S02 - ATCH 21 - Joliet_CBOC_Project_Manual_Issued_for_Bid.pdf
PDF 10 MB Posted
- Solicitation number
- 36C77623B0049
About this file
This file describes a cancelled federal contract opportunity for construction services. The solicitation was for a parking expansion project at the Joliet Community Based Outpatient Clinic, to be carried out by the Department of Veterans Affairs Technology Acquisition Center in Austin. The solicitation number was 36C77623B0049 and it was for construction work under the North American Industry Classification System category 236220. The contract was to be a firm-fixed-price award with an anticipated period of performance from September 2022 to August 2023. The estimated value was between $1 million and $5 million. The original response date was March 2022 but the opportunity was later cancelled.
View the file
Other files
Show 40 more
Latest 50 of 57 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Architect/MEPFP Engineer:
Virtual Energy Solutions, Inc
444 W. Lake Street, Suite 1700
Chicago, Illinois 60606
312.583.7023
Landscape Consulting
Planning Resources Inc.
913 Parkview Blvd.
Lombard, Illinois 60148
630.668.3788
Cost Estimating:
MMC Consulting & Contracting
5600 North River Rd., Suite 950
Rosemont, Illinois 60018
312.445.0000
Energy Consultant:
WSP
30 N. Lasalle, Suite 4200 Il
Chicago, Illinois 60602
312.782.8150
Structural Consulting:
Johnson Wilber Adams, Inc
330 S Naperville Rd #300
Wheaton, IL 60187
630 653 9060
Parking Expansion at Joliet CBOC
1201 Eagle Street
Joliet, Illinois 60432
Project Manual
Project Number: 578-371
Issue Date: April 21, 2023
Issue: Issued for Bid, Addendum 1
Structural/Civil Consulting:
David Mason + Associates
333 S. Des Plaines Street, Suite 200
Chicago, Illinois 60661
312.884.5100
Parking Expansion at Joliet CBOC
1201 Eagle Street
Joliet, Illinois 60432
Project Number: 578-371
Issue Date: April 21, 2023
Issue: Issued for Bid, Addendum 1
Seals:
Date: 03/24/2023
Date: 03/24/2023
Joliet, Illinois 05-10-2023
Project Number 578-371
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 03-23
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 05-23
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 04-23
01 33 23 Shop Drawings, Product Data, and Samples 04-23
01 35 26 Safety Requirements 04-23
01 42 19 Reference Standards 04-23
01 45 00 Quality Control 04-23
01 45 29 Testing Laboratory Services 04-23
01 45 35 Special Inspections 04-23
01 57 19 Temporary Environmental Controls 04-23
01 58 16 Temporary Interior Signage 04-23
01 74 19 Construction Waste Management 04-23
01 81 13 Sustainable Construction Requirements 04-23
01 91 00 General Commissioning Requirements 05-23
DIVISION 02 – EXISTING CONDITIONS
02 21 13 Site Surveys 04-23
02 41 00 Demolition 03-23
DIVISION 03 – CONCRETE
03 30 00 Cast-in-Place Concrete 02-22
DIVISION 04 – MASONRY
04 01 00 Maintenance of Masonry 04-23
04 05 13 Masonry Mortaring 04-23
04 05 16 Masonry Grouting 04-23
04 20 00 Unit Masonry 04-23
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 02-22
05 31 00 Steel Decking 02-22
05 36 00 Composite Metal Decking 02-22
05 50 00 Metal Fabrications 03-23
05 51 00 Metal Stairs 03-23
00 01 10-2
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 04-23
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 01 50.19 Preparation for Re-Roofing 04-23
07 13 52 Modified Bituminous Sheet Waterproofing 04-23
07 21 13 Thermal Insulation 04-23
07 22 00 Roof and Deck Insulation 04-23
07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Permeable 04-23
07 54 23 Thermoplastic Polyolefin (TPO) Roofing 04-23
07 60 00 Flashing and Sheet Metal 04-23
07 71 00 Roof Specialties 04-23
07 81 00 Applied Fireproofing 04-23
07 84 00 Firestopping 04-23
07 92 00 Joint Sealants 04-23
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 04-23
08 14 00 Interior Wood Doors 04-23
08 31 13 Access Doors and Frames 04-23
08 41 13 Aluminum-Framed Entrances, Windows, and Storefronts 04-23
08 71 00 Door Hardware 04-23
08 71 13 Automatic Doors 04-23
08 80 00 Glazing 04-23
