This is a 100% Performance Design Specification for a Design-Build project for the Roxbury Community College in Massachusetts. The project involves finalizing the design, procurement, installation, and commissioning of various Energy Conservation Measures (ECMs) across five campus buildings, including a geothermal heat pump system, a canopied solar photovoltaic system, roof-mounted solar thermal, lighting upgrades, a new energy management system, and HVAC upgrades. The project is being procured by the Division of Capital Asset Management and Maintenance (DCAMM) for the Roxbury Community College.
The project scope includes replacing existing equipment, installing new systems, and integrating the new systems with the existing infrastructure. Key ECMs include replacing domestic hot water heaters, installing low-flow plumbing fixtures, implementing a building automation system, upgrading lighting, installing variable frequency drives, and implementing renewable energy systems such as solar PV, solar thermal, and geothermal. The project requires coordination with the facility to minimize disruptions during construction. Contractors must comply with relevant codes, permits, and regulations, and provide necessary submittals, training, and commissioning. Pricing terms, funding sources, and other commercial details are not provided in the document.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE DESIGN
SPECIFICATION
100% PERFORMANCE SPECIFICATIONS
DCAMM No. RCC1301E ES1
September 30, 2015
63 Franklin Street Boston, MA 02110 www.arcengrs.com
(617) 542-0810
5 Centennial Drive Peabody, MA 01960 www.westonandsampson.com
(978) 532-1900
ROXBURY COMMUNITY COLLEGE 100% PERFORMANCE DESIGN SPECIFICATION
DCAMM No.: RCC1301E ES1 September 30, 2015
TABLE OF CONTENTS
PART 1 - GENERAL
1.1 GENERAL PROVISIONS
1.2 ALTERNATES
1.3 REFERENCE STANDARDS / PERFORMANCE REQUIREMENTS / QUALITY
ASSURANCE
1.4 CODES, PERMITS, FEES
1.5 OPERATIONS & MAINTENANCE (O&M)
1.6 ACCESSIBILITY
1.7 CERTIFICATIONS OF INSPECTION
1.8 SEISMIC RESTRAINT REQUIREMENTS
1.9 SUBMITTALS
1.10 DELIVERY, STORAGE, AND HANDLING
1.11 MATERIAL & EQUIPMENT STANDARDS
1.12 DISCOVERY OF HAZARDOUS MATERIALS
1.13 WORK RESTRICTIONS
1.14 COMMISSIONING
1.15 FACILITY TRAINING
PART 2 - DESCRIPTION OF THE WORK
2.1 PROJECT PHASING AND COORDINATION
2.2 EXISTING CONDITIONS DESCRIPTION
2.3 ECM LIST
2.4 ECM DETAILS
PART 3 - EXECUTION
3.1 INSTALLATION
3.2 GROUNDING
3.3 PV ARRAY CIRCUIT COMBINER BOX
3.4 SWITCH/DISCONNECTING MEANS
3.5 WIRING SPECIALTIES
3.6 DC-AC INVERTER
3.7 SOLAR PHOTOVOLTAIC (PV) MODULES
3.8 COLLECTOR SUPPORTS
3.9 INSTRUMENTATION
3.10 FIELD QUALITY CONTROL
3.11 FOLLOW-UP VERIFICATION
3.12 COMMISSIONING
3.13 INSTRUCTION
PART 4 - APPENDICES
4.1 APPENDIX A – DCAMM BUILDING AUTOMATION STANDARDS
4.2 APPENDIX B – REFERENCE HISTORICAL PHOTOGRAPHS
4.3 APPENDIX C – GEOTECHNICAL STUDY
4.4 APPENDIX D – ENERGY AUDIT ADDENDUM 9/29/2015
PART 1 - GENERAL
1.1 GENERAL PROVISIONS
A. Attention is directed to the Request for Proposals issued by DCAMM Office of Facilities Maintenance, Energy Efficiency and Sustainable Buildings Group, for Project # RCC1301E ES1, Roxbury Community College Energy and Water Upgrades, which are hereby made a part of this Design Specification.
B. This document describes the scope of work to a schematic design level only. It is anticipated that the design of the systems is completed by Architects and Engineers licensed to practice in the State of Massachusetts and employed by the design-build contractor. The role of the design team includes the completion of the Drawings and Specifications as outlined in these perfor-mance specifications and in the Energy Services Agreement (ESA) found in the RFP. Key de-sign disciplines include the following:
1. Mechanical Engineer
2. Civil Engineer
3. Electrical Engineer
4. Structural Engineer
5. Architect
C. The work included in this document will be performed for Roxbury Community College located at 1234 Columbus Avenue, Roxbury Crossing, MA 02120. The Roxbury Community College campus includes six buildings and 431,626 square feet of area. The intent of this project is to implement energy efficiency, water efficiency, basic mechanical, electrical, and general con-struction improvements and code compliance improvements to five campus buildings. These five buildings include:
Building 1 Media Center 37,687 GSF Building 2 Administration Building 32,627 GSF Building 3 Academic Building 169,320 GSF Building 4 Student Center 51,970 GSF Building 5 Reggie Lewis Track and Athletic Center 130,030 GSF Parking Lot 1 91,476 GSF
D. Reference Drawings: The scope of work is generally outlined in the Roxbury Community Col-lege Energy and Water Feasibility Study and the 30% Schematic Design Drawings appended to this document. The drawings included are as follows:
Sheet No.
Drawing No.
Description
1 TITLE PAGE
ECM 01.00
2 E0-000 ELECTRICAL - LEGEND AND NOTES
3 E1-200 ELECTRICAL - BUILDING #1 - BASEMENT & FIRST FLOOR PLANS
Sheet No.
Drawing No.
