RCC1301E_EC1_QandA_Clarifications.pdf

PDF 350 KB Posted

Attached to
RCC1301E Energy Design Build RFP Roxbury Community College
Solicitation number
BD-16-1019-DCP08-ENR01-00000005695
Issued by
Suffolk County, Massachusetts

About this file

This document contains clarifications to the "Questions_ScopeModification.pdf" for the energy design-build RFP issued by the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for Roxbury Community College. The RFP is seeking a contractor to finalize the design, procure, install, and commission various energy conservation measures (ECMs) including a geothermal heat pump system, solar photovoltaic and thermal systems, lighting upgrades, a new energy management system, and HVAC upgrades.

The clarifications address questions regarding the photometric survey requirements, the definition of a "hybrid" ground source heat pump system, and the flexibility in modifying the scope of work for certain ECMs as long as the overall RFP requirements are still met. The RFP is for a project located in Suffolk County, Massachusetts, and the awarded contractor will be responsible for the full scope of work over the contract term.

View the file

Other files

File Type Posted
Copy of Appendix E - RCC Building Loads on HP Loop 12_8_2015 QNo58.xlsx XLSX spreadsheet
RCC1301E Form A.doc DOC document
RCC1301E_EC1_FORM_E_ModifiedScope.xlsx XLSX spreadsheet
Roxbury Community College 100pct Performance Specifications 09-30-15-FINAL~1.pdf PDF
Proposal Submission Sign-in Sheet.pdf PDF
Site Visit 2 Attendees List 10-21-15.doc DOC document
Addendum No. 2 RCC1301E ES1.pdf PDF
Questions_ScopeModification.pdf.pdf PDF
Addendum No 1 RCC1301E ES1.pdf PDF
151110 RCC 100percent SD Report.pdf PDF
SDO-certified MWBE Sub-contractors.xls.xlsx XLSX spreadsheet
RCC1301E_Form_F_10.2.2015.doc DOC document
P5-202 BLDG 5 - SECOND FLR PLAN WATER HEATER REPLACEMENT.pdf.pdf PDF
RCC1301E_Form_E_12.11.2015.xlsx XLSX spreadsheet
Roxbury Community College 30pct Schematic Design Part1_9-30-2015.pdf PDF
RCC1301E EC1_FORMS_BCD_11.23.2015.xlsx XLSX spreadsheet
Addenda No. 4.pdf PDF
Prevailing Wage Rates 20150929-042.pdf PDF
151110 RCC 100 percent SD Drawings~1.pdf PDF
RCC1301E_ EC1_FORMS_BCD_ScopeModification.xlsx XLSX spreadsheet
Pre-proposal Conf Attendees 10-20-15.doc DOC document
RCC1301E EC1 SCOPE MODIFICATION CLARIFICATION.pdf PDF
RCC1301E_Form_E_9.30.2015.xlsx XLSX spreadsheet
RCC RFP Addenda 5 Dec 16 2015.pdf PDF
Addenda No. 2 RCC 1301E ES1 - Attachment A.pdf PDF
Roxbury Community College 30pct Schematic Design Part3_9-30-2015.pdf PDF
RCC Energy Water Upgrades Pre-Proposal Meeting Agenda _Minutes ERrev2.pdf PDF
RCC Pre-Proposal Conference Presentation 20 Oct 15.pdf PDF
RCC1301E EC1_FORMS_BCD_10.1.2015.xlsx XLSX spreadsheet
NTP-RCC1301E- EC1.pdf PDF
Roxbury Community College 30pct Schematic Design Part2_9-30-2015.pdf PDF
RCC_Scope_Modification.pdf.pdf PDF
Roxbury Community College ASHRAE Level II Energy and Water Audit and Feasibility Study.pdf PDF
DCAMM Final Audit Template 09-29-15(1).xlsm XLSM spreadsheet
ECM 04.00 AUTOMATIC TEMPERATURE Controls - 11.23.2015.pdf PDF
RCC1301E RFP 10-2-2015~1.pdf PDF
P5-202 BLDG 5 - SECOND FLR PLAN WATER HEATER REPLACEMENT~1.pdf PDF
RCC1301E ES1 Addendum No. 3.pdf PDF
RCC1301E ESA 10-2-2015.pdf PDF
SPV-E02-revised.pdf PDF
RCC1301E ES1 Addenda No. 2 - Attachment B.pdf PDF
AUTOMATIC TEMPERATURE CONTROLS - 11.23.2015.pdf.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Clarifications to “Questions_ScopeModification.pdf”

Please see DCAMM’s responses below to the clarifications requested by the Proposers, in response to the Re-Bid documents.

1.d. Does photometric survey refer to the photometric data (LM-80 & TM-21) commonly included in fixture specification sheets, or to something else?

Answer: Yes, and the photometric survey is to measure, document and verify existing lighting levels with current conditions and a comparison to lighting standards for the specific room use.

Any new fixtures or retrofits are expected to meet current lighting standards.

Is photometric data required for all fixture types, including “ON AIR” LED signs?

Answer: Yes, except for “ON AIR” LED signs; "ON AIR" lighting should include security lighting or single fixtures that remain on 24 hours a day for security in addition to directional signs or EXIT signs.

4. Please confirm that “hybrid” refers to a ground source heat pump (GSHP) system that operates in conjunction with auxiliary heat addition or rejection equipment (e.g. boilers, closed circuit fluid coolers, etc.) to satisfy space conditioning loads.

Answer: Yes

Please define and elaborate on the requirement that proposed cost savings alterations to the BOD for ECM 21.04 “still meet the RFP”. For example, would a reduced capacity system (say, 50%) meet the RFP’s BOD for a hybrid GSHP system?

Answer: Yes, system becomes less of a heating system, and more of a cooling system. The system should have the capability to have heating and cooling or exclusively heating or cooling and that can be accomplished by controls and sensors. If the fluid in the ground is less than 68 degree then there is no fluid transfer for heating. Be mindful of the construction costs and any reduction in savings that might affect the overall payback and cost to savings ration.

5. Please define and elaborate on the requirement to “still meet the RFP” with any recommended changes to the scope of work for ECM 22.00. For example, would a rehabilitation and repair scope of work for any of the ACUs or AHUs that provides an estimated additional 15 years of service life meet the intent of the RFP?

Answer: No, all equipment intended to be new.