07 HOT STACK PENETRATION.pdf

PDF 135 KB Posted

Attached to
RFP for Riverside Roofing
Solicitation number
RFP - MANC - 240000000261
Issued by
Washtenaw County, Marlette City, Michigan

About this file

This document appears to be a drawing/technical specification for a Hot Stack Penetration detail. The drawing provides notes and specifications for the installation of a sheet-metal sleeve and rain collar on a hot stack, including requirements for priming metal surfaces, sealants, clearances, and flashing.

The related state and local contract opportunity is an RFP for roofing work to be performed in Washtenaw County and Marlette City, Michigan. The RFP likely includes this Hot Stack Penetration detail as part of the required scope of work for the roofing project. The contract opportunity does not provide additional details on the project size, response deadlines, or award information.

View the file

Other files

File Type Posted
10_TPA_FA_FB_PARAPET WALL FLASHING.pdf PDF
17 WOOD CURB.pdf PDF
1_TPA_FA_FB_Factory Fabricated Roof Edge.pdf PDF
22 INSULATION FASTENER DENSITY_4X8 (1).pdf PDF
22 INSULATION FASTENER DENSITY_4X8.pdf PDF
34 LIGHT METAL ROOF EDGE.pdf PDF
37_TPA_FA_FB_Tie in.pdf PDF
Project-Roof 14 TPA Replacement.pdf PDF
Riverside Intermediate School- Roof 14 Walkway.pdf PDF
Roof 14 THERMastic Scope of Work.docx DOCX document
THERMglass_Type_IV.pdf PDF
TPA Prefab Universal Corners.pdf PDF
TPA Walkway Roll.pdf PDF
20_TPA_FA_FB_Curb Flashing.pdf PDF
35 LIGHT METAL ROOF EDGE RAISED.pdf PDF
Ad for Roof 14 Replacement FINAL (1).pdf PDF
Alumanation 301.pdf PDF
BURmastic Composite Ply HT.pdf PDF
Burmesh.pdf PDF
Project-Roof 14 Hot BUR Replacement (1).pdf PDF
RFP Addendum Documents.pdf PDF
Riverside Intermediate Roof 14 Bid Form Addendum UPDATED.pdf PDF
Roof 14 TPA Scope of Work (1).docx DOCX document
Roof 14 TPA Scope of Work.docx DOCX document
TPA Prefab Vent Pipe Boots.pdf PDF
TRA Elastomeric Sheeting.pdf PDF
TREMPrime_QD_Low_Odor.pdf PDF
TremTred.pdf PDF
05 STANDING SEAM EXPANSION JOINT.pdf PDF
15 BASE SHEET FASTENER_7 INCH.pdf PDF
18_TPA_FA_FB_Expansion Joint Curb.pdf PDF
25_TPA_FA_FB_End Lap.pdf PDF
2_TPA_FA_FB_COATED METAL EDGE.pdf PDF
8_TPA_FA_FB_SURFACE MOUNTED COUNTERFLASHING.pdf PDF
Ad for Roof 14 Replacement FINAL.pdf PDF
RFP Addendum Documents (1).pdf PDF
Riverside Intermediate Roof 14 Bid Form Addendum UPDATED (1).pdf PDF
Riverside Intermediate School- Roof 14 Walkway (1).pdf PDF
TPA FB Single Ply Roof System.pdf PDF
TPAmanual.pdf PDF
Tremco Low Rise Foam Insulation Adhesive.pdf PDF
06 METAL SLEEVE AND STORM COLLAR.pdf PDF
37 ROOF DRAIN.pdf PDF
9_TPA_FA_FB_WALL EXPANSION JOINT.pdf PDF
ASPHALTIC ROOFING SYSTEMS DAILY WATERS.pdf PDF
Polyroof_LV.pdf PDF
Premium_III.pdf PDF
Project-Roof 14 Hot BUR Replacement .pdf PDF
Project-Roof 14 TPA Replacement (1).pdf PDF
Riverside Intermediate School- AOC (1).pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DWG NO. 07 N.T.S.

NOTES

1. PRIME ALL METAL SURFACES THAT WILL COME INTO CONTACT WITH THE SPECIFIED ADHESIVE.

2. WHEN HOT STACK SERVICE TEMPERATURE EXCEEDS 400 DEGREES, WELD OR SOLDER RAIN COLLAR TO

PIPE IN LIEU OF INSTALLING SEALANT.

3. THE CLEARANCE REQUIRED BETWEEN THE HOT PIPE AND INSULATED METAL LINER WILL DEPEND ON THE

TEMPERATURE OF THE MATERIAL HANDLED BY THE STACK.

BUILT-UP ROOFING HOT/COLD

HOT STACK PENETRATION

SHEET-METAL SLEEVE

APPROPRIATE HIGH TEMPERATURE SEALANT

(SEE NOTE #2 BELOW)

SHEET-METAL RAIN COLLAR OVERLAPPING

FLASHING COLLAR BY 3" TO 4"

CLAMPING RING

STAINLESS STEEL

TREATED WOOD BLOCKING

ROOF DECK

SPECIFIED COVER BOARD

SPECIFIED INSULATION

SPECIFIED BUR MEMBRANE

TWO-PLY STRIPPING

4" MIN. FLANGE SET IN ASPHALT CEMENT

AND MECHANICALLY FASTENED 3" O.C.

BATTEN INSULATION

PERIMETER

MASTIC SEAL AT

EXISTING INSULATED

METAL LINER (SEE NOTE #3 BELOW)

HOT STACK

AutoCAD SHX Text R

AutoCAD SHX Text

2017 TREMCO

AutoCAD SHX Text C

AutoCAD SHX Text

8" MIN.

Sheets and Views
Model

File details come from the government source that posted it. Updated .