Description
4 E1-201 ELECTRICAL - BUILDING #1 - SECOND & THIRD FLOOR PLANS
5 E1-202 ELECTRICAL - BUILDING #1 - ATTIC PLAN
6 E2-200 ELECTRICAL - BUILDING #2 - FIRST & SECOND FLOOR PLANS
7 E2-201 ELECTRICAL - BUILDING #2 - THIRD & ATTIC FLOOR PLANS
8 E3-200 ELECTRICAL - BUILDING #3 - FIRST FLOOR PLANS
9 E3-201 ELECTRICAL - BUILDING #3 - SECOND FLOOR PLANS
10 E3-202 ELECTRICAL - BUILDING #3 - THIRD FLOOR PLANS
11 E3-203 ELECTRICAL - BUILDING #3 - FOURTH FLOOR PLANS
12 E3-204 ELECTRICAL - BUILDING #3 - FIFTH FLOOR PLANS
13 E3-205 ELECTRICAL - BUILDING #3 - ATTIC FLOOR PLANS
14 E4-200 ELECTRICAL - BUILDING #4 - FIRST FLOOR PLAN
15 E4-201 ELECTRICAL - BUILDING #4 - SECOND FLOOR PLAN
16 E4-202 ELECTRICAL - BUILDING #4 - THIRD FLOOR PLAN
17 E4-203 ELECTRICAL - BUILDING #4 - ATTIC FLOOR PLANS
18 E5-200 ELECTRICAL - BUILDING #5 - FIRST FLOOR PLAN
19 E5-201 ELECTRICAL - BUILDING #5 - SECOND FLOOR PLAN
ECM 04.00
20 M0-000 MECHANICAL - LEGEND AND NOTES
21 M0-400 MECHANICAL - DETAILS 1
22 M0-401 MECHANICAL - DETAILS 2
23 M0-402 MECHANICAL - DETAILS 3
24 M0-403 MECHANICAL - LAB AIRFLOW DETAILS
25 M0-500 MECHANICAL - SCHEDULES 1
26 M0-501 MECHANICAL - SCHEDULES 2
27 M1-200 MECHANICAL - BUILDING #1 - BASEMENT & FIRST FLOOR PLANS
28 M1-201 MECHANICAL - BUILDING #1 - SECOND & THIRD FLOOR PLANS
29 M1-202
MECHANICAL - BUILDING #1 - ATTIC DEMOLITION & NEW WORK
PLANS
30 MD2-201 MECHANICAL - BUILDING #2 - ATTIC DEMOLITION PLAN
31 M2-200 MECHANICAL - BUILDING #2 - FIRST & SECOND FLOOR PLAN
32 M2-201 MECHANICAL - BUILDING #2 - THIRD FLOOR & ATTIC PLAN
33 MD3-205 MECHANICAL - BUILDING #3 - ATTIC DEMOLITION PLAN
34 M3-200 MECHANICAL - BUILDING #3 - FIRST FLOOR PLAN
35 M3-201 MECHANICAL - BUILDING #3 - SECOND FLOOR PLAN
Sheet No.
Drawing No.
Description
36 M3-202 MECHANICAL - BUILDING #3 - THIRD FLOOR PLAN
37 M3-203 MECHANICAL - BUILDING #3 - FOURTH FLOOR PLAN
38 M3-204 MECHANICAL - BUILDING #3 - FIFTH FLOOR PLAN
39 M3-205 MECHANICAL - BUILDING #3 - ATTIC PLAN
40 M3-206 MECHANICAL - BUILDING #3 - ROOF PLAN
41 MD4-203 MECHANICAL - BUILDING #4 - ATTIC DEMOLITION PLAN
42 M4-200 MECHANICAL - BUILDING #4 - FIRST FLOOR PLAN
43 M4-201 MECHANICAL - BUILDING #4 - SECOND FLOOR PLAN
44 M4-202 MECHANICAL - BUILDING #4 - THIRD FLOOR PLAN
45 M4-203 MECHANICAL - BUILDING #4 - ATTIC PLAN
ECM 05.04
46 P0-000 PLUMBING - LEGEND, SCHEDULES, DETAILS, AND NOTES
47 P1-202 PLUMBING - BUILDING #1 - ATTIC PLAN
48 P2-201 PLUMBING - BUILDING #2 - SECOND FLOOR PLAN
49 P3-205 PLUMBING - BUILDING #3 - ATTIC PLAN
50 P4-203 PLUMBING - BUILDING #4 - ATTIC PLAN
ECM 05.06
51 P5-200 PLUMBING - BUILDING #5 - FIRST FLOOR PART PLANS
52 P5-201 PLUMBING - BUILDING #5 - SECOND FLOOR PART PLAN
ECM 06.00
53 M1-202
MECHANICAL - BUILDING #1 - ATTIC DEMOLITION & NEW WORK
PLANS
ECM 9.00
54 M0-500 MECHANICAL - SCHEDULES 1
55 M0-501 MECHANICAL - SCHEDULES 2
56 M1-202
MECHANICAL - BUILDING #1 - ATTIC DEMOLITION & NEW WORK
PLANS
57 M2-201 MECHANICAL - BUILDING #2 - THIRD FLOOR & ATTIC PLAN
58 M3-205 MECHANICAL - BUILDING #3 - ATTIC PLAN
59 M4-203 MECHANICAL - BUILDING #4 - ATTIC PLAN
ECM 11.01
60 E3-200 ELECTRICAL - BUILDING #3 - FIRST FLOOR PLANS
61 E4-200 ELECTRICAL - BUILDING #4 - FIRST FLOOR PLAN
ECM 15.06
Sheet No.
Drawing No.
Description
62 M0-000 MECHANICAL - LEGEND AND NOTES
63 M0-401 MECHANICAL - DETAILS 2
64 M0-402 MECHANICAL - DETAILS 3
65 M0-500 MECHANICAL - SCHEDULES 1
66 M1-202
MECHANICAL - BUILDING #1 - ATTIC DEMOLITION & NEW WORK
PLANS
ECM 19.00
67 E0-000 ELECTRICAL - LEGEND AND NOTES
ECM 21.01
68 SPV-C01 EXISTING SITE PLAN
69 SPV-C02 GENERAL PLAN & DRAINAGE PLAN
70 SPV-C03 SIGNS, PAVEMENT MARKINGS, & TIE PLAN
71 SPV-G01 SOLAR PV CANOPY CONCEPTUAL LAYOUT
72 SPV-E01 SOLAR PV - ELECTRICAL LEGEND & NOTES
73 SPV-E02 SOLAR PV - ELECTRICAL ONE LINE DIAGRAM
74 SPV-E03 SOLAR PV - ELECTRICAL ONE LINE DIAGRAM 2
75 SPV-E04 SOLAR PV - ELECTRICAL SITE PLAN
76 SPV-E05 SOLAR PV - ELECTRICAL DETAILS
77 SPV-S01 SOLAR PC CANOPY GENERAL NOTES AND DETAILS
78 SPV-S02 SOLAR PV CANOPY FOUNDATION PLAN
ECM 21.02
79 SHW-P00
SOLAR HOT WATER – PLUMBING NOTES, LEGEND &
ABBREVIATIONS
80 SHW-P01 SOLAR HOT WATER – PLUMBING SCHEMATIC
81 SHW-P02 SOLAR HOT WATER – PLUMBING ROOF LAYOUT
82 SHW-P03 SOLAR HOT WATER – PLUMBING MECHANICAL ROOM LAYOUT
83 SHW-P04 SOLAR HOT WATER – PLUMBING DETAILS I
84 SHW-P05 SOLAR HOT WATER – PLUMBING DETAILS II
85 SHW-E01 SOLAR HOT WATER - ELECTRICAL LEGEND & NOTES
86 SHW-E02 SOLAR HOT WATER - ELECTRICAL ROOF PLAN
ECM 21.03
87 GEO-C01 EXISTING SITE PLAN
88 GEO-E01 GEOTHERMAL - ELECTRICAL LEGEND & NOTES
89 GEO-E02 GEOTHERMAL - ELECTRICAL ONE LINE DIAGRAM
Sheet No.
Drawing No.
