S02 518-18-035_Construction Drawings Final R1 02042020 with deduct alternates-part 3 of 4.pdf
PDF 12 MB Posted
- Solicitation number
- 36C24120R0144
About this file
This document provides details for a federal solicitation requesting proposals for construction services. The solicitation seeks proposals to renovate the correct outpatient mental health clinic at the Edith Nourse Rogers Memorial Veterans Hospital in Bedford, Massachusetts, including correcting mental health deficiencies on the second floor and renovating the outpatient mental health clinic in Building 6. Proposals are due by September 4, 2020 at 12:00 PM. The estimated value of the construction is between $10 million and $20 million. This opportunity is set aside 100% for service-disabled veteran-owned small businesses. To be eligible for award, offerors must be verified as SDVOSBs by the Center for Veterans Enterprise and VetBiz at the time of proposal submission and award. A mandatory site visit will take place on July 29, 2020 at 9:00 AM. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1.
View the file
Other files
Show 40 more
Latest 50 of 60 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1/
1/
1/
1 1/2
1/
2 1/2 2
2 1/2 3
1/
1/
1 1/4 2 1/
1/
1 1/4
1/
2 1/2
1/
1/
1/
1 1/4 2
2 1/2
1 1/4 1 1/2
1/
1/
1/
MECH
TMS
ELEV.
IT
TMS
IT
STAIR
ELEV.
ROOM
MACHINE
STAIR
STAIR
STAIR
TOOL ROOM
CORRIDOR
STORAGE
BREAKROOM
SHOP
CARPENTER
STAIR 014
STAIR
RESTROOM
STAFF
RESTROOM
OFFICE
STORAGE
ELEC.
LOBBY
UNION OFFICE
ROOM
ELECTRICAL
MAIN
ROOM
MECHANICAL
ROOM
LOCKER
RESTROOM
STAFF
MCHIM
MCHIM
SHOP
ELEVATOR
MECHANICAL
RM.
ELEC. BREAK
ELEC. OFFICE
ELE./STORAGE
SHOP
MAINTENANCE
AREA
ELEC./STORAGE
VESTIBULE
CORRIDOR
CORRIDOR
CORRIDOR
SERVICE
TYPE DESCRIPTION
EXISTING FIRE SPRINKLER 1/2" QR PENDENT
EXISTING SPRINKLER 1/2" RECESSED PENDENT
EXISTING SPRINKLER 1/2" UPRIGHT
EXISTING SPRINKLER 1/2" QR SIDEWALL
AREA NOT IN ARCHITECTURAL OR FIRE PROTECTION SCOPE
NEW FIRE SPRINKLER 1/2" QR PENDENT
1. SIDEWALL FIRE SPRINKLER REQUIRED IN BOTTOM OF HOISTWAY FOR
HYDRAULIC ELEVATOR. SHUNT TRIP NOT REQUIRED WITH SPRINKLER
BELOW ELEVATOR CAB PER NFPA 72.
Department of Veterans Affairs
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Office of Construction and Facilities Management
CONSULTANTS:
Approved: Project Director
TJW CMG
BUILDING SIX
SEAL:ARCHITECT/ENGINEER:
STRUCTURAL ENGINEER
BOB D. CAMPBELL
4338 BELLEVIEW AVENUE
KANSAS CITY, MO 64111
(816) 531-4144
MEP ENGINEER
WATSON ENGINEERING
1112 STATE ROUTE 434
OWEGO, NY 13827
(607) 223-4334
35% DESIGN SUBMISSION 11/21/2018
60% DESIGN SUBMISSION 1/25/2019
100% SUBMITTAL
90% DESIGN SUBMISSION 8/30/2019
FIRE PROTECTION ENGINEER
CMG FIRE PROTECTION
10727 W 128 STREET
OVERLAND PARK, KS 66213
(913)239-8900
90% DESIGN RESUBMISSION10/23/2019
FX101
FIRE SPRINKLER FLOOR PLAN
- LOWER LEVEL NEW WORK
BEDFORD VAMC
MENTAL HEALTH
BEDFORD, MA
518-18-035
2019.12.11
1 fire sprinkler plan - lower level fire protection legend fire protection plan notes new fire protection general notes fire protection plan notes
AutoCAD SHX Text 1/8" = 1'-0"
AutoCAD SHX Text GENERAL: COORDINATE WITH WORK SHOWN ON STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS. ALL DEMOLISHED MATERIALS TO BE PROPERLY DISPOSED OF BY CONTRACTOR. RELOCATE SPRINKLERS AS NECESSARY FOR NEW CONSTRUCTION WORK. PROPOSED LOCATIONS FOR FIRE SPRINKLERS ARE SHOWN WITH THE NEW WALL LAYOUTS. EXISTING LOCATIONS CAN BE REUSED AFTER FIELD SURVEY AND IN CONFORMANCE WITH THE REQUIREMENTS OF NFPA 13 FOR SPACING. CONNECT NEW SPRINKLERS TO EXISTING PIPING WHERE LOCATIONS OF EXISTING PIPING CAN BE REUSED. FIRE SPRINKLER LOCATIONS AND TYPES, FIRE SPRINKLER PIPE AND SIZES SHALL MATCH EXISTING. CONTRACTOR SHALL OBTAIN AS-BUILT PLANS AND PROVIDE A COMPLETE FIELD SURVEY PRIOR TO STARTING WORK. PROVIDE SHOP DRAWINGS SHOWING ALL RELOCATED FIRE SPRINKLERS, NEW SPRINKLERS AND RELOCATED/REMOVED FIRE SPRINKLER PIPING. ALL RELOCATED FIRE SPRINKLERS MUST BE REPLACED WITH NEW PER NFPA 13. NFPA 13 - 2016 ED - 7.1.5 A SINGLE AIR VENT WITH A CONNECTION SHALL BE PROVIDED ON EACH WET PIPE SYSTEM. THE AIR VENT SHALL BE LOCATED NEAR A HIGH POINT IN THE SYSTEM TO ALLOW AIR TO BE REMOVED FROM THAT PORTION OF THE SYSTEM BY ONE OF THE FOLLOWING METHODS: (1) MANUAL VALVE, MINIMUM 1/2 (15MM) SIZE MANUAL VALVE, MINIMUM 1/2 (15MM) SIZE (2) AUTOMATIC AIR VENTAUTOMATIC AIR VENT
AutoCAD SHX Text A. EXISTING WET PIPE SPRINKLER SYSTEM SHALL BE EXTENDED / MODIFIED FOR NEW WORK. EXISTING WET PIPE SPRINKLER SYSTEM SHALL BE EXTENDED / MODIFIED FOR NEW WORK. B. ENTIRE SYSTEM SHALL BE DESIGNED FOR STRICT COMPLIANCE WITH 2015 NFPA-13, AND THE VA FIRE ENTIRE SYSTEM SHALL BE DESIGNED FOR STRICT COMPLIANCE WITH 2015 NFPA-13, AND THE VA FIRE PROTECTION DESIGN MANUAL. SYSTEM SHALL BE COMPLETE AND FULLY CODE COMPLIANT. C. CONTRACTOR SHALL COORDINATE WITH NEW REFLECTED CEILING PLAN, NEW DUCTWORK LAYOUT AND CONTRACTOR SHALL COORDINATE WITH NEW REFLECTED CEILING PLAN, NEW DUCTWORK LAYOUT AND LIGHTING LAYOUTS. FURNISH ALL MATERIALS, LABOR, TOOLS, TRANSPORTATION, INCIDENTALS AND APPURTENANCES TO COMPLETE IN EVERY DETAIL AND LEAVE IN WORKING ORDER ALL ITEMS OF WORK REQUIRED FOR SYSTEM OPERATION. D. FIRE PROTECTION CONTRACTOR SHALL PREPARE DETAILED AND COORDINATED SHOP DRAWINGS SO AS FIRE PROTECTION CONTRACTOR SHALL PREPARE DETAILED AND COORDINATED SHOP DRAWINGS SO AS TO AVOID CONFLICTS IN THE FIELD. ALL SPRINKLER LINES SHALL BE CONCEALED, AVOIDING INTERFERENCES WITH LIGHTS, DUCTS, PIPES, ETC. ALL COORDINATION SHALL TAKE PLACE PRIOR TO INSTALLATION. E. CONTRACTOR SHALL FILE ALL DRAWINGS, PAY ALL FEES AND OBTAIN PERMITS AND CERTIFICATES OF CONTRACTOR SHALL FILE ALL DRAWINGS, PAY ALL FEES AND OBTAIN PERMITS AND CERTIFICATES OF INSPECTIONS RELATIVE TO THIS WORK. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF EXISTING SPRINKLERS, PIPING, ETC. F. FIRE PROTECTION CONTRACTOR TO REPLACE EXISTING SPRINKLERS TO ACCOMMODATE AREAS WHERE FIRE PROTECTION CONTRACTOR TO REPLACE EXISTING SPRINKLERS TO ACCOMMODATE AREAS WHERE CEILING WORK IS TO TAKE PLACE. RE: ARCHITECTURAL REFLECTED CEILING PLANS. G. SYSTEM SHALL BE INSTALLED IN CONFORMANCE WITH NFPA 25 SECTION 5.2.2.2 AND PIPING SHALL SYSTEM SHALL BE INSTALLED IN CONFORMANCE WITH NFPA 25 SECTION 5.2.2.2 AND PIPING SHALL NOT BE SUBJECTED TO EXTERNAL LOADS BY MATERIALS EITHER RESTING ON THE PIPE OR HUNG FROM THE PIPE. