This document is a solicitation (RFP) from the Department of Veterans Affairs (VA) Office of Construction and Facilities Management for a Design-Build project to replace the existing seismically-deficient Central Utility Plant (Boiler Plant, Building 8) at the VA Sierra Nevada Health Care System in Reno, Nevada.

The key requirements include: designing and constructing a new approximately 11,000 GSF Central Utility Plant to house boilers, chillers, cooling towers, and bulk oxygen storage; improving an existing gravel parking lot; demolishing the existing Boiler Plant and converting that site to a new paved parking lot; and thoroughly testing all new systems before final connection to the existing utility feeds. The new Central Utility Plant must be designed to provide steam, heating, and cooling for the entire VA campus. All design must comply with VA technical design standards, and all construction must be performed by licensed Nevada contractors. Geotechnical analysis and full professional design services in all required disciplines are the responsibility of the selected Design-Build contractor.

View the file

Other files

File Type Posted
SolicitationAmendment0003.pdf PDF
S05 Response to Solicitation 36C10F24R50000 RFI No. 25.docx DOCX document
SolicitationAmendment0002.pdf PDF
S05 Response to Solicitation 36C10F24R50000 RFIs.docx DOCX document
SolicitationAmendment0001.pdf PDF
QSE 36C10F24R50000.pdf PDF
Design Drawings Plumbing_654-212.pdf PDF
Design Drawings General_654-212.pdf PDF
Construction Specifications Volume 2_654-212.pdf PDF
Design Drawings Electrical_654-212.pdf PDF
Design Drawings Mechanical_654-212.pdf PDF
Construction Specifications Volume 3_654-212.pdf PDF
Lead Paint Survey Building 8_ 2014_654-212.pdf PDF
Design Drawings Telecommunications_654-212.pdf PDF
Design Drawings Civil_654-212.pdf PDF
Geotechnical Engineering Report_654-212.pdf PDF
Design Drawings Structural_654-212.pdf PDF
P07 Wage Determination Washoe County Nevada Mar 22 2024.pdf PDF
Construction Specifications Volume 1_654-212.pdf PDF
Design Drawings Architectural_654-212.pdf PDF
Design Drawings Fire Protection_654-212.pdf PDF
Solicitation.pdf PDF
Asbestos Survey Building 8_2014_654-212.pdf PDF
Supplemental Comments to Design Drawings and Narratives_654-212.pdf PDF
Structural Calculations Report_654-212.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA PROJECT NUMBER

PROJECT NAME

654-212 Building 16 Central Utility Plant

SUBMITTAL Level 1 SD2 RFP SUBJECT All Design Narratives

All A/E Design Narratives

Architectural Design Narrative

Civil Design Narrative

Electrical Design Narrative

Fire Protection Narrative

Mechanical Design Narrative

Interior Design Narrative

Phasing Narrative

Plumbing Design Narrative

Structural Design Narrative

Telecommunications Narrative

654-212 (1791.06) Central Utility Plant

SUBMITTAL Level 1 SD2 RFP SUBJECT Architectural Design Narrative

Architecture 1

Project Overview and Background

The Ioannis A. Lougaris Veteran’s Administration Medical Center, also known as the VA Sierra Nevada Health Care System (VASNHCS) and component of the VA Sierra Pacific Network (VISN 21), provides primary and secondary care to a large geographical area that includes 20 counties in northern Nevada and northeastern California.

In addition to the main campus, at 975 Kirman Avenue in Reno, the VA Sierra Nevada Health Care System also includes four patient care sites within the Reno and Sparks area. These patient care sites are detached from the main campus. These sites include two primary care sites at the North and East campuses and Dental and Eye Clinics.

Further, the VASNHCS also offers services in three community-based outpatient clinics (CBOC) and one rural outreach clinic. These clinics include the VA Carson Valley Outpatient Clinic in Minden, Nevada, the Lahontan Valley VA Clinic in Fallon, Nevada, the VA Diamond View Outpatient Clinic in Susanville, California, and the Winnemucca Rural Outreach Clinic in Winnemucca, Nevada.

Building 8 is the existing Central Utility Plant that serves the campus.

This is a single-story building that is located between the main hospital and the parking garage.

This project to create bridging documents for a new Central Utility Plant that to be in the existing parking, just north of Building 8. In addition to housing the MEP systems, additional functions will be provided (programming). Placing the new building here, would displace existing handicap parking. The existing gravel parking lot on the corner of

Kirman Avenue and E Taylor Street will need to be paved and stripped to accommodate new handicap spaces.

Security

Based on risk assessment conducted on November 26th, 2019 in support of “Seismic Retrofit Project Book, Buildings 1D, 8, 10, 12 – Project #s 654-212, 654-101, 654-112, and 654-877” a “Physical Security SITE Design Guide Refresher – Reno Bldg 8 CUP” and “Blast Protection Design Guidance – Reno Bldg 8 CUP” reports were produced for the AE and VA. These reports, each considered “Controlled Unclassified Information” per PSDRM 1.9. However, the

STATE LOCATION MAP

654-212 (1791.06) Central Utility Plant

Architecture 2

“Physical Security SITE Design Guidance Refresher – Reno Bldg 8 CUP” report is included in this submission, for details reference.

LEED

Per the SOW, the New Central Utility Plant will be designed to achieve a LEED Silver Rating.

The design build team that is awarded the full construction drawings and construction, will be responsible for the certification process and associated fees.

Existing Access to Parking Garage

Currently access to the parking garage, ground floor, is through two entrances. There is one on the east side and one on the west side. The west side entry of the parking garage would pose a challenge for setback requirements for the new Central Utility Plant. Comments regarding the challenges and possible solutions are further discussed in the Design Options.