Description
90 GEO-E03 GEOTHERMAL - ELECTRICAL FIRST FLOOR POWER PLAN
91 GEO-H00 GEOTHERMAL - LEGEND
92 GEO-H01 GEOTHERMAL - BUILDING #3 - FIRST FLOOR DEMOITION PLAN
93 GEO-H02 GEOTHERMAL - BUILDING #3 - ATTIC DEMOITION PLAN
94 GEO-H03 GEOTHERMAL - BUILDING #3 - FIRST FLOOR NEW WORK PLAN
95 GEO-H04 GEOTHERMAL - BUILDING #3 - ATTIC FLOOR NEW WORK PLAN
96 GEO-H05 GEOTHERWAL - PROPOSED WELL FIELD LAYOUT
97 GEO-H06
GEOTHERMAL - CONDENSER WATER FLOW SCHEMATIC -
DEMOLITION
98 GEO-H07 GEOTHERMAL - CONDENSER WATER FLOW SCHEMATIC - PART 1
99 GEO-H08 GEOTHERMAL - CONDENSER WATER FLOW SCHEMATIC - PART 2
100 GEO-H09 GEOTHERMAL - DETAILS
101 GEO-H10 GEOTHERMAL - SCHEDULES
ECM 22.00
102 M0-000 MECHANICAL - LEGEND AND NOTES
103 M0-400 MECHANICAL - DETAILS 1
104 M0-401 MECHANICAL - DETAILS 2
105 M0-402 MECHANICAL - DETAILS 3
106 M0-403 MECHANICAL - LAB AIRFLOW DETAILS
107 M0-500 MECHANICAL - SCHEDULES 1
108 M0-501 MECHANICAL - SCHEDULES 2
109 M1-202
MECHANICAL - BUILDING #1 - ATTIC DEMOLITION & NEW WORK
PLANS
110 MD2-201 MECHANICAL - BUILDING #2 - ATTIC DEMOLITION PLAN
111 MD3-205 MECHANICAL - BUILDING #3 - ATTIC DEMOLITION PLAN
112 M3-200 MECHANICAL - BUILDING #3 - FIRST FLOOR PLAN
113 M3-201 MECHANICAL - BUILDING #3 - SECOND FLOOR PLAN
114 M3-202 MECHANICAL - BUILDING #3 - THIRD FLOOR PLAN
115 M3-203 MECHANICAL - BUILDING #3 - FOURTH FLOOR PLAN
116 M3-204 MECHANICAL - BUILDING #3 - FIFTH FLOOR PLAN
117 M3-205 MECHANICAL - BUILDING #3 - ATTIC PLAN
118 M3-206 MECHANICAL - BUILDING #3 - ROOF PLAN
119 MD4-203 MECHANICAL - BUILDING #4 - ATTIC DEMOLITION PLAN
120 M4-200 MECHANICAL - BUILDING #4 - FIRST FLOOR PLAN
Sheet No.
Drawing No.
Description
121 M4-201 MECHANICAL - BUILDING #4 - SECOND FLOOR PLAN
122 M4-202 MECHANICAL - BUILDING #4 - THIRD FLOOR PLAN
123 M4-203 MECHANICAL - BUILDING #4 - ATTIC PLAN
E. This document forms part of a large package of Energy Conservation Measures (ECMs) with the following summary of reference numbers, locations, and descriptions:
ECM No. 01.01 Lamps, Ballasts and Fixture Replacement Buildings 1, 2, 3, 4, 5 Retrofit existing T-8 Lighting Fixtures with LED
ECM No. 01.03 Fluorescent Fixture Retrofit Buildings 1, 2, 3, 4, 5 Retrofit existing fluorescent lighting fixtures with LED
ECM No. 04.00 Energy Management System and Controls Buildings 1, 2, 3, 4 Install DDC controllers on the energy management system
ECM No. 04.02 Outside Air Control and Economizers Buildings 3 Installed as part of ECM 22
ECM No. 04.07 DDC Controllers
Install DDC controllers on the energy management system as part of ECM 4.00.
ECM No. 04.13 Operational Enhancements Buildings 4 Installed as part of ECM 4.00.
ECM No. 05.04 Domestic Hot Water Heater Replacement
Replace existing domestic hot water heaters with new hot water heaters.
ECM No. 06.01 Sewer Conservation Buildings 1 Apply for sewer abatement for the cooling tower evaporative losses.
ECM No. 09.00 Variable Frequency Drives
Install VFDs on all new pumps and air handling units as part of ECM 22.
ECM No. 11.01 Vending misers Buildings 3,4 Add vending misers to vending machines.
ECM No. 14.01 Boiler Replacement
Replace boiler as part of ECM 21.04.
ECM No. 15.06 Cooling Tower Replacement and Upgrades Buildings 1 Install new cooling tower on existing dunnage.
ECM No. 19.00 Real-Time Metering Buildings 1, 2, 3, 4, 5 Install real-time metering at the main electrical service.
ECM No. 21.02 Renewable Energy Systems – Solar Thermal System Buildings 3 Installation of 16 evacuated tube solar thermal collectors on the roof of Building 3. The system should include solar thermal storage tank and connection to existing domestic hot water tanks in Building 3. System is expected to meet MassCEC grant eligibility requirements under the Com-monwealth Solar Hot Water program and should be capable of registering useful heat energy for Alternative Energy Credits as a Class I renewable energy system. Preliminary analysis has found that the Academic Building Lower Roof (Level 5) has an additional uniform load capacity of ap-proximately 8 pounds per square foot (psf), and approximately 15 psf for the concrete roof deck at the previous greenhouse location. The existing W18x40 beams along Grids 3.1 and 9.9 be-tween Grids F and G appear to control the uniform load capacity as they are subjected to drifting and sliding snow loads from the adjacent roofs. The existing roof framing may require reinforcing and/or supplemental framing based on the actual solar hot water framing configuration. The SER for the roof mounted solar hot water system shall apply the new solar hot water loads based on the actual framing configuration and verify the capacity of the existing roof framing. A summary of the proposed layout and the structural analysis shall be submitted to the owner for review. In-stallation of solar thermal collectors shall also be coordinated with other contractors for the re-moval of existing greenhouse and replacement of existing roof.
ECM No. 21.04 Renewable Energy Systems – Geothermal System Buildings 2, 3, 4, and Parking Lot #1 Installation of 120, 6-inch diameter by 500 feet deep, closed loop geothermal wells in Parking Lot #1. Scope of work includes trenching, piping, plumbing, monitoring systems, mechanical pump-ing and heat exchangers for complete ground source heat pump system for Buildings 2, 3, and 4.
Installed system is expected to register useful heat energy for Alternative Energy Credits as a Class I renewable energy system.
ECM No. 22.00 Air Handling Unit Replacement Buildings 1, 2, 3, 4 Replace existing air handling units.
ECM No. 22.00 Makeup Air Unit Replacement Buildings 3 Replace existing makeup air unit AHU-1.
