102123_Cubicle Curtain.pdf

PDF 14 KB Posted

Attached to
Z2DA--Renovate Correct Outpatient Mental Health Clinic Project 518-18-035
Solicitation number
36C24120R0144
Issued by

About this file

This solicitation requests proposals for the renovation of an outpatient mental health clinic and building at the Edith Nourse Rogers Memorial Veterans Hospital in Bedford, Massachusetts. The project includes correcting mental health deficiencies in the second floor of Building 6 and renovating the outpatient mental health area in Building 6. The total estimated value is between $10-20 million. The solicitation is set aside 100% for Service-Disabled Veteran Owned Small Businesses. Proposals are due by September 4, 2020. The technical representative is Michael Sanford and the contracting officer is Richard Coutermarsh. The NAICS code is 236220 and the small business size standard is $39.5 million. A formal site visit will take place on July 29, 2020. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration VISN 1.

View the file

Other files

File Type Posted
Amendment 0009 Answers to Vendor Questions.pdf PDF
36C24120R0144 0009.pdf PDF
224000 - PLUMBING FIXTURES - 20200902 Revision 1.pdf PDF
Amendment 0008 Answer to Vendor Questions.pdf PDF
VAMC Bedford Building 6_RFI 09_WME Reponse.pdf PDF
36C24120R0144 0008.pdf PDF
VAMC Bedford Building 6_RFI 07_WME Reponse.pdf PDF
2020-08-13 VAMC Bedford 6B Renovation Pre-Bid RFI 01.pdf PDF
2020-08-18_VAMC Bedford_leopardo rfi questions_WME Response.xlsx XLSX spreadsheet
2020.08.20_AE103 and AE602_REV2 Window Fire-Ratings.pdf PDF
Amendment 0007 Answer to Vendor Questions.pdf PDF
B6 Elevation_(11304).PDF PDF
22 40 00 Plumbing Fixtures_REV1.pdf PDF
B6 Elevation_(11305).PDF PDF
36C24120R0144 0007.pdf PDF
leopardo rfi questions_combined 08202020.xlsx XLSX spreadsheet
518-15-103 Upgrade Water - Geotechnical Report and drawings 10-18-2018.pdf PDF
Section 10 25 13 Patient Bed Service Walls from Final Specifications REV1 02182020.pdf PDF
MCE ACM_LBP Bedford VAMC Rpt-(1).pdf PDF
15767 Boring (1979).pdf PDF
2020.08.20_08 80 00 Glazing_REV1.pdf PDF
2020.08.25_VAMC Bedford Building 6_RFI 05_WME Reponse.pdf PDF
062013_GRFC.pdf PDF
leopardo rfi questions and answers.pdf PDF
2020-08-13 VAMC Bedford 6B Renovation Pre-Bid RFI 01-1.pdf PDF
B6 Elevation (11304).PDF PDF
B6 Elevation (11305).PDF PDF
MCE ACM_LBP Bedford VAMC Rpt.pdf PDF
36C24120R0144 0006.pdf PDF
Section 10 25 13 Patient Bed Service Walls from Final Specifications_REV1 02182020.pdf PDF
2020-08-13_VAMC Bedford 6B Renovation_Pre-Bid RFI 01.pdf PDF
2020-08-13_Transmittal 12_Correct Mental Health Deficiencies 6B - VAMC Bedford_Pre-Bid RFI 02.pdf PDF
VAMC Bedford Building 6_RFI 02_WME Reponse.pdf PDF
Answers to Vendor Questions.pdf PDF
36C24120R0144 0005.pdf PDF
2020-08-13_Transmittal 11_Correct Mental Health Deficiencies 6B - VAMC Bedford_Pre-Bid RFI 01.pdf PDF
14 24 00 Hydraulic Elevators_REV01.pdf PDF
2020-08-13_VAMC Bedford 6B Renovation_Pre-Bid RFI 01-1.pdf PDF
room B12 part 3.pdf PDF
room B12 part 1.pdf PDF
Questions and Answers.pdf PDF
room B12 part 2.pdf PDF
site walkthrough 581-18-001 518-18-035 07292020.pdf PDF
36C24120R0144 0004.pdf PDF
S06 36C24120R0144 0003.docx DOCX document
S06 36C24120R0144 0002.docx DOCX document
S06 36C24120R0144 0001.docx DOCX document
S02 518-18-035_Construction Drawings Final R1 02042020 with deduct alternates-part 1 of 4.pdf PDF
S02 518-18-001 Final Specifications_REV1 02182020.pdf PDF
S02 Wage Rates MA20200001 03132020.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