East Entrance

V A

P R

O J E

C T

N U

M B

E R

P

R O

J E

C T

N A

M E

-2

(1

.0

C e n tra l U tility P la n t S

U B

M

IT

T

L

L e v e l 1

S D

R

F P

S

U B

J E

C T rc h ite c tu ra l D e s ig n N a rra tiv rc h ite c tu re

D s ig n O p tio n

In th is o p tio n fo r th e b u ild in g fo o tp rin t, th e b u ild in g e n fo rc e s a fo o t s ta n d o ff fro m th e s tre e t a n d

’ fro m th e ra m p to th e g a ra g e to m e e t th e b la s t s ta n d o ff re q u ire m e n ts . T h e e x is tin g try to th e firs t flo o r o f th e g a ra g e w o u ld b e c lo s e d o ff a n d a n e w g a ra g e e n try o n th e s o u s id e w o u ld b e c re a te d b y re m o v in g a c o lu m n a n d a d d in g a b e a m

. T h e fo o tp rin t, a s s h o w

, is a p p ro x im a te ly

,0 s q u a re fe e t, a n d c o u ld p o s s ib ly e x p a n d b y a d d in g a d d itio n a l flo o rs . In is o p tio n th e e x is tin g c u rb c u t o n th e w e s t s id e o f th e lo t w o u ld h a v e to b e re m o v e d . T h x is tin g c u rb c u t o n th e s o u th w e s t p o rtio n o f th e p ro p e rty c o u ld re m a in a n d b e u s e d to p ro v id a c c e s s to th e p a ra g e g a ra g e o n c e th e

E x is tin g

C e n tra l U tility

P la n t is d e m o lis h e d

654-212 (1791.06) Central Utility Plant

Architecture 4

Programming

The existing Central Utility Plant (Building 8) to be demolished is 10, 238 square feet in size.

The replacement Central Utility Plant (Building 16) is to be limited to a maximum increase of 10% of the size of the existing Central Utility Plant, based on the SOW, which would be 11,261

SQ FT.

Central Utility Plant (Building 16) – Gross Square Feet

Level 1: 8,136

Mezzanine Level: 2,821

Total Square Footage: 10,957

Central Utility Plant (Building 16) – Useable Square Feet

Level 1:

Boiler Area (N3101) 2,885

Steam Pit (N3102) 194

Storage Room (N3103) 131

HAC (N3104) 66

Corridor (N3105) 147

Office (N3106) 137

Elec (N3107) 87

Elec Utility Room (N3108) 507

Pit (N3109) 62

Riser Room (N3110) 59

Chillers (N3111) 1,357

Oxygen Yard (N3112) 296

Electrical Switchgear (N3113) 129

Generators (N3114) 592

Control Room (N3115) 633

Conference/ Break Room (N3116) 193

Restroom (N3117) 74

Restroom (N3118) 74

Mezzanine:

654-212 (1791.06) Central Utility Plant

Architecture 5

Electrical Area (N3201) 1,357

TR (N3203) 178

Security (N3204) 100

Emergency Panels (N3205) 514

Corridor (N3206) 254

Lower Roof (Outdoors):

Cooling Tower & Pumps (N3202) 1,629

Occupancy & Classifications

NFPA 101 - 2021 EDITION – Chapter 40 – Industrial Occupancies

40.1.2.1.2 Special-Purpose Industrial Occupancy

Table 7.3.1.2 Occupant Load Factor

Special-Purpose Industrial Occupancy: N/A

Construction Type: (NFPA 101 Table A.8.2.1.2): Type I (332)

Fire-Resistance Ratings (NFPA 101 Table A.8.2.1.2):

columns: 2 hr beam, girders, trusses: 2 hr floor/ceiling assemblies: 2 hr roof/ceiling assemblies: 1 1/2 hr exterior non-bearing walls: 0 hr interior non-bearing walls: 0 hr

654-212 (1791.06) Central Utility Plant

Architecture 6

Fire-Resistive Requirements:

Non-combustible materials for structural frame, floors, roof deck, exterior non-bearing walls, interior non-bearing walls (U.N.O. at exterior). Building is to be equipped with a fully automatic fire sprinkler system throughout.

Phasing

The construction of the new Central Utility Plant will need to be done in phases and in coordination with the VA station.

654-212 (1791.06) Central Utility Plant

Architecture 7

VA Planning, Design and Construction Criteria

PG-18-1 Master Construction Specifications

PG-18-3 Design & Construction Procedures

PG-18-4 Standard Details and CAD Standards

PG-18-5 Equipment Guide List

PG-18-9 Space Planning Criteria, and VA – Space & Equipment Planning System

(VA-SEPS)

PG-18-10 Design Manuals (by discipline)

PG-18-12 Design Guides (graphical, by function)

PG-18-13 VA Barrier Free Design Standard (Supplement to the ABA Standards)

PG-18-14 Room Finishes, Door, and Hardware Schedule

PG-18-15 Major New Facilities, Major Additions, and Major Renovations Volume B

PG-18-15 Request for Proposals Design/Build Projects Volume E

PG-18-17 Environmental Guidance

H-18-8 Seismic Design Handbook

VHA Directive

Boiler and Boiler Plant Operations

VA ES-2018-

VHA Boiler and Associated Plant Safety Device Testing Manual Fifth Edition

VA Whole Building Commissioning Process Manual, latest edition

VA Sustainable Design Manual

NFPA National Fire Protection Association

NFPA 10 Standard for Portable Fire Extinguishers

NFPA 13 Standard for the Installation of Sprinkler Systems

NFPA 70 National Electrical Code

NFPA 72 National Fire Alarm and Signaling Code

NFPA 90A Standard for the Installation of Air-Conditioning and Ventilating Systems

NFPA 99 Health Care Facilities Code

NFPA 101 Life Safety Code

NFPA 241 Standard for Safeguarding Construction, Alteration and Demolition Operations

IBC International Building Code

IPC International Plumbing Code

IMC International Mechanical Code

ASHRAE Fundamentals Handbook

ASHRAE 62.1 Ventilation for Acceptable Indoor Air Quality

ASHRAE

Standards 15 &

Safety Standard for Refrigeration Systems and Designation and Safety Classification of Refrigerants. (ANSI Approved)

ASHRAE 90.1 ASHRAE Standard 90.1 Energy Standard for Buildings Except Low-Rise Residential Buildings

ABA Architectural Barriers Act (ABA) Standards (2015)

PSRDM VA Physical Security & Resiliency Design Manual (PSRDM) 2020, July 2022 Revision

654-212 (1791.06)

CENTRAL UTILITY PLANT

SUBMITTAL LEVEL 1 SD2 RFP

SUBJECT Civil Design Narrative

Choose an item. 1

Existing Site Conditions

The existing Boiler Plant (BP) site is located southeast of the intersection of Kirman Avenue and Belli Drive. North of the existing BP is an asphalt parking lot that contains many accessible parking spaces and general spaces for users of the VA hospital. The new Century Utility Plant

(CUP) will be constructed within the existing parking lot. The parking lot is bounded to the east by a two-story parking garage and the existing BP is adjacent to a maintenance building.