ECM No. 22.00 Computer Room Cooling Unit Replacement
Replace existing units CRU-1 and CRU-2 in the Server Room.
ECM No. 22.00 Exhaust Fan Replacement
Replace existing exhaust fans.
ECM No. 22.00 Condenser Water Pump Replacement Buildings 1 Replace existing P-3 and P-4 with resized units.
ECM No. 23.00 Power Factor Correction (building 3 only)
Install 250 kVAr capacitors and switching.
F. The Owner desires to obtain any and all available grants, rebates and incentives from the local utility, MADOER, MACEC, System of Assurance, or other awarding entity. The Contractor shall assist Owner and provide any required information, calculations, product information, cut sheets, etc., needed to receive eligible incentives for the benefit of the Owner from the electric or gas utility, or state agency for all eligible systems and equipment, including solar electrical generation equipment, pumps, motors, lighting, VFD, motor controllers, etc. Contractor shall prepare all necessary forms and technical information and submit to the Owner for review and signature before filing with electric or gas utility or State agencies with copies sent to the Own-er’s Engineer or Owners Project Manager. All grants, rebates and incentives shall be assigned to be paid directly to the Owner.
1.2 ALTERNATES
A. REQUIRED ADD ALTERNATES
ECM No. 05.06: Low Flow Toilers Buildings 5 Install low flow valves on 42 toilets.
ECM No. 05.08: Low Flow Showerheads Building 5 Install low flow showerheads on 36 showers.
ECM NO. 21.01: Renewable Energy Systems:
Solar PV Canopy and EV Charging Stations Parking Lot #1 This ECM includes the installation of 937 kW (DC) (nominal) solar photovoltaic parking lot canopies in Parking Lot #1, capable of producing an average of 1,032,000 kWh per year. Sys-tem design shall be based on string level inverters interconnected in accordance with net meter-ing requirements of local utility (Eversource) and eligibility under SREC II, and Massachusetts System of Assurance under the public entity net metering cap. Scope also includes installation of rainwater management system, subsurface tie-in to existing storm drain, new LED canopy lighting, new asphalt pavement, parking lot striping, and three dual electric vehicle charging sta-tions with point of sale transaction capabilities. Solar PV and new EV charging stations in-stalled per DOER LBE grant requirements and coordinated with geothermal system installation contractor.
ECM NO. 21.01.01: Renewable Energy Systems:
EV Charging Stations (Location #1) Parking Lot #1 This Alternate includes three dual electric vehicle charging stations with point of sale transac-tion capabilities, located in the existing Parking Lot #1.
ECM NO. 21.01.02: Renewable Energy Systems:
EV Charging Stations (Location #2) Parking Lot #1 This Alternate includes three dual electric vehicle charging stations in the northeast corner of Parking Lot #1.This alternate includes tree removal, clearing, grading, subgrade and pavement for the new added parking spaces.
ECM No. 23.00 Energy Awareness Program and Educational Kiosk Buildings 1,2,3,4, 5 Begin energy awareness program to involve facility and students for Energy Efficiency. In-cludes installation of an educational kiosk.
1.3 REFERENCE STANDARDS / PERFORMANCE REQUIREMENTS / QUALITY
ASSURANCE
A. Industry Organizations: Where abbreviations and acronyms are used, they shall mean the rec-ognized name of the entities indicated in Gale Research's "Encyclopedia of Associations" or in Columbia Books' "National Trade & Professional Associations of the U.S:
AA Aluminum Association, Inc. (The) AAMA American Architectural Manufacturers Association AASHTO American Association of State Highway and Transportation Officials ABAA Air Barrier Association of America ACI/Int. American Concrete Institute AGC Associated General Contractors of America (The) AIA American Institute of Architects (The) AISC American Institute of Steel Construction AISI American Iron and Steel Institute ALSC American Lumber Standard Committee, Incorporated AMCA Air Movement and Control Association International, Inc.
ANSI American National Standards Institute APA The Engineered Wood Association ARMA Asphalt Roofing Manufacturers Association ASCE American Society of Civil Engineers ASHRAE American Society of Heating, Refrigerating and Air-Conditioning Engineers ASME/Int. The American Society of Mechanical Engineers International ASTM/Int. American Society for Testing and Materials International AWI Architectural Woodwork Institute AWPA American Wood-Preservers' Association AWS American Welding Society
BCA Building Commissioning Association BHMA Builders Hardware Manufacturers Association BIA Brick Industry Association (The) CDA Copper Development Association CISCA Ceilings & Interior Systems Construction Association CRI Carpet & Rug Institute (The) CSI Construction Specifications Institute (The) DHI Door and Hardware Institute EPA Environmental Protection Agency (United States) FM Factory Mutual FMRC Factory Mutual Research (Now FM Global) FSC Forest Stewardship Council GA Gypsum Association GANA Glass Association of North America GS Green Seal HPVA Hardwood Plywood & Veneer Association ICRI International Concrete Repair Institute, Inc.
IEBC International Existing Building Code IESNA Illuminating Engineering Society of North America ILI Indiana Limestone Institute of America, Inc.
ISO International Organization for Standardization ISSFA International Solid Surface Fabricators Association ITS Intertek Testing Service NA LEED Leadership in Energy & Environmental Design (USGBC) MFMA Maple Flooring Manufacturers Association, Inc.
NAAMM National Association of Architectural Metal Manufacturers NAIMA North American Insulation Manufacturers Association NBGQA National Building Granite Quarries Association, Inc.
NCMA National Concrete Masonry Association NeLMA Northeastern Lumber Manufacturers' Association NEMA National Electrical Manufacturers Association NEBB National Environmental Balancing Bureau NFPA National Fire Protection Association NFRC National Fenestration Rating Council NOFMA The Wood Flooring Manufacturers Association (Formerly: National Oak Flooring Manufacturers Association) NRCA National Roofing Contractors Association NSF / Int. National Sanitation Foundation International NTMA National Terrazzo & Mosaic Association, Inc. (The) NWWDA National Wood Window and Door Association (Now WDMA) SDI Steel Deck Institute SDI Steel Door Institute SGCC Safety Glazing Certification Council SJI Steel Joist Institute SMACNA Sheet Metal and Air Conditioning Contractors' National Association SSINA Specialty Steel Industry of North America SSPC The Society for Protective Coatings TCA Tile Council of America, Inc.
UL Underwriters Laboratories Inc.
USGBC U.S. Green Building Council WCLIB West Coast Lumber Inspection Bureau
WDMA Window & Door Manufacturers Association (Formerly: NWWDA - National Wood Window and Door Association) WWPA Western Wood Products Association
B. General requirements, materials and installation shall comply with DCAMM Standard Specifica-tions, November 2012 Version 7.1, which shall form the basis for design specifications for the project. Where these specifications conflict with the ESA, the ESA (attached to RFP) shall take precedence at the direction of DCAMM. Where suitable DCAMM standard specifications are not available or appropriate, the design-build contractor shall develop documents from standards as recommended by Industry Organizations listed in paragraph A., above.
