Attachment 7 - M601 - MECHANICAL SCHEDULES.pdf

PDF 186 KB Posted

Attached to
Cancelled: Y1LZ--578-371 Construction - Parking Expansion at Joliet CBOC
Solicitation number
36C77623B0049
Issued by

About this file

This document contains mechanical schedules and specifications for an air handling unit project for the parking expansion at the Joliet Community Based Outpatient Clinic. Key details include specifications for two air handling units to serve the mechanical penthouse, with supply and return fans, cooling and heating coils, filters, and energy recovery sections. Also specified are hot water boilers, cabinet unit heaters, unit heaters, exhaust fans, finned tube radiation, a glycol makeup unit, pumps, expansion tanks, air separators, and humidifiers to provide HVAC services. The document provides equipment tags, locations, capacities, dimensions, connections sizes, electrical characteristics, manufacturers, and performance details. It is intended to procure HVAC equipment and components for the parking expansion project at the Joliet CBOC through the Department of Veterans Affairs Technology Acquisition Center Austin solicitation number 36C77623B0049.

View the file

Other files

File Type Posted
HCA Signed PCAC S30 - Cancellation of Bids - IFB - J.pdf PDF
S30 - Attachment - Abstract of Bids - Joliet.pdf PDF
Attachment 8 - Joliet Roof Report.pdf PDF
Attachment 6 - Joliet CBOC Elect. Add. 2 230726.pdf PDF
Attachment 2 - 09 06 00 Schedule for Finishes.pdf PDF
36C77623B0049 0005 - Joliet CBOC - RFIs-Wage Rates-Bid Opening.pdf PDF
Attachment 3 - AHU Heat Pipe Design Basis.pdf PDF
Attachment 4 - Joliet CBOC Arch RCPs Add. 2 230726.pdf PDF
Attachment 5 - Joliet CBOC Ceiling Diagrams 230726.pdf PDF
Attachment 1 - Technical Questions - Part 2.pdf PDF
Attachment 9 - Updated Wage Rates - Will County.pdf PDF
Attachment 1 - Technical Questions - Part 1.pdf PDF
Attachment 4 - Joliet Arch RCP.pdf PDF
36C77623B0049 0004 - Joliet CBOC - Extension and RFIs.pdf PDF
Attachment 5 - Joliet CBOC Laydown Areas.pdf PDF
Attachment 3 - Joliet CBOC Geotech Proposed Parking.pdf PDF
Attachment 2 - Infection Control Risk Assessment.pdf PDF
36C77623B0049 0003 - Joliet CBOC - Second Site Visit Sign-In.pdf PDF
Pre-Bid Site Visit 2 Sign-in 578-371.pdf PDF
36C77623B0049 0002 - Second Site Visit and RFI Extension.pdf PDF
36C77623B0049 0001 - Joliet CBOC - Site Visit Sign In.pdf PDF
Pre-Bid Site Sign-in 578-371.pdf PDF
S02 - ATCH 30 - Joliet_CBOC_Issued_for_Bid_A1_Struct_Part_8.pdf PDF
S02 - ATCH 32 - Contractor Safety - Environmental Form.pdf PDF
S02 - ATCH 8 - 7) Above Ceiling Entry and Wall Const Permits.pdf PDF
S02 - ATCH 14 - 13) 578-371 Phasing Plan.pdf PDF
S02 - ATCH 33 - Wage Rates - Will County 5.12.2.pdf PDF
S02 - ATCH 27 - Joliet_CBOC_Issued_for_Bid_A1_Arch_Part_5.pdf PDF
S02 - ATCH 16 - 15) No Smoking Policy 10-1-19.pdf PDF
S02 - ATCH 23 - Joliet_CBOC_Issued_for_Bid_A1_Arch_Part_1.pdf PDF
S02 - ATCH 4 - 3) Pre-Con Checklist Rev 07.27.21.pdf PDF
S02 - ATCH 15 - 14) 578-371 Specifications Book.pdf PDF
S02 - ATCH 2 - 1) Joliet CBOC Aerial Site Plan.pdf PDF
S02 - ATCH 34 - Site Visit Instructions.pdf PDF
S02 - ATCH 7 - 6) Dig Permit SOP Form.pdf PDF
S02 - ATCH 26 - Joliet_CBOC_Issued_for_Bid_A1_Arch_Part_4.pdf PDF
S02 - ATCH 25 - Joliet_CBOC_Issued_for_Bid_A1_Arch_Part_3.pdf PDF
S02 - ATCH 31 - Limitations on Subcontracting - Construction.pdf PDF
S02 - ATCH 11 - 10) Interim Life Safety Measures (ILSM).pdf PDF
S02 - ATCH 24 - Joliet_CBOC_Issued_for_Bid_A1_Arch_Part_2.pdf PDF
S02 - ATCH 17 - 16) Infection Control Barrier Sample.pdf PDF
S02 - ATCH 1 - 578-371 Construction SOW Final.pdf PDF
S02 - ATCH 6 - 5) Cutting Welding and Other Hot Work.pdf PDF
S02 - ATCH 13 - 12) OIT Horizontal Cable Requirements.pdf PDF
S02 - ATCH 18 - 17) Hines COVID-19 Guidelines.pdf PDF
S02 - ATCH 12 -11) Contractor PIV Instructions and Form.pdf PDF
S02 - ATCH 9 - 8) Pre-Construction Risk Assessment.pdf PDF
S02 - ATCH 21 - Joliet_CBOC_Project_Manual_Issued_for_Bid.pdf PDF
S02 - ATCH 29 - Joliet_CBOC_Issued_for_Bid_A1_MEP_Part_7.pdf PDF
S02 - ATCH 10 - 9) Infection Control Risk Assessment.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AIR HANDLING UNIT HEATING PIPE SCHEDULE