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF EXISTING SPRINKLERS, PIPING, ETC. H. FIRE PROTECTION CONTRACTOR TO REWORK EXISTING SPRINKLERS TO ACCOMMODATE AREAS WHERE FIRE PROTECTION CONTRACTOR TO REWORK EXISTING SPRINKLERS TO ACCOMMODATE AREAS WHERE CEILING WORK IS TO TAKE PLACE. RE: ARCHITECTURAL REFLECTED CEILING PLANS. LIGHT HAZARD OCCUPANCIES: OFFICES, CONFERENCE ROOMS, AND CUSTOMARY ACCESS AREAS. ORDINARY HAZARD GROUP 1 OCCUPANCIES: LABORATORIES, MECHANICAL EQUIPMENT ROOMS, ELECTRIC CLOSETS. ORDINARY HAZARD GROUP 2 OCCUPANCIES: STORAGE ROOMS, BUILDING MANAGEMENT STORAGE, FILE STORAGE AREAS FOR THE ENTIRE AREA OF THE SPACE UP TO 140 SQUARE METERS (1500 SQUARE FEET). I. PIPING AND FITTINGS SHALL BE IN ACCORDANCE WITH NFPA 13 AND AS FOLLOWS: PIPING AND FITTINGS SHALL BE IN ACCORDANCE WITH NFPA 13 AND AS FOLLOWS: PIPING SIZES 50 MM (2 INCHES) AND SMALLER SHALL BE BLACK STEEL SCHEDULE 40 WITH THREADED END CONNECTIONS. PIPING SIZES 65 MM (2 ½ INCHES) AND LARGER SHALL BE BLACK STEEL SCHEDULE 10 WITH GROOVED CONNECTIONS. GROOVES IN SCHEDULE 10 PIPING SHALL BE ROLLED GROOVED ONLY. FLEXIBLE SPRINKLER HOSE SHALL BE FM APPROVED AND LIMITED TO HOSE WITH THREADED END FITTINGS WITH A MINIMUM INSIDE DIAMETER OR 1-INCH AND A MAXIMUM LENGTH OF 6-FEET. J. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
VHABEDSanfoM Text Box
DEDUCT ALTERNATES
DEDUCT ALTERNATE NUMBER 1: Project 1 (Correct MH Deficiencies 6B Second Floor, VA Medical Center, Bedford, Massachusetts 518-18-001) and Project 2 (FCA Out Patient Mental Health Renovation Building 6 First Floor, VA Medical Center, Bedford, Massachusetts 518-18-035) - Delete all elevator work pertaining to specification section 14 24 00 Hydraulic Elevator. Elevator shaft to remain in project. Add to frame elevator shaft opening on the basement, first floor, and second floor with a two hour fire rated shaft wall system with 5/8” gypsum wallboard to face of shaft wall on the elevator lobby side of the opening; ensure face of gypsum board aligns with adjacent gypsum board; paint gypsum wallboard.
DEDUCT ALTERNATE NUMBER 2: Delete all roof repair work in Project 2 (FCA Out Patient Mental Health Renovation Building 6 First Floor, VA Medical Center, Bedford, Massachusetts 518-18-035).
DEDUCT ALTERNATE NUMBER 3: Delete all bathroom basement work and filling of abandoned steam trenches in Project 2 (FCA Out Patient Mental Health Renovation Building 6 First Floor, VA Medical Center, Bedford, Massachusetts 518-18-035).
UPUP
UP
UP
UP
UP
'-0
RELOCATED FIRE SPRINKLERS
Spri nk ler Stan dp ipe
Spri nk ler Stan dp ipe
'-2
13'-0
NORTH ZONE SOUTH ZONE
TYPE DESCRIPTION
EXISTING FIRE SPRINKLER 1/2" QR PENDENT
EXISTING SPRINKLER 1/2" RECESSED PENDENT
EXISTING SPRINKLER 1/2" UPRIGHT
EXISTING SPRINKLER 1/2" QR SIDEWALL
FX102
FIRE SPRINKLER FLOOR PLAN
- MAIN LEVEL EXISTING
BEDFORD VAMC
MENTAL HEALTH
BEDFORD, MA
518-18-035
2019.12.11
1 fire sprinkler demo plan - main level demolition general notes fire protection legend
Department of Veterans Affairs
Drawing Title
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn Dwg.
ofRevisions: Date o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Office of Construction and Facilities Management
CONSULTANTS:
Approved: Project Director
TJW CMG
BUILDING SIX
SEAL:ARCHITECT/ENGINEER:
35% DESIGN SUBMISSION 11/21/2018
60% DESIGN SUBMISSION 1/25/2019
100% SUBMITTAL
90% DESIGN SUBMISSION 8/30/2019
90% DESIGN RESUBMISSION 10/23/2019
STRUCTURAL ENGINEER
BOB D. CAMPBELL
4338 BELLEVIEW AVENUE
KANSAS CITY, MO 64111
(816) 531-4144
MEP ENGINEER
WATSON ENGINEERING
1112 STATE ROUTE 434
OWEGO, NY 13827
(607) 223-4334
FIRE PROTECTION ENGINEER
CMG FIRE PROTECTION
10727 W 128 STREET
OVERLAND PARK, KS 66213
(913)239-8900
100% DESIGN SUBMISSION 12/11/2019
AutoCAD SHX Text 1/8" = 1'-0"
AutoCAD SHX Text GENERAL: COORDINATE WITH WORK SHOWN ON STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS REF. TO NEW CONSTRUCTION FOR NEW SPRINKLER AND PIPING RELOCATIONS OR REMOVAL BASED ON NEW ARCHITECTURAL PLAN LAYOUTS. THIS DRAWING REFLECTS EXISTING PIPING AND SPRINKLER LOCATIONS AS INDICATED ON AS-BUILT DRAWINGS. ALL RELOCATED FIRE SPRINKLERS MUST BE REPLACED WITH NEW PER NFPA 13.
VHABEDSanfoM Text Box
DEDUCT ALTERNATES
DEDUCT ALTERNATE NUMBER 1: Project 1 (Correct MH Deficiencies 6B Second Floor, VA Medical Center, Bedford, Massachusetts 518-18-001) and Project 2 (FCA Out Patient Mental Health Renovation Building 6 First Floor, VA Medical Center, Bedford, Massachusetts 518-18-035) - Delete all elevator work pertaining to specification section 14 24 00 Hydraulic Elevator. Elevator shaft to remain in project. Add to frame elevator shaft opening on the basement, first floor, and second floor with a two hour fire rated shaft wall system with 5/8” gypsum wallboard to face of shaft wall on the elevator lobby side of the opening; ensure face of gypsum board aligns with adjacent gypsum board; paint gypsum wallboard.
DEDUCT ALTERNATE NUMBER 2: Delete all roof repair work in Project 2 (FCA Out Patient Mental Health Renovation Building 6 First Floor, VA Medical Center, Bedford, Massachusetts 518-18-035).
DEDUCT ALTERNATE NUMBER 3: Delete all bathroom basement work and filling of abandoned steam trenches in Project 2 (FCA Out Patient Mental Health Renovation Building 6 First Floor, VA Medical Center, Bedford, Massachusetts 518-18-035).
10'-0 10'-0
9'-11
NORTH ZONE SOUTH ZONE
ADDED FIRE SPRINKLER 1/2" QR PENDENT1
TYPE DESCRIPTION
EXISTING FIRE SPRINKLER 1/2" QR PENDENT
EXISTING FIRE SPRINKLER MOVED TO RELOCATED POSITION
RELOCATED FIRE SPRINKLER 1/2" QR PENDENT3
REMOVED FIRE SPRINKLER4
EXISTING SPRINKLER 1/2" RECESSED PENDENT
EXISTING SPRINKLER 1/2" UPRIGHT
CONTRACTOR SHALL VERIFY ALL SPRINKLERS - EXISTING AND NEW AND SHALL
SHOW ALL SPRINKLERS ON SHOP DRAWINGS AND SIZE ALL PIPE AND FITTINGS.