Existing vehicle access to the parking lot is provided from two curb-cut entries along the one-directional Kirman Avenue. Pedestrian access to and through the site is primarily through a large concrete walkway that separates the parking lot and the existing BP. The existing parking lot houses 26 accessible spaces and 29 standard spaces. The access drives within the parking lot serve as an entry and exit point to the lower levels of the existing parking structure.

The existing BP site and parking lot are almost entirely impervious, except for the small tree wells located along the east side of Kirman Avenue right-of-way. Surface runoff drains east toward grate inlets adjacent to the existing parking garage and maintenance buildings. These flows are collected and conveyed via storm sewer to the east.

Just north of the hospital, at the northeast corner of Kirman Avenue and Taylor street, is an existing gravel parking lot. This lot will be paved and reconfigured as part of this project. The existing parking lot serves government vehicles and entirely comprised of a compacted gravel parking surface. Existing runoff flows to the southeast corner where a small depressed area provides a small amount of attenuation. Excess flows exit the attenuation area through a curb cut in the Kirman Avenue sidewalk and convey to an existing inlet in Taylor Street. The existing parking lot has two entries, one on Kirman Avenue and one on Taylor Street.

Existing Utilities

The existing Boiler Plant has serval incoming and outgoing services including steam, natural gas, chilled water, oxygen, and electric. The BP supplies oxygen, steam, and natural gas to the main hospital across the street. Returning from the hospital is a condensate return line and a chilled water line. An existing utility tunnel provides a conduit for the majority of these utilities between the hospital and the existing BP. The tunnel runs under Kirman Avenue, through the existing parking lot, and enters the existing BP on the east side.

654-212 (1791.06)

CENTRAL UTILITY PLANT

Choose an item. 2

Electrical services for the BP are pulled from overhead power lines that run along the east side of Kirman Avenue. Several transformers are located behind an enclosed courtyard north of the existing BP. Lighting for the existing asphalt parking lot is provided by street lights within the parking area.

During construction of the new CUP, services to the existing BP will remain operational throughout. Temporary rerouting of the utilities within the existing utility tunnel will be necessary.

While several existing utilities are located within the Taylor Street and Kirman Avenue rights-of-way, there are no known existing utilities within the existing gravel parking lot.

Plumbing for existing boiler plant is minimal and is partially sprinkled. The existing 6” water lines are located in Kirman Avenue and Belli Drive. Existing fire hydrant is located on east side of Kirman and Belli intersection. The chilled water and oxygen lines are located inside the existing tunnel.

An existing 15” SDR 35 sanitary sewer is in Kirman Avenue and 12” SDR35 sanitary sewer line is directly south of the existing boiler plant. An existing 18” RCP storm sewer and fiber optic line are also directly south of the existing boiler plant. An existing 2” XTC gas line in

Kirman Avenue feeds to the boiler plant from west side.

654-212 (1791.06)

CENTRAL UTILITY PLANT

Choose an item. 3

Site Considerations

The project will construct the new Central Utility Plant (CUP) within the area of the existing asphalt parking lot. The geotechnical engineering report has been completed by Terracon

Consultant on October 12th, 2022. One-way traffic Kirman Avenue is to the west and two-way traffic Belli Drive is to the north of the site. The existing parking structure just to the east of the site has two access points for the lower level. One is located on the east side of the structure, while the other is on the west side and is currently accessed via the access drives of the existing parking lot. The new CUP requires a minimum 50-foot standoff from all unscreened vehicles. Because of this requirement, the west garage entry will be closed as part of this project. Closure will be achieved through the addition of anti-ram bollards installed along the entry. Access to the existing maintenance building and maintenance areas east of the site, which is currently provided through the existing asphalt road, will be provided through a new

24-feet wide, two-way access drive. This access drive will also provide fire truck access to those areas.

The new CUP building and surrounding flatwork areas will be enclosed within a fence and gate system. The gate and fencing system will be PSRDM compliant, 8-feet minimum in height, constructed of ornamental steel, and feature anti-climb features. Fence sections adjacent to

Kirman Avenue and Belli Drive shall be anti-ram enhanced. Options to achieve this are to purchase sections of fence that are anti-ram rated or lining the interior sides with rated guard rail. A sliding vehicle gate will be located on the west side of the compound at the location of the existing curb-cut in Kirman Avenue. This gate will feature security elements recommended within the security section of the design narrative but at a minimum shall be equipped with dual-authentication access control using person identification and license plate recognition.

Two pedestrian access gates will be located south of the CUP. Both gates shall include security elements recommended in the security section of the design narrative but at a minimum shall be equipped with personal identity verification, PIN code entry, an auto-closer, and an anti-prop alarm.

Storm runoff from the CUP and yard areas will be collected in storm inlets along the east side of the building. A pervious area will provide some attenuation of flows from the site, as well as

654-212 (1791.06)

CENTRAL UTILITY PLANT

Choose an item. 4 providing water quality treatment of storm water. Flows from this water quality basin will be collected in a new outlet structure and conveyed to the existing storm sewer system.

The repaved gravel parking lot to the north will act as temporary parking for displaced accessible parking spaces following the demolition of the asphalt parking lot north of the existing BP. The new parking lot will eliminate the existing curb-cut entry on Kirman Avenue and all access will be via the existing Taylor Street access. Removal of the Kirman access will allow additional parking and better circulation through the parking lot. Coordination with the

City of Reno will be required during the removal of the curb cut as it is expected that some traffic control measures will be necessary during construction.

A new detention and water quality basin will be added to the southeast corner of the parking lot. Flows from the detention pond will be conveyed to the back of an existing inlet in Taylor

Street. Again, coordination will be required with the City of Reno for construction within the

ROW. Emergency overflows from the pond will be conveyed via existing sidewalk chase, as in existing conditions.

New Utilities

New utility services will be provided to the new CUP from the mains within Kirman Avenue.

