17 WOOD CURB.pdf

PDF 135 KB Posted

Attached to
RFP for Riverside Roofing
Solicitation number
RFP - MANC - 240000000261
Issued by
Washtenaw County, Marlette City, Michigan

About this file

This document appears to be a technical drawing for a built-up roofing detail featuring a hot/cold wood curb. The drawing is related to a Request for Proposal (RFP) for roofing services issued by the jurisdictions of Washtenaw County and Marlette City in the state of Michigan. The drawing specifies the use of Tremco products, including a gravel surfacing, BUR membrane, insulation, and base sheet. The fasteners are to be placed 8 inches on center as specified. No other project details, response requirements, or contract information are provided in this technical drawing.

View the file

Other files

File Type Posted
20_TPA_FA_FB_Curb Flashing.pdf PDF
35 LIGHT METAL ROOF EDGE RAISED.pdf PDF
Ad for Roof 14 Replacement FINAL (1).pdf PDF
Alumanation 301.pdf PDF
BURmastic Composite Ply HT.pdf PDF
Burmesh.pdf PDF
Project-Roof 14 Hot BUR Replacement (1).pdf PDF
RFP Addendum Documents.pdf PDF
Riverside Intermediate Roof 14 Bid Form Addendum UPDATED.pdf PDF
Roof 14 TPA Scope of Work (1).docx DOCX document
Roof 14 TPA Scope of Work.docx DOCX document
TPA Prefab Vent Pipe Boots.pdf PDF
TRA Elastomeric Sheeting.pdf PDF
TREMPrime_QD_Low_Odor.pdf PDF
TremTred.pdf PDF
07 HOT STACK PENETRATION.pdf PDF
10_TPA_FA_FB_PARAPET WALL FLASHING.pdf PDF
1_TPA_FA_FB_Factory Fabricated Roof Edge.pdf PDF
22 INSULATION FASTENER DENSITY_4X8 (1).pdf PDF
22 INSULATION FASTENER DENSITY_4X8.pdf PDF
34 LIGHT METAL ROOF EDGE.pdf PDF
37_TPA_FA_FB_Tie in.pdf PDF
Project-Roof 14 TPA Replacement.pdf PDF
Riverside Intermediate School- Roof 14 Walkway.pdf PDF
Roof 14 THERMastic Scope of Work.docx DOCX document
THERMglass_Type_IV.pdf PDF
TPA Prefab Universal Corners.pdf PDF
TPA Walkway Roll.pdf PDF
06 METAL SLEEVE AND STORM COLLAR.pdf PDF
37 ROOF DRAIN.pdf PDF
9_TPA_FA_FB_WALL EXPANSION JOINT.pdf PDF
ASPHALTIC ROOFING SYSTEMS DAILY WATERS.pdf PDF
Polyroof_LV.pdf PDF
Premium_III.pdf PDF
Project-Roof 14 Hot BUR Replacement .pdf PDF
Project-Roof 14 TPA Replacement (1).pdf PDF
Riverside Intermediate School- AOC (1).pdf PDF
Riverside Intermediate School- AOC.pdf PDF
Roof 14 THERMastic Scope of Work (1).docx DOCX document
Sheeting Bond Black.pdf PDF
THERMastic 80 Adhesive.pdf PDF
TPA Coated Metal.pdf PDF
TPA_Single_Ply_Bonding_Adhesive.pdf PDF
TremSEAL Pro (1).pdf PDF
TremSEAL Pro.pdf PDF
Tremco LRF Insulation Application Detail.pdf PDF
15_TPA_FA_FB_Drain.pdf PDF
40_TPA_FA_FB_T_Joint Detail.pdf PDF
33_TPA_FA_FB_TERMINATION AT SLOPED ROOF.pdf PDF
01 AREA DIVIDER.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DWG NO. 17 N.T.S.

BUILT-UP ROOFING

HOT/COLD WOOD CURB

FASTENERS 8'' O.C.

AS SPECIFIED

SHEET METAL COVER

SPECIFIED TREMCO

GRAVEL SURFACING

SPECIFIED BUR MEMBRANE

SPECIFIED INSULATION

ROOF DECK AS SPECIFIED

SPECIFIED BASE SHEET

M

I

N

SPECIFIED CANT

TWO PLY STRIPPING

AutoCAD SHX Text R

AutoCAD SHX Text

2017 TREMCO

AutoCAD SHX Text C

Sheets and Views
Model

File details come from the government source that posted it. Updated .