05-01-15

518-18-035 Outpatient Mental Health Renovation

VAMC Bedford

10 21 23 - 1

SECTION 10 21 23

CUBICLE CURTAIN TRACKS

PART 1 - GENERAL

1.1 DESCRIPTION

A. This section specifies cubicle curtain track (C. C.T.) and curtain material.

1.2 RELATED WORK

A. Steel shapes for suspending track assembly: Sect ion 05 50 00, METAL

FABRICATIONS.

B. Acoustical ceiling tile and suspension systems S ection 09 51 00, ACOUSTICAL CEILINGS.

1.3 SUBMITTALS

A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT

DATA, AND SAMPLES.

B. Samples:

1. 305 mm (12 inch) long piece of cubicle curtain track with carrier access and end stop.

2. Clip anchor for fastening track to grid system of acoustical ceilings.

3. Curtain carrier for attaching curtain to track .

C. Shop Drawings: Showing layout of tracks and meth od of anchorage.

D. Manufacturer's Literature and Data:

1. Cubicle curtain track.

2. Cubicle curtain material.

1.4 DELIVERY, STORAGE AND HANDLING

A. Deliver material in original package marked to i dentify the contents, brand name, and the name of the manufacturer or sup plier.

B. Store in dry and protected location. Store so as to not bend or warp the tracks.

C. Do not open packages until contents are needed f or installation, unless verification inspection is required.

1.5 WARRANTY

A. Construction Warranty: Cubicle curtain tracks ar e subject to the terms of the Article “Warranty of Construction,” FAR clau se 52.246-21.

10 21 23 - 2

1.6 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of thi s specification to the extent referenced. The publications are referenced in the text by the basic designation only.

B. ASTM International (ASTM):

B221-14.................Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Shapes, and Tubes

B221M-13................Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Shapes, and Tubes (Metric)

B456-11.................Electrodeposited Coatings f or Copper Plus

Nickel Plus Chromium and Nickel Plus Chromium

C. Aluminum Association (AA):

DAF 45-09...............Designation System for Alum inum Finishes

D. American Architectural Manufacturers Association (AAMA):

2603-13.................Voluntary Specification, Pe rformance

Requirements and Test Procedures for Pigmented

Organic Coatings on Aluminum Extrusions and

Panels

E. The National Association of Architectural Metal Manufacturers (NAAMM):

AMP 500 Series..........Metal Finishes Manual

PART 2 - PRODUCTS

2.1 CUBICLE CURTAIN TRACKS

A. Channel Tracks (Surface Mounted Type): Extruded aluminum, ASTM B221M (B221), alloy 6063, temper T5 or T6, cha nnel shaped, with smooth inside raceway for curtain carriers.

B. Curtain Carriers: Nylon carriers, with nylon whe els on metal or nylon axles.

1. Equip each carrier with either stainless steel, chromium plated brass or steel hooks with swivel, or nickel chromiu m plated brass or stainless steel bead chain

2. Hook for bead chain may be the same material and finish as the bead chain or may be chromium plated steel.

3. Provide 2.2 carriers for every 305 mm (1 foot) o f each section of each track length, plus one (1) additional carrier.