Services include domestic water, wastewater, and natural gas. The existing utility tunnel carrying several utilities between the hospital and the existing BP will be connected to the new

CUP. The existing utilities within the tunnel must remain in service until the new CUP is fully completed and accepted by the VA. Temporary rerouting of the tunnel utilities will be required during construction. New utility service connections that extend into public ROW will need to be coordinated with the City of Reno for any lane or roadway closures required.

Parking Considerations

South of the new Central Utility Plant will be a new asphalt parking lot. The parking lot is divided into two sections. One section will be dedicated to accessible parking for the hospital patrons, and the other section will be for workers of the new CUP. The portion of parking that is dedicated to CUP workers will be within the 50-feet setback and therefore will be feature

654-212 (1791.06)

CENTRAL UTILITY PLANT

Choose an item. 5 gates to prohibit access by non-screened vehicles. The gates will be drop arm and feature security elements outlined in the security section of this design narrative.

To construct the new CUP building, the entire asphalt surface parking lot will be demolished, displacing 26 accessible spaces and 29 standard spaces that serve the existing hospital. The accessible spaces will be temporarily relocated to the newly repaved parking lot at Taylor and

Kirman. The lot will be temporarily striped to allow these additional accessible stalls. Once the parking lot to the south of the CUP is completed, a large portion of the accessible stalls will be moved to the new lot. The entire parking lot will then be restriped for the final configuration which will feature some accessible spaces and some standard spaces.

Site Construction Phasing

To allow the existing Boiler Plant to remain operational and to minimize impact to the hospital, the project will be phased. The phasing will be as follows:

1. Phase 1 – Construction of “Off-Site” parking lot at Kirman and Taylor.

a. The new asphalt parking lot will be temporarily striped to maximize the number of accessible parking spaces that will be displaced through the demolition of the lot north of the BP.

2. Phase 2 & 3 – Secure the site, demo/reroute utilities, and construction of new Central

Utility Plant (Building 16)

a. Demolish existing asphalt parking lot and temporary relocation of tunnel and site utilities that are serving the existing BP.

b. Reroute pedestrian pathway north of the existing BP to a temporary walkway and close off west entrance to the parking garage.

c. At completion of this phase, and after acceptance of the new plant by the VA, the existing utilities to the BP can be shut down.

3. Phase 4 – Demolition of Existing Boiler Plant (Building 8)

4. Phase 5 – Construction of new parking lot south of new CUP

5. Phase 6 – Restriping of “Off-Site” parking lot at Kirman and Taylor

a. The parking lot will be restriped to remove many of the accessible spaces and replace them with standard spaces.

654-212 (1791.06) Central Utility Plant

SUBJECT Electrical Design Narrative

Electrical-1

DIVISION 26 ELECTRICAL

1. GENERAL

A. Project Information:

The VA Sierra Nevada Healthcare System (VASNHCS) in Reno, Nevada requires the development of design and construction documents for a Central Utility Plant (CUP) to replace existing Boiler Plant (Bldg. 8). Existing Boiler Plant has aged and need to be replaced with a new and/ or modern facilities to serve the VASNHCS campus. The intent of this narrative is to provide an Electrical Schematic Design document for the Department of Veteran Affairs (DVA) Office of Construction and Facilities Management (CFM) for both design and construction execution.

B. Scope of Work

The Electrical (Division 26) Scope of work shall include the following:

i. Assessment of existing electrical service for the VASNHCS campus,

ii. Assessment and evaluation of existing and anticipated future loads for the new

CUP,

iii. Provide a schematic design for a new electrical service and emergency power system to support new CUP,

iv. Provide schematic design for general power distribution and lighting in new

CUP,

v. Provide a schematic design to size an Uninterrupted Power System (UPS) to support critical equipment during power outages/interruptions,

vi. Provide parking lot lighting for new gravel parking area north of VASNHCS campus.

C. Background

The VASNHCS campus is served by a 3-phase, 60Hz, 115A, 24.9kV Medium Voltage (MV) from NV Energy Company of Nevada (see Appendix A). There are two independent substations (Sutro 241 and Holcomb 241) serving the VASNHCS campus. Both feeds are delivered to the VASNHCS Campus via overhead distribution lines and transition underground through an electrical vault to utility metering enclosure / MV switches in the courtyard of existing Boiler Plant (Bldg. 8). The peak load recorded for the VASNHCS campus is 1.84MW. The VASNHCS power distribution loop originates from the MV switches to various buildings on campus via an underground electrical vault outside of the Plant courtyard. The Plant is served from a 2500kVA, 24.9kV – 480Y/277V, 3-phase pad mounted transformer. The service transformer feeds the main electrical service disconnect switch for parking garage /Building 15 and SE08 (service entrance switchboard) for existing Boiler Plant. The Switchboard (SE08) is rated 3000A, 480Y/277V, 3-phase and located in the courtyard of the Plant.

The plant (Bldg. 8) includes three (3) boilers, three (3) chillers, four (4) cooling towers, a cooling tower sump pit, the facility’s main HVAC system control computer/monitors, and a Command Center. The Plant also serves as the main or back-up location for all

654-212 (1791.06) Central Utility Plant

Electrical-2 facility alarm systems for security and life safety on the VASNHCS campus.

D. Design Concept

The general concept is to provide a design that allows for construction of a new CUP (Bldg. 16) while keeping existing Boiler Plant in operation and gradually phasing out the existing Boiler plant after the new CUP (Bldg. 16) is commissioned. The design shall provide a new electrical service for the new CUP and entire VASNHCS campus .