7 SIDEWALL FIRE SPRINKLER
FX103
FIRE SPRINKLER FLOOR PLAN
- MAIN LEVEL NEW WORK
BEDFORD VAMC
MENTAL HEALTH
BEDFORD, MA
518-18-035
2019.12.11
1 fire sprinkler plan - main level fire protection design notes new fire protection general notes fire protection legend
Department of Veterans Affairs
Drawing Title
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn Dwg.
ofRevisions: Date o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Office of Construction and Facilities Management
CONSULTANTS:
Approved: Project Director
TJW CMG
BUILDING SIX
SEAL:ARCHITECT/ENGINEER:
35% DESIGN SUBMISSION 11/21/2018
60% DESIGN SUBMISSION 1/25/2019
100% SUBMITTAL
90% DESIGN SUBMISSION 8/30/2019
90% DESIGN RESUBMISSION 10/23/2019
STRUCTURAL ENGINEER
BOB D. CAMPBELL
4338 BELLEVIEW AVENUE
KANSAS CITY, MO 64111
(816) 531-4144
MEP ENGINEER
WATSON ENGINEERING
1112 STATE ROUTE 434
OWEGO, NY 13827
(607) 223-4334
FIRE PROTECTION ENGINEER
CMG FIRE PROTECTION
10727 W 128 STREET
OVERLAND PARK, KS 66213
(913)239-8900
100% DESIGN SUBMISSION 12/11/2019
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
%%UIT
AutoCAD SHX Text
AutoCAD SHX Text
%%UELEV.
AutoCAD SHX Text
AutoCAD SHX Text
%%UDAU DIRTY
AutoCAD SHX Text
AutoCAD SHX Text
%%USTAIR
AutoCAD SHX Text
AutoCAD SHX Text
%%UELECTRICAL
AutoCAD SHX Text
AutoCAD SHX Text
%%UELECTRICAL
AutoCAD SHX Text
AutoCAD SHX Text
%%UCLOSET
AutoCAD SHX Text
AutoCAD SHX Text
%%URM
AutoCAD SHX Text
%%UCOMPUTER
AutoCAD SHX Text
AutoCAD SHX Text
%%UAREA
AutoCAD SHX Text
%%UWAITING
AutoCAD SHX Text
AutoCAD SHX Text
%%UDAU CLEAN
AutoCAD SHX Text
AutoCAD SHX Text
%%UCORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text
%%UCORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text
%%UCORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text
%%USTAIR
AutoCAD SHX Text
AutoCAD SHX Text
%%USTAIR
AutoCAD SHX Text
AutoCAD SHX Text
%%UELEV.
AutoCAD SHX Text
AutoCAD SHX Text
%%USTAIR
AutoCAD SHX Text
AutoCAD SHX Text
%%UCORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text
%%UCORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text
%%UENTRY
AutoCAD SHX Text
AutoCAD SHX Text
%%USTORAGE
AutoCAD SHX Text
%%UPATIENT
AutoCAD SHX Text
AutoCAD SHX Text
%%URESTROOM
AutoCAD SHX Text
AutoCAD SHX Text
%%URESTROOM
AutoCAD SHX Text
AutoCAD SHX Text
%%URESTROOM
AutoCAD SHX Text
%%USTAFF
AutoCAD SHX Text
AutoCAD SHX Text
%%URESTROOM
AutoCAD SHX Text
AutoCAD SHX Text
%%URESTROOM
AutoCAD SHX Text
%%USTAFF
AutoCAD SHX Text
AutoCAD SHX Text
%%URESTROOM
AutoCAD SHX Text
AutoCAD SHX Text
%%URESTROOM
AutoCAD SHX Text
%%USTAFF
AutoCAD SHX Text
AutoCAD SHX Text
%%URESTROOM
AutoCAD SHX Text
AutoCAD SHX Text
%%UMEDICATION
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
AutoCAD SHX Text
%%UCLOSET
AutoCAD SHX Text
AutoCAD SHX Text
%%UHAC
AutoCAD SHX Text
AutoCAD SHX Text
%%UCLOSET
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
AutoCAD SHX Text
%%USERVER
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
AutoCAD SHX Text
%%UTREATMENT
AutoCAD SHX Text
AutoCAD SHX Text
%%UEXAM
AutoCAD SHX Text
AutoCAD SHX Text
%%URECEPTION
AutoCAD SHX Text
AutoCAD SHX Text
%%UTEAM
AutoCAD SHX Text
AutoCAD SHX Text
%%URESTROOM
AutoCAD SHX Text
%%UCOLLECTION
AutoCAD SHX Text
%%UDAU
AutoCAD SHX Text
AutoCAD SHX Text
%%ULOUNGE
AutoCAD SHX Text
%%USTAFF
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
AutoCAD SHX Text
%%UTREATMENT
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
AutoCAD SHX Text
%%UTRAINING
AutoCAD SHX Text
%%USTUDENT
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
AutoCAD SHX Text
%%UTHERAPY 1
AutoCAD SHX Text
%%UGROUP
AutoCAD SHX Text
AutoCAD SHX Text
%%UTHERAPY 3
AutoCAD SHX Text
%%UGROUP
AutoCAD SHX Text
AutoCAD SHX Text
%%UTHERAPY 2
AutoCAD SHX Text
%%UGROUP
AutoCAD SHX Text
AutoCAD SHX Text
%%UROOM
AutoCAD SHX Text
%%UGROUP
AutoCAD SHX Text
%%ULARGE
AutoCAD SHX Text
AutoCAD SHX Text
%%USTATION
AutoCAD SHX Text
%%UOUTPOST
AutoCAD SHX Text
%%UPOLICE
AutoCAD SHX Text
AutoCAD SHX Text
%%UTREATMENT
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
AutoCAD SHX Text
%%UEXAM
AutoCAD SHX Text
AutoCAD SHX Text
%%UTREATMENT
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text
AutoCAD SHX Text
%%UOFFICE
AutoCAD SHX Text 1/8" = 1'-0"
AutoCAD SHX Text GENERAL: COORDINATE WITH WORK SHOWN ON STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS. ALL DEMOLISHED MATERIALS TO BE PROPERLY DISPOSED OF BY CONTRACTOR. FIRE SPRINKLER LOCATIONS AND TYPES, FIRE SPRINKLER PIPE AND SIZES ARE SHOWN FOR INFORMATION ONLY CONTRACTOR IS RESPONSIBLE FOR CORRECT DEVICES AND LOCATIONS PER NFPA 72 AND THE VA DESIGN GUIDE. CONTRACTOR SHALL OBTAIN AS-BUILT PLANS AND PROVIDE A COMPLETE FIELD SURVEY PRIOR TO STARTING WORK. PROVIDE SHOP DRAWINGS SHOWING ALL RELOCATED FIRE SPRINKLERS, NEW DEVICES AND RELOCATED/REMOVED FIRE SPRINKLER PIPING. REFER TO NEW CONSTRUCTION FOR NEW SPRINKLER AND PIPING LOCATIONS. ALL RELOCATED FIRE SPRINKLERS MUST BE REPLACED WITH NEW PER NFPA 13. NFPA 13 - 2016 ED - 7.1.5 A SINGLE AIR VENT WITH A CONNECTION SHALL BE PROVIDED ON EACH WET PIPE SYSTEM. THE AIR VENT SHALL BE LOCATED NEAR A HIGH POINT IN THE SYSTEM TO ALLOW AIR TO BE REMOVED FROM THAT PORTION OF THE SYSTEM BY ONE OF THE FOLLOWING METHODS: (1) MANUAL VALVE, MINIMUM 1/2 (15MM) SIZE MANUAL VALVE, MINIMUM 1/2 (15MM) SIZE (2) AUTOMATIC AIR VENTAUTOMATIC AIR VENT
AutoCAD SHX Text A. EXISTING WET PIPE SPRINKLER SYSTEM SHALL BE EXTENDED / MODIFIED FOR NEW WORK. EXISTING WET PIPE SPRINKLER SYSTEM SHALL BE EXTENDED / MODIFIED FOR NEW WORK. (PROVIDE NEW CONTROL VALVE TO ISOLATE THE NEW CONSTRUCTION.) B. ENTIRE SYSTEM SHALL BE DESIGNED FOR STRICT COMPLIANCE WITH 2015 NFPA-13, AND ENTIRE SYSTEM SHALL BE DESIGNED FOR STRICT COMPLIANCE WITH 2015 NFPA-13, AND THE VA FIRE PROTECTION DESIGN MANUAL. SYSTEM SHALL BE COMPLETE AND FULLY CODE COMPLIANT. C. CONTRACTOR SHALL COORDINATE WITH NEW REFLECTED CEILING PLAN, NEW DUCTWORK CONTRACTOR SHALL COORDINATE WITH NEW REFLECTED CEILING PLAN, NEW DUCTWORK LAYOUT AND LIGHTING LAYOUTS. FURNISH ALL MATERIALS, LABOR, TOOLS, TRANSPORTATION, INCIDENTALS AND APPURTENANCES TO COMPLETE IN EVERY DETAIL AND LEAVE IN WORKING ORDER ALL ITEMS OF WORK REQUIRED FOR SYSTEM OPERATION. D. FIRE PROTECTION CONTRACTOR SHALL PREPARE DETAILED AND COORDINATED SHOP FIRE PROTECTION CONTRACTOR SHALL PREPARE DETAILED AND COORDINATED SHOP DRAWINGS SO AS TO AVOID CONFLICTS IN THE FIELD. ALL SPRINKLER LINES SHALL BE CONCEALED, AVOIDING INTERFERENCES WITH LIGHTS, DUCTS, PIPES, ETC. ALL COORDINATION SHALL TAKE PLACE PRIOR TO INSTALLATION. E. CONTRACTOR SHALL FILE ALL DRAWINGS, PAY ALL FEES AND OBTAIN PERMITS AND CONTRACTOR SHALL FILE ALL DRAWINGS, PAY ALL FEES AND OBTAIN PERMITS AND CERTIFICATES OF INSPECTIONS RELATIVE TO THIS WORK. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF EXISTING SPRINKLERS, PIPING, ETC. F. FIRE PROTECTION CONTRACTOR TO REPLACE EXISTING SPRINKLERS TO ACCOMMODATE AREAS FIRE PROTECTION CONTRACTOR TO REPLACE EXISTING SPRINKLERS TO ACCOMMODATE AREAS WHERE CEILING WORK IS TO TAKE PLACE. RE: ARCHITECTURAL REFLECTED CEILING PLANS. G. SYSTEM SHALL BE INSTALLED IN CONFORMANCE WITH NFPA 25 SECTION 5.2.2.2 AND PIPING SYSTEM SHALL BE INSTALLED IN CONFORMANCE WITH NFPA 25 SECTION 5.2.2.2 AND PIPING SHALL NOT BE SUBJECTED TO EXTERNAL LOADS BY MATERIALS EITHER RESTING ON THE PIPE OR HUNG FROM THE PIPE. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF EXISTING SPRINKLERS, PIPING, ETC. H. FIRE PROTECTION CONTRACTOR TO REWORK EXISTING SPRINKLERS TO ACCOMMODATE AREAS FIRE PROTECTION CONTRACTOR TO REWORK EXISTING SPRINKLERS TO ACCOMMODATE AREAS WHERE CEILING WORK IS TO TAKE PLACE. RE: ARCHITECTURAL REFLECTED CEILING PLANS. LIGHT HAZARD OCCUPANCIES: OFFICES, CONFERENCE ROOMS, AND CUSTOMARY ACCESS AREAS. ORDINARY HAZARD GROUP 1 OCCUPANCIES: LABORATORIES, MECHANICAL EQUIPMENT ROOMS, ELECTRIC CLOSETS. ORDINARY HAZARD GROUP 2 OCCUPANCIES: STORAGE ROOMS, BUILDING MANAGEMENT STORAGE, FILE STORAGE AREAS FOR THE ENTIRE AREA OF THE SPACE UP TO 140 SQUARE METERS (1500 SQUARE FEET). I. PIPING AND FITTINGS SHALL BE IN ACCORDANCE WITH NFPA 13 AND AS FOLLOWS: PIPING AND FITTINGS SHALL BE IN ACCORDANCE WITH NFPA 13 AND AS FOLLOWS: PIPING SIZES 50 MM (2 INCHES) AND SMALLER SHALL BE BLACK STEEL SCHEDULE 40 WITH THREADED END CONNECTIONS. PIPING SIZES 65 MM (2 ½ INCHES) AND LARGER SHALL BE BLACK STEEL SCHEDULE 10 WITH GROOVED CONNECTIONS. GROOVES IN SCHEDULE 10 PIPING SHALL BE ROLLED GROOVED ONLY. FLEXIBLE SPRINKLER HOSE SHALL BE FM APPROVED AND LIMITED TO HOSE WITH THREADED END FITTINGS WITH A MINIMUM INSIDE DIAMETER OR 1-INCH AND A MAXIMUM LENGTH OF 6-FEET. J. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
VHABEDSanfoM Text Box
DEDUCT ALTERNATES
DEDUCT ALTERNATE NUMBER 1: Project 1 (Correct MH Deficiencies 6B Second Floor, VA Medical Center, Bedford, Massachusetts 518-18-001) and Project 2 (FCA Out Patient Mental Health Renovation Building 6 First Floor, VA Medical Center, Bedford, Massachusetts 518-18-035) - Delete all elevator work pertaining to specification section 14 24 00 Hydraulic Elevator. Elevator shaft to remain in project. Add to frame elevator shaft opening on the basement, first floor, and second floor with a two hour fire rated shaft wall system with 5/8” gypsum wallboard to face of shaft wall on the elevator lobby side of the opening; ensure face of gypsum board aligns with adjacent gypsum board; paint gypsum wallboard.
DEDUCT ALTERNATE NUMBER 2: Delete all roof repair work in Project 2 (FCA Out Patient Mental Health Renovation Building 6 First Floor, VA Medical Center, Bedford, Massachusetts 518-18-035).
DEDUCT ALTERNATE NUMBER 3: Delete all bathroom basement work and filling of abandoned steam trenches in Project 2 (FCA Out Patient Mental Health Renovation Building 6 First Floor, VA Medical Center, Bedford, Massachusetts 518-18-035).
Department of Veterans Affairs
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Office of Construction and Facilities Management
CONSULTANTS:
Approved: Project Director
BUILDING SIX
SEAL:ARCHITECT/ENGINEER:
STRUCTURAL ENGINEER
BOB D. CAMPBELL
4338 BELLEVIEW AVENUE
KANSAS CITY, MO 64111
(816) 531-4144
MEP ENGINEER
WATSON ENGINEERING
1112 STATE ROUTE 434
OWEGO, NY 13827
(607) 223-4334
1 100% Revisions 1/24/20
MEP100
GENERAL MEP NOTES BEDFORD VAMC
MENTAL HEALTH
BEDFORD, MA
518-18-035
1/24/20
100% S
UBMITTAL
JWE MPL
GENERAL NOTES:
1. THE GENERAL NOTES ON THIS SHEET APPLY TO ALL THE DRAWING DISCIPLINES.
2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY ALL ASPECTS OF THE DESIGN, TO INCLUDE, BUT NOT LIMITED TO DIMENSIONS, EXISTING CONDITIONS, PROJECT EXTENTS, SITE ACCESS, AND WORK OF SUB-
TRADES, PRIOR TO SUBMITTING A BID.
3. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS POSSIBLE, ALTHOUGH NO ATTEMPT WAS MADE TO SHOW EVERY OFFSET, FITTING, BEAM, PIPE SUPPORT, CLEARANCE, ETC. IT IS THE CONTRACTOR’S
RESPONSIBILITY TO SURVEY ALL WORK AREAS AND SUBMIT FINAL, DETAILED COORDINATED SHOP DRAWINGS FOR REVIEW BY THE DESIGNER OF RECORD TO ENSURE THAT THE DESIGN INTENT WILL BE MET AND THAT ALL TRADES ARE PROPERLY COORDINATED. CHANGES REQUIRED TO FIT EQUIPMENT, PIPING, AND DUCTWORK SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER. ANY MAJOR DISCREPANCIES SHALL BE
CLARIFIED PRIOR TO SUBMITTAL OF BID.
4. BECAUSE OF THE SMALL SCALE OF THE DRAWINGS, IT IS NOT POSSIBLE TO INDICATE ALL OFFSETS, TRANSITIONS, FITTINGS, CLEARANCES, POSSIBLE CLASHES, AND ACCESSORIES THAT MAY BE REQUIRED.
COORDINATE ALL THE WORK OF ALL THE TRADES TO INSURE ALL DUCTS, PIPES, CONDUITS, ETC. DO NOT CONFLICT AND CLEAR STRUCTURAL AND ARCHITECTURAL MEMBERS. THE CONTRACTOR IS RESPONSIBLE FOR
DEVELOPING COORDINATED SHOP DRAWINGS FOR REVIEW PRIOR TO STARTING INSTALLATION.
5. CONTRACTOR SHALL VISIT THE SITE AND BE FULLY COGNIZANT OF ALL CONDITIONS PRIOR TO SUBMITTING BID. REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO SUBMITTAL OF BID.
6. IF A JOB REQUIRES TYING INTO ANY EXISTING MECHANICAL SYSTEM, THE CONTRACTOR SHALL CONDUCT NECESSARY PRE TEST, ADJUST, AND BALANCING (TAB) ACTIVITIES TO VERIFY BASELINE SOURCE CAPACITY
FROM THE FACILITY, UNLESS THE OWNER CAN PROVIDE SUFFICIENT FACILITY MECHANICAL TREND LOGS TO ESTABLISH THAT SUFFICIENT SOURCE CAPACITY EXISTS. UPON DETERMINING INSUFFICIENT SOURCE CAPACITY, THE CONTRACTOR SHALL IMMEDIATELY REPORT FINDINGS TO THE OWNER AND ENGINEER FOR RECORD FOR ADDITIONAL GUIDANCE BEFORE PROCEEDING.
7. IF A JOB REQUIRES TYING INTO ANY EXISTING ELECTRICAL SYSTEM, THE CONTRACTOR SHALL CONDUCT NECESSARY VERIFICATION TO DETERMINE THAT SUFFICIENT ELECTRICAL SOURCE CAPACITY EXISTS FROM THE NEAREST FEED IMMEDIATELY UPSTREAM OF THE CONNECTION POINT, UNLESS THE OWNER CAN PROVIDE SUFFICIENT FACILITY ELECTRICAL TREND LOGS TO ESTABLISH THAT SUFFICIENT SOURCE CAPACITY EXISTS.
8. THE WORK INCLUDES ALL ITEMS OF THE SPECIFICATIONS THAT ARE EITHER WRITTEN ON THE DRAWINGS OR SEPARATELY IN A SPECIFICATIONS BOOK.