# OF # OF HEATING SECTION

TAG TUBES FINS # OF CAPACITY (MBH) VELOCITY (FPM) FLOW RATE (ACFM) DBT (°F) WBT (°F) RH (%) SPEC. HUM. (GR/LB)

IN FACE PER INCH ROWS TOTAL SENSIBLE SUPPLY EXHAUST OA SA RA EA OA SA RA EA OA SA RA EA OA SA RA EA OA SA RA EA

AHU-1 50 11 5 342.5 342.5 459 459 10500 10500 10500 10500 -10.0 16.4 70.0 38.9 -11.0 10.6 53.0 38.1 58.2 13.8 30.7 93.1 2.40 1.94 34.06 33.18

AHU-2 50 11 5 342.5 342.5 459 459 10500 10500 10500 10500 -10.0 16.4 70.0 38.9 -11.0 10.6 53.0 38.1 58.2 13.8 30.7 93.1 2.40 1.94 34.06 33.18

AIR HANDLING UNIT COOLING PIPE SCHEDULE

# OF # OF COOLING SECTION

TAG TUBES FINS # OF CAPACITY (MBH) VELOCITY (FPM) FLOW RATE (ACFM) DBT (°F) WBT (°F) RH (%) SPEC. HUM. (GR/LB)

IN FACE PER INCH ROWS TOTAL SENSIBLE SUPPLY EXHAUST OA SA RA EA OA SA RA EA OA SA RA EA OA SA RA EA OA SA RA EA

AHU-1 50 11 5 105.2 105.2 459 459 10500 10500 10500 10500 95.0 85.0 70.0 79.5 75.0 72.3 53.0 56.8 40.1 54.9 30.7 22.3 101.53 101.64 34.06 34.04

AHU-2 50 11 5 105.2 105.2 459 459 10500 10500 10500 10500 95.0 85.0 70.0 79.5 75.0 72.3 53.0 56.8 40.1 54.9 30.7 22.3 101.53 101.64 34.06 34.04

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Joliet Community Based Outpatient Clinic 1201 Eagle Street Joliet, Illinois 60432

Drawing No.

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA JOLIET CBOC

JOLIET, ILLINOIS

578-371 36C25219D0020

© 2020 Virtual Energy Solutions, INC.