Existing electrical service in the courtyard of the Boiler Plant (Bldg. 8) shall be removed as part of the Boiler Plant demolition. The electrical design scheme shall be as follows:

i. Provide a new Electrical Service from NV Energy to serve the new CUP and the entire VASNHCS campus. The peak loading ever recorded by the VASNHCS campus according to NV Energy is 1.84MW (ref. Appendix A). Preliminary loading of the new CUP is estimated at 1.5MW (ref. Appendix B). The total demand load therefore to support the new CUP and existing load (@ NEC 220.87) on the VASNHCS campus would be approximately 3.34MW within the loading limit (4.9MW, allocated by NV Energy) for the VASNHCS campus. An application submission shall be required by NV Energy for existing service replacement and/ or relocation. The new service shall be provided with new utility switch(es) with metering units, and service transformers (ref. Appendix C). Utility MV lines shall be rerouted from new service equipment to existing electrical vault for reconnection of power to the VASNHCS main campus. New service feeders shall be provided from the main switchboard of new CUP (Bldg. 16) to reconnect power to Bldg. 7.

ii. The essential power distribution shall comprise of emergency generator, paralleling switchgear, automatic transfer switch(es), and emergency distribution board. The generator shall be provided with underground fuel tank to support full operation for a minimum of 96 hours. The essential electrical system shall be served from a combined total of 2.5MW 480Y/277V, 3ph generators. Existing 1MW generator on the west side of Building 7 (#6 GENERATOR) and (2), 750kW, 480Y/277V, 3ph new generators shall provide the essential power needs for the CUP.

iii. Provide new electrical rooms for both Normal and emergency power distribution.

Essential mechanical loads shall be served from Motor Control Center distribution board(s) downstream of Equipment Branch ATS(s). An estimate capacitor bank of 200kVAR (for approx. motor loads of 350kW @ 0.8pf) shall be provided at main switchboard for power factor correction. General lighting loads shall be served at 277V and Plug Loads/ Miscellaneous loads shall be served at 208Y/120V.

iv. Coordinated demolition shall be provided to remove existing Boiler Plant and electric service equipment in the courtyard. The demolition process shall be phased with commissioning of Bldg. 16 to reduce and/ or prevent power interruptions and other utility services to the hospital. Removal of existing electrical service equipment shall also be coordinated with NV Energy.

654-212 (1791.06) Central Utility Plant

Electrical-3

2. ELECTRICAL CODES AND STANDARDS

A. Architectural Barriers Act (ABA) Standards

B. VA PG-18-13 VA Barrier Free Design Standard

C. ASHRAE Standard 90.1-2019 – Energy Standard for Buildings Except Low-Rise Residential

D. Illuminating Engineering Society (IES) Handbook, 10th Edition

E. IECC 2021 – International Energy Conservation Code

F. JCAHO EC 7.40 – Emergency Electrical Power System Inspection, Maintenance, and Testing

G. NFPA 70-2020 – National Electrical Code (NEC)

H. NFPA 99-2021 – Health Care Facilities Code

I. NFPA 101-2021 – Life Safety Code

J. NFPA 110-2022 – Standard for Emergency and Standby Power Systems

K. NFPA 111-2019 – Standard on Stored Electrical Energy Emergency and Standby Power Systems

L. NFPA 780-2020 – Standard for the Installation of Lightning Protection Systems

M. VA PG-18-10 Electrical Design Manual, December 2019

N. VA PG-18-10 Lighting Design Manual, January 2022

O. VA Physical Security & Resiliency Design Manual (PSRDM) 2020, July 2022 Revision

3. ELECTRICAL DEMOLITION

Demolition of electrical work shall include:

A. Disconnection and removal of all lighting fixtures, electrical devices, data devices and all associated raceway and conductors in the existing Boiler Plant (Bldg. 8).

B. Disconnection and removal of all electrical distribution boards and panelboards in the Boiler Plant.

C. Disconnection of power and removal of all existing Mechanical and other miscellaneous equipment in the Boiler Plant.

D. Disconnection and removal of existing Electric service and associated feeders in the Boiler Plant Courtyard serving the VASNHCS campus.

E. Disconnection of existing 1MW generator (#6 GENERATOR) for reconnection/addition to essential power in Bldg. 16.

4. SITE LIGHTING SYSTEMS

A. New site lighting shall be provided for new Parking Lot around new CUP and Gravel Parking Lot in the Northwest Corner of E Taylor St. and Kirman Ave.

B. Site Lighting fixtures shall be LED with light levels and uniformity ratios per the VA Lighting Design Manual (VA-LDM). Fixtures shall be full-cutoff type to meet Dark Sky Initiatives and reduce light pollution. Provide a minimum of 80 CRI for exterior LED fixtures per the VA-LDM. Refer to Appendix E for additional lighting design guidelines

654-212 (1791.06) Central Utility Plant

Electrical-4 for parking areas. Site lighting control shall include standard dusk to dawn, and the ability to dim fixtures or adjust on/off schedules for fixtures.

5. BUILDING POWER DISTRIBUTION SYSTEMS

A. NORMAL POWER SYSTEM

i. The new service for Bldg. 16 and the VASNHCS campus shall be served from existing two (2) MV Substations, Sutro 241 and Holcomb 241. The Utility equipment shall comprise of (2) MV switches (SW-1, SW-2) with (2) utility metering devices attached. The VASNHCS MV Main Switchgear (SWGR MS-1) shall have (2) sides P and Q, fed from NV Energy substations Holcomb 241 and Sutro 241, respectively. The Electrical contractor shall coordinate with NV Energy in advance to prepare and provide all the necessary appurtenances as required to install MV switches SWGR MS-1 shall be 1200A Bus, 24.9kV, 3ph, 3W with 1200AF/200AT main breakers and a 1200AF/200AT tie breaker separating the sides P and Q. Each side of SWGR MS-1 shall have (3) 1200AF/200AT breakers. One (1) breaker on each side of SWGR MS-1 will refeed power to existing electrical vault serving the west part of VASNHCS campus and another pair (breakers) will serve power to Bldg. 16. Remaining breaker pair on SWGR MS-1 shall be labeled for future use. Building 16 shall be provided with a 3000A, 480Y/277V, 3ph, 4W switchboard (SWBD SE16), served from a 2500kVA, 24.9kV-480Y/277V, 3ph, 4W transformer. The 2500kVA transformer shall be fed from (2) service feeders; P and Q via (2) MV load-break selector switches downstream of SWGR MS-1. Provide 800A breaker in SWBD SE16 to refeed power to existing main distribution panel of Bldg.7. Refer to Appendix C for preliminary Electrical One-Line diagram of the new Electrical Service for the VASNHCS campus.