C. Anticipated DCAMM trade sections for this project include, but are not limited to:
DIVISION 01 - GENERAL REQUIREMENTS
Section 013100 Project Management and Coordination Section 013200 Construction Progress Documentation Section 013300 Submittal Requirements Section 013543 Environmental Protection Procedures Section 014000 Quality Requirements Section 014200 References Section 014325 Testing Agency Services Section 015000 Temporary Facilities and Controls Section 015716 Temporary Pest Control Section 016000 Product Requirements Section 017418 Demolition Waste Management and Disposal Section 017419 Construction Waste Management and Disposal Section 017700 Contract Closeout Section 018100 Commissioning Section 018113 Sustainable Design Requirements
DIVISION 02 - EXISTING CONDITIONS
Section 024100 Demolition
DIVISION 03 - CONCRETE
Section 033000 Cast-In-Place Concrete Section 035300 Concrete Floor Topping
DIVISION 04 - MASONRY
Section 042000 Unit Masonry
DIVISION 05 - METALS
Section 051200 Structural Steel Framing Section 055000 Metal Fabrications
DIVISION 06 - WOOD, PLASTICS AND COMPOSITES
Section 061000 Rough Carpentry Section 061600 Sheathing Section 062013 Exterior Finish Carpentry Section 064023 Interior Architectural Woodwork
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
Section 072100 Thermal Insulation Section 072713 Membrane Air Barriers Section 076100 Sheet Metal Roofing Section 076200 Sheet Metal Flashing and Trim Section 077200 Roof Accessories Section 078413 Penetration Firestopping Section 079200 Joint Sealants
DIVISION 08 - OPENINGS
Section 081113 Hollow Metal Doors and Frames Section 087100 Door Hardware Section 088000 Glazing Section 089000 Louvers and Vents
DIVISION 09 - FINISHES
Section 092116 Gypsum Board Assemblies Section 092117 Gypsum Board Shaft Wall Assemblies Section 095113 Acoustical Panel Ceilings Section 096500 Resilient Flooring Section 096800 Carpeting Section 099000 Painting and Coating
DIVISION 21 - FIRE SUPPRESSION
Section 210001 Fire Protection
DIVISION 22 - PLUMBING
Section 220001 Plumbing
DIVISION 23 - HEATING VENTILATING AND AIR CONDITIONING
Section 230001 Heating, Ventilating and Air-Conditioning
DIVISION 26 - ELECTRICAL
Section 260001 Electrical Work
DIVISION 27 – COMMUNICATIONS
Section 270000 Communication Cabling Systems
DIVISION 31 - EARTHWORK
Section 311000 Site Clearing Section 312000 Earth Moving Section 312500 Erosion and Sedimentation Controls Section 315000 Excavation Support and Protection
DIVISION 32 - EXTERIOR IMPROVEMENTS
Section 321216 Asphalt Paving Section 321313 Concrete Paving Section 329200 Turf and Grasses
1.4 CODES, PERMITS, FEES
A. The Commonwealth of Massachusetts currently recognizes the 2009 International Codes (Icodes) including the International Mechanical Code 2009 with specific amend-ments/regulations referred to as the 8th Edition Base Code as the governing code. All design of structural components and systems shall satisfy the 8th Edition of the Massachusetts State Building Code (CMR 780) and Massachusetts State Fire Code (CMR 527)- including all current amendments - for a commercial structure constructed in the City of Boston, MA.
B. Unless otherwise specified or indicated, materials, workmanship and equipment performance shall conform with the latest governing edition of the following standards, codes, specifications, requirements, and regulations, including but not limited to:
1. All Applicable NFPA Standards
2. State and Local Building Codes:
3. American Society of Mechanical Engineers
4. American Society of Testing and Materials
5. American National Standards Institute
6. Underwriters' Laboratories, Inc.
7. Occupational Safety and Health Administration
8. Department of Environmental Protection
9. Massachusetts State Building Codes
10. Massachusetts State Fire Codes
11. Massachusetts State Plumbing Codes
12. Thermal Insulation Manufacturers Association (Tllv1A)
13. Institute of Electrical and Electronics Engineers (IEEE)
14. Insulated Cable Engineers Association (ICEA)
15. Certified Ballast Manufacturers (CMB)
16. Illuminating Engineering Society (IES)
17. Local Conservation Commission & DEP
18. Any other local codes or authorities having jurisdiction including any other standards spe-cifically indicated in other paragraphs of this specification.
C. All pressure vessels shall conform to ASME and Massachusetts’s codes and regulations.
D. This Design/Build Contractor shall give all notices, file all plans, prepare existing building code evaluations, obtain and pay for all permits and licenses, and obtain all necessary approvals from authorities having jurisdiction. Deliver all certificates of inspection to the authorities having ju-risdiction. No work shall be covered before examination and approval by inspectors, and au-thorities having jurisdiction. Replace unacceptable work to conform to requirements without ex-tra cost to DCAMM. If work is covered before inspection and approval, the Contractor shall pay costs of uncovering and reinstalling the covering, whether it meets contract requirements or not.
E. The Design/Build Contractor shall be the engineer-of-record, shall produce and stamp all doc-uments as necessary for obtaining permits.
F. Refer to the ESA for further requirements
1.5 OPERATIONS & MAINTENANCE (O&M)
A. For a listing of O&M criteria, Proposers should refer to the standard Commonwealth Energy Services Agreement (ESA), Part C, and Schedule C of the ESA, found in the RFP.
1.6 ACCESSIBILITY
A. All work shall be installed so that parts requiring periodic inspection, maintenance and repair are readily accessible.
1.7 CERTIFICATIONS OF INSPECTION
A. Furnish upon completion of all work, certificates of inspections from the manufacturers stating that authorized factory engineers have inspected and tested the operation of their respective equipment and found same to be in satisfactory operating conditions.
1.8 SEISMIC RESTRAINT REQUIREMENTS
A. The contractor shall provide an engineered seismic design system to resist the effects of earth-quake motions in accordance with ASCE 7. The seismic design category and all associated val-ues shall be in accordance with ASCE 7. For each seismic restraint, provide certified calcula-tions to verify adequacy to meet the following design requirements:
1. Ability to accommodate relative seismic displacements of supported item between points of support
2. Ability to accommodate the required seismic forces
B. For each respective set of anchor bolts provide calculations to verify adequacy to meet com-bined seismic-induced sheer and tension forces
C. For each weldment between structure and item subject to seismic force, provide calculations to verify adequacy.
D. Calculations shall be stamped by a professional engineer who is registered in the Common-wealth of Massachusetts and has specific experience in seismic calculations.
E. Restraints shall maintain the restrained item in a captive position without short-circuiting the vibration isolation.
F. Furnish and install vibration control devices, materials, and related items.
1.9 SUBMITTALS
A. Refer to Section 6.5 of ESA.
B. Product Data: Submit manufacturer's product information, specifications and descriptive printed literature, for all materials, products and finishes used.
