RCC1301E EC1_FORMS_BCD_11.23.2015.xlsx

XLSX spreadsheet 868 KB Posted

Attached to
RCC1301E Energy Design Build RFP Roxbury Community College
Solicitation number
BD-16-1019-DCP08-ENR01-00000005695
Issued by
Suffolk County, Massachusetts

About this file

This document contains instructions for filling out Forms B, C, and D related to an Energy Design Build RFP for Roxbury Community College in Roxbury, Massachusetts. The RFP is for a contract to finalize design, procure, install, and commission various ECMs, including a geothermal heat pump system, a canopied solar photovoltaic system, roof mounted solar thermal, lighting upgrades, a new EMS system, and HVAC upgrades. The instructions provide details on how to complete the forms, including breakdowns of capital investments, installation period supporting investments, post-installation period investments, and other funds such as rebates and grants. The RFP requires contractors to provide a Total Contract Value, as well as details on cost effectiveness, project funding, project changes, and risk factors for achieving savings, performance, and cash flows.

The pricing terms require an "Open Book/Closed Book" approach, with contractors providing detailed breakdowns of materials, equipment, labor, and other costs. There are no set-asides mentioned, and the incumbent contractor is not specified. The funding for the project comes from a combination of the Commonwealth's own funds as well as utility rebates and other known grants provided by the state.

View the file

Other files

File Type Posted
Copy of Appendix E - RCC Building Loads on HP Loop 12_8_2015 QNo58.xlsx XLSX spreadsheet
RCC1301E Form A.doc DOC document
RCC1301E_EC1_FORM_E_ModifiedScope.xlsx XLSX spreadsheet
Roxbury Community College 100pct Performance Specifications 09-30-15-FINAL~1.pdf PDF
Proposal Submission Sign-in Sheet.pdf PDF
Site Visit 2 Attendees List 10-21-15.doc DOC document
Addendum No. 2 RCC1301E ES1.pdf PDF
RCC1301E_EC1_QandA_Clarifications.pdf PDF
Questions_ScopeModification.pdf.pdf PDF
Addendum No 1 RCC1301E ES1.pdf PDF
151110 RCC 100percent SD Report.pdf PDF
SDO-certified MWBE Sub-contractors.xls.xlsx XLSX spreadsheet
RCC1301E_Form_F_10.2.2015.doc DOC document
P5-202 BLDG 5 - SECOND FLR PLAN WATER HEATER REPLACEMENT.pdf.pdf PDF
RCC1301E_Form_E_12.11.2015.xlsx XLSX spreadsheet
Roxbury Community College 30pct Schematic Design Part1_9-30-2015.pdf PDF
Addenda No. 4.pdf PDF
Prevailing Wage Rates 20150929-042.pdf PDF
151110 RCC 100 percent SD Drawings~1.pdf PDF
RCC1301E_ EC1_FORMS_BCD_ScopeModification.xlsx XLSX spreadsheet
Pre-proposal Conf Attendees 10-20-15.doc DOC document
RCC1301E EC1 SCOPE MODIFICATION CLARIFICATION.pdf PDF
RCC1301E_Form_E_9.30.2015.xlsx XLSX spreadsheet
RCC RFP Addenda 5 Dec 16 2015.pdf PDF
Addenda No. 2 RCC 1301E ES1 - Attachment A.pdf PDF
Roxbury Community College 30pct Schematic Design Part3_9-30-2015.pdf PDF
RCC Energy Water Upgrades Pre-Proposal Meeting Agenda _Minutes ERrev2.pdf PDF
RCC Pre-Proposal Conference Presentation 20 Oct 15.pdf PDF
RCC1301E EC1_FORMS_BCD_10.1.2015.xlsx XLSX spreadsheet
NTP-RCC1301E- EC1.pdf PDF
Roxbury Community College 30pct Schematic Design Part2_9-30-2015.pdf PDF
RCC_Scope_Modification.pdf.pdf PDF
Roxbury Community College ASHRAE Level II Energy and Water Audit and Feasibility Study.pdf PDF
DCAMM Final Audit Template 09-29-15(1).xlsm XLSM spreadsheet
ECM 04.00 AUTOMATIC TEMPERATURE Controls - 11.23.2015.pdf PDF
RCC1301E RFP 10-2-2015~1.pdf PDF
P5-202 BLDG 5 - SECOND FLR PLAN WATER HEATER REPLACEMENT~1.pdf PDF
RCC1301E ES1 Addendum No. 3.pdf PDF
RCC1301E ESA 10-2-2015.pdf PDF
SPV-E02-revised.pdf PDF
RCC1301E ES1 Addenda No. 2 - Attachment B.pdf PDF
AUTOMATIC TEMPERATURE CONTROLS - 11.23.2015.pdf.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