B

IM

/2

-M

A T

O C

-P a rk in g E x p a n s io n a t J o lie t C

B O

C

-3

/2

-J o lie t C

B O

C P a rk in g

E x p a n s io n M

E C

H

.r v t

/2

/2

:5

:2

P M

M601

MECHANICAL SCHEDULES

PARKING EXPANSION AT

JOLIET CBOC

07/21/2023

EPTHEP

HOT WATER CONDENSING BOILER SCHEDULE

TAG LOCATION NATURAL GAS HEATING DATA ELECTRICAL DATA DIMENSIONS

UNIT WEIGHT

(LBS)

BASIS OF DESIGN

REMARKS

TYPE MARK

ROOM

NUMBER

ROOM NAME

GAS

INPUT

(BTU/HR)

HEATING

OUTPUT

(BTU/HR)

WATER FLOW

(GPM)

WATER TEMPS

FLA MOCP V PH HZ L W H MANUFACTURER MODEL

EWT (DEG. F) LWT (DEG. F)

B 1 -- Boiler Plant 3,000,000 2,760,000 138 120 160 6 20 208 3 60 120" 35" 87" 7100 FULTON VTG-3000

B 2 -- Boiler Plant 3,000,000 2,760,000 138 120 160 6 20 208 3 60 120" 35" 87" 7100 FULTON VTG-3000

B 3 -- Boiler Plant 3,000,000 2,760,000 138 120 160 6 20 208 3 60 120" 35" 87" 7100 FULTON VTG-3000

CABINET UNIT HEATER SCHEDULE (HYDRONIC)

TAG LOCATION

CAPACITY (BTU/HR)

FLUID

FLOWRATE

(GPM)

EWT

(DEG. F.)

LWT

(DEG. F.)

LEAVING

AIR TEMP

(DEG. F. )

FAN MOTOR DATA ELECTRICAL DATA DIMENSIONS

UNIT WEIGHT

(LBS)

BASIS OF DESIGN

REMARKS

TYPE MARK

ROOM

NUMBER

ROOM NAME

AIRFLOW

(CFM)

QTY FLA V PH HZ L W H MANUFACTURER MODEL

CUH 001 001

New North Vestibule

106,000 5.30

160 120 105 1410 3 3 120 1 60 85" 25" 10" 243 TRANE FF

CUH 104 104 Vestibule 48,100 3.00 160 120 105 790 2 3 120 1 60 61" 10" 25" 166 TRANE FF

CUH 1001 1001

Wheelchair

Storage 106,000

5.30

160 120 105 1410 3 3 120 1 60 85" 10" 25" 221 TRANE FF

CUH 1072 1072 Corridor 70,900 4.50 160 120 105 1105 3 3 120 1 60 73" 10" 25" 196 TRANE FF

CUH S-1 S-1 Stair #1 62,090 4.14 160 120 105 1015 3 3 120 1 60 66" 10" 25" 176 TRANE FF

UNIT HEATER SCHEDULE (HYDRONIC)

TAG LOCATION COIL DATA FAN MOTOR DATA ELECTRICAL DATA DIMENSIONS

UNIT WEIGHT

(LBS)

BASIS OF DESIGN

REMARKS

TYPE MARK

ROOM

NUMBER

ROOM NAME

CAPACITY

(BTU/HR)

EWT

(DEG. F.)

LWT

(DEG. F.)

LEAVING

AIR TEMP

(DEG. F. )

AIRFLOW

(CFM)

QTY FLA V PH HZ L W H MANUFACTURER MODEL

UH B018A B018 Mech. 36,000 160 120 95 850 1 1.2 120 1 60 21" 5" 19" 24 TRANE UHS

UH B018B B018 Mech. 36,000 160 120 95 850 1 1.2 120 1 60 21" 5" 19" 24 TRANE UHS

UH B019 B019 Elec. 24,000 160 120 95 580 1 0.8 120 1 60 18" 5" 16" 22 TRANE UHS

UH B020 B020 Gen Room 24,000 160 120 95 580 1 0.8 120 1 60 18" 5" 16" 22 TRANE UHS

HUMIDIFIER SCHEDULE- GAS FIRED

TYPE MARK SERVICE

NATURAL GAS BURNER DATA STEAM

DISCHARGE

(LB/HR)

WATER FLOW

(GPM)

ELECTRICAL DATA DIMENSIONS

UNIT WEIGHT

(LBS)

BASIS OF DESIGN

REMARKS

INPUT

(BTU/HR)