9. WHERE THERE IS A CONFLICT ON THE PLANS, SPECIFICATIONS, NOTES, GENERAL NOTES, REFERENCES, PUBLICATIONS, CODES, ETC. WITH RESPECT TO CONSTRUCTION, MATERIALS, PRODUCTS, METHODS, WORKMANSHIP, PROCEDURE, EXECUTION, ETC. THE MOST STRINGENT SHALL BE UTILIZED OR INSTALLED. THE MOST STRINGENT SHALL BE DEFINED AS THE SPECIFICATION OR REQUIREMENT THAT ALLOWS ALL SPECIFICATIONS OR REQUIREMENTS THAT ARE IN CONFLICT TO BE SATISFIED. NO RELIEF OR EXTRA PAYMENT SHALL BE MADE TO THE CONTRACTOR BECAUSE OF THIS INTERPRETATION.
10. CONTRACTOR SHALL NOT BEGIN FABRICATION, CUT ANY MEMBERS, OR BEGIN INSTALLATION UNTIL THE SUBMITTALS AND COORDINATED SHOP DRAWINGS HAVE BEEN APPROVED. ANY WORK CONSTRUCTED OR INSTALLED PRIOR TO THE APPROVAL OF SUBMITTALS AND COORDINATED SHOP DRAWINGS SHALL BE AT THE CONTRACTOR'S RISK AND SHALL BE REMOVED AND REINSTALLED OR RECONSTRUCTED AT THE CONTRACTOR'S EXPENSE AT THE REQUEST OF THE OWNER'S REPRESENTATIVE TO THE COMPLETE SATISFACTION OF THE OWNER'S REPRESENTATIVE.
11. ALL WORK SHALL BE DONE WITH COMPLETE COMPLIANCE WITH THE PUBLISHED EDITIONS OF THE APPLICABLE CODES AND STANDARDS WHETHER STATUTORY OR NOT. ALL WORK SHALL BE INSTALLED TO COMPLY WITH THE INTERNATIONAL BUILDING MECHANICAL, PLUMBING, ELECTRICAL, AND FIRE CODES, NATIONAL ELECTRICAL CODE, UNDERWRITER'S LABORATORY, INC., AMERICAN NATIONAL STANDARD INSTITUTE, INC., NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION, BASIC ELECTRICAL REGULATIONS, AND CODES AND STANDARDS OF THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA). IF ANY PART OF THE INSTALLATION DOES NOT MEET CODE, NOTIFY THE OWNER'S REPRESENTATIVE PRIOR TO BEGINNING THE INSTALLATION. IF ANY PART OF THE PROJECT CANNOT BE INSTALLED TO CONFORM WITH THE PLANS AND/OR SPECIFICATIONS, NOTIFY THE OWNER'S REPRESENTATIVE PRIOR TO BEGINNING THE INSTALLATION.
12. UNLESS STATED OTHERWISE, ALL EXISTING MATERIAL AND EQUIPMENT SHALL REMAIN THE PROPERTY OF THE PROJECT OWNER.
13. THE CONTRACTOR SHALL DEVELOP AND PRESENT A CONSTRUCTION PLAN AND WORK SCHEDULE WITH ALL PHASING, STAGING, AND SEQUENCING OF WORK FOR APPROVAL PRIOR TO THE COMMENCEMENT AND
BEGINNING IMPLEMENTATION OF HIS WORK. THE CONTRACTOR SHALL DETERMINE PRIOR TO SUBMITTING HIS WORK SCHEDULE, THE SPECIFIC TIME AVAILABILITY OF ALL AREAS AND SPACES AND DETERMINE WHAT WORK MUST BE DONE OUTSIDE OF NORMAL WORKING HOURS. ALL WORK OUTSIDE OF NORMAL WORKING HOURS IS TO BE PERFORMED AT NO ADDITIONAL COST TO THE OWNER
14. WITH THE EXCEPTION OF SIGNIFICANT NOISE GENERATING ACTIVITIES SUCH AS CORE DRILLING, ETC., WORK OUTSIDE OF THE OCCUPIED SPACES, SUCH AS ON THE ROOF, ETC., MAY BE PERFORMED DURING NORMAL
WORKING HOURS.
15. UNLESS SPECIFICALLY NOTED AS EXISTING, ALL ITEMS, EQUIPMENT, AND WORK SHOWN IS NEW AND SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR.
16. DURING THE EXECUTION OF THIS CONTRACT, THE SITE AND BUILDINGS WILL BE OCCUPIED AND IN USE. WORK DONE UNDER THIS CONTRACT SHALL BE PERFORMED WITHOUT INCONVENIENCE TO THE OWNER INSOFAR
AS POSSIBLE. ALL WORK SHALL BE COORDINATED WITH THE OWNER'S REPRESENTATIVE AND IS SUBJECT TO THEIR CONTINUOUS APPROVAL.
17. THE CONTRACTOR IS COMPLETELY RESPONSIBLE FOR ALL CHARACTERISTICS OF THE EQUIPMENT THAT HE INTENDS TO INSTALL AND MUST FOLLOW MANUFACTURER RECOMMENDATIONS FOR PROPER INSTALLATION.
IF THERE ARE ANY DIFFERENCES IN THE EQUIPMENT SHOWN ON THE DESIGN DRAWINGS AND THE EQUIPMENT TO BE INSTALLED, THE CONTRACTOR SHALL MAKE ALL CHANGES AND ADJUSTMENTS TO ACCOMMODATE THE PROPOSED EQUIPMENT AT NO ADDITIONAL COST TO THE OWNER. THIS APPLIES TO ALL SUPPORT SERVICES AND FACILITIES NECESSARY TO PROPERLY INSTALL THE EQUIPMENT TO FUNCTION ADEQUATELY AS PART OF THE SYSTEMS FOR WHICH THEY WERE DESIGNED AND SELECTED. THESE CHARACTERISTICS INCLUDE SUCH THINGS AS WEIGHT, CLEARANCE, DIMENSIONS, ELECTRICAL, MECHANICAL, PLUMBING, AND UTILITY SERVICES, ETC. ACCOMMODATING SERVICES INCLUDE SUCH THINGS AS DIMENSIONS, LOCATIONS, AND SIZES OF SUPPORTING MEMBERS, PIPE, CONNECTION SIZES, ELECTRICAL SERVICE SIZE AND PROTECTION, ELECTRICAL CONNECTION LOCATION, UTILITY AND PLUMBING CONNECTION SIZES AND LOCATIONS, ETC. ALL REQUIRED CHANGES TO THE CONTRACT DRAWINGS AND SPECIFICATIONS SHALL BE DESIGNED AND STAMPED BY REGISTERED ENGINEERS IN THE APPROPRIATE DISCIPLINE EMPLOYED BY THE CONTRACTOR AND SHALL BE INCLUDED AS PART OF THE EQUIPMENT SUBMITTALS. ALL CHANGES SHALL BE SUBJECT TO THE
APPROVAL OF THE PROJECT A/E AND THE OWNER'S REPRESENTATIVE.
18. BEFORE ANY DEMOLITION OR CONSTRUCTION WORK IS BEGUN, THE CONTRACTOR AND THE OWNER'S REPRESENTATIVE SHALL SURVEY THE EXISTING BUILDING AREA TO BE MODIFIED AND/OR REPLACED TO ACCURATELY DOCUMENT EXISTING CONDITIONS. THIS SURVEY WILL BE USED BY THE OWNER'S REPRESENTATIVE AT JOB COMPLETION TO DETERMINE WHICH BUILDING/SITE COMPONENTS MUST BE REPLACED WITH
NEW.
19. UNLESS STATED OTHERWISE, REQUEST APPROVAL FROM THE OWNER'S REPRESENTATIVE SEVEN DAYS IN ADVANCE FOR THE SHUTDOWN OF ANY EXISTING SYSTEM.
20. UNLESS STATED OTHERWISE, FINAL ADVANCE NOTICE OF 48 HOURS SHALL BE GIVEN TO THE OWNER'S REPRESENTATIVE PRIOR TO THE PROPOSED SHUTDOWN OF ANY SYSTEM.
21. THE CLOSING AND OPENING OF VALVES SHALL BE WITNESSED BY THE OWNER'S REPRESENTATIVE.
22. PROVIDE ADEQUATE FIRE PROTECTION IN THE ENTIRE CONSTRUCTION AREA FOR THE DURATION OF THE CONSTRUCTION PERIOD.
23. THE ENTIRE EXISTING FIRE PROTECTION SYSTEM SHALL BE RESTORED TO FULL OPERATION AT THE END OF EACH WORKING DAY. ALL EXISTING FIRE ALARMS AND FIRE EXITS AND ANY OTHER ASPECT OF THE EXISTING
FIRE ALARM SYSTEM SHALL REMAIN IN FULL OPERATION. THE COST OF RESPONSE TO ANY FALSE ALARM AS CHARGED BY ANY LOCAL FIRE DEPARTMENT SHALL BE PAID BY THE CONTRACTOR.
