Text
AIR HANDLING UNIT
i_dic Line i_dic Line i_dic Line i_dic Typewritten Text
DURING PHASES D1 & C1
i_dic Typewritten Text
DURING PHASE D1
i_dic Typewritten Text
DURING PHASE C6E
i_dic Typewritten Text
DURING PHASE C6W
i_dic Typewritten Text
DURING PHASE C2
i_dic Typewritten Text
SUMMARY OF PHASES:
PHASING - MAIN DEMOLITION WORK:
D1: Demolish Remnant Structure and Existing Northeast Vestibule D2: Remove portions of Existing Foundation Walls at North for New Window & Door Openings D3: Remove Existing Air Handling Units from Basement i_dic Typewritten Text
PHASING - NEW CONSTRUCTION:
C1: Construct New North Vestibule, Elevator, New Northeast Vestibule, Refinish North Facade, Roof Access Stair C2: New Air Handling Unit Penthouse C3: Replace Existing Roofing System, Entire CBOC C4: Install New Over-Roof Ductwork & Roof Mounted Mechanical Equipment C5: Replace Existing Mechanical Equipment, Ceilings, & Lighting South Portion of CBOC C6E: Replace Existing Ductwork, Mechanical Equipment, Ceilings, Lighting, North Portion of CBOC - East Side C6W: Replace Existing Ductwork, Mechanical Equipment, Ceilings, Lighting, North Portion of CBOC - West Side C7: Infill Existing Duct Shaft Openings in Basement
S1: New North Parking Lot including Landscaping & Site Lighting S2: Seal Coat & Re-stripe Existing South Lots, New Lighting i_dic Typewritten Text CLOSE OUT Phase: Commissioning, Training, Punch List, & Final Clean i_dic Line i_dic Ellipse i_dic Typewritten Text
30 WEEKS
i_dic Typewritten Text
7 WEEKS
i_dic Typewritten Text
7 WEEKS
i_dic Typewritten Text
14 WEEKS
i_dic Typewritten Text
12 WEEKS
i_dic Typewritten Text
DURATIONS SHOWN ARE APPROXIMATE
i_dic Typewritten Text
DEMOLISH REMNANT STRUCTURE
EXISTING NORTHEAST VESTIBULE
i_dic Typewritten Text
OPENINGS IN FOUNDATION FOR NEW
WINDOWS AND DOOR
i_dic Line i_dic Typewritten Text
CONSTRUCT NEW NORTH & NORTHEAST
VESTIBULE
i_dic Line i_dic Typewritten Text
CONSTRUCT NEW AIR HANDLING UNIT
PENTHOUSE
i_dic Line i_dic Typewritten Text
REPLACE EXISTING ROOFING SYSTEM,
NEW ROOF OPENINGS FOR OVER-ROOF DUCTWORK
i_dic Line i_dic Line i_dic Typewritten Text
INSTALL OVER-ROOF DUCTWORK
i_dic Line i_dic Typewritten Text
S1: NEW NORTH PARKING LOT
S2: SEAL COAT & RE-STRIPE EXISTING SOUTH LOTS
i_dic Typewritten Text
REPLACE EXISTING DUCTWORK, MECHANICAL EQUIPMENT,
CEILINGS, LIGHTING: NORTH PORTION OF CBOC - EAST SIDE
i_dic Line i_dic Typewritten Text
REPLACE EXISTING DUCTWORK, MECHANICAL EQUIPMENT,
CEILINGS, LIGHTING: NORTH PORTION OF CBOC - WEST SIDE
i_dic Line i_dic Typewritten Text
INSTALL NEW MECHANICAL EQUIPMENT,
CEILINGS, LIGHTING: SOUTH PORTION OF CBOC
i_dic Line i_dic Typewritten Text
DEMOLISH EXISTING AIR HANDLING UNITS,
BASEMENT
i_dic Line i_dic Text Box
INFILL EXISTING DUCT SHAFT OPENINGS IN BASEMENT
i_dic Line i_dic Typewritten Text
COMMISSIONING, TRAINING,
PUNCH LIST, & FINAL CLEAN
i_dic Line i_dic Rectangle i_dic Typewritten Text
DIAGNOSTICS & DISPENSARY
i_dic Line i_dic Typewritten Text
DURING PHASE C1
i_dic Typewritten Text
12 WEEKS
i_dic Rectangle i_dic Typewritten Text C6E i_dic Rectangle i_dic Typewritten Text C6W i_dic Rectangle i_dic Typewritten Text C5 i_dic Line i_dic Rectangle i_dic Typewritten Text Site Work S2 i_dic Typewritten Text
UP
C Ex Gx Hx Jx Kx K'x Lx
1x
4x
6x
9x
12x
13x
14x
CxBxAxA1xB1xC1xD1xE1x
3x
5x
5.8x
8x
10x
6.1x
Fx A.E
15x
9.5x
1.2x
MECHANICAL/ELECTRICAL SPACE
SUPPORT
PATIENT EDUCATION
NUTRITION
CONFERENCE
STAFF
RESTROOMS
HOME BASED PRIMARY CARE
VERTICAL CIRCULATION
FUNCTIONS LEGEND
BASEMENT LEVEL
Elev. Equip.