C. Shop Drawings: Provide complete erection and installation drawings to clearly indicate proper assembly and installation of all systems and building components. Drawings shall be prepared and signed by a professional engineer registered in the Commonwealth of Massachusetts.
D. Wiring Diagrams: Power, signal, and control wiring (factory and field wiring diagrams).
E. List of all software integration points and functions available to the Energy Management Sys-tem (EMS) via the standard integration protocols (Modbus, BACnet)
F. Direct Digital Control (DDC) system one-line diagrams and sequence of operations.
G. Certification: Submit written certification prepared and signed by a professional engineer regis-tered to practice in the Commonwealth of Massachusetts, verifying that systems, components, equipment meets indicated design requirements and codes of authorities having jurisdiction.
H. Samples: Provide samples as required by DCAMM.
1.10 DELIVERY, STORAGE, AND HANDLING
A. Deliver and store all materials so they will not be damaged or deformed.
B. Parking Lot 3 may be used for storage. This area to be shared with other contractors for other contract work.
C. Stack materials on platforms or pallets, covered with tarpaulins or other suitable weather-tight ventilated covering. Store steel so that the water accumulations will drain freely.
D. Provide secure storage for materials and equipment on site.
E. Site Security – It shall be the responsibility of the contractor and their subs to maintain site se-curity of their materials stored in Lot 3.
1.11 MATERIAL & EQUIPMENT STANDARDS
A. No equipment or material shall be used unless previously approved by DCAMM. All materials, equipment and accessories provided shall be new and unused.
B. All materials, equipment and accessories provided shall be new and unused products of recog-nized manufacturers as approved by DCAMM.
1.12 DISCOVERY OF HAZARDOUS MATERIALS
A. The General Contractor and Design/Build Team shall cooperate with DCAMM and the Facility to review existing documentation and field conditions to identify the potential of hazardous ma-terials, and assist in identifying services required with respect to the analysis, detection, remov-al, containment, treatment, and disposal of such regulated materials.
B. Refer to referenced DCAMM Specifications, including Section 017418 Demolition Waste MGMT and Disposal and Section 024100 Demolition.
1.13 WORK RESTRICTIONS
A. Normal working hours shall be Monday thru Friday, from 7 am to 4 pm. The contractor will be permitted to conduct construction activities in the designated work area during these hours.
B. Special circumstance or other events may require the contractor to conduct construction activi-ties outside of the time designated as Normal Working Hours. The contractor must request per-mission from DCAMM in writing 15 calendar days prior to the requested period. The written request shall include a description of the construction activity to be performed, time of day con-struction activity is to be performed and the anticipated duration of the construction activity.
C. Heating, cooling and ventilation must be available 24 hours per day, 7 days per week, 365 days per year. Temporary shutdowns of these systems required to implement proposed improvements must be accomplished without impacting school calendar or other College activities and busi-ness. Refer to Part 2 Section 2.1 PHASING OF THE WORK and the ESA, including Section 20 and Schedule H Standards of Comfort.
1.14 COMMISSIONING
A. Please refer to the "DCAMM Request for Proposals (RFP), in the ESA under Attachment E Part 1, Schedule G”, for commissioning requirements.
1.15 FACILITY TRAINING
A. Session shall include:
1. Up to four people.
2. Minimum three day training school.
3. ATC shop drawings and owner’s manual.
4. On-Site Training: Minimum of six separate days of 8 hour training sessions.
PART 2 - DESCRIPTION OF THE WORK
2.1 PROJECT PHASING AND COORDINATION
A. Work Phasing Sequence for Parking Lot
1. Reclaim Asphalt*
2. Install new gravity stormwater drainage and tie to existing stormwater*
3. Install Canopy Foundations*
4. Install Closed Loop Geothermal Wells, Trenches, Piping and Valve Vaults*
5. Install New Asphalt Pavement
6. Install Parking Canopy Structure
*Excavated soil shall be handled under soil management plan as developed and directed by Licensed Site Professional pursuant to Massachusetts Contingency Plan rules and regulations.
B. The contractor shall be provide a full project schedule prior to the start of any work.
C. All shutdowns, including electrical service, ventilation, heating, cooling, gas, domestic water must be coordinated with the facility. The contractor shall provide temporary services as neces-sary for any space which must remain occupied during construction as determined by the facili-ty.
D. Confine operations to areas within contract limits indicated. Do not disturb portions of the site beyond the areas in which the Work is indicated.
1. Owner Occupancy: Allow for Owner occupancy and use by the public (if applicable).
2. Driveways and Entrances: Keep driveways and entrances serving the premises clear and available to the Owner, the Owner’s employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
E. Schedule and perform work to afford minimum of interruption to normal and continuous opera-tion of utility systems. The Contractor shall submit to Owner for approval, proposed schedule for performing work; including construction of new utilities, re-routing of existing utilities and final connection of new work to existing work. Schedule shall indicate shutdown time required for each operation.
1. Work includes checking all safety devices to verify that they have come back on-line after interruption. This requirement will not be waived.
F. The Contractor shall notify the DCAMM and Operating Agency in writing, 1 week in advance of the proposed time for shutting down or interrupting any utilities, services or facilities which may affect the operation of other buildings, services or facilities of the Operating Agency.
G. Coordinate with DCAMM and the Designer, work in connection with adjacent driveways, walks, or other facilities which would prevent access thereto or interrupt, restrict, or otherwise infringe upon the Operating Agency’s use thereof.
H. The Contractor shall be aware of the sensitivity of the neighborhood organizations to noise, dust, debris, vibration, and site maintenance and take appropriate precautions to avoid conflict.
I. Damage to existing work, if caused by the Contractor’s operations under this Contract, shall be repaired at the Contractor’s expense.
1. An existing conditions survey shall be conducted, with the Designer, the DCAMM Project Manager, and User Agency representatives, at which existing conditions will be vide-otaped by the General Contractor. A copy of the videotape will be provided to the DCAMM Project Manager.
J. Trenching and other work outside construction limits shall be expedited to fullest extent and carried out with minimum of inconvenience to normal operation of the Operating Agency and public traffic. Walks, paved or landscaped areas over which temporary driveways cross, shall upon completion of the work, be restored to their original condition. Temporary roadways shall be bridged over trenched areas.
K. Confine operations at the site to areas permitted by:
1. Laws
2. Ordinances
3. Permits
4. Contract Documents
5. Owner’s Regulations
L. If required by User Agency or the DCAMM Project Manager, workers will be required to wear identifying name badges. In secure areas, submit names of workers for clearing by the DCAMM Project Manager.
M. Contractor shall supervise the use of the site related to construction and be responsible for cor-recting any damage identified by the DCAMM Project Manager to the DCAMM Project Man-ager’s satisfaction.