24. CONTRACTOR SHALL NOT PENETRATE OR CUT ANY STRUCTURAL MEMBERS NOT SPECIFICALLY SHOWN ON THE DRAWINGS (E.G., JOISTS, BEAMS, ETC.). IF STRUCTURAL MEMBERS CONFLICT WITH ROUTING, CONTACT
THE OWNER'S REPRESENTATIVE FOR DIRECTION BEFORE PROCEEDING. EXERCISE CAUTION IN CUTTING CONCRETE FLOORS AND WALLS TO AVOID EXISTING UTILITIES WHICH MAY BE LOCATED IN AND UNDER
CONCRETE SURFACES.
25. THE CONTRACTOR SHALL PROVIDE NEW OPENINGS IN WALLS, FLOOR, AND ROOF, AND PATCH EXISTING OPENINGS IN CONJUNCTION WITH THE DEMOLITION AND INSTALLATION OF THE NEW BUILDING COMPONENTS, INCLUDING MECHANICAL, PLUMBING, ELECTRICAL, AND GENERAL CONTRACTOR'S ITEMS. ALL NECESSARY FRAMING, COUNTER-FLASHING, ETC. SHALL BE INCLUDED.
26. FOR ALL FLOOR, WALL, AND ROOF PENETRATION, VERIFY THE LOCATION OF THE EXISTING STRUCTURAL MEMBERS PRIOR TO DRILLING AND CUTTING, RELOCATE OPENINGS AS REQUIRED AND OFFSET DUCTS, PIPES, CONDUIT, ETC.
27. ALL EXISTING DUCTWORK, PIPING, CONDUIT, AND MECHANICAL, PLUMBING, AND ELECTRICAL EQUIPMENT NOT TO BE REUSED OR REMAIN IN SERVICE SHALL BE REMOVED FROM THE FACILITY. THE OWNER'S REPRESENTATIVE HAS THE OPTION TO RECLAIM ANY DEMOLISHED MATERIALS OR EQUIPMENT, IN WHICH CASE IT SHALL BE DELIVERED TO THE LOCATION DESIGNATED BY THE OWNER'S REPRESENTATIVE.
28. FOR EACH PHASE AND BEFORE INTERRUPTING EACH EXISTING UTILITY, DETERMINE, IN ADVANCE, IF ANY DOWNSTREAM SERVICE BEYOND THE CONSTRUCTION AREA OF THE PHASE, WILL BE INTERRUPTED AND PROVIDE A TEMPORARY SERVICE BYPASSING THE CONSTRUCTION AREA. DETERMINE ALL SUCH TEMPORARY SERVICES PRIOR TO SUBMITTING BID. THERE WILL BE NO FUTURE CONSIDERATION TO THE CONTRACTOR FOR ANY TEMPORARY SERVICES REQUIRED. PREPARE A DETAILED SHOP DRAWING SHOWING ALL OF THE EXISTING UTILITIES IN THEIR RELOCATED LOCATION AND ALL THE NEW HVAC SYSTEMS.
29. THE FLOOR AREAS BELOW OVERHEAD WORK, WHERE WELDING "HOT WORK" IS TO BE PERFORMED, SHALL BE CLEARED TO A MINIMUM DISTANCE OF 36 FEET BEYOND THE POINT DIRECTLY BELOW THE OVERHEAD "HOT WORK". ALL FLAMMABLE MATERIALS SHALL BE CLEARED TO A DISTANCE 50 FEET BEYOND THE POINT DIRECTLY BELOW THE OVERHEAD "HOT WORK".
30. EXISTING DUCTWORK, DOMESTIC COLD WATER PIPING, DOMESTIC HOT WATER PIPING, CHILLED AND HEATING HOT WATER PIPING, WASTE, VENT, FIRE SPRINKLER LINES, FIRE ALARM EQUIPMENT, ELECTRICAL CONDUIT, TELEPHONE CONDUIT, COMMUNICATION CONDUIT, PNEUMATIC TUBING, ETC., MAY HAVE TO BE RELOCATED TO FACILITATE THE INSTALLATION OF THE NEW WORK. THE CONTRACTOR SHALL DETERMINE ALL EXISTING SERVICES THAT REQUIRE RELOCATION PRIOR TO SUBMITTING HIS BID AND INCLUDE ALL COSTS IN THE BID. THERE WILL BE NO EXTRA COMPENSATION TO THE CONTRACTOR FOR THIS WORK.
31. CONTRACTOR IS RESPONSIBLE FOR A COMPLETE WORKING SYSTEM, AS SUCH THE CONTRACTOR IS HEREBY NOTIFIED THAT SOME WORK MAY BE REQUIRED OUTSIDE OF THE AREAS SHOWN ON THESE DRAWINGS.
THIS COULD INCLUDE ELECTRICAL WORK, REFRIGERANT LINE ROUTING, CONTROL MODIFICATIONS OR CONNECTIONS AT REMOTE LOCATIONS, CONTROL PANELS, CPU'S, ETC.
32. THE CONTRACTOR SHALL PAY FOR ALL DAMAGE, INCLUDING WATER DAMAGE, TO PROPERTY AND EQUIPMENT CAUSED BY HIS WORK THROUGHOUT THE CONSTRUCTION AND WARRANTEE PERIOD.
33. ALL WORK WITHIN THE BASEMENT AREA SHALL BE DONE OUTSIDE NORMAL WORKING HOURS. THE WORK AREA SHALL BE CLEANED AND RESTORED PRIOR TO THE END OF EACH WORK DAY.
34. REMOVE T-BARS AND 2X4 CEILING PANELS AS REQUIRED FOR THE DEMOLITION AND THE INSTALLATION OF THE NEW WORK. REINSTALL EXISTING OR REPLACE WITH NEW AS REQUIRED TO THE SATISFACTION OF THE
OWNER'S REPRESENTATIVE. FOR ANY HARD CEILING AREA, CUT AND DEMOLISH ENOUGH OF THE HARD CEILING TO DO THE WORK REQUIRED. REBUILD AND PATCH THE DEMOLISHED. FINISH AND PAINT TO MATCH
EXISTING TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE.
35. ANY DEVICE THAT REQUIRES ACCESS FOR ADJUSTMENT OR ROUTINE MAINTENANCE, SUCH AS BUT NOT LIMITED TO VALVES, VOLUME DAMPERS, CONTROL DEVICES, VAVS, ETC. SHALL BE INSTALLED IN AN ACCESSIBLE
LOCATION.
36. ALL UL LISTED EQUIPMENT SHALL BE INSTALLED AS PER LISTING OR LABELING. MAXIMUM FUSE SIZES MEANS FUSE PROTECTION IS REQUIRED.
37. PATCH AND PAINT TO MATCH EXISTING, ALL SURFACES DAMAGED BY THE DEMOLITION AND ALL OPENINGS NOT TO BE REUSED.
38. REPAIR DAMAGE TO CEILING, WALLS, ETC. TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE.
39. WHEN A DETAIL OR NOTE IS IDENTIFIED AS TYPICAL, THE CONTRACTOR IS TO APPLY THE DETAIL OR NOTE TO EVERY SIMILAR CONDITION, WHETHER OR NOT THE REFERENCED DETAIL OR NOTE IS REPEATED OR
REFERENCED.
40. WHERE NO CONSTRUCTION DETAIL IS INDICATED, SUCH WORK SHALL BE SIMILAR TO COMPARABLE WORK DETAILED OR NOTED ELSEWHERE OR TO MATCH EXISTING CONDITIONS, SUBJECT TO THE APPROVAL OF THE
OWNER'S REPRESENTATIVE.
41. ALL HOLES, VOIDS, AND DAMAGED OR UNEVEN SURFACES WHICH ARE CAUSED BY THE CONTRACTOR'S WORK AND WHICH REMAIN EXPOSED IN THE WALL, FLOOR, CEILING, OR OTHER SURFACES SHALL BE PATCHED, REPAIRED, AND BROUGHT FLUSH WITH THE ADJACENT CONSTRUCTION. SUCH SURFACES, NOT CONCEALED BY THE NEW CONSTRUCTION, SHALL MATCH IN EVERY RESPECT THE EXISTING NON-DAMAGED CONSTRUCTION. REMOVE EXISTING UTILITIES BACK BEHIND EXISTING SURFACES AND CAP SO AS NOT TO INTERFERE WITH NEW PATCHES.
42. WHEREVER NEW WALL, FLOOR, OR CEILING FINISHES ARE INDICATED, THE CONTRACTOR SHALL BRING EXISTING ELECTRICAL, MECHANICAL, PLUMBING, AND OTHER BUILDING COMPONENTS FLUSH WITH THE NEW
FINISHED SURFACES IF APPROPRIATE.
43. THE DEMOLITION SHALL INCLUDE ALL ASSOCIATED ANCHORAGES, HANGERS, SUPPORTS, BRACES, FASTENERS, MASTIC, MORTAR, LATH, AND RELATED ITEMS. THE EXISTING SUBSTRATE, INCLUDING CONCRETE, MASONRY, METAL FRAMING AND FURRING SHALL BE REPAIRED WHERE DAMAGE BY THE CONTRACTOR'S WORK.