B003
Badge B004
Phone B002C
Home Based Primary Care
B002
Stair #2 S-2
Comm.
B005
Reception B001
Women's Restroom
B006
Men's Restroom
B011
HAC
B007
Copy Room B009
Phone B002A
Phone B002B
Phone B017
Phone B016
A.O.
B015
Clinical Nurse Manager
B014
Chief Medical Director
B013
Patient Education/Group
Room B011
Patient Education/Exercise
B022
Store B012
Corridor C0-2
Corridor C0-3
Corridor C0-4
Corridor C0-1
Mech.
B018
Elec.
B019
Gen Room B020
PAS Call Center
B024
Education Storage
B022
Nutrition Services
B021
Main Conference
Room B023
Mech.
B025
Patient Education/Group
Room B033
Patient Education/Group
Room B032
Patient Ed/Internet
Cafe B031
Corridor C0-6
Corridor C0-8
Corridor C0-7
Staff Lounge B042
Men's Staff Locker
B036
Women's Staff Locker
B034
Mech.
Corridor C0-9
Corridor C0-5
Mech.
B026
Elec.
B029
Elec.
B028
Comm B030
Facility Storage
B041
EMS
B038
Biomed B039
FMS
B040
Stair #1 S-1
Corridor C0-1
Elevator
EL-1
Mech.
B018
Patient Education/Exercise
B022
Vending
Cooking Classroom
0023A
444 W. Lake St. Suite 1700 Chicago, IL 60606
312.583.7023 www.virtualenergysolutions.com
Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432
Scale:
Date:
Checked By:Drawn By:Designed By:
Drawing Title:
Contract No.
File No.Building No.
Client Project No.
Project Title:Approved: Chief, failites Management Services
Approved: Medical Center Director
Approved:
Approved: Location:
VES Project Number: 191006
AS NOTED
VA JOLIET CBOC
JOLIET, ILLINOIS
578-371 36C25219D0020
N O
T F
O R
C O
N S
T R
U C
T
IO
N
© 2020 Virtual Energy Solutions, INC.
B
IM
/2
-M
A T
O C
-P a rk in g E x p a n s io n a t J o lie t C
B O
C
-3
/2
J o lie t
C B
O C
P a rk in g E x p a n s io n V
E S
A rc h
.r v t
-0
-1
:5
:4
A
M DEMOLITION PHASING BASMENT
PARKING EXPANSION AT
JOLIET CBOC
Revisions Date
ISSUED FOR 90% CD 02/10/2023
3/32" = 1'-0"
1 BASEMENT LEVEL PLAN 0 8' 16' 32'
i_dic Polygon i_dic Callout
EXISTING REMNANT STRUCTURE & NORTHEAST VESTIBULE TO BE REMOVED
i_dic Typewritten Text
PHASE D1
i_dic Callout
EXISTING REMNANT STRUCTURE & NORTHEAST VESTIBULE TO BE REMOVED
i_dic PolyLine i_dic Rectangle i_dic Single Door i_dic Single Door i_dic Rectangle i_dic Single Door i_dic Single Door i_dic Polygon i_dic Typewritten Text
BASEMENT LEVEL: DEMOLITION / CLINIC FUNCTIONS
i_dic Polygon i_dic Typewritten Text
UNOCCUPIED
DURING
PHASE D1
i_dic PolyLine i_dic PolyLine i_dic Typewritten Text
PHASE D1
i_dic Callout
EXISTING REMNANT STRUCTURE & NORTHEAST VESTIBULE TO BE REMOVED
i_dic Typewritten Text
PHASE D1
i_dic Callout