08 90 00 Louvers and Vents 04-23
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 04-23
09 06 00 Schedule for Finishes 04-23
09 22 16 Non-Structural Metal Framing 04-23
09 29 00 Gypsum Board 04-23
09 30 13 Ceramic/Porcelain Tiling 04-23
09 51 00 Acoustical Ceilings 04-23
09 65 13 Resilient Base and Accessories 04-23
09 65 19 Resilient Tile Flooring LVT 04-23
09 91 00 Painting 04-23
DIVISION 10 – SPECIALTIES
10 26 00 Wall and Door Protection 04-23
10 75 00 Flagpoles 04-23
DIVISION 14– CONVEYING EQUIPEMENT
14 24 00 New Hydraulic Elevator (MRL Type) 05-23
00 01 10-3
DIVISION 21- FIRE SUPPRESSION
21 13 13 Wet Pipe Sprinkler Systems 04-23
21 13 16 Dry Pipe Sprinkler Systems 03-23
DIVISION 22 – PLUMBING
22 40 00 Plumbing Fixtures 03-23
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 10 Common Work Results for Boiler Plant and Steam
Generation
03-23
23 05 11 Common Work Results for HVAC 03-23
23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment
03-23
23 05 41 Noise and Vibration Control for HVAC Piping and
Equipment
03-23
23 05 93 Testing, Adjusting, and Balancing for HVAC 03-23
23 07 11 HVAC and Boiler Plant Insulation 03-23
23 08 00 Commissioning of HVAC Systems 03-23
23 08 11 Demonstrations and Tests for Boiler Plant 03-23
23 09 23 Direct-Digital Control System for HVAC 03-23
23 11 23 Facility Natural-Gas Piping 03-23
23 21 13 Hydronic Piping 03-23 23 21 23 Hydronic Pumps 03-23 23 22 13 Steam and Condensate Heating Piping 03-23 23 25 00 HVAC Water Treatment 03-23
23 31 00 HVAC Ducts and Casings 03-23
23 34 00 HVAC Fans 03-23
23 36 00 Air Terminal Units 03-23
23 37 00 Air Outlets and Inlets 03-23
23 40 00 HVAC Air Cleaning Devices 03-23
23 51 00 Breechings, Chimneys, and Stacks 03-23 23 52 25 Low-Pressure Water Heating Boilers 03-23 23 72 00 Air-to-Air Energy Recovery Equipment 03-23
23 73 00 Indoor Central-Station Air-Handling Units 03-23
23 82 00 Convection Heating and Cooling Units 03-23
23 82 16 Air Coils 03-23
DIVISION 25 – INTEGRATED AUTOMATION
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 03-23
26 05 19 Low-Voltage Electrical Power Conductors and Cables 03-23
26 05 26 Grounding and Bonding for Electrical Systems 03-23
26 05 33 Raceway and Boxes for Electrical Systems 03-23
00 01 10-4
26 09 23 Lighting Controls 03-23
26 27 26 Wiring Devices 03-23
26 29 11 Motor Controllers 03-23
26 51 00 Interior Lighting 03-23
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 03-23
27 05 33 Raceways and Boxes for Communications Systems 03-23
27 10 00 Control, Communication and Signal Wiring 03-23
27 51 23 Intercommunications and Program Systems 03-23
27 52 23 Nurse Call and Code Blue Systems 05-23
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 31 00 Fire Detection and Alarm 05-23
DIVISION 31 – EARTHWORK
31 20 00 Earthwork 11-21
31 23 19 Dewatering 11-21
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 11-21
32 12 16 Asphalt Paving 11-21
32 17 23 Pavement Markings 11-21
32 90 00 Planting 11-21
DIVISION 34 – TRANSPORTATION
34 71 13 Passive Vehicle Barriers 11-21
Joliet, Illinois 04-21-2023
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
GENERAL DRAWINGS
GI 001 Cover Sheet
GI 002 Code Analysis, Symbols, Abbreviations, & General
Notes
GI 003 Architectural Symbols & Abbreviations
GI 004 Life Safety Plans
GC 001 General Areas of Work – Architectural Demolition
GC 002 General Areas of Work –Architectural New Work
GC 003 Proposed Project Schedule with Phasing
GC 004 Basement Level Plan-Demolition Phasing
GC 005 First Floor Level Plan-Demolition Phasing
GC 006 Roof Level Plan-Demolition Phasing
GC 007 Basement Level Plan-New Construction Phasing
GC 008 First Floor Level Plan-New Construction Phasing
GC 009 First Floor Level Plan-New Construction Phasing
GC 010 Roof Level Plan-New Construction Phasing
GC 011 Site Work Plan-New Construction Phasing GC 011
ARCHITECTURAL
AD 100 Basement Demolition Plan
AD 101 First Floor Demolition Plan
AD 102 Roof Demolition Plan
AD 103 First Floor Demolition Plan-Ambulance Bay
AD 104 Miscellaneous Demolition Basement Level