INSTRUCTIONS FOR FILLING OUT FORMS B, C & D - ENERGY DESIGN BUILD PROJECT
GENERAL INSTRUCTIONS FOR ALL FORMS (B, C & D)
a.Proposer is to fill in all cells highlighted green. Please make sure to fill out the Financial Questions on the 2nd tab.
b.Cells highlighted grey are not applicable and should not be filled in by Proposer.
c.White cells are automatic calculation cells and should not be changed. Proposer shall verify numbers shown in these cells are correct .
d.Yellow cells are predetermined values and should not, at any time, be changed by the Proposer. Under limited circumstances, DCAM may allow a change upon Director written approval.
e.Red cells should only be used by the Proposer as directed: Line 9 may be used if Proposers are using only Lines 2-8 versus Line 1 (not both). If Proposers would like to submit sucontractors costs under Line 1, Proposers can use Line 9 only if they use the clarifications cell to explain what is included in Line 9 and not in Line 1.
f.Please check all calculations and verify the values in the proposal. Please notify DCAM contact person if a cell is not calculating correctly.
g.DO NOT ALTER the Form without permission from the DCAMM Project Manager.
SPECIFIC INSTRUCTIONS FOR FORM B
a.Please fill out a Form B for each individual ECM. All pricing is to be "Open Book/Closed Book" as defined below. Please follow all instructions below. For any self-calculating parts of the forms, please verify calculations.
b.For each ECM, Proposer may break down each major piece of equipment or system on another spreadsheet as back-up. Please provide reference. Back-up information should be available, but not submitted.
c.Make sure to include Alternate ECMs and recommended changes, if applicable.
d.Please confirm that the Summary Form B Total Contract Value tab is accurate (it computes automatically). The Total Contract Value on this tab will be used as the TCV for the ESA. Note: at the Commonwealth's sole discretion alternates and/or recommended changes will be added to the TCV.
ITEM #DESCRIPTIONINSTRUCTIONS
Installation Period CostsComplete either item #1 or (items #2-8)1Subcontractor Competitive Bid AmountProposer may be asked to provide Bid Tab Summary as backup with at least 3 bidders ranked by cost showing company name, bid value, any clarification/amendments, etc. Enter value in this line item and skip line items 2 through 8.
orIf the work is sole sourced (not competitively bid) the Proposer/subcontractor will be required to fill out items 2 through 8.
2Direct MaterialsProposer to provide a break out of direct materials to a level which can be easily analyzed. This will require sufficient backup in the form of an itemized listing of direct materials, quantities, and unit prices. Unit pricing must be backed up by quotes, invoices or pricing methodology acceptable to DCAM.
3Direct EquipmentProposer to provide a break out of direct equipment to a level which can be easily analyzed. This will require sufficient backup in the form of an itemized listing of direct equipment, quantities, and unit prices. Unit pricing must be backed up by quotes, invoices or pricing methodology acceptable to DCAM.
4Direct LaborProposer to provide a break out of direct labor to a level which can be easily analyzed. This will require sufficient backup in the form of an itemized listing of direct labor, quantities, and unit prices. Unit pricing must be backed up by quotes, invoices or pricing methodology acceptable to DCAM.
5Direct Labor Fringe BenefitsProposer to provide a break out of direct labor fringe benefits to a level which can be easily analyzed. This will require sufficient backup in the form of an itemized listing of direct quantities and unit prices. Unit pricing must be backed up by quotes, invoices or pricing methodology acceptable to DCAM.
6Insurance and Taxes on LaborProposer to provide a break out of insurance and taxes on labor to a level which can be easily analyzed. This will require sufficient backup in the form of an itemized listing of direct quantities and unit prices. Unit pricing must be backed up by quotes, invoices or pricing methodology acceptable to DCAM.
7P&P BondProposer to provide a break out of payment and performance bonds to a level which can be easily analyzed. This will require sufficient backup in the form of an itemized listing of direct quantities. Pricing must be backed up by quotes, invoices or pricing methodology acceptable to DCAM.
8Overhead and ProfitOverhead and Profit of Subcontractor.
9Proposer Direct Materials, Equipment & LaborProposer can put direct materials, equipment, and labor (if applicable) here. DCAM may require sufficient backup in the form of an itemized listing of direct materials, equipment, quantities and unit prices. Unit pricing must be backed up by quotes, invoices or pricing methodology acceptable to DCAM. Mark-ups are assumed to be in the pricing.
10Proposer EngineeringAutomatically calculated based on mark-up entered.
11Proposer GC's & Proj. MgmntAutomatically calculated based on mark-up entered.
12Proposer P&P BondsAutomatically calculated as percentage of Item 1, Subcontractor Competitive Bid Amount.
13Proposer Overhead & ProfitOverhead and Profit of Proposer, applied to line 1 or 2-9. No overhead/ profit allowed on lines 9-12.
15Training/CommissioningCost of training and commissioning. Automatically calculated as percentage of Item 1, Subcontractor Competitive Bid Amount or lites 2-8. Mark-up from proposal.
16Maintenance During ConstructionTotal cost of maintenance during the installation period. Automatically calculated as percentage of Item 1, Subcontractor Competitive Bid Amount or lites 2-8. Proposer may guarantee utilities, which will result in a more competitive proposal.
Other Funds19Guaranteed RebatesGuaranteed utility rebates.
20Other Known GrantsDCAM will provide any other applicable grant totals.
21Estimated SavingsPredetermined values established by DCAM.
22PaybackAutomatically calculated based on TCV Less Other Funds and Savings.
SPECIFIC INSTRUCTIONS FOR FORM C
a.For Base Proposal Requirements: the savings for Base Proposal Requirements have already been calculated based upon the assumptions listed and the calculations found in Attachment B-III. Please follow the instructions on Form C. Form C calculates dollar savings using established rates. Please note instructions tab and verify information is presented accurately on Form C.
b.If proposing an alternative or recommended change affecting savings, please see Form C – Table 2 and follow instructions.
SPECIFIC INSTRUCTIONS FOR FORM D
a.Please fill out Form D entitled “Cashflow Model”. This form automatically calculates. Please verify information. This does not include alternatives or recommended changes. Proposers may add a new form that does. Please note: the project should have a minimum cash flow ratio of 1 : 1.10. Proposals with higher ratios will be evaluated more favorably.
b.Please note: a Schedule of Values that breaks down cost per Schedule M of the ESA may be requested of Proposers during Q&A.

Questions

FINANCIAL QUESTIONS - Please answer directly in spreadsheet
1Total Contract Value
Please confirm that the Summary Total Contract Value tab is accurate (it computes automatically). The Total Contract Value on this tab will be used as the TCV for the ESA. Note: at the Commonwealth's sole discretion alternates and/or recommended changes will be added to the TCV.
Answer:
2Cost Effectiveness
a.For Base Proposal Requirements: the savings for Base Proposal Requirements have already been calculated based upon the assumptions listed and the calculations found in Attachment B-III. The Commonwealth will determine which of the Required Alternatives or Additions/Alternatives it chooses and the Commonwealth will modify Form C accordingly for Schedule E of the ESA. Please state here that the Proposer understands that the project must be designed, installed, and commissioned to meet those savings in Schedule B-7.
Answer:
b.Are you proposing a recommended change affecting savings? If so, please note here and make sure to fill out Form C - Table 2 and in the space provided at the bottom of the Form B.
Answer:
3Project Funding
a.Please see the ESA Schedule B-3 for funding specifics. Please state acceptance of these terms.
Answer:
b.Please verify that your Company has the financial capability to complete the project under the payment terms specified.
Answer:
c.Please fill out Form D entitled "Cashflow Model". This form automatically calculates. Please verify information. Please verify that you have read the note on Form D concerning the ratio. If the ratio is at 1:1.1 or lower (rounded), please discuss recommended changes or other cost savings that your company has offered that would improve the cash flow ratio.
Answer:
4Project Changes
The ESA contains provisions that allow the Commonwealth and the Proposer to modify the contract price to account for unforeseen conditions, additions, or deletions after the ESA has been executed. Section 24 and Schedule B-10 of Attachment E, Part I details the process for changes to scope. The Proposer is limited to a 20% mark-up for overhead and profit to be shared with any subcontractor.
a.Please state acceptance of these terms.
Answer:
b.Please discuss specifically how as the Contractor, or through your subs, risk of changes has been factored into this project and pricing.
Answer:
5Risk Factors for Achieving Savings/Performance/Cashflows
a.Please briefly state and address the potential risk factors that may be associated with achieving the savings from the ECMs proposed.
Answer:
b.Please briefly discuss how your company's Proposal will mitigate this risk.
Answer:

ECM 01.01

FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD

PROJECT NUMBER:RCC1301E EC1Design Build Contract
FACILITY/PROJECT:Roxbury Community CollegeAudit Costs/Savings Form
PROPOSER:Revised by DCAMM 1/12/2015
ECM:ECM 01.01: Lamps, Ballasts and Fixtures Replacement
DATE:
GUARANTEED PRICE
COSTMARKUPSMU %TOTAL COST
CAPITAL INVESTMENTS
SUBCONTRACTOR
1Subcontractor Competitive Bid Amount$0
OR
2Subcontractor Direct Materials$0
3Subcontractor Direct Equipment$0
4Subcontractor Direct Labor$0
5Subcontractor Direct Labor Fringe Benefits$0
6Subcontractor Insurance and Taxes on Labor$0
7Subcontractor P&P Bond$0
8Subcontractor Overhead & Profit$0
PROPOSER
9Proposer Direct Materials, Equipment & Labor$0
10Proposer Engineering$0$0
11Proposer GC's & Proj. Mgmnt$0$0
12Proposer P&P Bonds$0$0
13Proposer Overhead & Profit$0$0
SUBTOTAL CAPITAL INVESTMENT$0$0$0