RESTRICTED ACCESS: SOUTH PORTION, BASEMENT LEVEL
i_dic Callout
LIMITED ACCESS TO STAFF LOCKERS:
NO MORE THAN 49 OCCUPANTS
i_dic Typewritten Text 02/23/2023 i_dic Typewritten Text
PHASE D1
i_dic Typewritten Text
VHAHINWalshA
30 WEEKS
Ex Gx Hx Jx Kx K'x Lx
1x
4x
6x
9x
12x
13x
14x
CxBxAx
A1x
B1xC1xD1xE1x
3x
5x
5.8x
8x
10x
6.1x
Fx A.E
15x
9.5x
1.2x
MECHANICAL/ELECTRICAL SPACE
SUPPORT
SECURITY & SAFETY
STAFF
RESTROOMS
PRIMARY CARE
WOMEN'S HEALTH
RADIOLOGY
EYE CLINIC
PHYSICAL/OCCUPATIONAL THERAPY
PHARMACY
PODIATRY
AUDIOLOGY
RESPIRATORY
RECEPTION
LAB
VERTICAL CIRCULATION
FUNCTIONS LEGEND
FIRST FLOOR LEVEL
CARDIOLOGY
DRIVE THROUGH TESTING
FMS
Elevator
EL-1
Stair #2 S-2
Corridor C1-15
Rad Control
Dispensary
Storage 1116A
Diagnostic
Marco
Rad Room
Corridor C1-13
Corridor C1-14
Corridor C1-11
Toilet
Toilet
HAC
Toilet 1112E
Soiled Utility 1112A
Storage 1112B
PM&R
Treatment 1112D
Eye Tech
Visual Fields
Treatment 1112C
Toilet
Toilet 1102A
Eye
Blood Draw 1114D
Eye
Blood Draw 1114C
Draw Analysis
1114E
Toilet 1114F
Blood Draw 1114B
Eye
Eye
1-On-1 Room 1017C
Work Room 1017B
Supervisor Office
1017A
Nurse Triage
Exam 1
Exam 2
Nurse Triage
Women Health Exam
IT
Telemed
Telemed
Telemed
Closet
Telemed
Telemed
Toilet 1043A
Telemed
Telemed 1038Exam 17
Exam 16
PACT 2
PACT 1
Exam 15
Exam 14
Exam 12
Exam 13
Exam 5
Women Health Exam
Toilet
Toilet 1047A
Men's Restroom
Women's Restroom
Treatment Room
Toilet
Treatment Room
CWT
CWT
Security
Wheelchair Storage
Group
Treatment
Treatment Room
Group Treatment
Treatment Room
Treatment Room
Treatment Room
Treatment Room
Soiled Utility
Exam 6
Exam 7
Exam 8
Exam 9
Clean Storage
Room B131 Exam10
Procedure 1 Shared Gyno
Toilet 1059B
Toilet
Closet 1059A
Procedure 2
Exam 11
Exam 19
Exam 18
PACT
PACT 4
Women Health Exam
Women Health Exam
Corridor C1-3
Telemed
HAC
Stair #1 S-1
Mobile Port Waiting
Toilet 1068A
Toilet 1031A
Pharm. D
Pharm. D
Nutritionist
Teleretinal
Cardio/Pod Shared Office
Soiled Utility
Clean Utility
Social Worker
Shell Space
Corridor C1-10
Podiatry Exam
Podiatry Exam
Tech Work Room
Audiology Exam
Cast Room
Podiatry Exam
Audiology Exam
Oxygen Evaluation
PFT Blood Gas
Clean Utility
Soiled Utility
Control
Sound Booth
Control
Sound Booth
Stor.
Corridor C1-12
Corridor C1-9
Corridor
Ambulance Bay C1-36
Corridor C1-5
Corridor C1-5
Corridor C1-7
Corridor C1-6
Corridor C1-6
Corridor C1-4
Corridor C1-8
Corridor C1-1
General Waiting
Corridor C1-2
Photo Alcove
Reception
Equipment Alcove
Nourishment Alcove
Scale Alcove
Meds
1065C
1065B
1065A
Elec. Clos.
1089A
Scale Alcove
PAS
Elec.
