SolicitationAmendment0003.pdf

PDF 17 KB Posted

Attached to
Design Build Central Utilities Plant - Reno NV -- Y1NB
Solicitation number
QSE--36C10F24R50000
Issued by

About this file

This document is Amendment 0003 to Solicitation 36C10F24R50000 for the Design Build Central Utilities Plant project at the VA Sierra Nevada Health Care System in Reno, Nevada.

The amendment disseminates the Phase II Specification Section 01321616 Network Analysis Schedules (Design-Build) to all successful offerors from Phase I, extends an invitation for a preconstruction site visit to those Phase I offerors, and requests Phase II proposals be submitted by August 29, 2024 at 2:00pm PT. All other terms and conditions of the solicitation remain unchanged. The project scope involves replacing the seismically deficient boiler plant, demolishing the existing facility, and constructing a new central utility plant to provide steam, heating, and cooling services for the entire VA campus.

View the file

Other files

File Type Posted
S05 Response to Solicitation 36C10F24R50000 RFI No. 25.docx DOCX document
SolicitationAmendment0002.pdf PDF
S05 Response to Solicitation 36C10F24R50000 RFIs.docx DOCX document
SolicitationAmendment0001.pdf PDF
QSE 36C10F24R50000.pdf PDF
Design Drawings Plumbing_654-212.pdf PDF
Design Drawings General_654-212.pdf PDF
Construction Specifications Volume 2_654-212.pdf PDF
Design Drawings Electrical_654-212.pdf PDF
Design Drawings Mechanical_654-212.pdf PDF
Construction Specifications Volume 3_654-212.pdf PDF
Lead Paint Survey Building 8_ 2014_654-212.pdf PDF
Design Drawings Telecommunications_654-212.pdf PDF
Design Drawings Civil_654-212.pdf PDF
Geotechnical Engineering Report_654-212.pdf PDF
Design Drawings Structural_654-212.pdf PDF
P07 Wage Determination Washoe County Nevada Mar 22 2024.pdf PDF
Construction Specifications Volume 1_654-212.pdf PDF
Design Drawings Architectural_654-212.pdf PDF
Design Drawings Fire Protection_654-212.pdf PDF
Solicitation.pdf PDF
Asbestos Survey Building 8_2014_654-212.pdf PDF
Supplemental Comments to Design Drawings and Narratives_654-212.pdf PDF
Design Discipline Narratives_654-212.pdf PDF
Structural Calculations Report_654-212.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Document Number: 36C10F24R50000 PROCESSED Page 1 of 3

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION NUMBER

3. EFFECTIVE DATE

07/18/2024

4. REQUISITION/PURCHASE REQ. NUMBER 5. PROJECT NUMBER (If applicable) 654-212

36C10FCODE

OCFM WRO

400 Mare Island Way, Suite 100 Vallejo, CA 94590

6. ISSUED BY CODE7. ADMINISTERED BY (If other than Item 6)

9A. AMENDMENT OF SOLICITATION NUMBER

36C10F24R50000

CODE FACILITY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, country, state and ZIP Code) (X)

X 9B. DATED (SEE ITEM 11)

05/01/2024

10A. MODIFICATION OF CONTRACT/ORDER

NUMBER

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X XThe above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning __1__copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project No - 654 - 212 Project Title - Replace Seismically Deficient Boiler Plant, Building 8 Project Location - VA, VISN 21, VA Sierra Nevada Health Care System VASNVHCS, Reno, NV, 89502. The purpose of this amendment is to disseminate Phase II document to all successful offers from Phase I requirements, extend invitation for Preconstruction site visit to successful offers from Phase I, request Phase II proposal by response due date and the following. A. See attached document for Phase II Spec Sec 01321616 Network Analysis Schedules (Design-Build). B. Preconstruction Conference / Site visit is schedule for TBD. C. Phase II proposal shall be submitted to the address indicated in the solicitation no later than August 29, 2024, by 2:00pm PST. D. All other terms and items within the solicitation remain the unchanged.

CLOSING DATE/TIME:

08/29/2024 - 14:00 PT US/Pacific

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) Ashok K. Singh

(Signature of person authorized to sign)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED

By (Signature of Contracting Officer)

16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV.

11/2016) Prescribed by GSA FAR (48 CFR) 53.243

Document Number: 36C10F24R50000 PROCESSED Page 2 of 3

Table of Contents

Section Description Page Number

J List of Attachments

Document Number: 36C10F24R50000 PROCESSED Page 3 of 3

Section J - List of Attachments Title Dates Number of

Pages S02 Spec Sec 01321616 Network Analysis Schedules Design Build - ADDED 07/18/2024

File details come from the government source that posted it. Updated .