INSTALLATION PERIOD SUPPORTING INVESTMENT

14Training/Commissioning$0$0
15Maint. During Construction$0$0
SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT$0$0$0

POST-INSTALLATION PERIOD INVESTMENT

16Maintenance Post-Installation$0
17Extended Warranty$0
SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT$0$0$0

TOTAL CONTRACT VALUE (TCV) $0 $0 $0

OTHER FUNDS

18Estimated Rebate$85,405$85,405
19Other Known Grants (DCAMM to provide)$0
SUBTOTAL OTHER FUNDS$85,405$0$85,405

TCV LESS OTHER FUNDS ($85,405) $0 ($85,405)

20Estimated Savings$31,012
21Payback (years)-2.8
22Recommended Changes?(Fill in Y/N)
If yes, Change in Cost to Base(Put in negative number if decreases)
Revised TCV
23Increase in Savings?(Fill in Y/N)
(If Yes, please submit additional information in Form C Savings Table 2)
Cells to be filled in by Proposer
Post-Installation Maintenance Breakdown By Year
Cells not applicableYearCost
1
Predetermined value2
3
Only fill in if DCAM approved4
5
CLEARAutomatically calculatesNote: Breakdown table does not self-calculate. Please ensure that
the total for the Breakdown Table matches cell G43.
* Fill out only applicable fields - not all fields must be filled out

Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.

ECM 01.03

FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD

PROJECT NUMBER:RCC1301E EC1Design Build Contract
FACILITY/PROJECT:Roxbury Community CollegeAudit Costs/Savings Form
PROPOSER:Revised by DCAMM 1/12/2015
ECM:ECM 01.03: Fluorescent Fixture Retrofits
DATE:
GUARANTEED PRICE
COSTMARKUPSMU %TOTAL COST
CAPITAL INVESTMENTS
SUBCONTRACTOR
1Subcontractor Competitive Bid Amount$0
OR
2Subcontractor Direct Materials$0
3Subcontractor Direct Equipment$0
4Subcontractor Direct Labor$0
5Subcontractor Direct Labor Fringe Benefits$0
6Subcontractor Insurance and Taxes on Labor$0
7Subcontractor P&P Bond$0
8Subcontractor Overhead & Profit$0
PROPOSER
9Proposer Direct Materials, Equipment & Labor$0
10Proposer Engineering$0$0
11Proposer GC's & Proj. Mgmnt$0$0
12Proposer P&P Bonds$0$0
13Proposer Overhead & Profit$0$0
SUBTOTAL CAPITAL INVESTMENT$0$0$0

INSTALLATION PERIOD SUPPORTING INVESTMENT

14Training/Commissioning$0$0
15Maint. During Construction$0$0
SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT$0$0$0

POST-INSTALLATION PERIOD INVESTMENT

16Maintenance Post-Installation$0
17Extended Warranty$0
SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT$0$0$0

TOTAL CONTRACT VALUE (TCV) $0 $0 $0

OTHER FUNDS

18Estimated Rebate$8,635$8,635
19Other Known Grants (DCAMM to provide)$0
SUBTOTAL OTHER FUNDS$8,635$0$8,635

TCV LESS OTHER FUNDS ($8,635) $0 ($8,635)

20Estimated Savings$8,238
21Payback (years)-1.0
22Recommended Changes?(Fill in Y/N)
If yes, Change in Cost to Base(Put in negative number if decreases)
Revised TCV
23Increase in Savings?(Fill in Y/N)
(If Yes, please submit additional information in Form C Savings Table 2)
Cells to be filled in by Proposer
Post-Installation Maintenance Breakdown By Year
Cells not applicableYearCost
1
Predetermined value2
3
Only fill in if DCAM approved4
5
CLEARAutomatically calculatesNote: Breakdown table does not self-calculate. Please ensure that
the total for the Breakdown Table matches cell G43.
* Fill out only applicable fields - not all fields must be filled out

Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.

ECM 01.07

FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD

PROJECT NUMBER:RCC1301E EC1Design Build Contract
FACILITY/PROJECT:Roxbury Community CollegeAudit Costs/Savings Form
PROPOSER:Revised by DCAMM 1/12/2015
ECM:ECM 01.07: HID Lamp Retrofits
DATE:
GUARANTEED PRICE
COSTMARKUPSMU %TOTAL COST
CAPITAL INVESTMENTS
SUBCONTRACTOR
1Subcontractor Competitive Bid Amount$0
OR
2Subcontractor Direct Materials$0
3Subcontractor Direct Equipment$0
4Subcontractor Direct Labor$0
5Subcontractor Direct Labor Fringe Benefits$0
6Subcontractor Insurance and Taxes on Labor$0
7Subcontractor P&P Bond$0
8Subcontractor Overhead & Profit$0
PROPOSER
9Proposer Direct Materials, Equipment & Labor$0
10Proposer Engineering$0$0
11Proposer GC's & Proj. Mgmnt$0$0
12Proposer P&P Bonds$0$0
13Proposer Overhead & Profit$0$0
SUBTOTAL CAPITAL INVESTMENT$0$0$0

INSTALLATION PERIOD SUPPORTING INVESTMENT

14Training/Commissioning$0$0
15Maint. During Construction$0$0
SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT$0$0$0

POST-INSTALLATION PERIOD INVESTMENT

16Maintenance Post-Installation$0
17Extended Warranty$0
SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT$0$0$0

TOTAL CONTRACT VALUE (TCV) $0 $0 $0

OTHER FUNDS

18Estimated Rebate$13,175$13,175
19Other Known Grants (DCAMM to provide)$0
SUBTOTAL OTHER FUNDS$13,175$0$13,175

TCV LESS OTHER FUNDS ($13,175) $0 ($13,175)

21Estimated Savings$6,093
21Payback (years)-2.2
22Recommended Changes?(Fill in Y/N)
If yes, Change in Cost to Base(Put in negative number if decreases)
Revised TCV
23Increase in Savings?(Fill in Y/N)
(If Yes, please submit additional information in Form C Savings Table 2)
Cells to be filled in by Proposer
Post-Installation Maintenance Breakdown By Year
Cells not applicableYearCost
1
Predetermined value2
3
Only fill in if DCAM approved4
5
CLEARAutomatically calculatesNote: Breakdown table does not self-calculate. Please ensure that
the total for the Breakdown Table matches cell G43.
* Fill out only applicable fields - not all fields must be filled out

Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.