B. EMERGENCY POWER SYSTEM

i. The essential electrical system shall comprise of a 4000A, 480V, 3ph, 3W Paralleling Switchgear (PSG-16-EG) and a 4000A, 480V, 3ph, 4W Emergency Switchboard (SWBD 16-EG-EM). Provide (2) 750kW 480Y/277V, 3ph, 4W diesel generators to serve essential power to SWBD 16-EG-EM via PSG-16- EG. Existing 1MW generator shall also be reconnected to PSG-16-EG for a total of 2.5MW of essential power to serve Bldg. 16. The essential electrical system for Bldg. 16 shall include (4) 800A and (3) 600A 480V, 3ph, 4W, Automatic Transfer Switches, (2) Motor Control Centers (MCC), (1) 600A distribution board and a 45kVA UPS. Refer to Appendix C for preliminary concept Electrical One-Line diagram of the essential power distribution to the

CUP.

6. BUILDING LIGHTING SYSTEMS

A. Lighting in Bldg. 16 shall be LED and comply with the current VA Lighting Design Manual. Refer to Appendix E for additional lighting design guidelines for specific spaces.

i. General Design Parameters:

654-212 (1791.06) Central Utility Plant

Electrical-5

a) Average Maintained Illumination - Ambient: 300 lx (30 FC) at 3’-0” AFF

b) Average Maintained Illumination - Task: 1000 lx (100 FC) on countertop working surface

c) Uniformity Ratio (avg / min): Ambient: 3:1

d) Color Temperature (CCT): 3500 degrees

e) Color Rendering (CRI): minimum of 80

7. ELECTRICAL CALCULATIONS

A. Voltage drop calculations shall be performed for all new feeders. Feeders shall be sized to limit voltage drop to the levels recommended by the energy code (2% for feeders, 3% for branch circuits, with the combined drop no more than 5%).

B. Fault currents shall be calculated to determine the available interrupting current (AIC) rating at the primary and secondary sides of the transformer(s) and at the loads they serve. Provide calculations for voltage and current harmonic distortions (THD) associated with distribution boards/Motor control centers. These calculations shall be performed via SKM PowerTools for Windows software or approved software by the VASNHCS. Final fault current and arc-flash calculations shall be performed by the electrical equipment supplier and based upon installed equipment on the project. A protective device coordination study shall also be performed by the electrical equipment supplier and all recommended settings shall be implemented at the time of installation. Equipment buses with non-linear loads that shows harmonic distortions shall be mitigated with active or passive components.

C. Preliminary Lightning protection calculation assessment (ref. Appendix D) indicates a lightning protection system is required for the CUP (Bldg. 16). Lightning Protection shall be provided for the CUP.

D. Energy code compliance shall be performed via COMCheck software.

8. GENERAL ELECTRICAL EQUIPMENT

A. Medium Voltage Transformers

i. Provide 2500kVA new transformer for the CUP shall meet VA specifications and be 24.9kV-480Y/277V. Provide pad-mounted, oil-filled copper-wound, with dead-front, loop-style primary connections, 4-position v-blade break before make primary switching, primary fusing and include fault indicators on all incoming primary feeders. Transformers shall be installed on concrete pads.

B. Site Underground Feeders, Branch Circuits, and Raceways

i. Primary, medium voltage feeders shall be copper conductors with 25kV insulation and routed within Schedule 40 PVC raceways in concrete-encasement. Provide a spare raceway in concrete encased duct bank for future use. Manholes and handholes shall be provided where required to minimize cable pulling tensions. All utility manholes and handholes shall be equipped with lockable covers.

ii. All conductors shall be copper and routed within raceways.

654-212 (1791.06) Central Utility Plant

Electrical-6

iii. A copper ground conductor shall be routed with all circuits except building service entrance feeders.

iv. Minimum raceway size shall be 1/2” above grade and 1” below grade.

C. Building Lightning Protection

i. Lightning protection design shall meet the NFPA 780 - Standards for the Installation of Lightning Protection Systems, and NFPA 70 – National Electric Code.

D. MV and Low Voltage Switchboards/Distribution Panelboards

i. MV Switchgear for CUP shall be metal clad and UL 1558 listed. Provide electrically operated draw-out type circuit breakers with electronic relays.

ii. New Low Voltage switchboards shall be sized for the loads they serve and include 25% spare capacity and spare space. Bussing will be copper. The switchboard ampere interrupting current (AIC) rating shall be fully rated and sized based on the available fault current. Switchboards shall be UL 891 listed and floor mounted on a 4” tall concrete house-keeping.

iii. New distribution panelboards shall be sized for the loads they serve and include 30% spare capacity and spare space. Provide copper bussing for new panelboards. The distribution panelboard ampere interrupting current (AIC) rating shall be fully rated and sized based on the available fault current.

iv. New circuit breakers in the existing main switchboard and main emergency distribution panelboard shall have available ampere interrupting current (AIC) ratings to match the panelboard.

v. Provide power circuit breakers for switchgears and switchboards rated 1600A and above. Switchgears and switchboards rated below 1600A may be provided with molded case circuit breakers. Circuit breakers for Paralleling switchgear shall be 100% rated.

E. Metering and Power Monitoring

i. Metering shall be provided at the main service entrance in accordance with the Utility Company standards.

ii. Power monitoring and metering shall be provided at the main switchboard and distribution equipment for both the normal and essential electrical systems. The monitoring/metering equipment shall communicate with the VA-centralized remote metering station via a data backbone. The equipment shall record, store and trend voltage, current, kW, kWh, kVA, kVAR, power factor, and voltage and current total harmonic distortion.

F. Surge Protection

i. A Type 2 Surge Protective Device (SPD) shall be provided on the main electrical service and at panelboards that serve sensitive electronic equipment.

G. Generators

i. Provide at least two dedicated generators to serve as emergency backup for essential loads in the new CUP. Preliminary load estimation indicates at least a combined total of 1500kW will be required to support essential loads in the

654-212 (1791.06) Central Utility Plant

Electrical-7

CUP.

H. Transfer Switches

i. Provide Automatic transfer switches (ATS) to serve essential power to the new CUP. Based on preliminary load analysis, 800A and 600A, 480Y/277V ATS’s shall be provided for the CUP. New ATS’s shall tie into existing Master ATS controller panel of the VASNHCS campus.

I. Uninterruptible Power Supplies (UPS’s)

i. Uninterrupted Power Supply Units shall be provided to support critical loads and telecommunication devices in telecommunication rooms or enclosures.

Preliminary UPS size of 45kVA is proposed to support critical plug loads and equipment in the CUP. UPS shall have battery backup to support a minimum of 10minutes run time.

J. Transformers

i. Indoor dry-type, step-down transformers shall be provided to convert 480V power to 208Y/120V located in electrical rooms. Windings shall be copper.

Transformers 30kVA and larger shall have a 150-degree C temperature rise and transformers less than 30kVA shall have a 115-degree C temperature rise.

All transformers rated 30 kVA and larger shall have two 2.5% full capacity taps above, and four 2.5% full capacity taps below normal rated primary voltage.

ii. Transformers shall be floor mounted on a 4” tall concrete house-keeping pad.

K. Panelboards

i. New panelboards shall be provided as required for the project. Panelboards shall include main circuit breakers where required by the NEC and bolt-on style circuit breakers. 30% spare capacity shall be provided per the VA Electrical Design Manual. Bussing shall be copper. Fault currents shall be calculated to determine the AIC rating for the panelboard and circuit breakers. All panelboards and circuit breakers shall be fully rated.

ii. Panelboards shall be provided with clear, concise schedules.

L. Motor Controllers

i. Variable Frequency Drives (VFD’s) shall be utilized on large horsepower motors and other equipment where variable speed control of the equipment may be performed. VFD’s shall incorporate a circuit breaker disconnecting means, surge protection, and include automatic reset/restart when power is lost or transferred from normal to an emergency source. An interlock with a downstream local disconnecting means shall be provided where VFD’s are not located at the equipment.

ii. Combination type magnetic controller/fused switch style disconnect switches shall be provided for equipment where VFD’s are not utilized.

M. Disconnect Switches

i. New disconnect switches shall be provided for HVAC equipment. Provide heavy duty style switches, rated for the environment installed in and fused if

654-212 (1791.06) Central Utility Plant

Electrical-8 required to protect equipment from high available fault currents. Disconnecting means shall be provided within sight of all motors and other equipment.

ii. Provide motor-rated disconnect for any fan-powered boxes.

N. Building Feeders, Branch Circuits, and Raceways

i. All conductors shall be copper and routed within raceways.

ii. A copper ground conductor shall be routed with all circuits except building service entrance feeders.

iii. Minimum raceway size shall be 3/4” above grade and 1” below grade.

O. Wiring Devices

i. Receptacles shall be specification grade, NEMA 5-20R grounding type, and ivory in color as required by the VA design guide.

ii. Cover plates shall be 302 brushed stainless steel. Cover plates for devices fed from emergency circuits shall be 302 brushed stainless steel and engraved with “EMERGENCY” with red letters.

iii. Ground-fault circuit interrupter (GFCI) style duplex receptacles shall be provided within 6’ of all sinks.

iv. Multi-service floor boxes shall be utilized to house receptacles and voice/data outlets in open spaces on the ground floor. Floor boxes shall be cast iron, 4-compartment style with a flanged cover and separate raceways for power and data.

v. Multi-service recessed poke-through devices shall be utilized to house receptacles and voice/data outlets in open spaces on floors above grade.

Poke-throughs shall be 5-gang style in a metal housing with a flanged aluminum cover and separate raceways for power and data.

vi. Exterior receptacles shall be weather-resistant, GFCI style duplex receptacles and be provided with while-in-use covers.

P. Grounding and Bonding

i. Service entrance grounding shall be provided in accordance with the NEC.

Grounding and bonding connections shall be made to an external ground rod, the telecommunications ground bus, the water service, structural steel, a concrete-encased electrode (Ufer), and above ground metal piping.

ii. Ground rods shall be copper-clad steel, ¾” diameter by 10’-0” long. Ground rods shall be provided until the resistance to earth does not exceed 5 ohms.

iii. Equipment grounding conductors shall be installed with all feeders, and power and lighting branch circuits.

iv. All metallic raceways shall be grounded and the equipment grounding conductor shall be bonded to all junction boxes, pull boxes, enclosures and panelboards.

Q. Labeling/Nameplates

i. All new and/or modified medium-voltage site and building distribution equipment shall be provided with new phenolic resin labels screwed to the equipment.

Normal power distribution equipment shall have white lettering on a black

654-212 (1791.06) Central Utility Plant

Electrical-9 background. Essential electrical distribution equipment should be provided with white lettering on a red background. Lettering shall be 1” tall and include the name of the equipment, name of the equipment it is fed from, and the sizes of the conductors that it is fed with.

ii. All new and/or modified low-voltage building electrical distribution equipment shall be provided with new phenolic resin labels screwed to the equipment.

Normal power distribution equipment shall have white lettering on a black background. Essential electrical distribution equipment shall have white lettering on a red background. Lettering shall be ½” tall and include the name of the equipment, name of the equipment it is fed from, and the sizes of the conductors that it is fed with.

iii. All new wiring device cover plates shall be labeled with a permanent adhesive label listing panel and circuit feeding the wiring device.

9. GENERAL LIGHTING EQUIPMENT

A. Site Lighting

i. Site lighting shall consist of LED light sources rated to operate between -40 degrees C and 50 degrees C, have a Correlated Color Temperature (CCT) of 4000K and a Color Rendering Index (CRI) of 80 or greater.

ii. Light poles for site lighting shall be specified to meet the 80 MPH wind requirements for the site with an additional 30% gust factor and the effective projected area of the selected light fixtures. Light poles shall be steel, straight round . All poles shall be equipped with a handhole and mounted to concrete bases. Pole bases shall project 6” above finished grade in most areas. Open parking areas shall have pole bases 36” above finished grade.

B. Building Lighting

i. Building lighting shall consist of recessed troffer, downlight, and strip light style fixtures with LED light sources with integral lamps and drivers. Drivers shall be a minimum of 85% efficient at full load, have a power factor greater than 95%, total harmonic distortion less than 20%, and operate with a universal 120/277V input. All lights shall be serviceable from below the ceiling. Emergency lighting fixtures along the path of egress shall also incorporate a 90-minute battery backup to meet emergency lighting levels.

ii. Self-contained emergency lighting units shall consist of lamp heads, batteries, battery charger, and an integral test switch. Batteries shall be nickel-cadmium and rated to operate for a minimum of 90 minutes.

iii. Exit light fixtures shall be LED type with red lettering and a brushed aluminum finish. Fixtures shall be single or double-faced with directional arrows as required. Fixtures shall incorporate a nickel-cadmium battery for operation of a minimum of 90 minutes, battery charger and an integral test switch.

iv. Exterior building wall mounted lighting shall be full cut-off, LED type. Lights in areas of emergency building egress shall incorporate a 90-minute battery backup.