1114A
Boiler Plant
Egress
Corridor
Exit
Vestibule
Storage
444 W. Lake St. Suite 1700 Chicago, IL 60606
312.583.7023 www.virtualenergysolutions.com
Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432
Scale:
Date:
Checked By:Drawn By:Designed By:
Drawing Title:
Contract No.
File No.Building No.
Client Project No.
Project Title:Approved: Chief, failites Management Services
Approved: Medical Center Director
Approved:
Approved: Location:
VES Project Number: 191006
AS NOTED
VA JOLIET CBOC
JOLIET, ILLINOIS
578-371 36C25219D0020
N O
T F
O R
C O
N S
T R
U C
T
IO
N
© 2020 Virtual Energy Solutions, INC.
B
IM
/2
-M
A T
O C
-P a rk in g E x p a n s io n a t J o lie t C
B O
C
-3
/2
J o lie t
C B
O C
P a rk in g E x p a n s io n V
E S
A rc h
.r v t
-0
-1
:5
:5
A
M DEMOLITION PHASING FIRST
FLOOR LEVEL
PARKING EXPANSION AT
JOLIET CBOC
Revisions Date
ISSUED FOR 90% CD 02/10/2023
3/32" = 1'-0"
FIRST FLOOR LEVEL
0 8' 16' 32' i_dic Polygon i_dic Callout
EXISTING REMNANT STRUCTURE & NORTHEAST VESTIBULE TO BE REMOVED
i_dic Callout
EXISTING REMNANT STRUCTURE & NORTHEAST VESTIBULE TO BE REMOVED
i_dic PolyLine i_dic Typewritten Text
FIRST FLOOR LEVEL: DEMOLITION / CLINIC FUNCTIONS
i_dic Polygon i_dic Typewritten Text
UNOCCUPIED
DURING
PHASE D1
i_dic Single Door i_dic Rectangle i_dic Rectangle i_dic Rectangle i_dic Rectangle i_dic Callout
TEMPORARY EGRESS DOOR &
WALKWAY
i_dic PolyLine i_dic PolyLine i_dic Line i_dic Typewritten Text
PHASE D1
i_dic Typewritten Text
PHASE D1
i_dic Typewritten Text
PHASE D1
i_dic PolyLine i_dic Typewritten Text 02/23/2023 i_dic Typewritten Text
PHASE D1
i_dic Typewritten Text
VHAHINWalshA
14 WEEKS
C
Ex Gx Hx Jx Kx K'x Lx
1x
4x
6x
9x
12x
13x
14x
CxBxAx
A1x
B1xC1xD1xE1x
3x
5x
5.8x
8x
10x
6.1x
Fx A.E
15x
9.5x
1.2x
A
B
F
2.3
D
E
1.2
2.2
Office
Vestibule
Lobby
Elevator E-2
MECHANICAL/ELECTRICAL SPACE
SUPPORT
SECURITY & SAFETY
STAFF
RESTROOMS
PRIMARY CARE
WOMEN'S HEALTH
RADIOLOGY
EYE CLINIC
PHYSICAL/OCCUPATIONAL THERAPY
PHARMACY
PODIATRY
AUDIOLOGY
RESPIRATORY
RECEPTION
LAB
VERTICAL CIRCULATION
FUNCTIONS LEGEND
FIRST FLOOR LEVEL
CARDIOLOGY
DRIVE THROUGH TESTING
FMS
Elevator
EL-1
Stair #2 S-2
Corridor C1-15
Rad Control
Dispensary
Storage 1116A
Diagnostic
Marco
Rad Room
Corridor C1-13
Corridor C1-14
Corridor C1-11
Toilet
Toilet
HAC
Toilet 1112E
Soiled Utility 1112A
Storage 1112B
PM&R
Treatment 1112D
Eye Tech
Visual Fields
Treatment 1112C
Toilet
Toilet 1102A
Eye
Blood Draw 1114D
Eye
Blood Draw 1114C
Draw Analysis
1114E
Toilet 1114F
Blood Draw 1114B
Eye
Eye
1-On-1 Room 1017C
Work Room 1017B
Supervisor Office
1017A
Nurse Triage
Exam 1
Exam 2
Nurse Triage
Women Health Exam
IT
Telemed
Telemed
Telemed
Closet
Telemed
Telemed
Toilet 1043A
Telemed
Telemed 1038Exam 17
Exam 16
PACT 2
PACT 1
Exam 15
Exam 14
Exam 12
Exam 13
Exam 5
Women Health Exam
Toilet
Toilet 1047A
Men's Restroom
Women's Restroom
Treatment Room
Toilet
Treatment Room
CWT
CWT
Security
Wheelchair Storage
Group
Treatment
Treatment Room
Group Treatment
Treatment Room
Treatment Room
Treatment Room
Treatment Room
Soiled Utility
Exam 6
Exam 7
Exam 8
Exam 9
Clean Storage
Room B131 Exam10
Procedure 1 Shared Gyno
Toilet 1059B
Toilet
Closet 1059A
Procedure 2
Exam 11
Exam 19
Exam 18
PACT
PACT 4
Women Health Exam
Women Health Exam
Corridor C1-3
Telemed
HAC
Stair #1 S-1
Mobile Port Waiting
Toilet 1068A
Toilet 1031A
Pharm. D
Pharm. D
Nutritionist
Teleretinal
Cardio/Pod Shared Office
Soiled Utility
Clean Utility
Social Worker
Shell Space
Corridor C1-10
Podiatry Exam
Podiatry Exam
Tech Work Room
Audiology Exam
Cast Room
Podiatry Exam
Audiology Exam
Oxygen Evaluation
PFT Blood Gas
Clean Utility
Soiled Utility
Control
Sound Booth
Control
Sound Booth
Stor.