ECM 04.02

FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD

PROJECT NUMBER:RCC1301E EC1Design Build Contract
FACILITY/PROJECT:Roxbury Community CollegeAudit Costs/Savings Form
PROPOSER:Revised by DCAMM 1/12/2015
ECM:ECM 04.02: Outside Air Control, and Economizers
DATE:
GUARANTEED PRICE
COSTMARKUPSMU %TOTAL COST
CAPITAL INVESTMENTS
SUBCONTRACTOR
1Subcontractor Competitive Bid Amount$0
OR
2Subcontractor Direct Materials (M)$0
3Subcontractor Direct Equipment$0
4Subcontractor Direct Labor$0
5Subcontractor Direct Labor Fringe Benefits$0
6Subcontractor Insurance and Taxes on Labor$0
7Subcontractor P&P Bond$0
8Subcontractor Overhead & Profit$0
PROPOSER
9Proposer Direct Materials, Equipment & Labor$0
10Proposer Engineering$0$0
11Proposer GC's & Proj. Mgmnt$0$0
12Proposer P&P Bonds$0$0
13Proposer Overhead & Profit$0$0
SUBTOTAL CAPITAL INVESTMENT$0$0$0

INSTALLATION PERIOD SUPPORTING INVESTMENT

14Training/Commissioning$0$0
15Maint. During Construction$0$0
SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT$0$0$0

POST-INSTALLATION PERIOD INVESTMENT

16Maintenance Post-Installation$0
17Extended Warranty$0
SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT$0$0$0

TOTAL CONTRACT VALUE (TCV) $0 $0 $0

OTHER FUNDS

18Estimated Rebate$11,000$11,000
19Other Known Grants (DCAMM to provide)$0
SUBTOTAL OTHER FUNDS$11,000$0$11,000

TCV LESS OTHER FUNDS ($11,000) $0 ($11,000)

20Estimated Savings$16,091
21Payback (years)-0.7
22Recommended Changes?(Fill in Y/N)
If yes, Change in Cost to Base(Put in negative number if decreases)
Revised TCV
23Increase in Savings?(Fill in Y/N)
(If Yes, please submit additional information in Form C Savings Table 2)
Cells to be filled in by Proposer
Post-Installation Maintenance Breakdown By Year
Cells not applicableYearCost
1
Predetermined value2
3
Only fill in if DCAM approved4
5
CLEARAutomatically calculatesNote: Breakdown table does not self-calculate. Please ensure that
the total for the Breakdown Table matches cell G43.
* Fill out only applicable fields - not all fields must be filled out

Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.

ECM 04.07

FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD

PROJECT NUMBER:RCC1301E EC1Design Build Contract
FACILITY/PROJECT:Roxbury Community CollegeAudit Costs/Savings Form
PROPOSER:Revised by DCAMM 1/12/2015
ECM:ECM 04.07 DDC Controllers
DATE:
GUARANTEED PRICE
COSTMARKUPSMU %TOTAL COST
CAPITAL INVESTMENTS
SUBCONTRACTOR
1Subcontractor Competitive Bid Amount$0
OR
2Subcontractor Direct Materials$0
3Subcontractor Direct Equipment$0
4Subcontractor Direct Labor$0
5Subcontractor Direct Labor Fringe Benefits$0
6Subcontractor Insurance and Taxes on Labor$0
7Subcontractor P&P Bond$0
8Subcontractor Overhead & Profit$0
PROPOSER
9Proposer Direct Materials, Equipment & Labor$0
10Proposer Engineering$0$0
11Proposer GC's & Proj. Mgmnt$0$0
12Proposer P&P Bonds$0$0
13Proposer Overhead & Profit$0$0
SUBTOTAL CAPITAL INVESTMENT$0$0$0

INSTALLATION PERIOD SUPPORTING INVESTMENT

14Training/Commissioning$0$0
15Maint. During Construction$0$0
SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT$0$0$0

POST-INSTALLATION PERIOD INVESTMENT

16Maintenance Post-Installation$0
17Extended Warranty$0
SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT$0$0$0

TOTAL CONTRACT VALUE (TCV) $0 $0 $0

OTHER FUNDS

18Estimated Rebate$0
19Other Known Grants (DCAMM to provide)$0
SUBTOTAL OTHER FUNDS$0$0$0

TCV LESS OTHER FUNDS $0 $0 $0

20Estimated Savings$187,812
21Payback (years)0.0
22Recommended Changes?(Fill in Y/N)
If yes, Change in Cost to Base(Put in negative number if decreases)
Revised TCV
23Increase in Savings?(Fill in Y/N)
(If Yes, please submit additional information in Form C Savings Table 2)
Cells to be filled in by Proposer
Post-Installation Maintenance Breakdown By Year
Cells not applicableYearCost
1
Predetermined value2
3
Only fill in if DCAM approved4
5
CLEARAutomatically calculatesNote: Breakdown table does not self-calculate. Please ensure that
the total for the Breakdown Table matches cell G43.
* Fill out only applicable fields - not all fields must be filled out

Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.

ECM 04.13

FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD

PROJECT NUMBER:RCC1301E EC1Design Build Contract
FACILITY/PROJECT:Roxbury Community CollegeAudit Costs/Savings Form
PROPOSER:Revised by DCAMM 1/12/2015
ECM:ECM 04.13: Operational Enhancements
DATE:
GUARANTEED PRICE
COSTMARKUPSMU %TOTAL COST
CAPITAL INVESTMENTS
SUBCONTRACTOR
1Subcontractor Competitive Bid Amount$0
OR
2Subcontractor Direct Materials$0
3Subcontractor Direct Equipment$0
4Subcontractor Direct Labor$0
5Subcontractor Direct Labor Fringe Benefits$0
6Subcontractor Insurance and Taxes on Labor$0
7Subcontractor P&P Bond$0
8Subcontractor Overhead & Profit$0
PROPOSER
9Proposer Direct Materials, Equipment & Labor$0
10Proposer Engineering$0$0
11Proposer GC's & Proj. Mgmnt$0$0
12Proposer P&P Bonds$0$0
13Proposer Overhead & Profit$0$0
SUBTOTAL CAPITAL INVESTMENT$0$0$0

INSTALLATION PERIOD SUPPORTING INVESTMENT

14Training/Commissioning$0$0
15Maint. During Construction$0$0
SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT$0$0$0

POST-INSTALLATION PERIOD INVESTMENT

16Maintenance Post-Installation$0
17Extended Warranty$0
SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT$0$0$0

TOTAL CONTRACT VALUE (TCV) $0 $0 $0

OTHER FUNDS

18Estimated Rebate$0
19Other Known Grants (DCAMM to provide)$0
SUBTOTAL OTHER FUNDS$0$0$0

TCV LESS OTHER FUNDS $0 $0 $0

20Estimated Savings$17,000
21Payback (years)0.0
22Recommended Changes?(Fill in Y/N)
If yes, Change in Cost to Base(Put in negative number if decreases)
Revised TCV
23Increase in Savings?(Fill in Y/N)
(If Yes, please submit additional information in Form C Savings Table 2)
Cells to be filled in by Proposer
Post-Installation Maintenance Breakdown By Year
Cells not applicableYearCost
1
Predetermined value2
3
Only fill in if DCAM approved4
5
CLEARAutomatically calculatesNote: Breakdown table does not self-calculate. Please ensure that
the total for the Breakdown Table matches cell G43.
* Fill out only applicable fields - not all fields must be filled out

Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.