BURNER

QTY. TURNDOWN

N.G. PRESSURE

(INCH W.C.) FLA VOLTS PHASE HZ L W H MANUFACTURER MODEL

H 1 AHU-2 360,000 1 10:1 14 300 1 9 120 1 60 56" 22" 47" 916.00 DRI STEEM LX-300

H 2 AHU-1 360,000 1 10:1 14 300 1 9 120 1 60 56" 22" 47" 916.00 DRI STEEM LX-300

PUMP SCHEDULE - END SUCTION

TAG LOCATION

SYSTEM NAME

PUMP DATA ELECTRICAL DATA DIMENSIONS

WEIGHT

(LBS)

BASIS OF DESIGN

REMARKS

TYPE MARK

ROOM

NUMBER

ROOM NAME

DESIGN

FLOWRATE

(GPM)

DISCHARGE

PRESSURE (FT)

IMPELLER

SIZE

RPM NPSHr

(FT)

BHP HP VOLTS PHASE HZ L W H MANUFACTURER MODEL

P CHW-1 200

AHU

PENTHOUSE

PRIMARY CHILLED WATER 300 30 9 3/4" 1800

4.39

3.07 5.0 480 3 60 52" 19" 26" 637 BELL & GOSSETT e-1510 PROVIDE WITH VIBRATION ISOLATION INERTIA BASE

P CHW-2 200

AHU

PENTHOUSE

PRIMARY CHILLED WATER 300 30 9 3/4" 1800

4.39

3.07 5.0 480 3 60 52" 19" 26" 637 BELL & GOSSETT e-1510 PROVIDE WITH VIBRATION ISOLATION INERTIA BASE

P HW-1 -- Boiler Plant HEATING HOT WATER 200 75 9 1/2" 1800 5.96 5.06 7.5 208 3 60 35" 14" 18" 342 BELL & GOSSETT e-1510

P HW-2 -- Boiler Plant HEATING HOT WATER 200 75 9 1/2" 1800 5.96 5.06 7.5 208 3 60 35" 14" 18" 342 BELL & GOSSETT e-1510

P HW-3 -- Boiler Plant HEATING HOT WATER 200 75 9 1/2" 1800 5.96 5.06 7.5 208 3 60 35" 14" 18" 342 BELL & GOSSETT e-1510

EXPANSION TANK SCHEDULE

TAG LOCATION

SYSTEM NAME INLET SIZE

TANK

VOLUME

(GAL)

ACCEPTANCE

VOLUME

(GAL)

CHARGE

PRESSURE

(PSI)

MAX

WORKING

PRESSURE

(PSI)

DIMENSIONS

FLOODED

WEIGHT (LBS)

BASIS OF DESIGN

REMARKS

TYPE MARK

ROOM

NUMBER

ROOM NAME DIA. H MANUFACTURER MODEL

ET 1 -- Boiler Plant HEATING HOT WATER 1" 34.4 34.4 15 125 20" 37" 408 BELL & GOSSETT B130 BLADDER TYPE, FLOOR MOUNTED

ET 2 200

AHU

PENTHOUSE

1" 23.0 0.0 0 125 20" 29" 0 Taco CA90-125

AIR SEPARATOR SCHEDULE

TAG LOCATION

SYSTEM NAME

CONNECTION

SIZES

MAX

WORKING

PRESSURE

(PSI)

DIMENSIONS

FLOODED

WEIGHT

(LBS)

BASIS OF DESIGN

REMARKS

TYPE MARK

ROOM

NUMBER

ROOM NAME DIA. H MANUFACTURER MODEL

AS 1 -- Boiler Plant HEATING HOT WATER 6" 150 18" 40" 564 BELL & GOSSETT RL-6F

AS 2 6" 150 18" 40" 564 BELL & GOSSETT RL-6F

AIR HANDLING UNIT SCHEDULE

TAG

LOCATION TYPE

SUPPLY FAN DATA COOLING SECTION HEATING SECTION

FILTER

UNIT ELECTRICAL DATA

UNIT

WEIGHT

(LBS)

BASIS OF DESIGN

REMARKS

TYPE MARK

AIRFLOW (CFM)

EXTERNAL

STATIC

PRESSURE

(IN. W.C.) FAN RPM FAN QTY. HP (EA) TYPE

COIL CAPACITY

FLUID

FLOW

(GPM)

FACE

VELOCITY

WPD

(FT)

EAT

(DEG.F.)

