Roof 14 THERMastic Scope of Work (1).docx
DOCX document 98 KB Posted
- Attached to
- RFP for Riverside Roofing
- Solicitation number
- RFP - MANC - 240000000261
- Issued by
- Washtenaw County, Marlette City, Michigan
About this file
The provided document is a Scope of Work for the Riverside Intermediate Roof 14 THERMastic Replacement project. The project is located in Washtenaw County, Michigan and the City of Marlette. The Scope of Work outlines the requirements for the roof replacement, including obtaining permits, setting up safety measures, removing existing roofing and insulation, installing new insulation, base sheets, and a multi-ply roofing system with an elastomeric coating and gravel surfacing. The contractor will also be responsible for installing new flashings, counterflashings, and coping caps. The project includes a 20-year manufacturer's warranty with inspections during years 2, 5, 10, and 15.
The document does not provide pricing terms, set-asides, incumbent information, funding sources, or other financial details. The document focuses solely on the technical requirements of the roofing system replacement project.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Riverside Intermediate Roof 14 THERMastic Replacement Scope of Work
1. Obtain all necessary permits.
2. Set up safety per OSHA guidelines.
3. Remove existing roofing and insulation down to structural decking.
4. Mechanically attach/ adhere matching insulation at R-30. Mechanically attach the first layer and adhere all subsequent layers of insulation in Premium III asphalt at 30 lbs/ sq.
5. Install ½” Securock adhered in Premium III asphalt at 30lbs/sq.
6. Install new 4 lb lead drain flashing with gravel stop and 4 lb lead flashing at all soil stacks.
7. Install Burmastic Comp Ply HT base sheet adhered in Premium III asphalt at a rate of 25lbs/sq.
8. Install 3 plies Thermglass Type IV felt with Premium III asphalt interply at rate of 25lbs per sq.
9. Install TRA Elastomeric flashings adhered in Thermastic 80 at rate of 30lbs/sq.
10. Bar terminate top of flashings.
11. Strip-in Vertical laps with Polyroof LV and 6” BURmesh.
12. Apply Alumanation 301 at 2.5 gals per sq (40 wet mils) to all flashings and drains.
13. Install Thermastic 80 flood coat at 60 lb/ sq and gravel at rate of 400 lb/sq.
14. Install new metal pitch pockets with hoods. Fill with grout and Tremseal Pitch Pocket sealer.
15. Install new 24-gauge kynar coated steel/ aluminum counter flashings and flashings to match existing.
16. Install new 24-gauge kynar coated steel/ aluminum coping caps to match existing.
17. Provide manufacturer’s 20-year Quality Assurance warranty that includes inspections during years 2, 5, 10 and 15. Inspections shall include online report of findings and recommended maintenance.