ECM 05.04

FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD

PROJECT NUMBER:RCC1301E EC1Design Build Contract
FACILITY/PROJECT:Roxbury Community CollegeAudit Costs/Savings Form
PROPOSER:Revised by DCAMM 1/12/2015
ECM:ECM 05.04: DHW Replacement / Fuel Switching
DATE:
GUARANTEED PRICE
COSTMARKUPSMU %TOTAL COST
CAPITAL INVESTMENTS
SUBCONTRACTOR
1Subcontractor Competitive Bid Amount$0
OR
2Subcontractor Direct Materials$0
3Subcontractor Direct Equipment$0
4Subcontractor Direct Labor$0
5Subcontractor Direct Labor Fringe Benefits$0
6Subcontractor Insurance and Taxes on Labor$0
7Subcontractor P&P Bond$0
8Subcontractor Overhead & Profit$0
PROPOSER
9Proposer Direct Materials, Equipment & Labor$0
10Proposer Engineering$0$0
11Proposer GC's & Proj. Mgmnt$0$0
12Proposer P&P Bonds$0$0
13Proposer Overhead & Profit$0$0
SUBTOTAL CAPITAL INVESTMENT$0$0$0

INSTALLATION PERIOD SUPPORTING INVESTMENT

14Training/Commissioning$0$0
15Maint. During Construction$0$0
SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT$0$0$0

POST-INSTALLATION PERIOD INVESTMENT

16Maintenance Post-Installation$0
17Extended Warranty$0
SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT$0$0$0

TOTAL CONTRACT VALUE (TCV) $0 $0 $0

OTHER FUNDS

18Estimated Rebate$0
19Other Known Grants (DCAMM to provide)$0
SUBTOTAL OTHER FUNDS$0$0$0

TCV LESS OTHER FUNDS $0 $0 $0

20Estimated Savings$14,903
21Payback (years)0.0
22Recommended Changes?(Fill in Y/N)
If yes, Change in Cost to Base(Put in negative number if decreases)
Revised TCV
23Increase in Savings?(Fill in Y/N)
(If Yes, please submit additional information in Form C Savings Table 2)
Cells to be filled in by Proposer
Post-Installation Maintenance Breakdown By Year
Cells not applicableYearCost
1
Predetermined value2
3
Only fill in if DCAM approved4
5
CLEARAutomatically calculatesNote: Breakdown table does not self-calculate. Please ensure that
the total for the Breakdown Table matches cell G43.
* Fill out only applicable fields - not all fields must be filled out

Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.

ECM 06.01

FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD

PROJECT NUMBER:RCC1301E EC1Design Build Contract
FACILITY/PROJECT:Roxbury Community CollegeAudit Costs/Savings Form
PROPOSER:Revised by DCAMM 1/12/2015
ECM:ECM 06.01 Sewer and Irrigation Abatement
DATE:
GUARANTEED PRICE
COSTMARKUPSMU %TOTAL COST
CAPITAL INVESTMENTS
SUBCONTRACTOR
1Subcontractor Competitive Bid Amount$0
OR
2Subcontractor Direct Materials$0
3Subcontractor Direct Equipment$0
4Subcontractor Direct Labor$0
5Subcontractor Direct Labor Fringe Benefits$0
6Subcontractor Insurance and Taxes on Labor$0
7Subcontractor P&P Bond$0
8Subcontractor Overhead & Profit$0
PROPOSER
9Proposer Direct Materials, Equipment & Labor$0
10Proposer Engineering$0$0
11Proposer GC's & Proj. Mgmnt$0$0
12Proposer P&P Bonds$0$0
13Proposer Overhead & Profit$0$0
SUBTOTAL CAPITAL INVESTMENT$0$0$0

INSTALLATION PERIOD SUPPORTING INVESTMENT

14Training/Commissioning$0$0
15Maint. During Construction$0$0
SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT$0$0$0

POST-INSTALLATION PERIOD INVESTMENT

16Maintenance Post-Installation$0
17Extended Warranty$0
SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT$0$0$0

TOTAL CONTRACT VALUE (TCV) $0 $0 $0

OTHER FUNDS

18Estimated Rebate$0
19Other Known Grants (DCAMM to provide)$0
SUBTOTAL OTHER FUNDS$0$0$0

TCV LESS OTHER FUNDS $0 $0 $0

20Estimated Savings$3,400
21Payback (years)0.0
22Recommended Changes?(Fill in Y/N)
If yes, Change in Cost to Base(Put in negative number if decreases)
Revised TCV
23Increase in Savings?(Fill in Y/N)
(If Yes, please submit additional information in Form C Savings Table 2)
Cells to be filled in by Proposer
Post-Installation Maintenance Breakdown By Year
Cells not applicableYearCost
1
Predetermined value2
3
Only fill in if DCAM approved4
5
CLEARAutomatically calculatesNote: Breakdown table does not self-calculate. Please ensure that
the total for the Breakdown Table matches cell G43.
* Fill out only applicable fields - not all fields must be filled out

Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.

ECM 09.00

FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD

PROJECT NUMBER:SDE1301E EC1Design Build Contract
FACILITY/PROJECT:State House Energy UpgradesAudit Costs/Savings Form
PROPOSER:Revised by DCAMM 1/12/2015
ECM:ECM 09.00: VFDs
DATE:
GUARANTEED PRICE
COSTMARKUPSMU %TOTAL COST
CAPITAL INVESTMENTS
SUBCONTRACTOR
1Subcontractor Competitive Bid Amount$0
OR
2Subcontractor Direct Materials$0
3Subcontractor Direct Equipment$0
4Subcontractor Direct Labor$0
5Subcontractor Direct Labor Fringe Benefits$0
6Subcontractor Insurance and Taxes on Labor$0
7Subcontractor P&P Bond$0
8Subcontractor Overhead & Profit$0
PROPOSER
9Proposer Direct Materials, Equipment & Labor$0
10Proposer Engineering$0$0
11Proposer GC's & Proj. Mgmnt$0$0
12Proposer P&P Bonds$0$0
13Proposer Overhead & Profit$0$0
SUBTOTAL CAPITAL INVESTMENT$0$0$0

INSTALLATION PERIOD SUPPORTING INVESTMENT

14Training/Commissioning$0$0
15Maint. During Construction$0$0
SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT$0$0$0

POST-INSTALLATION PERIOD INVESTMENT

16Maintenance Post-Installation$0
17Extended Warranty$0
SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT$0$0$0

TOTAL CONTRACT VALUE (TCV) $0 $0 $0

OTHER FUNDS

18Estimated Rebate$9,750$9,750
19Other Known Grants (DCAMM to provide)$0
SUBTOTAL OTHER FUNDS$9,750$0$9,750

TCV LESS OTHER FUNDS ($9,750) $0 ($9,750)

20Estimated Savings$3,003
21Payback (years)-3.2
22Recommended Changes?(Fill in Y/N)
If yes, Change in Cost to Base(Put in negative number if decreases)
Revised TCV
23Increase in Savings?(Fill in Y/N)
(If Yes, please submit additional information in Form C Savings Table 2)
Cells to be filled in by Proposer
Post-Installation Maintenance Breakdown By Year
Cells not applicableYearCost
1
Predetermined value2
3
Only fill in if DCAM approved4
5
CLEARAutomatically calculatesNote: Breakdown table does not self-calculate. Please ensure that
the total for the Breakdown Table matches cell G43.
* Fill out only applicable fields - not all fields must be filled out

Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.