LAT

(DEG.F.)

EWT

(DEG. F)

LWT

(DEG. F)

COIL

CAPACITY

(BTU/HR)

FLUID

FLOW

(GPM)

FLUID

PRESSU

RE

DROP

(FT.)

EAT

(DEG. F)

LAT (DEG.

F)

EWT

(DEG. F)

LWT

(DEG. F) FLA MCA MOCP V PH HZ

MANUFACTURER MODEL

SUPPLY MIN. OA

TOTAL

(BTU/HR)

SENSIBLE

(BTU/HR)

AHU 1 MECHANICAL PENTHOUSE VAV 35,000 10,500 3.50 3470 9 9.5 PLENUM 2,058,900 1,194,100 364 450 12.22 87 52 44 56 2,853,000 199 5.76 -2 65 160 120 MERV 8 PREFILTER/ MERV 13 INTERMEDIATE, MERV 17 FINAL FILTER 129 134 0 480 3 60 36,652 TEMTROL CUSTOM

AHU 2 MECHANICAL PENTHOUSE VAV 35,000 10,500 3.50 3470 9 9.5 PLENUM 2,058,900 1,194,100 364 450 12.22 87 52 44 56 2,853,000 199 5.76 -2 65 160 120 MERV 8 PREFILTER/ MERV 13 INTERMEDIATE, MERV 17 FINAL FILTER 129 134 0 480 3 60 36,652 TEMTROL CUSTOM

UNIT HEATER SCHEDULE (ELEC)

TAG LOCATION HTG. ELEMENT DATA FAN MOTOR DATA UNIT ELECTRICAL DATA DIMENSIONS (IN) UNIT

WEIGHT

(LBS)

BASIS OF DESIGN

REMARKS

TYPE MARK

ROOM

NUMBER

ROOM NAME

CAPACITY

(KW)

L.A.T.

(DEG. F)

FAN AIRFLOW

(CFM)

QTY FLA V PH HZ L W H MANUFACTURER MODEL

UH B003 B003 Elev. Equip. 3 105 350 1 15 480 3 60 21 5 19 24 MARLEY MUH0381 REMOTE THERMOSTAT

UH 003A 003A Mach. Room 3 105 350 1 15 480 3 60 21 5 19 24 MARLEY MUH0381 REMOTE THERMOSTAT

AHU RETURN/RELIEF FAN SECTION UNIT SCHEDULE

TAG

LOCATION

DISCHARGE

DIRECTION

RETURN FAN DATA UNIT ELECTRICAL DATA

UNIT

WEIGHT

(LBS)

BASIS OF DESIGN

REMARKS

TYPE MARK

RETURN

AIRFLOW

(CFM)

EXTERNAL

STATIC

PRESSURE

(IN. WC) FAN RPM FAN QTY. HP (EA) TYPE

FLA MCA MOCP V PH HZ MANUFACTURER MODEL

RF 1 ROOF HORIZONTAL 35,000 2.00 3490 6 11.5 PLENUM 87 90 100 480 3 60 7,078 TEMTROL CUSTOM

RF 2 ROOF HORIZONTAL 35,000 2.00 3490 6 11.5 PLENUM 87 90 100 480 3 60 7,078 TEMTROL CUSTOM

EXHAUST FAN SCHEDULE

TAG LOCATION FAN DATA MOTOR DATA DIMENSIONS

UNIT WEIGHT

(LBS)

BASIS OF DESIGN

REMARKSTYPE MARK

ROOM

NUMBER ROOM NAME CFM

E.S.P. (INCHES

W.C.) FAN TYPE RPM DRIVE BHP HP V PH HZ L W H MANUFACTURER MODEL

EF 1 C1-36 Ambulance Bay 2520 0.50 INLINE 1725 DIRECT 0.67 1.00 480 3 60 26" 24" 26" 100.00 GREENHECK SQ-140-VG

FINNED TUBE RADIATION SCHEDULE

TAG HYDRONIC DATA

FLUID FLOW

(GPM)