Corridor C1-12
Corridor C1-9
Corridor
Ambulance Bay C1-36
Corridor C1-5
Corridor C1-5
Corridor C1-7
Corridor C1-6
Corridor C1-6
Corridor C1-4
Corridor C1-8
Corridor C1-1
General Waiting
Corridor C1-2
Photo Alcove
Reception
Equipment Alcove
Nourishment Alcove
Scale Alcove
Meds
1065C
1065B
1065A
Elec. Clos.
1089A
Scale Alcove
PAS
Elec.
1114A
Boiler Plant
444 W. Lake St. Suite 1700 Chicago, IL 60606
312.583.7023 www.virtualenergysolutions.com
Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432
Scale:
Date:
Checked By:Drawn By:Designed By:
Drawing Title:
Contract No.
File No.Building No.
Client Project No.
Project Title:Approved: Chief, failites Management Services
Approved: Medical Center Director
Approved:
Approved: Location:
VES Project Number: 191006
AS NOTED
VA JOLIET CBOC
JOLIET, ILLINOIS
578-371 36C25219D0020
N O
T F
O R
C O
N S
T R
U C
T
IO
N
© 2020 Virtual Energy Solutions, INC.
B
IM
/2
-M
A T
O C
-P a rk in g E x p a n s io n a t J o lie t C
B O
C
-3
/2
J o lie t
C B
O C
P a rk in g E x p a n s io n V
E S
A rc h
.r v t
-0
-1
:5
:5
A
M NEW CONSTRUCTION PHASING
FIRST FLOOR LEVEL
PARKING EXPANSION AT
JOLIET CBOC
Revisions Date
3/32" = 1'-0"
FIRST FLOOR LEVEL
0 8' 16' 32' i_dic Rectangle i_dic Polygon i_dic PolyLine i_dic PolyLine i_dic Polygon i_dic Rectangle i_dic Callout
TEMPORARY EGRESS DOOR &
WALKWAY
i_dic Single Door i_dic Rectangle i_dic Rectangle i_dic Callout
PHASE C1
i_dic Callout
UNOCCUPIED DURING
PHASE C2
i_dic Callout
UNOCCUPIED DURING
PHASE C1
i_dic Typewritten Text
CONSTRUCT NEW NORTHEAST
VESTIBULE INCLUDING OFFICE,
ELEVATOR + LOBBY
i_dic Polygon i_dic Callout
PHASE C1
i_dic Typewritten Text
CONSTRUCT NEW NORTH
FACADE COMPLETE WITH
INSULATION AND MASONRY
CLADDING
i_dic PolyLine i_dic Callout
PHASE C2
i_dic Callout
NEW AHU PENTHOUSE:
STRUCTURE, ENCLOSURE, AND MECHANICAL EQUIPMENT INSTALLATION
i_dic Callout
PHASE C2
i_dic Typewritten Text
FIRST FLOOR LEVEL: CLINIC FUNCTIONS
i_dic Rectangle i_dic Typewritten Text 02/23/2023 i_dic Typewritten Text
PHASES C1 & C2
i_dic Typewritten Text
VHAHINWalshA Typewritten Text
12 WEEKS
VHAHINWalshA
12 WEEKS
Ex Gx Hx Jx Kx K'x Lx
1x
4x
6x
9x
12x
13x
14x
CxBxAx
A1x
B1xC1xD1xE1x
3x
5x
5.8x
8x
10x
6.1x
Fx A.E
15x
9.5x
1.2x
A
B
F
2.3
D
E
1.2
2.2
Office
Vestibule
Lobby
Elevator E-2
MECHANICAL/ELECTRICAL SPACE
SUPPORT
SECURITY & SAFETY
STAFF
RESTROOMS
PRIMARY CARE
WOMEN'S HEALTH
