This is an evaluation criteria addendum to FAR 52.212-2 that outlines how the Department of Veterans Affairs will evaluate quotes for preventative maintenance inspection services for Steris sterilizing equipment. The evaluation will use a comparative process considering three factors: Price, Past Performance, and Technical Proposal.
The evaluation approach specifies that price will be evaluated by summing all line item prices including options, past performance will assess risks based on the contracting officer's knowledge, customer surveys, CPARS records, and other reasonable bases. The technical proposal must demonstrate the offeror's qualifications and capabilities without including pricing information. The government reserves the right to select quotes that exceed minimum requirements if they provide additional benefits, though this is not required. The evaluation will compare quotes to determine which provides the best overall value to the government, with the award going to the responsible quoter whose conforming quote is most advantageous considering all factors.
View the file
Other versions and copies of FAR 52.212-2
Show all 20
Who attaches FAR 52.212-2
Other files
| File | Type | Posted |
|---|---|---|
| S02 36C26225Q0341 0001 Solicitation Q and A.docx | DOCX document | |
| S02 FAR 52.212-1 ADDENDUM.docx | DOCX document | |
| S02 Statement of Work Steris PMI.docx | DOCX document | |
| 36C26225Q0341.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM TO 52.212-2 EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
(a) Basis for Award. The Government will issue a purchase order to the responsible quoter whose quotation conforming to the solicitation will be most advantageous to the Government, price and other factors considered.
(b) The following factors shall be used to evaluate quotations:
(1) Price
(2) Past Performance
(3) Technical Proposal
(c) Evaluation Approach. The Government will evaluate quotations using the comparative evaluation process outlined in FAR 13.106-2 (b) (3), where quotations will be compared to one another to determine which provides the best benefit to the Government. The Government reserves the right to consider a quotation other than the lowest price that provides additional benefit(s). Quotations may exceed minimum requirements of the solicitation. The Government reserves the right to select a quotation that provides benefit to the Government that exceeds the minimum requirements of the solicitation but is not required to do so. Each response must meet the minimum requirements of the solicitation. The Government is not requesting or accepting alternate quotations. The evaluation will consider the following:
(1) Past Performance: The past performance evaluation will assess the relative risks associated with a quoter’s likelihood of success in fulfilling the solicitation’s requirements as indicated by the quoter’s record of past performance. The past performance evaluation may be based on the contracting officer’s knowledge of and previous experience with the supply or service being acquired; Customer surveys, and past performance questionnaire replies; Contractor Performance Assessment Reporting System (CPARS) at http://www.cpars.gov/; or any other reasonable basis.
(2) Price: The Government will evaluate the price by adding the total of all line-item prices, including all options The Total Evaluated Price will be that sum.
(d) Options. The Government will evaluate quotations for award purposes by adding the total price for all options to the total price for the basic requirement.
(3) Technical Proposal: The technical proposal will primarily determine the qualifications and capability of the offeror to participate in this contract. It should be specific and complete in every detail. The proposal should be concise and provide sufficient information to demonstrate the offeror’s capacity to satisfactorily perform the task outlined in the solicitation. No price information shall be included in the technical proposal.
(End of Provision)
File details come from the government source that posted it. Updated .