44. PROVIDE ALL VALVES, INSTRUMENTS, FITTINGS, ETC. AS SHOWN ON THE PIPING DIAGRAMS, SCHEMATICS, ETC. IT IS NOT POSSIBLE TO SHOW ALL VALVES, INSTRUMENTS, ETC. ON THE PLANS, HOWEVER, SELECTED VALVES HAVE BEEN SHOWN FOR REFERENCE. ALL VALVES SHALL BE ACCESSIBLE FROM THE FLOOR OR FROM FIXED PLATFORMS.
45. ALL NEW FIRE ALARM DEVICES INSTALLED IN HVAC EQUIPMENT SUCH AS SMOKE DETECTORS, SMOKE DAMPERS, FIRE/SMOKE DAMPERS, ETC. SHALL BE CONNECTED TO THE MAIN FIRE ALARM PANEL.
46. ALL EQUIPMENT AND MATERIALS SUBJECT TO THE WEATHER THAT ARE NOT FACTORY PAINTED SHALL BE FIELD PAINTED AND WEATHER PROOFED WITH PRIMER, AND TWO COATS OF EXTERIOR PAINT. MATCH THE
COLOR OF THE EXISTING BUILDING EXTERIOR. THE COLOR AND QUANTITY OF THE PAINT IS SUBJECT TO THE APPROVAL OF THE OWNER'S REPRESENTATIVE. SUBMITTAL REQUIRED.
47. ANY ANTICIPATED HAZARDOUS MATERIALS (HAZMAT) IS INDICATED ON THE DRAWINGS, HOWEVER, IT IS IMPOSSIBLE TO PREDICT WHERE EXACTLY ALL HAZMAT MAY BE ENCOUNTERED. IF HAZMAT IS ENCOUNTERED OR
SUSPECTED AT ANY POINT DURING CONSTRUCTION, CEASE ALL WORK IMMEDIATELY AND CONTACT THE OWNER’S REPRESENTATIVE FOR GUIDANCE.
48. THE CONTROLS CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR MAKING THE CONTROL SYSTEM COMPLETE AND FULLY OPERABLE. THE CONNECTION TO THE EXISTING CONTROL SYSTEM SHALL BE COMPLETE SUCH
THAT ALL NEW MONITORING AND CONTROL POINTS ARE RECOGNIZED BY THE EXISTING CONTROL SYSTEM AND THAT ALL NEW POINTS CAN BE READ, ACTUATED, AND RESET FROM THE EXISTING FRONT END, AND VICE- VERSA. IT IS THE CONTRACTOR’S RESPONSIBILITY TO DETERMINE IF THERE IS ENOUGH SPACE AND/OR COMPATABILITY EXISTS TO USE EXISTING CONTROLLERS OR OTHER ASSOCIATED EXISTING CONTROLS EQUIPMENT. IF COMPATIBILITY AND/OR SPACE DOES NOT EXIST, IT IS THE CONTROLS CONTRACTOR RESPONSIBILITY TO PROVIDE THE REQUIRED CONTROLLERS, BRIDGES, ETC. TO ALLOW FULL INTEGRATION OF REQUIRED POINTS AND TO SATISFY THE SEQUENCE OF OPERATIONS. THE ENGINEER SHALL BE NOTIFIED WHEN EACH PHASE OF THE SYSTEM HAS BEEN COMPLETELY CHECKED OUT, ADJUSTED, CALIBRATED, AND PUT INTO FINAL WORKING CONDITION WITH ALL THE TROUBLESHOOTING COMPLETED. A SUBSEQUENT JOBSITE MEETING WILL BE SCHEDULED WITH TWO WEEKS NOTICE AT WHICH TIME THE CONTROLS CONTRACTOR WILL DEMONSTRATE THE OPERATION OF THE CONTROL SYSTEMS TO ALL CONCERNED. IF ANY ITEMS OF THE CONTROL SEQUENCE CANNOT BE SUCCESSFULLY DEMONSTRATED OR REQUIRE FURTHER TROUBLESHOOTING, A SUBSEQUENT CONTROLS INSPECTION WILL BE REQUIRED AND WILL BE AT THE CONTRACTOR'S EXPENSE. THIS PROVISION SHALL BE A CONDITION OF FINAL ACCEPTANCE. THE CONTRACTOR SHALL BE PREPARED TO DEMONSTRATE ALL ITEMS IN THE SEQUENCE OF OPERATION. SUBSEQUENT CONTROLS DEMONSTRATIONS AND VERIFICATIONS WILL BE REQUIRED AT THE COMPLETION OF THE PROJECT.
49. UNLESS THE OWNER CHOOSES TO USE THEIR OWN THIRD PARTY COMMISSIONING AGENCY, THE CONTRACTOR SHALL UTILIZE A THIRD PARTY COMMISSIONING AGENCY FOR ALL NECESSARY FINAL TESTING, ADJUSTING, AND BALANCING (TAB) AND BUILDING SYSTEM COMMISSIONING. FULL DOCUMENTATION, TO INCLUDE NECESSARY FACILITY STAFF TRAINING, SHALL BE COMPLETED AND SUBMITTED TO ALLOW FOR
REQUIRED CONTINUED OPERATION AND MAINTENANCE.
SEISMIC BRACING NOTES:
THE FOLLOWING ITEMS SHALL BE SEISMICALLY BRACED IN ACCORDANCE WITH SPECIFICATION SECTION 13 05 41-SEISMIC RESTRAINT REQUIREMENTS, WHERE REQUIRED:
1. EQUIPMENT WEIGHING MORE THAN 400 POUNDS, WHICH IS SUPPORTED DIRECTLY ON THE FLOOR OR ROOF.
2. EQUIPMENT WEIGHING MORE THAN 20 POUNDS, WHICH IS SUSPENDED FROM THE ROOF OR FLOOR OR HUNG FROM A WALL.
3. GAS AND MEDICAL PIPING WITH AN INSIDE DIAMETER GREATER THAN OR EQUAL TO 2 ½ INCHES.
4. PIPING IN BOILER PLANTS AND EQUIPMENT ROOMS WITH AN INSIDE DIAMETER GREATER THAN OR EQUAL TO 1 ¼ INCHES.
5. ALL OTHER PIPING WITH AN INSIDE DIAMETER GREATER THAN OR EQUAL TO 2 ½ INCHES, INCLUDING PIPING FOR AUTOMATIC FIRE SUPPRESSION SYSTEMS.
6. ALL PIPING SUSPENDED BY INDIVIDUAL HANGERS, 12 INCHES OR MORE IN LENGTH FROM THE TOP OF PIPE TO THE BOTTOM OF THE SUPPORT FOR THE HANGER.
7. ALL ELECTRICAL CONDUITS, WITH AN INSIDE DIAMETER GREATER THAN OR EQUAL TO 2 ½ INCHES.
8. ALL RECTANGULAR AIR HANDLING DUCTS WITH A CROSS SECTIONAL AREA GREATER THAN OR EQUAL TO SIX SQUARE FEET.
9. ALL ROUND AIR HANDLING DUCTS WITH A DIAMETER GREATER THAN OR EQUAL TO 28 INCHES.
10. ALL DUCTS SUSPENDED BY HANGERS 12 INCHES OR MORE IN LENGTH FROM THE TOP OF THE DUCT TO THE BOTTOM OF SUPPORT FOR THE HANGER.
VHABEDSanfoM Text Box
DEDUCT ALTERNATES
DEDUCT ALTERNATE NUMBER 1: Project 1 (Correct MH Deficiencies 6B Second Floor, VA Medical Center, Bedford, Massachusetts 518-18-001) and Project 2 (FCA Out Patient Mental Health Renovation Building 6 First Floor, VA Medical Center, Bedford, Massachusetts 518-18-035) - Delete all elevator work pertaining to specification section 14 24 00 Hydraulic Elevator. Elevator shaft to remain in project. Add to frame elevator shaft opening on the basement, first floor, and second floor with a two hour fire rated shaft wall system with 5/8” gypsum wallboard to face of shaft wall on the elevator lobby side of the opening; ensure face of gypsum board aligns with adjacent gypsum board; paint gypsum wallboard.
DEDUCT ALTERNATE NUMBER 2: Delete all roof repair work in Project 2 (FCA Out Patient Mental Health Renovation Building 6 First Floor, VA Medical Center, Bedford, Massachusetts 518-18-035).
DEDUCT ALTERNATE NUMBER 3: Delete all bathroom basement work and filling of abandoned steam trenches in Project 2 (FCA Out Patient Mental Health Renovation Building 6 First Floor, VA Medical Center, Bedford, Massachusetts 518-18-035).