ECM 11.1

FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD

PROJECT NUMBER:RCC1301E EC1Design Build Contract
FACILITY/PROJECT:Roxbury Community CollegeAudit Costs/Savings Form
PROPOSER:Revised by DCAMM 1/12/2015
ECM:ECM 11.1: Vendingmisers
DATE:
GUARANTEED PRICE
COSTMARKUPSMU %TOTAL COST
CAPITAL INVESTMENTS
SUBCONTRACTOR
1Subcontractor Competitive Bid Amount$0
OR
2Subcontractor Direct Materials$0
3Subcontractor Direct Equipment$0
4Subcontractor Direct Labor$0
5Subcontractor Direct Labor Fringe Benefits$0
6Subcontractor Insurance and Taxes on Labor$0
7Subcontractor P&P Bond$0
8Subcontractor Overhead & Profit$0
PROPOSER
9Proposer Direct Materials, Equipment & Labor$0
10Proposer Engineering$0$0
11Proposer GC's & Proj. Mgmnt$0$0
12Proposer P&P Bonds$0$0
13Proposer Overhead & Profit$0$0
SUBTOTAL CAPITAL INVESTMENT$0$0$0

INSTALLATION PERIOD SUPPORTING INVESTMENT

14Training/Commissioning$0$0
15Maint. During Construction$0$0
SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT$0$0$0

POST-INSTALLATION PERIOD INVESTMENT

16Maintenance Post-Installation$0
17Extended Warranty$0
SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT$0$0$0

TOTAL CONTRACT VALUE (TCV) $0 $0 $0

OTHER FUNDS

18Estimated Rebate$915$915
19Other Known Grants (DCAMM to provide)$0
SUBTOTAL OTHER FUNDS$915$0$915

TCV LESS OTHER FUNDS ($915) $0 ($915)

20Estimated Savings$846
21Payback (years)-1.1
22Recommended Changes?(Fill in Y/N)
If yes, Change in Cost to Base(Put in negative number if decreases)
Revised TCV
23Increase in Savings?(Fill in Y/N)
(If Yes, please submit additional information in Form C Savings Table 2)
Cells to be filled in by Proposer
Post-Installation Maintenance Breakdown By Year
Cells not applicableYearCost
1
Predetermined value2
3
Only fill in if DCAM approved4
5
CLEARAutomatically calculatesNote: Breakdown table does not self-calculate. Please ensure that
the total for the Breakdown Table matches cell G43.
* Fill out only applicable fields - not all fields must be filled out

Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.

ECM 14.01

FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD

PROJECT NUMBER:RCC1301E EC1Design Build Contract
FACILITY/PROJECT:Roxbury Community CollegeAudit Costs/Savings Form
PROPOSER:Revised by DCAMM 4/17/2014
ECM:ECM 14.01: Replace Boilers in Bldg. No. 3
DATE:
GUARANTEED PRICE
COSTMARKUPSMU %TOTAL COST
CAPITAL INVESTMENTS
SUBCONTRACTOR
1Subcontractor Competitive Bid Amount$0
OR
2Subcontractor Direct Materials$0
3Subcontractor Direct Equipment$0
4Subcontractor Direct Labor$0
5Subcontractor Direct Labor Fringe Benefits$0
6Subcontractor Insurance and Taxes on Labor$0
7Subcontractor P&P Bond$0
8Subcontractor Overhead & Profit$0
PROPOSER
9Proposer Direct Materials, Equipment & Labor$0
10Proposer Engineering$0$0
11Proposer GC's & Proj. Mgmnt$0$0
12Proposer P&P Bonds$0$0
13Proposer Overhead & Profit$0$0
SUBTOTAL CAPITAL INVESTMENT$0$0$0

INSTALLATION PERIOD SUPPORTING INVESTMENT

14Training/Commissioning$0$0
15Maint. During Construction (Base Req. Cost per RFP pg. 5)$0$0
SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT$0$0$0

POST-INSTALLATION PERIOD INVESTMENT

16Maintenance Post-Installation$0
17Extended Warranty$0
SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT$0$0$0

TOTAL CONTRACT VALUE (TCV) $0 $0 $0

OTHER FUNDS

18Estimated Rebate$0
19Other Known Grants (DCAMM to provide)$0
SUBTOTAL OTHER FUNDS$0$0$0

TCV LESS OTHER FUNDS $0 $0 $0

20Estimated Savings$26,478
21Payback (years)0.0
22Recommended Changes?(Fill in Y/N)
If yes, Change in Cost to Base(Put in negative number if decreases)
Revised TCV
23Increase in Savings?(Fill in Y/N)
(If Yes, please submit additional information in Form C Savings Table 2)
Cells to be filled in by Proposer
Post-Installation Maintenance Breakdown By Year
Cells not applicableYearCost
1
Predetermined value2
3
Only fill in if DCAM approved4
5
CLEARAutomatically calculatesNote: Breakdown table does not self-calculate. Please ensure that
the total for the Breakdown Table matches cell G43.
* Fill out only applicable fields - not all fields must be filled out

Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.

ECM 15.06

FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD

PROJECT NUMBER:RCC1301E EC1Design Build Contract
FACILITY/PROJECT:Roxbury Community CollegeAudit Costs/Savings Form
PROPOSER:Revised by DCAMM 4/17/2014
ECM:ECM 15.06: Cooling Tower and Upgrades
DATE:
GUARANTEED PRICE
COSTMARKUPSMU %TOTAL COST
CAPITAL INVESTMENTS
SUBCONTRACTOR
1Subcontractor Competitive Bid Amount$0
OR
2Subcontractor Direct Materials$0
3Subcontractor Direct Equipment$0
4Subcontractor Direct Labor$0
5Subcontractor Direct Labor Fringe Benefits$0
6Subcontractor Insurance and Taxes on Labor$0
7Subcontractor P&P Bond$0
8Subcontractor Overhead & Profit$0
PROPOSER
9Proposer Direct Materials, Equipment & Labor$0
10Proposer Engineering$0$0
11Proposer GC's & Proj. Mgmnt$0$0
12Proposer P&P Bonds$0$0
13Proposer Overhead & Profit$0$0
SUBTOTAL CAPITAL INVESTMENT$0$0$0

INSTALLATION PERIOD SUPPORTING INVESTMENT

14Training/Commissioning$0$0
15Maint. During Construction$0$0
SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT$0$0$0

POST-INSTALLATION PERIOD INVESTMENT

16Maintenance Post-Installation$0
17Extended Warranty$0
SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT$0$0$0

TOTAL CONTRACT VALUE (TCV) $0 $0 $0

OTHER FUNDS

18Estimated Rebate$0
19Other Known Grants (DCAMM to provide)$0
SUBTOTAL OTHER FUNDS$0$0$0

TCV LESS OTHER FUNDS $0 $0 $0

20Estimated Savings($10,097)
21Payback (years)0.0
22Recommended Changes?(Fill in Y/N)
If yes, Change in Cost to Base(Put in negative number if decreases)
Revised TCV
23Increase in Savings?(Fill in Y/N)
(If Yes, please submit additional information in Form C Savings Table 2)
Cells to be filled in by Proposer
Post-Installation Maintenance Breakdown By Year
Cells not applicableYearCost
1
Predetermined value2
3
Only fill in if DCAM approved4
5
CLEARAutomatically calculatesNote: Breakdown table does not self-calculate. Please ensure that
the total for the Breakdown Table matches cell G43.
* Fill out only applicable fields - not all fields must be filled out

Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.