RADIOLOGY
EYE CLINIC
PHYSICAL/OCCUPATIONAL THERAPY
PHARMACY
PODIATRY
AUDIOLOGY
RESPIRATORY
RECEPTION
LAB
VERTICAL CIRCULATION
FUNCTIONS LEGEND
FIRST FLOOR LEVEL
CARDIOLOGY
DRIVE THROUGH TESTING
FMS
Elevator
EL-1
Stair #2 S-2
Corridor C1-15
Rad Control
Dispensary
Storage 1116A
Diagnostic
Marco
Rad Room
Corridor C1-13
Corridor C1-14
Corridor C1-11
Toilet
Toilet
HAC
Toilet 1112E
Soiled Utility 1112A
Storage 1112B
PM&R
Treatment 1112D
Eye Tech
Visual Fields
Treatment 1112C
Toilet
Toilet 1102A
Eye
Blood Draw 1114D
Eye
Blood Draw 1114C
Draw Analysis
1114E
Toilet 1114F
Blood Draw 1114B
Eye
Eye
1-On-1 Room 1017C
Work Room 1017B
Supervisor Office
1017A
Nurse Triage
Exam 1
Exam 2
Nurse Triage
Women Health Exam
IT
Telemed
Telemed
Telemed
Closet
Telemed
Telemed
Toilet 1043A
Telemed
Telemed 1038Exam 17
Exam 16
PACT 2
PACT 1
Exam 15
Exam 14
Exam 12
Exam 13
Exam 5
Women Health Exam
Toilet
Toilet 1047A
Men's Restroom
Women's Restroom
Treatment Room
Toilet
Treatment Room
CWT
CWT
Security
Wheelchair Storage
Group
Treatment
Treatment Room
Group Treatment
Treatment Room
Treatment Room
Treatment Room
Treatment Room
Soiled Utility
Exam 6
Exam 7
Exam 8
Exam 9
Clean Storage
Room B131 Exam10
Procedure 1 Shared Gyno
Toilet 1059B
Toilet
Closet 1059A
Procedure 2
Exam 11
Exam 19
Exam 18
PACT
PACT 4
Women Health Exam
Women Health Exam
Corridor C1-3
Telemed
HAC
Stair #1 S-1
Mobile Port Waiting
Toilet 1068A
Toilet 1031A
Pharm. D
Pharm. D
Nutritionist
Teleretinal
Cardio/Pod Shared Office
Soiled Utility
Clean Utility
Social Worker
Shell Space
Corridor C1-10
Podiatry Exam
Podiatry Exam
Tech Work Room
Audiology Exam
Cast Room
Podiatry Exam
Audiology Exam
Oxygen Evaluation
PFT Blood Gas
Clean Utility
Soiled Utility
Control
Sound Booth
Control
Sound Booth
Stor.
Corridor C1-12
Corridor C1-9
Corridor
Ambulance Bay C1-36
Corridor C1-5
Corridor C1-5
Corridor C1-7
Corridor C1-6
Corridor C1-6
Corridor C1-4
Corridor C1-8
Corridor C1-1
General Waiting
Corridor C1-2
Photo Alcove
Reception
Equipment Alcove
Nourishment Alcove
Scale Alcove
Meds
1065C
1065B
1065A
Elec. Clos.
1089A
Scale Alcove
PAS
Elec.
1114A
Boiler Plant
444 W. Lake St. Suite 1700 Chicago, IL 60606
312.583.7023 www.virtualenergysolutions.com
Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432
Scale:
Date:
Checked By:Drawn By:Designed By:
Drawing Title:
Contract No.
File No.Building No.
Client Project No.