F FAHRENHEIT
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT (HOSE
CONNECTION
FM FLOW METER
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOOR SINK
FS FLOW SWITCH
FU FIXTURE UNITS
EL
ELEVATION
EMCS ENERGY MONOSERRAT AND
CENTRAL SYSTEM
EPA ENVIROMENTAL PROTECTION
AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWH ELECTRIC WATER HEATER
EWS EYE WASH STATION
EWS/SH EYE WASH/DRENCH SHOWER
EX EXISTING
DCW DOMESTIC COLD WATER
DFU DRAINAGE FIXTURE UNITS
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DI DEIONIZED WATER
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRINKING WATER RETURN
DWS DRINKING WATER SUPPLY
DWV DRAIN WASTE VENT
C CELSIUS
CA COMPRESSED AIR
CGA COMPRESSED GAS ASSOCIATION
CFM CUBIC FEET PER MINUTE
CI CAST IRON
CO CLEANOUT
CS CLINICAL SINK
CV CONTROL VALVE
BFP REDUCED PRESSURE BACKFLOW
PREVENTER
BHP BREAK HORSEPOWER
BSP BLACK STEEL PIPE
BT BATHTUB
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER
HOUR
A/E ARCHITECT / ENGINEER
AD AREA DRAIN/ACCESS DOOR
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AG AIR GAP
AP ACCESS PANEL
AS AUTOMATIC SPRINKLER
ASD ADJUSTABLE SPEED DRIVES
ASD AUTOMATIC SPRINKLER DRAIN
ASHRAE AMERICAN SOCIETY OF
HEATING, REFRIGERATION, AIR
CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
ASPE AMERICAN SOCIETY OF PLUMBING
ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AV ACID VENT
AW ACID WASTE
L/S LITER PER SECOND
LA LABORATORY AIR
LAV LAVATORY
LBS/HR POUNDS PER HOUR
LCW LABORATORY COLD WATER
LHW LABORATORY HOT WATER
LNG LIQUID NATURAL GAS
LOX LIQUID OXYGEN
LV LABORATORY VACUUM
LW LOW WATER
M METER
MA MEDICAL AIR
MAV MANUAL AIR VENT
MBH 1000 BTUH
MED MEDICAL
MER MECHANICAL EQUIPMENT ROOM
MH MANHOLE
MOU MEMORANDUM OF UNDERSTADING
MSB MOP SERVICE BASIN
MV MEDICAL VACUUM
N2 NITROGEN
N20 NITROUS OXIDE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM.A. NOMINAL
NPW NON POTABLE WATER
NTS NOT TO SCALE
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OR OPERATING ROOM
OVFL OVERFLOW
KW KILOWATT
KWH KILOWATT-HOUR
ID
INSIDE DIAMETER
IE INVERT ELEVATION
ICW INDUSTRIAL COLD WATER
IHW INDUSTRIAL HOT WATER
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IRW IRRIGATION WATER
IW INDIRECT WASTE
IWH INSTANTANEOUS WATER HEATER
IWR INDUSTRIAL WATER RETURN
IWS INDUSTRIAL WATER SUPPLY
H&CW HOT AND COLD WATER
HB HOSE BIBB
HD HUB DRAIN
HEX HEAT EXCHANGER
HP HORSEPOWER
HS HAND SINK
HST HOT WATER STORAGE TANK
(DOMESTIC)
HWB HOT WATER BOILER
HWCP HOT WATER CIRCULATING PUMP
HWP HOT WATER PUMP
HYD HYDRANT
GAL GALLON
GCO GRADE CLEANOUTS
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWH GAS FIRED WATER HEATER
PA PASCAL
PD PRESSURE DROP OR DIFFERENCE
PDI PLUMBING AND DRAINAGE INSTITUTE
PG PRESSURE GAGE
PP PLUMBING PUMP
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ATMOSPHERE
PSIG POUNDS PER SQUARE INCH GAGE
PTRV PRESSURE TEMPERATURE RELIEF VALVE
PW POTABLE WATER
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RL ROOF LEADER
RP RECIRCULATION PUMP
RO REVERSE OSMOSIS WATER
RWL RAIN WATER LEADER
SAN SANITARY SEWER
SMACNA SHEET METAL AND AIR CONDITIONING
CONTRACTORS NATIONAL ASSOCIATION
SCFM STANDARD CUBIC FOOT/MINUTE
SCW SOFTENED COLD WATER
SDMH STORM DRAIN MANHOLE
SMH SANITARY MANHOLE
SP SUMP PUMP
SPR SPRINKLER LINE
SQFT/SF SQUARE FEET
SS STAINLESS STEEL
ST STORAGE TANK
SW STORM WATER
TCV TEMPERATURE CONTROL VALVE
TD TEMPERATURE DIFFERENCE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSTAT THERMOSTAT
TWR TEMPERED WATER RETURN
TWS TEMPERED WATER SUPPLY
TYP TYPICAL
V VENT
VAC VACUUM
VB VACUUM BREAKER
VCO VACUUM CLEANER OUTLET
VP VACUUM PUMP
VS VENT STACK
VSD VARIABLE SPEED DRIVE
VTR VENT THROUGH ROOF
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAGE
WH WALL HYDRANT
WH WATER HEATER
WHA WATER HAMMER ARRESTER
WL WATER LINE
WM WATER METER
WPD WATER PRESSURE DROP
WS WASTE STACK
WSFU WATER SUPPLY FIXTURE UNITS
YCO YARD CLEANOUT
YH YARD HYDRANT
EL
ID
PL105
A
PL105
DRAWING SYMBOLS
26-P3
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
PUMP NO.3 IN BUILDING NO.26
EQUIPMENT ABBREVIATION (PUMP)
DRAWING NUMBER WHERE DRAWN
GENERAL PLUMBING SYMBOLS
LIMIT OF DEMOLITION
REDUCER OR INCREASER
SIDE CONNECTION
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
UNION
RISE OR DROP IN PIPE
CAPPED OUTLET
POINT OF CONNECTION BETWEEN NEW AND EXISTING WORK
PIPE UP
PIPE DOWN
CLEAN OUT
HOSE BIB
CO
PLUMBING PIPING SYMBOLS
DOMESTIC HOT WATER, HOT WATER
DOMESTIC COLD WATER, COLD WATER
DOMESTIC HOT WATER RETURN, HOT WATER RETURN
SANITARY SEWER
VENT (SANITARY)
PLUMBING VALVE SYMBOLS
BALL VALVE
TEE
BEND
SAN
Department of Veterans Affairs
Drawing Title Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Office of Construction and Facilities Management
CONSULTANTS:
Approved: Project Director
BUILDING SIX
SEAL:ARCHITECT/ENGINEER:
STRUCTURAL ENGINEER
BOB D. CAMPBELL
4338 BELLEVIEW AVENUE
KANSAS CITY, MO 64111
(816) 531-4144
MEP ENGINEER
WATSON ENGINEERING
1112 STATE ROUTE 434
OWEGO, NY 13827
(607) 223-4334
1 100% Revisions 1/24/20
P001
PLUMBING ABBREVIATIONS &
SYMBOLS
BEDFORD VAMC
MENTAL HEALTH
BEDFORD, MA
518-18-035
1/24/20
100% S
UBMITTAL
JWE JAH
VHABEDSanfoM Text Box
DEDUCT ALTERNATES
DEDUCT ALTERNATE NUMBER 1: Project 1 (Correct MH Deficiencies 6B Second Floor, VA Medical Center, Bedford, Massachusetts 518-18-001) and Project 2 (FCA Out Patient Mental Health Renovation Building 6 First Floor, VA Medical Center, Bedford, Massachusetts 518-18-035) - Delete all elevator work pertaining to specification section 14 24 00 Hydraulic Elevator. Elevator shaft to remain in project. Add to frame elevator shaft opening on the basement, first floor, and second floor with a two hour fire rated shaft wall system with 5/8” gypsum wallboard to face of shaft wall on the elevator lobby side of the opening; ensure face of gypsum board aligns with adjacent gypsum board; paint gypsum wallboard.
DEDUCT ALTERNATE NUMBER 2: Delete all roof repair work in Project 2 (FCA Out Patient Mental Health Renovation Building 6 First Floor, VA Medical Center, Bedford, Massachusetts 518-18-035).
DEDUCT ALTERNATE NUMBER 3: Delete all bathroom basement work and filling of abandoned steam trenches in Project 2 (FCA Out Patient Mental Health Renovation Building 6 First Floor, VA Medical Center, Bedford, Massachusetts 518-18-035).
L
LL L L L L L L L L L L L
L L
L L
L L
L L
L L
L L
L L
L L
L L
LLLLLLLLLL
LLLLLLLLLLL
LLLLLLLLLLL
L
L
L
L
L
L
L
L
A B C D E F G I J K L M N P Q S T U V
7.5
6.5
R.1
6.9
B.9 D.1 R.9 T.1
SAN SAN SAN SAN SAN SAN SAN SAN
S AN6"ø
"ø
2"ø
2"ø
2"ø
4"ø
"ø5"ø
STAFF
RESTROOM
RESTROOM
H.1H O R
7.9
3.9
E.9 Q.1J.1 L.9 N.9D.9
4.1
STAFF
RESTROOM
OFFICE
STORAGE
ELEC.
ELEV.
LOBBY
ELEV.
STAIR
038MACHINE
ROOM
LOCKER ROOM
CORRIDOR
MCHIM
MCHIM
ELEVATOR
SHOP
MECHANICAL
ELEC. BREAK
RM.
ELEC. OFFICE
ELE./STORAGE
ELEC./STORAGE
STAIR
AREA
MAINTENANCE
SHOP
STAIR
MECHANICAL
SERVICE ROOM
MAIN
ELECTRICAL
ROOM
UNION OFFICE
VESTIBULE
CORRIDOR
ST…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .