S05 Response to Solicitation 36C10F24R50000 RFI No. 25.docx

DOCX document 13 KB Posted

Attached to
Design Build Central Utilities Plant - Reno NV -- Y1NB
Solicitation number
QSE--36C10F24R50000
Issued by

About this file

This document appears to be a response to a Request for Information (RFI) related to Solicitation 36C10F24R50000 for a Design Build Central Utilities Plant project in Reno, Nevada. The key details are:

The solicitation has a page limit of 30 pages for proposal submissions, up from the originally stated 25 pages. This change is the only modification to the solicitation, and the proposal due date remains unchanged. The project scope includes designing and constructing a new Central Utility Plant (CUP) to replace the seismically deficient existing Boiler Plant, Building 8. The CUP will house boilers, chillers, cooling towers, and a bulk oxygen system to provide utilities for the entire VA Sierra Nevada Health Care System campus. Additional work includes improvements to an existing parking lot, demolition of the Boiler Plant, and conversion of the Boiler Plant site to a new parking lot. The Design Build Contractor will be responsible for all required professional design services and construction activities, which must comply with VA technical design requirements.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

25. We usually see a maximum file size in Mb for the Phase 1 and Phase 2 proposals, but could not find that in the solicit. Can the VA please confirm maximum file sizes that can be electronically submitted?

The only submission requirement is that “submission should not exceed 25 pages maximum”, not including CPARS. – Shall be changed to read as follows - submission should not exceed 30 pages maximum.

Please Note: Proposal Due date remains unchanged.

All other terms and conditions of the solicitation announcement remain unchanged.

File details come from the government source that posted it. Updated .