10 21 23 - 3

C. End Stop Connectors, Ceiling Flanges and Other A ccessories: Fabricate from the same material with the same finish as the tracks or from nylon.

D. Hangers and Fittings: Fabricate from the same ma terial with the same finish as the tracks. Hangers may be round or squar e for channel tracks and round for tubular tracks. Design fittings to be compatible with design of tracks and to safely transmit the track l oad to the hangers.

E. At end of each section of track, make provision for insertion and removal of carriers. Design to prevent accidental r emoval of carrier.

Provide operating mechanism shall be removable with common tools.

2.3 CURTAINS

A. Cubicle Curtain Fabric: Maharam Flourish 2, 51 1521-002 Briar.

B. Mesh: 100% polyester with 1/2” diameter openin gs.

1. Integrated header and footer.

2. Color: buff

C. Fabrication

1. Fabric to be tabled and squared.

2. Width: Equal to track length, as indicated on d rawings plus 10 percent added fullness, but not less than 12 in ches of added fullness.

3. Length: Equal to floor-to-ceiling height minus 12” from bottom. Top

18” to be mesh.

2.4 FASTENERS

A. Exposed Fasteners, Screws and Bolts: Stainless s teel or chromium/nickel plated brass.

B. Concealed Fasteners, Screws and Bolts: Hot-dip g alvanized.

C. Metal Clips: Anchor curtain tracks to exposed gr id of lay-in acoustical tile ceilings, with concealed metal (butterfly) typ e or two piece snap locking type ceiling clip of high strength spring s teel.

1. When it is not possible to install the metal cei ling clip, the cubicle curtain track may be screwed to the ceiling grid.

2.5 FINISHES

A. Aluminum: Finish numbers for aluminum specified are in accordance with

AA DAF 45. AA-C22A31 finish, chemically etched medi um matte with clear anodic coating, Class II Architectural, .01 mm (0.4 mils) thick.

10 21 23 - 4

B. Chrome/Nickel Plating: Satin or polished finish, ASTM B546, minimum thickness of chromium plate as follows:

1. 0.005 mm (0.2 mil) on copper alloys.

2. 0.01 mm (0.4 mil) on steel.

C. Stainless Steel: No. 4 in accordance with NAAMM AMP 500.

D. Baked Enamel or Powder Coat Finish: AAMA 2603.

2.6 FABRICATION

A. Weld and grind smooth joints of fabricated compo nents.

B. Form tracks and bends of lengths that will produ ce the minimum number of joints. Make track sections up to 4877 mm (16 fe et) without joints.

Form corner bend on a 305 mm (12 inch) radius.

C. Provide steel anchor plates, supports, and ancho rs for securing components to building construction.

D. Form flat surface without distortion.

E. Shop assemble components and package complete wi th anchors and fittings.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install tracks after finish painting and ceiling finishing operations are complete.

B. Install track level and hangers plumb and secure ly anchor to the ceiling to form a rigid installation.

C. Anchor surface mounted curtain tracks directly t o exposed grid of lay-in acoustical tile ceilings with suitable faste ners, spaced approximately 610 mm (24 inches) on center.

D. Anchor surface mounted curtain tracks to concret e, plaster and gypsum board ceilings with a minimum of 3 mm (1/8-inch) di ameter fastenings or concealed clips spaced not more than 914 mm (3 feet ) on center.

E. Install suspended track 2210 mm (87 inches) abov e the finished floor, with hangers spaced no more than 1219 mm (4 feet) o n center. At ceiling line, provide flange fittings secured to hangers wi th set screws.

Secure track to walls with flanged fittings and to hangers with special fittings.

F. Fasten end stop caps to prevent them from being forced out by the striking weight of carriers.

10 21 23 - 5

G. Remove damaged or defective components and repla ce with new components or repair to the original condition.

H. Install track rigid, plumb, level and true, and securely anchored to the overhead construction.

I. Verify that carrier units operate smoothly and e asily over the full range of travel.

- - - E N D - - -