AD 105 Miscellaneous Demolition First Floor Level
AD 301 Demolition Wall Section & Details at Remnant
Structure
AE 100F Existing Foundations, Partial Plan
AD 110N Demolition Reflected Ceiling Plan-Basement North
AD 110S Demolition Reflected Ceiling Plan-Basement South
AD 111N Demolition Reflected Ceiling Plan-1st Floor North
AD 111S Demolition Reflected Ceiling Plan-1st Floor South
00 01 15 - 2
AE 100N Basement Level Plan North
AE 101N First Floor Plan North
AE 102N Roof Plan – North Portion
AE 102S Roof Plan – South Portion
AE 103 Miscellaneous New Work Basement Level
AE 104 Miscellaneous New Work First Floor Level
AC 100N Reflected Ceiling Plan-Basement North
AC 100S Reflected Ceiling Plan-Basement South
AC 101N Reflected Ceiling Plan-1st Floor North
AC 101S Reflected Ceiling Plan-1st Floor South
AC 400 Reflected Ceiling Enlarged Plans-Basement Level
AC 401 Reflected Ceiling Enlarged Plan-Fist Floor Level
AC 402 First Floor Level Reflected Ceiling Plan – AHU
Penthouse Soffit
AC 403 Enlarged Ceiling Plans and Details
AE 201 Elevations
AE 202 Elevations
AE 203 Elevations-AHU Penthouse East & West
AE 204 Elevations-AHU Penthouse North & South
AE 205 Interior Elevations
AE 206 Interior Elevations
AE 207 Interior Elevations
AE 301 Building Sections
AE 302 Building Sections
AE 303 Wall Sections
AE 304 Wall Sections
AE 305 Wall Sections
AE 306 Wall Sections & Details
AE 307 AHU Penthouse Sections
AE 308 AHU Penthouse Sections & Details at Stair S-4
AE 309 AHU Penthouse Wall Sections
AE 310 AHU Penthouse Wall Sections
AE 400 Enlarged Plan – Basement Level
AE 401 Enlarged Plan – First Floor Level
AE 402 First Floor Level Ambulance Bay Plan & Details
AE 403 AHU Penthouse Level Plan & Details
AE 404 AHU Penthouse Roof Level Plan & Details
00 01 15 - 3
AE 405 AHU Penthouse Access Stair Plans & Details
AE 406 Enlarged Plan – Ambulance Bay Roof
AE 407 North Roof Access Stair Plan & Details
AE 501 Partition Types & Details
AE 502 Details - Exterior
AE 601 Door Schedule & Details
AE 602 Window & Storefront Schedule & Details
AE 603 Window Details
AI 601 Finish Plan & Finish Schedule
CIVIL
C1.0 General Notes
C1.1 Topographical Survey
C2.0 Demolition Plan
C3.0 Site Plan
C4.0 Grading Plan
C4.1 Driveway Grading Plan & Stormwater Excavation
C5.0 Utility Plan
C5.1 Stormtrap Details
C5.2 Stormtrap Details
C5.3 Stormtrap Details
C6.0 Erosion Control/SWPPP Plan
C6.1 Erosion Control/SWPPP Details
C6.2 Erosion Control/SWPPP Notes
C6.3 Erosion Control/SWPPP Notes
C7.0 Details
C7.1 Details
C7.2 Details
C8.0 Traffic Control Details
LANDSCAPE
AS 102 Parking Lot Striping Plan
LS 101 Landscape & Planting Plan
LS 102 Landscape & Planting Details
LS 103 Landscape & Planting Details
00 01 15 - 4
MECHANICAL
M001 Mechanical Symbols And Abbreviations
MD100-N Basement Level - Mechanical Demolition Plan - North
MD100-S Basement Level - Mechanical Demolition Plan - South
MD101-N First Floor - Mechanical Demolition Plan - North
MD101-S First Floor - Mechanical Demolition Plan - South
MD102-N Roof North - Mechanical Demolition Plan
MD102-S Roof South - Mechanical Demolition Plan
MH100-N Basement Level - Mechanical Ventilation Plan - North
MH100-S Basement Level - Mechanical Ventilation Plan - South
MH101-N First Floor - Mechanical Ventilation Plan - North
MH101-S First Floor - Mechanical Ventilation Plan - South
MH102-N Roof North - Mechanical Ventilation Plan
MH102-S Roof South - Mechanical Ventilation Plan
MP100-N Basement Level - Mechanical Piping Plan - North
MP100-S Basement Level - Mechanical Piping Plan - South
MP101-N First Floor - Mechanical Piping Plan - North
MP101-S First Floor - Mechanical Piping Plan - South
MP102-N Roof North - Mechanical Piping Plan
MP102-S Roof South - Mechanical Piping Plan
M501 Mechanical Details
M502 Mechanical Details
M503 Mechanical Details
M601 Mechanical Schedules
M602 Mechanical Schedules
M604 Mechanical Schedules
M605 Mechanical Schedules
M701 Mechanical Piping and Control Diagrams
ELECTRICAL
E001 Electrical Symbols And Abbreviations
ESD101 Electrical Demolition Site Plan
ED100-N Basement Level - Electrical Demolition Plan - North
ED100-S Basement Level - Electrical Demolition Plan - South
ED101-N First Floor - Electrical Demolition Plan - North
00 01 15 - 5
ED101-S First Floor - Electrical Demolition Plan - South
ED102-N Roof North - Electrical Demolition Plan
ED102-S Roof South - Electrical Demolition Plan
EL100-N Basement Level - Electrical Lighting Plan - North
EL100-S Basement Level - Electrical Lighting Plan - South
EL101-N First Floor - Electrical Lighting Plan - North
EL101-S First Floor - Electrical Lighting Plan - South
EP100-N Basement Level - Electrical Power Plan - North
EP100-S Basement Level - Electrical Power Plan - South
EP101-N First Floor - Electrical Power Plan - North
EP101-S First Floor - Electrical Power Plan - South
EP102-N Roof North - Electrical Power Plan
EP102-S Roof South - Electrical Power Plan
ES101 Electrical Site Plan
ED101 Electrical 1st Floor Demolition Plan
E501 Electrical Details
E502 Electrical Details
E601 Electrical Schedules
E602 Electrical Schedules
E603 Electrical Controls Riser
PLUMBING & FIRE PROTECTION
P001 Plumbing Symbols, Abbreviations & Schedules
PD100-N Basement Level - Plumbing Demolition Plan - North
PD100-S Basement Level - Plumbing Demolition Plan - South
PD101-N First Floor - Plumbing Demolition Plan - North
PD101-S First Floor - Plumbing Demolition Plan - South
PD102-N Roof - Plumbing Demolition Plan - North
P100-N Basement Level - Plumbing Plan - North
P100-S Basement Level - Plumbing Plan - South
P101-N First Floor - Plumbing Plan – North
P101-S First Floor – Plumbing Plan - South
P102-N Roof - Plumbing Waste & Vent Plan-North
FP001 Fire Protection Symbols and Abbreviations
FP100-N Basement Level-Fire Protection Plan – North
FP101-N First Floor-Fire Protection Plan – North
00 01 15 - 6
FP501 Fire Protection Details
STRUCTURAL – NORTH VESTIBULE
S 001 General Notes
S 002 General Notes
S 010 Typical Details
S 011 Typical Details
S 012 Typical Details
S 100 Enlarged Structural Plans
S 102 Enlarged Structural Plans
S 103 Parking Expansion Retaining Wall Plan
S 200 Concrete Schedules and Details
S 201 Concrete Sections and Details
S 300 Steel Sections and Details
STRUCTURAL – AHU PENTHOUSE
S001 Structural General Notes
S010 Structural Schedules
SB101 Foundation Plan
SF101 AHU Platform Framing Plan
S401 Foundation Details and Sections
S501 Framing Details and Sections
S502 Framing Details and Sections
S503 Framing Details and Sections
S504 Framing Details and Sections
- - - END - - -
Joliet, Illinois 5-10-2023
01 00 00 -1
SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for:
1. Removal of the existing remnant of the former Silver Cross
Hospital (SCH) structure located immediately north of the
Joliet CBOC,
2. Redevelop the northern parcel of land for new staff parking,
3. Construct a new staff entry vestibule at the north side of the existing CBOC including new elevator and engineering space,
4. Finish the exterior walls at the north walls of the CBOC with new windows,
5. Remove the existing northeast vestibule,
6. Construct a new vestibule and office at the northeast corner, first floor,
7. Construct a new roof access stair at the existing north stair including roof level enclosure,
8. Construct a new mechanical penthouse directly over the existing ambulance bay,
9. Remove and replace existing mechanical systems including new
AHUs, new hot water boilers, new over-roof ductwork, mechanical piping, selective replacement of interior ductwork, and new VAV terminal units within the facility,
10. Replace the existing roofing system of the entire CBOC,
11. Restripe existing southern parking lots and replace site lighting.
B. All work as required by drawings and specifications.
01 00 00 -2
C. Visits to the site by Bidders may be made in accordance with what is listed in the solicitation and at the discretion of the
Contracting Officer.
D. Offices of Virtual Energy Solutions, Inc., as