1. An existing conditions survey shall be conducted, with the Designer, The DCAMM Pro-ject Manager, and User Agency representatives, at which existing conditions will be vide-otaped by the General Contractor. A copy of the videotape will be provided to the DCAMM Project Manager.
N. All available existing utilities adjacent to the construction site will be available for use during construction unless indicated otherwise. Temporary connections to these utilities, all metering, transformers, removal, usage, and their associated costs will be the responsibility of the appro-priate Subcontractor.
O. Outages required for construction purposes shall be scheduled for the shortest practical periods of time, in coordination with the User Agency’s designated representative, for specified, mutu-ally agreeable periods of time, after each of which the interruption shall cease and the service shall be restored. This procedure shall be repeated to suit the User Agency’s working schedule, as many times as required until all work is completed. Any outages of service shall be approved by DCAMM’s Project Manager, prior to commencing the work. No outages or shutdowns of service shall occur without the written authorization of the DCAMM’s Project Manager prior to commencing the work. Give notice of any scheduled shutdowns, a minimum of weeks in ad-vance. User Agency shall make their best efforts to meet this request without adversely affect-ing the electric service to the existing building.
P. Prior to any deactivation and relocation or demolition work and arrange a conference with the Designer and the DCAMM’s Project Manager in the field to inspect each of the items to be de-activated, removed or relocated. Care shall be taken to protect all equipment designated to be relocated and reused or to remain in operation and be integrated with the new systems.
Q. All deactivation, relocation and temporary tie ins of systems and equipment shall be provided by the Contractor. All demolition and removal of systems and equipment shall be provided by the Contractor. All hazardous electrical materials shall be legally disposed of by the electrical subcontractor.
R. DCAMM’s Project Manager reserves the right to inspect the material scheduled for removal and salvage any items he deems usable as spare parts.
2.2 EXISTING CONDITIONS DESCRIPTION
A. Building #1 – Visual / Performing Arts
1. General Info
a. Built – 1988
b. Function – Classes and Performance Space
c. Number of Floors – 3
d. Size – 33,744 sq ft.
2. Mechanical Systems
a. Primary heating in each space is achieved by electric duct heaters as well as electric baseboard located in perimeter spaces. Ventilation is achieved by three air handling units connected to each space by ductwork. Ventilation air cooling is provided by the units through connection to the condenser water loop while ventilation air heat-ing is provided by the electric duct heaters throughout the building. Return air is exhausted through various exhaust fans located in the mechanical room.
b. ACU-8 – Attic Mechanical Room
1) Serves auditorium and stage area of building
2) 18,000 CFM, 15% OA, constant volume
3) Cooling provided by packaged water cooled condenser connected to building condenser water loop.
4) Associated with RAF-49 also located in attic mechanical room
c. ACU-6, ACU-7 – Attic Mechanical Room
1) Identical units connected to same intake and supply air ductwork
2) 15,000 CFM, 32% OA, variable volume controlled by inlet guide vanes
3) Cooling provided by packaged water cooled condenser connected to building condenser water loop.
4) Associated with RAF-48 also located in attic mechanical room
d. CT-2 – Building Roof
1) Open circuit cooling tower serving building #1 condenser water loop
2) 180 tons of nominal cooling capacity
e. RAF-48
1) 20,350 CFM vane-axial return fan located in attic mechanical room
f. RAF-49
1) 15,350 CFM vane-axial return fan located in attic mechanical room
g. 10 other miscellaneous smaller exhaust fans
h. P-3, P-4 – Attic Mechanical Room
1) Identical pumps in lead/lag
2) Serve building condenser water loop
3) 540 GPM, 75 ft. head
4) Gould 4X6X11G Model 3405
3. Electrical System
a. The campus is primary metered. A 1,500kVA, 13.8kV:277/480V, exterior pad mounted transformer provides secondary service to a 2000 amp, 277/480V, 3 phase, 4 wire main switchboard in a basement main electric room.
4. Lighting Systems
a. The Auditorium house lighting systems consists of incandescent cylinder fixtures connected to the auditorium dimming system. The remainder of the spaces in the building consist of linear fluorescent fixtures and recessed down lighting.
b. Renovations in this building are also replacing portions of the lighting systems under a separate project. The renovations occurring under the separate project are indicat-ed with hatching on the electrical drawings.
5. Plumbing Systems
a. EWH-2
1) Provides all domestic hot water to building
2) 120 gallon tank
3) Electric heating, 15kW capacity
4) Located in attic mechanical room
5) Hubbell SE120-0-15CST4
B. Building #2 – Administration Building
1. General Info
a. Built – 1988
b. Function – Offices and Meeting Areas
c. Number of Floors – 3
d. Size – 24,480 sq ft.
2. Mechanical Systems
a. Primary heating and cooling is achieved by cabinet water-source heat pump (WSHP) units for all exterior spaces and above-ceiling ducted WSHP units for interior spac-
es. These units are connected to a main condenser water loop that serves building 2, 3, and 4. Ventilation is provided by a single air handler (ACU-3) located in the attic mechanical room. This unit includes an electric heating coil and a DX cooling coil associated with an external water cooled condensing unit connected to the condenser water loop also located in the attic mechanical room.
b. ACU-3 – Attic Mechanical Room
1) 3,720 CFM supply air, 100% OA
2) DX cooling coil – 122 MBH sensible, 211.8 MBH total cooling capacity
3) Electric Heating coil, 273 MBH capacity
c. WCCU-3 – Attic Mechanical Room
1) Serves ACU-3
2) Connected to main condenser water loop serving buildings 2, 3, and 4.
3) 211 MBH total cooling capacity
3. Electrical System
a. The campus is primary metered. A 600kVA, 13.8kV:277/480V, exterior pad mounted transformer provides secondary service to a 800 amp, 277/480V, 3 phase, 4 wire main switchboard in a basement main electric room.
4. Lighting Systems
a. The lighting systems consist primarily of linear fluorescent fixtures and recessed down lighting.
b. Renovations in this building are also replacing portions of the lighting systems under a separate project. The renovations occurring under the separate project are indicat-ed with hatching on the electrical drawings.
5. Plumbing Systems
a. DHW-1
1) Provides all hot water to building
2) 52 gallon tank
3) Electric heating, 9kW capacity
4) Located in second floor janitor closet
C. Building #3 – Academic Building
1. General Info
a. Built – 1988
b. Function – Classrooms and Laboratories
c. Number of Floors – 5
d. Size – 133,320 sq ft.