PRESSURE

DROP (FT. )

DIMENSIONS BASIS OF DESIGN

REMARKS

TYPE MARK

CAPACITY

(BTU/HR/LF)

EWT (DEG. F.) LWT (DEG. F.) L W H MANUFACTURER MODEL

FT S-2 990 160 120 0.50 2.00 72" 5.5" 20" STERLING LT SERIES

PROVIDE WITH SLOPED TOP ENCLOSURE TO

MATCH DEMOLISHED UNIT

REMARKS:

1. REFER TO SPECIFICATIONS FOR SPECIFIC REQUIREMENTS FOR AIR HANDLING UNITS AND COMPONENTS. REMARKS MADE HERE ARE NOT INCLUSIVE OF ALL REQUIREMENTS FOR PROCURING THESE UNITS, AND ARE SIMPLY TO HIGHLIGHT MAJOR ITEMS OF CONCERN TO CLARIFY DESIGN INTENT.

2. BOTH CHILLED WATER AND HEATING WATER SYSTEM UTILIZE 30% PROPYLENE GLYCOL AS THE FLUID. COILS SHALL BE SELECTED ACCORDINGLY.

3. UNIT SHALL BE PROVIDED WITH INDIVIDUAL VFD PER FAN - WITH ALL COMPONENTS HOUSED IN AN ELECTRICAL PANEL ATTACHED TO THE UNIT AND COORDINATED FOR ACCESS AND CLEARANCE WITH

ALL OTHER ELEMENTS.

4. UNIT SHALL BE PROVIDED WITH HEAT PIPE TYPE ENERGY RECOVERY SECTION.

5. UNIT SHALL BE PROVIDED WITH UV LIGHTS AT DOWNSTREAM SIDE OF COOLING COIL.

6. UNIT SHALL BE PROVIDED WITH 725 LB/HR HUMIDIFIER DISTRIBUTION MANIFOLD FACTORY INSTALLED AND PIPED TO EXTERIOR OF UNIT. STEAM GENERATING HUMIDIFIER SHALL BE SEPARATELY

PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR AS SHOWN IN DRAWINGS.

7. SINGLE POINT OF 120V/1PH POWER SHALL BE PROVIDED WITH UNIT AS A JUNCTION BOX WHICH IS FACTORY WIRED TO ALL LIGHTS, SWITCHES, RECEPTACLES, AND OTHER 120V LOADS.

8. SINGLE POINT OF 480V/3PH POWER FOR ALL FANS SHALL BE PROVIDED AS PART OF THE UNIT DESIGN.

9. IN GENERAL ALL DAMPERS WILL BE PROVIDED BY AHU MANUFACTURER, WITHOUT DAMPER ACTUATORS. THE TEMPERATURE CONTROLS CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING DAMPER ACTUATORS IN THE FIELD TO MATCH THE REQUIREMENTS OF THE MANUFACTURER-PROVIDED DAMPERS. MECHANICAL CONTRACTOR AND TEMPERATURE CONTROLS CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THIS ITEM IN SUBMITTALS AND FOR INSTALLATION.

GLYCOL MAKEUP UNIT SCHEDULE

TAG LOCATION

SYSTEM NAME

PUMP DATA ELECTRICAL DATA DIMENSIONS

WEIGHT

(LBS)

BASIS OF DESIGN

REMARKS

TYPE MARK

ROOM

NUMBER

ROOM NAME

TANK CAPACITY

(GAL.)

MAXIMUM

WORKING

PRESSURE

(PSI)

HP VOLTS PHASE HZ L W H MANUFACTURER MODEL

GMU 1 -- Boiler Plant HEATING HOT WATER 53 150 0.3 120 1 60 24" 24" 51" 145 ARMSTRONG GLA-U-HP-2

Revisions Date

ISSUED FOR 60% DD 12/30/2022

ISSUED FOR 90% CD 02/10/2023

ISSUED FOR 100% CD 03/07/2023

ISSUED FOR BID 03/24/2023

ISSUED FOR BID ADDENDUM 2 07/21/2023

200732-Joliet CBOC Parking Expansion MECH 2020
M601 - MECHANICAL SCHEDULES

File details come from the government source that posted it. Updated .