Architect-Engineers, will render certain technical services during construction. Such services shall be considered advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
E. Work subject to tests by testing laboratories to be retained by
General Contractor in accordance with Section 01 45 29 TESTING
LABORATORY SERVICES.
F. Contractor work hours:
1. Normal working hours for this contract will be from 7:AM to
4:30PM (local time), Monday through Friday except for weekends and established Federal Holidays.
2. Performing on-site work outside normal working hours will require approval from the Contracting Officer and the COR.
Requests shall be submitted via email at least 72 hours prior to the requested date and at no additional to the Government.
Approvals are subject to the availability of on-site staff.
All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, GENERAL CONSTRUCTION: BASE BID : Work includes general construction, alterations, roads, walks, grading, drainage, paving, landscaping , and necessary removal of existing structures and construction and certain other items.
01 00 00 -3
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at
Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the
Contracting Officer.
C. Guards:
1. The General Contractor shall provide unarmed guards at the project site after construction hours as directed by the COR.
01 00 00 -4
2. The Contractor shall provide the guards and VA police with communication devices as directed.
3. The general Contractor shall install equipment for recording guard rounds to ensure systematic checking of the premises.
D. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
2. The General Contractor shall install all permanent cores at completion of the work. See Section 08 71 00, DOOR HARDWARE and coordinate.
E. Document Control:
1. Before starting any work, the General Contractor/Sub
Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or
“Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting
Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of
Contracting Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the
VA.
01 00 00 -5
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an
Engineering Document Management Software (EDMS).
Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
F. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted
24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2. A limited number of permits shall be issued for General
Contractor and its employees for parking in designated areas only. Contractor to coordinate with VA Medical Center Facility
Manager.
1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the
Government. The temporary buildings and utilities shall remain
01 00 00 -6 the property of the Contractor and shall be removed by the
Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the
Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the
Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
D. Working space and space available for storing materials shall be as determined by the COR.
E. Workers are subject to rules of Medical Center applicable to their conduct.
F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.
G. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
01 00 00 -7
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by
Department of Veterans Affairs in quantities sufficient for not more than two workdays. Provide unobstructed access to
Medical Center areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
H. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
All such actions shall be coordinated with the COR or Utility
Company involved:
1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
I. Phasing:
1. The Medical Center must maintain its operation. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the
CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:
2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the
Contractor intends to accomplish work in each specific area of
01 00 00 -8 site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to Medical Center Director, COR and Contractor.
