This document is an Addendum No. 2 to a Request for Proposals (RFP) issued by the Commonwealth of Massachusetts for energy design and construction services at Roxbury Community College. The RFP seeks proposals to provide design, construction, commissioning, warranty, data acquisition and reporting, and measurement and verification services for a base proposal consisting of 12 Energy Conservation Measures (ECMs) and three Add Alternatives. The ECMs include lighting upgrades, HVAC system improvements, domestic water and sewer conservation measures, renewable energy systems such as geothermal heat pumps and solar water heating, and other facility upgrades. The RFP provides detailed information on the scope of work, drawings, and specification sections for each ECM.
The RFP requires proposers to review a previously completed energy and water feasibility study for the facility. Pricing terms, set-asides, funding requirements, and other salient details are not provided in this addendum, but would likely be included in the full RFP document. The contract will be awarded by the Commonwealth of Massachusetts to the successful proposer to finalize design, procure, install, and commission the identified ECMs at Roxbury Community College.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4RCC 1301E ES1
Addenda No. 2 Page 1 of 4
ATTACHMENT B
PART I - SCOPE OF SERVICES OVERVIEW
A. Introduction
The Commonwealth is soliciting Proposals from Proposers to provide design, construction, commissioning, warranty, data acquisition and reporting, and measurement and verification services at Roxbury Community College located at 1234 Columbus Avenue, Roxbury Crossing
MA 02120, as outlined in this Attachment. The services required are divided into one (1) option consisting of 12 Base ECMs with three (3) Add Alternatives, as outlined in the Introduction.
The Commonwealth has completed its analysis included in Part II and Part III of this attachment to provide a significant amount of information to prospective Proposers. The table below summarizes the ECMs and requested services. The Proposer must read the full RFP for the full scope of services required.
Addenda No. 2 Page 2 of 4
Table B-1: Scope of Services
Base Proposal (Required)
Reference LOCATION: BLDG/Parking Lot No.
ECM
A tt ac h m e n t
B P ar t
II
P ag e N o
D ra w in g R e fe re n ce
Se ct io n o f
Sp e ci fi ca ti o an d o r
B as is o f D e si gn
1 2 3 4 5 Lot
01.00 Lighting
01.01 Lamps, Ballasts, Fixtures 4-82 E0-000
thru
E5-201
2.4.A
01.03 Fluorescent Fixture Retrofits 4-82 2.4.A
01.07 HID Lamp Retrofits 4-82 2.4.A
04.00 EMS and Controls
04.02 Outside Air Control, and Economizers 4-83 M0-000
M4-203
MD2-201
MD4-203
2.4.B
04.07 DDC Controllers 4-83 2.4.B
04.13 Operational Enhancements
4-83 2.4.B
05.00 Domestic Water
05.04 DHW Heater Replace / Fuel Switching 4-87
P0-000 thru P5-201
2.4.C.1
06.00 Sewer Conservation
06.01 Sewer and Irrigation Abatement 4-89 M1-202 2.4.D
09.00 Variable Frequency Drives
09.00 VFD's
4-90
M0-000
MD4-203
11.00 Vending/Plug Controllers
11.1 Vending misers
4-98
E3-200
E4-200 2.4.E
14.00 Boilers
14.01 Replace Boilers (as component of 21.04) 4-100 MD3-205 2.4.J
Addenda No. 2 Page 3 of 4
Base Proposal (Required) continued
Reference LOCATION: BLDG/Parking Lot No
A tt ac h m e n t
B P ar e N o
D ra w in g R e fe re e N o
Se ct io n o f
Sp e ci fi ca ti o r
B as is o f D e
15.00 Chillers
15.06 Cooling Tower and Upgrades 4-100
M0-000 thru
M1-202 2.4.F
19.00 Real-Time Metering
19.00 Real-Time Metering 4-101 E0-000 2.4.G
21.00 Renewable Energy Systems
21.02 Solar Water Heating 5-109
SHW-P00
thru
SHW-E01
2.4.I
21.04 Geothermal Heat Pumps 5-120
GEO-C01
thru
GEO-H10
2.4.J
22.00 Misc. Specialty Equipment
22.00 Air Handling Units, Make Up Air Unit, Computer Room Cooling Replacement, Condenser Water Pump Exhaust Fans, Water Cooled Condensing Units.
M0-000
-MD4-203
2.4.K
23.00 Other proposed by the Facility
23.00 Power Correction Factors 4-102
2.4.L
Addenda No. 2 Page 4 of 4
Add Alternative (REQUIRED)
Reference LOCATION: BLDG/Parking Lot No.
A tt ac h m e n t
B P ar e N o
D ra w in g R e fe re e N o
Se ct io n o f
Sp e ci fi ca ti o r
B as is o f D e
05.00 Domestic Water
05.06 Toilets (Low Flow) 4-87
P0-000 thru P5-201
2.4.C.2
05.08 Low Flow Shower Heads 4-87
P0-000- P5-201
2.4.C.3
21.00 Renewable Energy Systems
21.01.1 Photovoltaic Modules
+EV Charging STA Location OPTION 1
5-109
SPV-C01
thru
-SPV-S02
2.4.H
21.01.2 Photovoltaic Modules
+EV Charging STA Location OPTION 2
5-109
SPV-C01
thru
-SPV-S02
2.4.H
23.00 Other
23.01 Education Kiosk
2.4.L
The feasibility study located below is a preliminary analysis. Please note, unless otherwise directed, for ECMs that may be referenced both in the Feasibility Study and in Attachment B
Parts II-III, services in Attachments B, Parts II-III are in addition to or supersede information in the Feasibility Study. If there is any discrepancy or question, the Proposer should direct a question to the Contact Person. Many ECMs are studied, in the Feasibility Study, however the
Commonwealth is only asking for services on ECMs/Alternatives as shown in the table above.
Please review the energy and water feasibility study entitled “Roxbury Community
College ASHRAE Level II Energy and Water Audit and Feasibility Study.pdf” dated
March 2015 by downloading a copy at: www.COMMBUYS.com, http://www.comm-pass.com/
File details come from the government source that posted it. Updated .