2. Mechanical Systems
a. Primary heating and cooling is achieved by cabinet water-source heat pump (WSHP) units for all exterior spaces and above-ceiling ducted WSHP units for interior spac-
es. These units are connected to a condenser water loop that serves building 2, 3, and 4. Ventilation is provided by a three air handlers (ACU-1, 2, and 5) located in the attic mechanical room. There is also a makeup air unit (AHU-1) that serves lab hoods in the 5th floor lab spaces.
b. P-1, P-2 – Attic Mechanical Room
1) Identical pumps in lead/lag
2) Serve main condenser water loop
3) 2400 GPM, 140 ft. head
4) Gould 10X10-14L Model 3405
c. ACU-1 – North Attic Mechanical Room
1) 12,000 CFM supply, 100% OA
2) DX cooling coil – 364 MBH sensible, 633 total cooling capacity, associated with WCCU-1
3) Electric heating coil – 757 MBH
4) Serves classrooms and hallways on all floors in the north section of the build-ing.
d. ACU-2 – South Attic Mechanical Room
1) 12,000 CFM supply, 100% OA
2) DX cooling coil – 364 MBH sensible, 633 total cooling capacity, associated with WCCU-2
3) Electric heating coil – 757 MBH
4) Serves classrooms and hallways on all floors in the south section of the build-ing.
e. ACU-5 – South Attic Mechanical Room
1) 4,800 CFM supply, 20% OA
2) DX cooling coil – 131 MBH sensible, 187 total cooling capacity, associated with packaged compressor unit connected to main condenser water loop
3) Serves library on the 1st and 2nd floors of the building
f. WCCU-1 – North Attic Mechanical Room
1) Serves ACU-1
2) Connected to main condenser water loop serving buildings 2, 3, and 4.
3) 636 MBH total cooling capacity
g. WCCU-2 – South Attic Mechanical Room
1) Serves ACU-2
2) Connected to main condenser water loop serving buildings 2, 3, and 4.
3) 636 MBH total cooling capacity
h. B-1 – North Attic Mechanical Room
1) Electric boiler serving main condenser water loop
2) 840 kW capacity
3) Coates 24CWB-2
i. EF-1 – EF-23, EF 63 – North attic mechanical room
1) Various centrifugal exhaust fans serving lab hoods
3. Electrical System
a. The campus is primary metered. This building is service with two exterior pad mounted transformers. A 1,600kVA, 13.8kV:277/480V, exterior pad mounted transformer provides secondary service to a 2,000 amp, 277/480V, 3 phase, 4 wire main switchboard. A 2,500kVA, 13.8kV:277/480V, exterior pad mounted trans-former provides secondary service to a 4,000 amp, 277/480V, 3 phase, 4 wire main switchboard. Both switchboards are located in a main electric room in the basement.
4. Lighting Systems
a. The lighting systems consist primarily of linear fluorescent fixtures and recessed down lighting.
b. Renovations in this building are also replacing portions of the lighting systems under a separate project. The renovations occurring under the separate project are indicat-ed with hatching on the electrical drawings.
5. Plumbing Systems
a. EWH-5 – South Attic Mechanical Room
1) Serves all domestic HW fixtures on south side of building
2) 130 gallon, 9kW
3) SF130-0-9CST4
b. EWH-6 – North Attic Mechanical Room
1) Serves all domestic HW fixtures on north side of building
2) 130 gallon, 9kW
3) SF130-0-9CST4
c. EWH-7 – North Attic Mechanical Room
1) Abandoned in place
D. Building #4 – Student Center
1. General Info
a. Built – 1988
b. Function – Student Lounge, Classrooms, and Laboratories
c. Number of Floors – 3
d. Size –38,832 sq ft.
2. Mechanical Systems
a. Primary heating and cooling is achieved by cabinet water-source heat pump (WSHP) units for all exterior spaces and above-ceiling ducted WSHP units for interior spac-
es. These units are connected to a condenser water loop that serves building 2, 3, and 4. Ventilation air is provided by an air handler, ACU-4. This unit provides cooling through a DX coil associated with WCCU-4 and heating is provided by an electric heating coil. There is also a makeup air unit, AHU-2, that serves the exist-ing kitchen on level 2.
b. ACU-4 – Attic Mechanical Room
1) 6,000 CFM, 100% OA, constant volume
2) DX cooling coil – 152 MBH sensible, 264 MBH total cooling capacity
3) Electric heating coil – 364 MBH total capacity
c. WCCU-4 – Attic Mechanical Room
1) Serves ACU-4
2) Connected to main condenser water loop serving buildings 2, 3, and 4.
3) 264 MBH total cooling capacity
d. AHU-2 – Attic Mechanical Room
1) Kitchen makeup air unit
2) 8,000 cfm, 100% OA, constant volume
3) Electric heating coil – 406 MBH total capacity
3. Electrical System
a. The campus is primary metered. A 1,000kVA, 13.8kV:277/480V, exterior pad mounted transformer provides secondary service to a 1,600 amp, 277/480V, 3 phase, 4 wire main switchboard in a basement main electric room.
4. Lighting Systems.
a. The lighting systems consist primarily of linear fluorescent fixtures and recessed down lighting.
b. Renovations in this building are also replacing portions of the lighting systems under a separate project. The renovations occurring under the separate project are indicat-ed with hatching on the electrical drawings.
5. Plumbing Systems
a. EWH-3 – Attic Mechanical Room
1) Two identical domestic hot water heaters
2) 120 gallon capacity
3) 36 kW
4) SF250-0-36CST4
E. Building #5 – Reggie Lewis Track and Athletic Center
1. General Info
a. Built – 1995
b. Function – indoor basketball stadium, field house, locker room facilities
c. Number of Floors – 2
d. Size –70,000 sq ft. field house, 12,000 sq ft. gymnasium
2. Mechanical Systems
a. There are three areas of RLTAC that each utilize different HVAC equipment. The main, two-story complex consists of the gym, office, and multi-purpose rooms. This area is heated by a central AHU connected to a central hot water boiler. Cooling is provided by an air-cooled DX coil. Perimeter HW fin tube and VAV boxes provide heating, cooling, and ventilation for the area. The field house area is heated by four ceiling mounted natural gas fired heating/ventilating units. The field house is not cooled. The gym area is heated and cooled by two packaged gas fired DX roof top units.
b. AHU-1 – Mechanical Room 22B3
1) Serves central gym and office spaces
2) 25,900 CFM supply air, 50% OA, variable volume
3) DX cooling coil – 850 MBH sensible, 1,246 MBH total cooling capacity
4) HW heating coil – 702 MBH total capacity
5) Associated with return fan RF-1
c. AHU-2, AHU-3 – Gymnasium
1) Identical units serving main gymnasium area
2) 13,140 CFM supply air, 75% OA, variable volume
3) DX cooling coil –442 MBH sensible, 675.5 MBH total cooling capacity
4) Gas fired heating coil – 934 MBH
d. HV-1, HV-2, HV-3, HV-4 – Field House
1) Four identical ceiling-mounted heating and ventilating units serving field house
2) 31,000 CFM, 36% OA, variable volume
3) Gas fired heating coil – 1,500 MBH
e. B-1 - mechanical room 22B3
1) Six burner gas HW boiler with temperature reset schedule
2) Hydrotherm MG2310
3) 1,848 MBH capacity
3. Electrical System
a. An…