654-212 (1791.06) Central Utility Plant

Electrical-10

C. Lighting Controls

i. Site lighting controls shall consist of a multi-pole astronomical electronic time switch with photocell dusk-to-dawn control to allow for multiple control schemes for exterior lighting.

ii. Indoor wall-mounted occupancy sensors shall be dual technology, automatic off/manual on, low-voltage type. Wall-mounted sensors shall be utilized in enclosed offices and small spaces where ceiling mounted coverage is not required. Sensors shall include all required power packs, etc. for a complete control system. For spaces required to comply with ASHRAE 90.1, space occupancy sensors shall be integrated with receptacles for plug load control.

iii. Indoor ceiling-mounted occupancy sensors shall be dual technology, automatic off/manual on, low-voltage type. Ceiling-mounted sensors shall be utilized in open offices and larger spaces where coverage by ceiling is required. Sensors shall include all required digital room controller, power packs, etc. for a complete control system. Wall-mounted override switches shall be included.

iv. Standard manual light switches shall be quiet toggle type, specification grade and ivory in color as required by the VA design guide. Manual light switches shall be utilized in spaces where automatic control of lights is detrimental to the occupant, such as in electrical and mechanical rooms.

END DIVISION 26

654-212 (1791.06) Central Utility Plant

Electrical-11

Appendix A: Utility Company Correspondence

654-212 (1791.06) Central Utility Plant

Electrical-12

Appendix B: Preliminary Load Estimates/Calculations

654-212 (1791.06) Central Utility Plant

Electrical-13

Appendix C: Preliminary New Electrical Service Concept

654-212 (1791.06) Central Utility Plant

Electrical-14

Appendix C Cont’d: Preliminary New Electrical Service for CUP Concept

654-212 (1791.06) Central Utility Plant

Electrical-15

Appendix D: Lightning Risk Assessment

654-212 (1791.06) Central Utility Plant

Electrical-16

Appendix D: Lighting Design Guide Matrix

654-212 (1791.06) Central Utllity Plant

SUBMITTAL Level 2 SD2 RFP SUBJECT Fire Protection

Fire Protection 1

Fire Protection Project Overview

Fire Protection Scope The fire protection design narrative is intended to satisfy the requirements of the VA Fire Protection Design Manual, A/E Submission Instructions for Design-Build Projects: Request for Proposal Documents, and SOW. The author of this fire protection narrative is Dominique Noel, PE of Rated Engineering. Dominique Noel is serving as the project Qualified Fire Protection Engineer as required by the Department of Veterans Affairs “Qualifications and Scope of Services - Project Fire Protection Engineer” document of the Level 1 and Level 2 RFP Document Submission.

While this project includes the evaluation of life safety and code compliance applicable to the scope of work, the life safety scope of work is being performed by Spur Engineering, with Rated Engineering’s review. Refer to the architectural narrative for life safety design scope.

This project creates bridging documents for a new Bldg 16 Central Utility Plant (CUP) north of the existing Bldg 8 CUP. In addition to housing the MEP systems, additional functions will be provided (programming).

The CUP is approximately 11,000 square feet and 2 stories of industrial use.

The campus is the Ioannis A. Lougaris Veteran’s Administration Medical Center, also known as the VA Sierra Nevada Health Care System (VASNHCS) a component of the VA Sierra Pacific Network.

The building tenant/owner is the Department of Veterans Affairs.

Applicable Codes and Standards

• NFPA 13 Standard for the Installation of Sprinkler Systems – 2022 Edition

• NFPA 30 Flammable and Combustible Liquids Code – 2021 Edition

• NFPA 55 Compressed Gases and Cryogenic Fluids Code – 2023 Edition

• NFPA 72 National Fire Alarm and Signaling Code – 2022 Edition

• NFPA 99 Health Care Facilities Code – 2021 Edition

• NFPA 101 Life Safety Code – 2021 Edition

• VA Fire Protection Design Manual – 2021 Edition

• VA Fire Protection Design Manual – Eighth Edition – June 1, 2021

Note that not all NFPA publications are applicable in their entirety. The applicability of NFPA and criteria shall be confirmed within the VA fire Protection Design Manual – 8th Edition.

Building Characteristics

Occupancy Classification

The building contains Special Purpose Industrial and Business Occupancies. Since no assembly use areas exceed 50 occupants per room, there are no assembly occupancies.

654-212 (1791.06) Central Utllity Plant

Fire Protection 2

The building construction type is Type I (332).

Refer to architectural narrative and plans for occupancy, occupancy separation, construction type, allowable height and area, fire resistive requirements, occupant load and means of egress requirements.

Specific Hazards

The facility contains several hazardous areas. Significant coordination shall be given to quantities of hazardous materials, oxygen storage and underground diesel storage tanks requirements.

Bulk Oxygen Storage – Bulk oxygen system is defined by NFPA 55 as, “an assembly of equipment such as oxygen storage containers, pressure regulators, pressure relief devices, vaporizers, manifolds, and interconnected piping, that has a storage capacity of more than 20,000 SCF of oxygen and that terminates at the source valve.” A volume of 20,000 SCF of oxygen is equivalent to 173 gallons of liquid oxygen. While there are no anticipated cylinders in the oxygen storage yard, it is planned to contain a 3,000-gallon main tank and a 525 gallon reserve tank.

Minimum separation distances between bulk liquid oxygen systems and exposure hazard (Table 9.3.2 of NFPA 55)

- Building of Type 1 construction 1 ft

- Exterior walls that encroach on the container to form a court with three or more sides (per 8.12.2.7)

- All classes of flammable and combustible liquids in belowground tanks or vaults

- Horizontal distance from oxygen storage container to tank or vault – 15 ft.

- Horizontal distance from oxygen storage container to filling and vent connections…