ECM 19.00

FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD

PROJECT NUMBER:RCC1301E EC1Design Build Contract
FACILITY/PROJECT:Roxbury Community CollegeAudit Costs/Savings Form
PROPOSER:Revised by DCAMM 4/17/2014
ECM:ECM 19.00: Real-Time Metering
DATE:
GUARANTEED PRICE
COSTMARKUPSMU %TOTAL COST
CAPITAL INVESTMENTS
SUBCONTRACTOR
1Subcontractor Competitive Bid Amount$0
OR
2Subcontractor Direct Materials$0
3Subcontractor Direct Equipment$0
4Subcontractor Direct Labor$0
5Subcontractor Direct Labor Fringe Benefits$0
6Subcontractor Insurance and Taxes on Labor$0
7Subcontractor P&P Bond$0
8Subcontractor Overhead & Profit$0
PROPOSER
9Proposer Direct Materials, Equipment & Labor$0
10Proposer Engineering$0$0
11Proposer GC's & Proj. Mgmnt$0$0
12Proposer P&P Bonds$0$0
13Proposer Overhead & Profit$0$0
SUBTOTAL CAPITAL INVESTMENT$0$0$0

INSTALLATION PERIOD SUPPORTING INVESTMENT

14Training/Commissioning$0$0
15Maint. During Construction$0$0
SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT$0$0$0

POST-INSTALLATION PERIOD INVESTMENT

16Maintenance Post-Installation$0
17Extended Warranty$0
SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT$0$0$0

TOTAL CONTRACT VALUE (TCV) $0 $0 $0

OTHER FUNDS

18Estimated Rebate$0
19Other Known Grants (DCAMM to provide)$0
SUBTOTAL OTHER FUNDS$0$0$0

TCV LESS OTHER FUNDS $0 $0 $0

20Estimated Savings$15,734
21Payback (years)0.0
22Recommended Changes?(Fill in Y/N)
If yes, Change in Cost to Base(Put in negative number if decreases)
Revised TCV
23Increase in Savings?(Fill in Y/N)
(If Yes, please submit additional information in Form C Savings Table 2)
Cells to be filled in by Proposer
Post-Installation Maintenance Breakdown By Year
Cells not applicableYearCost
1
Predetermined value2
3
Only fill in if DCAM approved4
5
CLEARAutomatically calculatesNote: Breakdown table does not self-calculate. Please ensure that
the total for the Breakdown Table matches cell G43.
* Fill out only applicable fields - not all fields must be filled out

Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.

ECM 21.02

FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD

PROJECT NUMBER:RCC1301E EC1Design Build Contract
FACILITY/PROJECT:Roxbury Community CollegeAudit Costs/Savings Form
PROPOSER:Revised by DCAMM 4/17/2014
ECM:ECM 21.02: Solar Water Heating
DATE:
GUARANTEED PRICE
COSTMARKUPSMU %TOTAL COST
CAPITAL INVESTMENTS
SUBCONTRACTOR
1Subcontractor Competitive Bid Amount$0
OR
2Subcontractor Direct Materials$0
3Subcontractor Direct Equipment$0
4Subcontractor Direct Labor$0
5Subcontractor Direct Labor Fringe Benefits$0
6Subcontractor Insurance and Taxes on Labor$0
7Subcontractor P&P Bond$0
8Subcontractor Overhead & Profit$0
PROPOSER
9Proposer Direct Materials, Equipment & Labor$0
10Proposer Engineering$0$0
11Proposer GC's & Proj. Mgmnt$0$0
12Proposer P&P Bonds$0$0
13Proposer Overhead & Profit$0$0
SUBTOTAL CAPITAL INVESTMENT$0$0$0

INSTALLATION PERIOD SUPPORTING INVESTMENT

14Training/Commissioning$0$0
15Maint. During Construction$0$0
SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT$0$0$0

POST-INSTALLATION PERIOD INVESTMENT

16Maintenance Post-Installation$0
17Extended Warranty$0
SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT$0$0$0

TOTAL CONTRACT VALUE (TCV) $0 $0 $0

OTHER FUNDS

18Estimated Rebate$57,420$57,420
19Other Known Grants (DCAMM to provide)$0
SUBTOTAL OTHER FUNDS$57,420$0$57,420

TCV LESS OTHER FUNDS ($57,420) $0 ($57,420)

20Estimated Savings$8,801
21Payback (years)-6.5
22Recommended Changes?(Fill in Y/N)
If yes, Change in Cost to Base(Put in negative number if decreases)
Revised TCV
23Increase in Savings?(Fill in Y/N)
(If Yes, please submit additional information in Form C Savings Table 2)
Cells to be filled in by Proposer
Post-Installation Maintenance Breakdown By Year
Cells not applicableYearCost
1
Predetermined value2
3
Only fill in if DCAM approved4
5
CLEARAutomatically calculatesNote: Breakdown table does not self-calculate. Please ensure that
the total for the Breakdown Table matches cell G41.
* Fill out only applicable fields - not all fields must be filled out

Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.

ECM 21.04

FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD

PROJECT NUMBER:RCC1301E EC1Design Build Contract
FACILITY/PROJECT:Roxbury Community CollegeAudit Costs/Savings Form
PROPOSER:Revised by DCAMM 4/17/2014
ECM:ECM 21.04: Geothermal Heat Pumps
DATE:
GUARANTEED PRICE
COSTMARKUPSMU %TOTAL COST
CAPITAL INVESTMENTS
SUBCONTRACTOR
1Subcontractor Competitive Bid Amount$0
OR
2Subcontractor Direct Materials$0
3Subcontractor Direct Equipment$0
4Subcontractor Direct Labor$0
5Subcontractor Direct Labor Fringe Benefits$0
6Subcontractor Insurance and Taxes on Labor$0
7Subcontractor P&P Bond$0
8Subcontractor Overhead & Profit$0
PROPOSER
9Proposer Direct Materials, Equipment & Labor$0
10Proposer Engineering$0$0
11Proposer GC's & Proj. Mgmnt$0$0
12Proposer P&P Bonds$0$0
13Proposer Overhead & Profit$0$0
SUBTOTAL CAPITAL INVESTMENT$0$0$0

INSTALLATION PERIOD SUPPORTING INVESTMENT

14Training/Commissioning$0$0
15Maint. During Construction$0$0
SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT$0$0$0

POST-INSTALLATION PERIOD INVESTMENT

16Maintenance Post-Installation$0
17Extended Warranty$0
SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT$0$0$0

TOTAL CONTRACT VALUE (TCV) $0 $0 $0

OTHER FUNDS

18Estimated Rebate$0
19Other Known Grants (DCAMM to provide)$0
SUBTOTAL OTHER FUNDS$0$0$0

TCV LESS OTHER FUNDS $0 $0 $0

20Estimated Savings$136,026
21Payback (years)0.0
22Recommended Changes?(Fill in Y/N)
If yes, Change in Cost to Base(Put in negative number if decreases)
Revised TCV
23Increase in Savings?(Fill in Y/N)
(If Yes, please submit additional information in Form C Savings Table 2)
Cells to be filled in by Proposer
Post-Installation Maintenance Breakdown By Year
Cells not applicableYearCost
1
Predetermined value2
3
Only fill in if DCAM approved4
5
CLEARAutomatically calculatesNote: Breakdown table does not self-calculate. Please ensure that
the total for the Breakdown Table matches cell G41.
* Fill out only applicable fields - not all fields must be filled out

Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.