Project Title:Approved: Chief, failites Management Services
Approved: Medical Center Director
Approved:
Approved: Location:
VES Project Number: 191006
AS NOTED
VA JOLIET CBOC
JOLIET, ILLINOIS
578-371 36C25219D0020
N O
T F
O R
C O
N S
T R
U C
T
IO
N
© 2020 Virtual Energy Solutions, INC.
B
IM
/2
-M
A T
O C
-P a rk in g E x p a n s io n a t J o lie t C
B O
C
-3
/2
J o lie t
C B
O C
P a rk in g E x p a n s io n V
E S
A rc h
.r v t
-0
-1
:5
:5
A
M NEW CONSTRUCTION PHASING
FIRST FLOOR LEVEL
PARKING EXPANSION AT
JOLIET CBOC
Revisions Date
3/32" = 1'-0"
FIRST FLOOR LEVEL
0 8' 16' 32' i_dic Rectangle i_dic Callout
TEMPORARY EGRESS DOOR &
WALKWAY
i_dic Single Door i_dic Rectangle i_dic Rectangle i_dic Polygon i_dic PolyLine i_dic Line i_dic Typewritten Text
FIRST FLOOR LEVEL: CLINIC FUNCTIONS
i_dic Callout
UNOCCUPIED DURING
PHASE C6E
i_dic PolyLine i_dic Typewritten Text 02/23/2023 i_dic Typewritten Text
PHASE C6E
i_dic Typewritten Text
VHAHINWalshA
7 WEEKS
Ex Gx Hx Jx Kx K'x Lx
1x
4x
6x
9x
12x
13x
14x
CxBxAx
A1x
B1xC1xD1xE1x
3x
5x
5.8x
8x
10x
6.1x
Fx A.E
15x
9.5x
1.2x
A
B
F
2.3
D
E
1.2
2.2
Office
Vestibule
Lobby
Elevator E-2
MECHANICAL/ELECTRICAL SPACE
SUPPORT
SECURITY & SAFETY
STAFF
RESTROOMS
PRIMARY CARE
WOMEN'S HEALTH
RADIOLOGY
EYE CLINIC
PHYSICAL/OCCUPATIONAL THERAPY
PHARMACY
PODIATRY
AUDIOLOGY
RESPIRATORY
RECEPTION
LAB
VERTICAL CIRCULATION
FUNCTIONS LEGEND
FIRST FLOOR LEVEL
CARDIOLOGY
DRIVE THROUGH TESTING
FMS
Elevator
EL-1
Stair #2 S-2
Corridor C1-15
Rad Control
Dispensary
Storage 1116A
Diagnostic
Marco
Rad Room
Corridor C1-13
Corridor C1-14
Corridor C1-11
Toilet
Toilet
HAC
Toilet 1112E
Soiled Utility 1112A
Storage 1112B
PM&R
Treatment 1112D
Eye Tech
Visual Fields
Treatment 1112C
Toilet
Toilet 1102A
Eye
Blood Draw 1114D
Eye
Blood Draw 1114C
Draw Analysis
1114E
Toilet 1114F
Blood Draw 1114B
Eye
Eye
1-On-1 Room 1017C
Work Room 1017B
Supervisor Office
1017A
Nurse Triage
Exam 1
Exam 2
Nurse Triage
Women Health Exam
IT
Telemed
Telemed
Telemed
Closet
Telemed
Telemed
Toilet 1043A
Telemed
Telemed 1038Exam 17
Exam 16
PACT 2
PACT 1
Exam 15
Exam 14
Exam 12
Exam 13
Exam 5
Women Health Exam
Toilet
Toilet 1047A
Men's Restroom
Women's Restroom
Treatment Room
Toilet
Treatment Room
CWT
CWT
Security
Wheelchair Storage
Group
Treatment
Treatment Room
Group Treatment
Treatment Room
Treatment Room
Treatment Room
Treatment Room
Soiled Utility
Exam 6
Exam 7
Exam 8
Exam 9
Clean Storage
Room B131 Exam10
Procedure 1 Shared Gyno
Toilet 1059B
Toilet
Closet 1059A
Procedure 2
Exam 11
Exam 19
Exam 18
PACT
PACT 4
Women Health Exam
Women Health Exam
Corridor C1-3
Telemed
HAC
Stair #1 S-1
Mobile Port Waiting
Toilet 1068A
Toilet 1031A
Pharm. D
Pharm. D
Nutritionist
Teleretinal
Cardio/Pod Shared Office
Soiled Utility
Clean Utility
Social Worker
Shell Space
Corridor C1-10
Podiatry Exam
Podiatry Exam
Tech Work Room
Audiology Exam
Cast Room
Podiatry Exam
Audiology Exam
Oxygen Evaluation
PFT Blood Gas
Clean Utility
Soiled Utility
Control
Sound Booth
Control
Sound Booth
Stor.