J. Parts of the building will be vacated by Government in accordance with the phasing as described in the construction drawings beginning immediately after date of receipt of Notice to Proceed and turned over to Contractor.
1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical
Centers operations will not be hindered. Contractor shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access. Coordinate alteration work in areas occupied by
Department of Veterans Affairs so that Medical Center operations will continue during the construction period.
2. Immediate areas of alterations not mentioned in preceding
Subparagraph 1 will be temporarily vacated while alterations are performed.
K. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m
(seven feet) minimum height, around the construction area indicated on the drawings. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line
01 00 00 -9 posts and top and bottom rails with tie wires spaced at maximum
375mm (15 inches). Bottom of fences shall extend to 25mm (one inch) above grade. Remove the fence when directed by COR.
L. When a building and/or construction site is turned over to
Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1. Contractor shall maintain a minimum temperature of 4 degrees C
(40 degrees F) at all times, except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company
(Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.
M. Utilities Services: Maintain existing utility services for
Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR
[Chief Engineer] [Chief of Facilities Management]. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical
Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR
01 00 00 -10
ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR
COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS
FOR ELECTRONIC SAFETY AND SECURITY for additional requirements.
2. Contractor shall submit a request to interrupt any such services to COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical
Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
N. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
01 00 00 -11
O. To minimize interference of construction activities with flow of
Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.
Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
P. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF
ROADWAYS.
1.7 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply
Service, of buildings and areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by all three, to the Contracting
Officer. This report shall list by rooms and spaces:
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.
3. Shall note any discrepancies between drawings and existing conditions at site.
4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.
01 00 00 -12
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by
Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled
"DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR
52.243-4).
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by
Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workers in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this
01 00 00 -13 protection shall be maintained intact until all work in the area is completed.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are identified by attached tags as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS (FAR 52.236-9)
A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workers, the Contractor shall trim
01 00 00 -14 those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.
B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The
Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and
"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.
D. Refer to FAR clause 52.236-7, "Permits and Responsibilities," which is included in General Conditions. A National Pollutant
Discharge Elimination System (NPDES) permit is required for this project. The Contractor is considered an "operator" under the permit and has extensive responsibility for compliance with permit requirements. VA will make the permit application available at the (appropriate medical center) office. The apparent low bidder, contractor and affected subcontractors shall furnish all information and certifications that are required to comply with the permit process and permit requirements. Many of the permit requirements will be satisfied by completing construction as shown and specified. Some requirements involve the Contractor's method of operations and operations planning and the Contractor is responsible for employing best management practices. The affected activities often include, but are not limited to the following:
01 00 00 -15
1. Designating areas for equipment maintenance and repair;
2. Providing waste receptacles at convenient locations and provide regular collection of wastes;
3. Locating equipment wash down areas on site, and provide appropriate control of wash-waters;
4. Providing protected storage areas for chemicals, paints, solvents, fertilizers, and other potentially toxic materials;
and
5. Providing adequately maintained sanitary facilities.
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged.
Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems
(including telephone) which are not scheduled for discontinuance or abandonment.
01 00 00 -16
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243-4) and "DIFFERING SITE CONDITIONS"
(FAR 52.236-2).
1.11 PHYSICAL DATA – SOIL CONDITIONS
A. Data and information furnished is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
B. Subsurface conditions have been developed by core borings and test pits.
C. A copy of the soil report will be made available for inspection by bidders upon request to the Engineering Officer at the VA
Medical Center and shall be considered part of the contract documents.
D. Government does not guarantee that other materials will not be encountered nor that proportions, conditions or character of several materials will not vary from those indicated by explorations. Bidders are expected to examine site of work and logs of borings; and, after investigation, decide for themselves character of materials and make their bids accordingly. Upon proper application to Department of Veterans Affairs, bidders will be permitted to make subsurface explorations of their own at site.
1.12 PROFESSIONAL SURVEYING SERVICES
A. A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the
Contractor shall perform services specified herein and in other specification sections. The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract.
01 00 00 -17
1.13 LAYOUT OF WORK
A. The Contractor shall lay out the work from Government established base lines and bench marks, indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The Contractor shall furnish, at Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work.
The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the
Contracting Officer. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the Contracting Officer until authorized to remove them. If such marks are destroyed by the Contractor or through
Contractor's negligence before their removal is authorized, the
Contracting Officer may replace them and deduct the expense of the replacement from any amounts due or to become due to the
Contractor.
(FAR 52.236-17)
B. Establish and plainly mark center lines for each building and corner of column lines and/or addition to each existing building, and such other lines and grades that are reasonably necessary to properly assure that location, orientation, and elevations established for each such structure and/or addition, roads, parking lots, are in accordance with lines and elevations shown on contract drawings.
C. Following completion of general mass excavation and before any other permanent work is performed, establish and plainly mark
(through use of appropriate batter boards or other means) sufficient additional survey control points or system of points as may be necessary to assure proper alignment, orientation, and grade of all major features of work. Survey shall include, but not be limited to, location of lines and grades of footings, exterior walls, center lines of columns in both directions, major utilities and elevations of floor slabs:
01 00 00 -18
1. Such additional survey control points or system of points thus established shall be checked and certified by a registered land surveyor or registered civil engineer. Furnish such certification to the COR before any work (such as footings, floor slabs, columns, walls, utilities and other major controlling features) is placed.
D. During progress of work, and particularly as work progresses from floor to floor, Contractor shall have line grades and plumbness of all major form work checked and certified by a registered land surveyor or registered civil engineer as meeting requirements of contract drawings. Furnish such certification to the COR before any major items of concrete work are placed. In addition, Contractor shall furnish to the COR certificates from a registered land surveyor or registered civil engineer that the following work is complete in every respect as required by contract drawings.
1. Lines of each building and/or addition.
2. Elevations of bottoms of footings and tops of floors of each building and/or addition.
3. Lines and elevations of sewers and of all outside distribution systems.
4. Lines of elevations of all swales and interment areas.
5. Lines and elevations of roads, streets and parking lots.
E. Whenever changes from contract drawings are made in line or grading requiring certificates, record such changes on a reproducible drawing bearing the registered land surveyor or registered civil engineer seal, and forward these drawings upon completion of work to COR.
F. Upon completion of the work, the Contractor shall furnish the COR one electronic copy and reproducible drawings at the scale of the contract drawings, showing the finished grade on the grid developed for constructing the work. These drawings shall bear the seal of the registered land surveyor or registered civil engineer.
01 00 00 -19
G. The Contractor shall perform the surveying and layout work of this and other articles and specifications in accordance with the provisions of Article "Professional Surveying Services".
1.14 AS-BUILT DRAWINGS
A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR review, as often as requested.
C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.
D. Paragraphs A, B, & C shall also apply to all shop drawings.
1.15 WARRANTY MANAGEMENT
A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of
Construction in at least 30 days before the planned pre-warranty conference, submit four sets of the warranty management plan.
Include within the warranty management plan all required actions and documents to assure that the Government receives all warranties to which it is entitled. The plan must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesman, or of engineering background, not necessarily familiar with this contract. The term “status” as indicated below must include due date and whether item has been submitted or was approved.
Warranty information made available during the construction phase must be submitted to the Contracting Officer for approval prior to each monthly invoice for payment. Assemble approved information in a binder and turn over to the Government upon
01 00 00 -20 acceptance of the work. The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period. A joint 4 month and 9 month warranty inspection will be conducted, measured from time of acceptance, by the Contactor and the Contracting Officer. Include in the warranty management plan, but not limited to, the following:
1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers within the company of the Contractor, subcontractors, manufacturers or suppliers involved.
2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.
3. Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers and for all commissioned systems such as fire protection and alarm systems, sprinkler systems and lightning protection systems, etc.
4. A list for each warranted equipment item, feature of construction or system indicating:
a. Name of item.
b. Model and serial numbers.
c. Location where installed.
d. Name and phone numbers of manufacturers and suppliers.
e. Name and phone numbers of manufacturers or suppliers.
f. Names, addresses and phone numbers of sources of spare parts.
g. Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties must be indicated with separate warranty expiration dates.
h.…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .