Roof 14 THERMastic Scope of Work.docx

DOCX document 98 KB Posted

Attached to
RFP for Riverside Roofing
Solicitation number
RFP - MANC - 240000000261
Issued by
Washtenaw County, Marlette City, Michigan

About this file

The document is a Scope of Work for the Riverside Intermediate Roof 14 THERMastic Replacement project in Michigan. The scope requires the contractor to obtain necessary permits, set up safety per OSHA guidelines, remove existing roofing and insulation, install new insulation, cover boards, base sheets, plies, flashings, coatings, metal work, and provide a 20-year quality assurance warranty. The related state and local contract opportunity is an RFP for the Riverside Roofing project, which involves Washtenaw County and Marlette City, Michigan. The scope does not provide pricing terms, set asides, or funding information. It focuses on the technical requirements for the roof replacement work.

View the file

Other files

File Type Posted
20_TPA_FA_FB_Curb Flashing.pdf PDF
35 LIGHT METAL ROOF EDGE RAISED.pdf PDF
Ad for Roof 14 Replacement FINAL (1).pdf PDF
Alumanation 301.pdf PDF
BURmastic Composite Ply HT.pdf PDF
Burmesh.pdf PDF
Project-Roof 14 Hot BUR Replacement (1).pdf PDF
RFP Addendum Documents.pdf PDF
Riverside Intermediate Roof 14 Bid Form Addendum UPDATED.pdf PDF
Roof 14 TPA Scope of Work (1).docx DOCX document
Roof 14 TPA Scope of Work.docx DOCX document
TPA Prefab Vent Pipe Boots.pdf PDF
TRA Elastomeric Sheeting.pdf PDF
TREMPrime_QD_Low_Odor.pdf PDF
TremTred.pdf PDF
07 HOT STACK PENETRATION.pdf PDF
10_TPA_FA_FB_PARAPET WALL FLASHING.pdf PDF
17 WOOD CURB.pdf PDF
1_TPA_FA_FB_Factory Fabricated Roof Edge.pdf PDF
22 INSULATION FASTENER DENSITY_4X8 (1).pdf PDF
22 INSULATION FASTENER DENSITY_4X8.pdf PDF
34 LIGHT METAL ROOF EDGE.pdf PDF
37_TPA_FA_FB_Tie in.pdf PDF
Project-Roof 14 TPA Replacement.pdf PDF
Riverside Intermediate School- Roof 14 Walkway.pdf PDF
THERMglass_Type_IV.pdf PDF
TPA Prefab Universal Corners.pdf PDF
TPA Walkway Roll.pdf PDF
05 STANDING SEAM EXPANSION JOINT.pdf PDF
15 BASE SHEET FASTENER_7 INCH.pdf PDF
18_TPA_FA_FB_Expansion Joint Curb.pdf PDF
25_TPA_FA_FB_End Lap.pdf PDF
2_TPA_FA_FB_COATED METAL EDGE.pdf PDF
8_TPA_FA_FB_SURFACE MOUNTED COUNTERFLASHING.pdf PDF
Ad for Roof 14 Replacement FINAL.pdf PDF
RFP Addendum Documents (1).pdf PDF
Riverside Intermediate Roof 14 Bid Form Addendum UPDATED (1).pdf PDF
Riverside Intermediate School- Roof 14 Walkway (1).pdf PDF
TPA FB Single Ply Roof System.pdf PDF
TPAmanual.pdf PDF
Tremco Low Rise Foam Insulation Adhesive.pdf PDF
06 METAL SLEEVE AND STORM COLLAR.pdf PDF
37 ROOF DRAIN.pdf PDF
9_TPA_FA_FB_WALL EXPANSION JOINT.pdf PDF
ASPHALTIC ROOFING SYSTEMS DAILY WATERS.pdf PDF
Polyroof_LV.pdf PDF
Premium_III.pdf PDF
Project-Roof 14 Hot BUR Replacement .pdf PDF
Project-Roof 14 TPA Replacement (1).pdf PDF
Riverside Intermediate School- AOC (1).pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Riverside Intermediate Roof 14 THERMastic Replacement Scope of Work

1. Obtain all necessary permits.

2. Set up safety per OSHA guidelines.

3. Remove existing roofing and insulation down to structural decking.

4. Mechanically attach/ adhere matching insulation at R-30. Mechanically attach the first layer and adhere all subsequent layers of insulation in Premium III asphalt at 30 lbs/ sq.

5. Install ½” Securock adhered in Premium III asphalt at 30lbs/sq.

6. Install new 4 lb lead drain flashing with gravel stop and 4 lb lead flashing at all soil stacks.

7. Install Burmastic Comp Ply HT base sheet adhered in Premium III asphalt at a rate of 25lbs/sq.

8. Install 3 plies Thermglass Type IV felt with Premium III asphalt interply at rate of 25lbs per sq.

9. Install TRA Elastomeric flashings adhered in Thermastic 80 at rate of 30lbs/sq.

10. Bar terminate top of flashings.

11. Strip-in Vertical laps with Polyroof LV and 6” BURmesh.

12. Apply Alumanation 301 at 2.5 gals per sq (40 wet mils) to all flashings and drains.

13. Install Thermastic 80 flood coat at 60 lb/ sq and gravel at rate of 400 lb/sq.

14. Install new metal pitch pockets with hoods. Fill with grout and Tremseal Pitch Pocket sealer.

15. Install new 24-gauge kynar coated steel/ aluminum counter flashings and flashings to match existing.

16. Install new 24-gauge kynar coated steel/ aluminum coping caps to match existing.

17. Provide manufacturer’s 20-year Quality Assurance warranty that includes inspections during years 2, 5, 10 and 15. Inspections shall include online report of findings and recommended maintenance.

image1.png

File details come from the government source that posted it. Updated .