Corridor C1-12
Corridor C1-9
Corridor
Ambulance Bay C1-36
Corridor C1-5
Corridor C1-5
Corridor C1-7
Corridor C1-6
Corridor C1-6
Corridor C1-4
Corridor C1-8
Corridor C1-1
General Waiting
Corridor C1-2
Photo Alcove
Reception
Equipment Alcove
Nourishment Alcove
Scale Alcove
Meds
1065C
1065B
1065A
Elec. Clos.
1089A
Scale Alcove
PAS
Elec.
1114A
Boiler Plant
444 W. Lake St. Suite 1700 Chicago, IL 60606
312.583.7023 www.virtualenergysolutions.com
Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432
Scale:
Date:
Checked By:Drawn By:Designed By:
Drawing Title:
Contract No.
File No.Building No.
Client Project No.
Project Title:Approved: Chief, failites Management Services
Approved: Medical Center Director
Approved:
Approved: Location:
VES Project Number: 191006
AS NOTED
VA JOLIET CBOC
JOLIET, ILLINOIS
578-371 36C25219D0020
N O
T F
O R
C O
N S
T R
U C
T
IO
N
© 2020 Virtual Energy Solutions, INC.
B
IM
/2
-M
A T
O C
-P a rk in g E x p a n s io n a t J o lie t C
B O
C
-3
/2
J o lie t
C B
O C
P a rk in g E x p a n s io n V
E S
A rc h
.r v t
-0
-1
:5
:5
A
M NEW CONSTRUCTION PHASING
FIRST FLOOR LEVEL
PARKING EXPANSION AT
JOLIET CBOC
Revisions Date
3/32" = 1'-0"
FIRST FLOOR LEVEL
0 8' 16' 32' i_dic Polygon i_dic Callout
UNOCCUPIED DURING
PHASE C6W
i_dic PolyLine i_dic Typewritten Text
FIRST FLOOR LEVEL: CLINIC FUNCTIONS
i_dic Typewritten Text 02/23/2023 i_dic Typewritten Text
PHASE C6W
i_dic PolyLine i_dic PolyLine i_dic PolyLine i_dic Typewritten Text
VHAHINWalshA
7 WEEKS
| Joliet CBOC Phasing & Clinic Functions - Simplified.pdf |
| Sheets |
| SHEET 01 TIMELINE & PHASING |
| SHEET 02 BASEMENT DEMOLITION PHASE D1 |
| SHEET 03 BASEMENT DEMO PHASE D2 & NEW CONSTRUCTION C1 |
| SHEET 04 BASEMENT NEW CONSTRUCTION PHASE C1 |
| SHEET 05 1ST FLOOR DEMOLITION PHASE D1 |
| SHEET 06 ROOF LEVEL PHASES C1 C2 C3 & C4 |
| SHEET 07 SITE WORK PLAN PHASES S1 & S2 |
| SHEET 08 1ST FLOOR NEW CONSTRUCTION PHASES C1 & C2 |
| SHEET 09 1ST FLOOR CLINIC FUNCTION PHASES C1 & C2 |
| SHEET 10 1ST FLOOR NEW CONSTRUCTION PHASES C3 & C5 |
| SHEET 11 1ST FLOOR CLINIC FINCTIONS PHASES C3 & C5 |
| SHEET 12 1ST FLOOR NEW CONSTRUCTION PHASE C6E |
| SHEET 13 IST FLOOR CLINIC FUNCTIONS PHASE C6E |
| SHEET 14 1ST FLOOR NEW CONSTRUCTION PHASE C6W |
| SHEET 15 1ST FLLOR CLINIC FUNCTIONS PHASE C6W |
| SHEET 16 BASEMENT LEVEL NEW CONSTRUCTION PHASES D3 & C7 |
| 2023-03-28T15:09:30-0500 | |
| AARON WALSH |
| 2023-03-30T07:52:38-0500 | |
| Richard F Fraider 3548196 |