ECM 22.00

FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD

PROJECT NUMBER:RCC1301E EC1Design Build Contract
FACILITY/PROJECT:Roxbury Community CollegeAudit Costs/Savings Form
PROPOSER:Revised by DCAMM 4/17/2014
ECM:ECM 22.00: AHUs, Water cooled Condensing Units, Exhaust Fans, Condenser Water Pump
DATE:
GUARANTEED PRICE
COSTMARKUPSMU %TOTAL COST
CAPITAL INVESTMENTS
SUBCONTRACTOR
1Subcontractor Competitive Bid Amount$0
OR
2Subcontractor Direct Materials$0
3Subcontractor Direct Equipment$0
4Subcontractor Direct Labor$0
5Subcontractor Direct Labor Fringe Benefits$0
6Subcontractor Insurance and Taxes on Labor$0
7Subcontractor P&P Bond$0
8Subcontractor Overhead & Profit$0
PROPOSER
9Proposer Direct Materials, Equipment & Labor$0
10Proposer Engineering$0$0
11Proposer GC's & Proj. Mgmnt$0$0
12Proposer P&P Bonds$0$0
13Proposer Overhead & Profit$0$0
SUBTOTAL CAPITAL INVESTMENT$0$0$0

INSTALLATION PERIOD SUPPORTING INVESTMENT

14Training/Commissioning$0$0
15Maint. During Construction (Base Req. Cost per RFP pg. 5)$0$0
SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT$0$0$0

POST-INSTALLATION PERIOD INVESTMENT

16Maintenance Post-Installation$0
17Extended Warranty$0
SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT$0$0$0

TOTAL CONTRACT VALUE (TCV) $0 $0 $0

OTHER FUNDS

18Estimated Rebate$0
19Other Known Grants (DCAMM to provide)$0
SUBTOTAL OTHER FUNDS$0$0$0

TCV LESS OTHER FUNDS $0 $0 $0

20Estimated Savings$8,320
21Payback (years)0.0
22Recommended Changes?(Fill in Y/N)
If yes, Change in Cost to Base(Put in negative number if decreases)
Revised TCV
23Increase in Savings?(Fill in Y/N)
(If Yes, please submit additional information in Form C Savings Table 2)
Cells to be filled in by Proposer
Post-Installation Maintenance Breakdown By Year
Cells not applicableYearCost
1
Predetermined value2
3
Only fill in if DCAM approved4
5
CLEARAutomatically calculates

* Fill out only applicable fields - not all fields must be filled out

Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.

ECM 23.00

FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD

PROJECT NUMBER:RCC1301E EC1Design Build Contract
FACILITY/PROJECT:Roxbury Community CollegeAudit Costs/Savings Form
PROPOSER:Revised by DCAMM 12/13/2013
ECM:ECM 23.00: Power Correction Factors
DATE:
GUARANTEED PRICE
COSTMARKUPSMU %TOTAL COST
CAPITAL INVESTMENTS
SUBCONTRACTOR
1Subcontractor Competitive Bid Amount$0
OR
2Subcontractor Direct Materials$0
3Subcontractor Direct Equipment$0
4Subcontractor Direct Labor$0
5Subcontractor Direct Labor Fringe Benefits$0
6Subcontractor Insurance and Taxes on Labor$0
7Subcontractor P&P Bond$0
8Subcontractor Overhead & Profit$0
PROPOSER
9Proposer Direct Materials, Equipment & Labor$0
10Proposer Engineering$0$0
11Proposer GC's & Proj. Mgmnt$0$0
12Proposer P&P Bonds$0$0
13Proposer Overhead & Profit$0$0
SUBTOTAL CAPITAL INVESTMENT$0$0$0

INSTALLATION PERIOD SUPPORTING INVESTMENT

14Training/Commissioning$0$0
15Maint. During Construction$0$0
SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT$0$0$0

POST-INSTALLATION PERIOD INVESTMENT

16Maintenance Post-Installation$0
17Extended Warranty$0
SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT$0$0$0

TOTAL CONTRACT VALUE (TCV) $0 $0 $0

OTHER FUNDS

18Estimated Rebate$0
19Other Known Grants (DCAM to provide)$0
SUBTOTAL OTHER FUNDS$0$0$0

TCV LESS OTHER FUNDS $0 $0 $0

20Estimated Savings$4,800
21Payback (years)0.0
22Recommended Changes?(Fill in Y/N)
If yes, Change in Cost to Base(Put in negative number if decreases)
Revised TCV
23Increase in Savings?(Fill in Y/N)
(If Yes, please submit additional information in Form C Savings Table 2)

Cells to be filled in by Proposer

Cells not applicable

Predetermined value

Only fill in if DCAM approved

CLEAR Automatically calculates

* Fill out only applicable fields - not all fields must be filled out

Please input clarifications on markups/costs here. Please ensure they comply with RFP, ESA & Audit Contract (if applicable). Please provide back-up for interest rates here.

ADD ALT ECM 05.06

FORM B - TOTAL CONTRACT VALUE - ENERGY DESIGN BUILD

PROJECT NUMBER:RCC1301E EC1Design Build Contract
FACILITY/PROJECT:Roxbury Community CollegeAudit Costs/Savings Form
PROPOSER:Revised by DCAMM 1/12/2015
ECM:ADD ALT ECM 05.06: Toilets (Low Flow)
DATE:
GUARANTEED PRICE
COSTMARKUPSMU %TOTAL COST
CAPITAL INVESTMENTS
SUBCONTRACTOR
1Subcontractor Competitive Bid Amount$0
OR
2Subcontractor Direct Materials$0
3Subcontractor Direct Equipment$0
4Subcontractor Direct Labor$0
5Subcontractor Direct Labor Fringe Benefits$0
6Subcontractor Insurance and Taxes on Labor$0
7Subcontractor P&P Bond$0
8Subcontractor Overhead & Profit$0
PROPOSER
9Proposer Direct Materials, Equipment & Labor$0
10Proposer Engineering$0$0
11Proposer GC's & Proj. Mgmnt$0$0
12Proposer P&P Bonds$0$0
13Proposer Overhead & Profit$0$0
SUBTOTAL CAPITAL INVESTMENT$0$0$0

INSTALLATION PERIOD SUPPORTING INVESTMENT

14Training/Commissioning$0$0
15Maint. During Construction$0$0
SUBTOTAL INSTALLATION PERIOD SUPPORTING INVESTMENT$0$0$0

POST-INSTALLATION PERIOD INVESTMENT

16Maintenance Post-Installation$0
17Extended Warranty$0
SUBTOTAL POST-INSTALLATION PERIOD INVESTMENT$0$0$0

TOTAL CONTRACT VALUE (TCV) $0 $0 $0

OTHER FUNDS

18Estimated Rebate$10,000$10,000
19Other Known Grants (DCAMM to provide)$0
SUBTOTAL OTHER FUNDS$10,000$0$10,000

TCV LESS OTHER FUNDS ($10,000) $0 ($10,000)

20Estimated Savings$6,099
21Payback (years)-1.6
22Recommended Changes?(Fill in Y/N)

This is the start of the file's text. The full file is on GovTribe.