This document appears to be a set of general information drawings related to a federal contract opportunity for the design and construction of a new Central Utility Plant (CUP) at the VA Sierra Nevada Health Care System in Reno, Nevada.
The key details are:
- The scope of work includes demolishing the existing Boiler Plant, Building 8, and constructing a new approximately 11,000 GSF CUP building to house boilers, chillers, cooling towers, and a bulk oxygen system to provide utilities for the entire VA campus.
- The project also includes improvements to an existing gravel parking lot, converting the Boiler Plant location into a new paved parking lot, and relocating the campus's main electrical service.
- A Request for Proposal (RFP) solicitation has been issued for this Design-Build project, and supporting conceptual drawings, narratives, and specifications have been provided for informational purposes only. The selected contractor will be responsible for completing their own design.
- All design and construction work must comply with VA requirements and standards, and be performed by licensed professionals in the State of Nevada or equivalent.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. DEPARTMENT OF VETERANS AFFAIRS
GENERAL 30x42 DRAWINGS
VA SIERRA NEVADA HEALTH CARE SYSTEM
975 KIRMAN AVE
RENO, NV 89502
VA PROJECT NUMBER: 654-212
SHEET INDEX
SEQUENCE NUMBER SHEET NAME
[01] GENERAL
01 GI000 COVER SHEET
02 GI001 GENERAL INFORMATION
03 GI011 LIFE SAFETY PLANS
04 GI021 PHASING PLANS
CENTRAL UTILITY PLANT
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
U.S. DEPARTMENT OF VETERANS AFFAIRS
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
OKLAHOMA CITY, OK 73109
(405) 842-6100
CODY DOUGLAS
ARCH - SETH A. CAVIN #7580 EXP. 12/31/2023
MECH - JAMES R. MYLES #027005 EXP. 12/31/2023
ELEC - BRADY MERZ #027238 EXP. 12/31/2023
CIVIL ENGINEER
CALIBRE ENGINEERING
9090 S. RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH, CO 80129
(303) 730-0434
BEN MURPHY
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
2519 MADISON AVENUE, SUITE 100
KANSAS CITY, MO. 64108
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FULLY SPRINKLERED
STRUCTURAL ENGINEER
DEGENKOLD ENGINEERS
375 BEALE STEET, SUITE 500
SAN FRANCISCO, CA 94105
(415) 354-6439
ROBERT GRAFF
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
FRANK FINLEY
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
/2
/2
:2 :3
A
M
COVER SHEET
CAB 01 95NR
LEVEL 1 SD2 RFP
CENTRAL UTILITY PLANT
VA PROJECT NUMBER: 654-212
CENTRAL UTILITY PLANT
04/21/2023
654-212
VA SIERRA NEVADA HEALTH CARE SYSTEM
975 KIRMAN AVE
RENO, NV 89502
VA SIERRA NEVADA HEALTH CARE SYSTEM
975 KIRMAN AVE
RENO, NV 89502
LEVEL 1 SD2 RFP
GI000
SPUR #: 1791.06
SHEET INDEX
SEQUENCE NUMBER SHEET NAME
[01] GENERAL
01 GI000 COVER SHEET
02 GI001 GENERAL INFORMATION
03 GI011 LIFE SAFETY PLANS
04 GI021 PHASING PLANS
[02] CIVIL
05 GC100 CIVIL COVER SHEET
06 CE101 EXISTING CONDITIONS PLAN FOR CUP SITE
07 CE102 EXISTING CONDITIONS PLAN FOR NEW PAVED PARKING LOT SITE
08 CP100 CIVIL PHASING PLAN
09 CD101 DEMOLITION PLAN FOR CUP SITE
10 CD102 DEMOLITION PLAN FOR NEW PAVED PARKING LOT SITE
11 CS101 SITE PLAN FOR NEW CUP SITE
12 CS102 SITE PLAN FOR NEW PAVED PARKING LOT SITE
13 CS103 SITE PLAN FOR NEW PAVED PARKING LOT SITE - INTERIM
14 CS200 CIVIL SITE DETAILS
15 CS201 CIVIL SITE DETAIL 2
16 CS202 CIVIL SITE DETAIL 3
17 CG101 GRADING PLAN FOR CUP SITE
18 CG102 GRADINL PLAN FOR NEW PAVED PARKING LOT SITE
19 CU101 UTILITY PLAN FOR CUP SITE
20 CU102 UTILITY PLAN FOR NEW PAVED PARKING LOT SITE
21 CU200 UTILITY DETAILS
[03] STRUCTURAL
22 S-001 GENERAL NOTES
23 S-002 SYMBOLS AND ABBREVIATIONS
24 SB111 FOUNDATION AND GROUND LEVEL PLAN
25 SF112 MEZZANINE AND ROOF LEVEL FRAMING PLAN
26 S-201 BUILDING ELEVATIONS
27 S-301 BUILDING SECTIONS
28 S-501 TYPICAL CONCRETE DETAILS
29 S-502 TYPICAL MASONRY DETAILS
30 S-503 TYPICAL MASONRY DETAILS
31 S-504 TYPICAL STEEL DETAILS
32 S-505 TYPICAL DECK DETAILS
[04] ARCHITECTURAL
33 AS000D ARCHITECTURAL SITE PLAN - DEMO
34 AS000 ARCHITECTURAL SITE PLAN - REFERENCE
35 AS002D ARCHITECTURAL SITE PLAN - NEW
36 AE021 PARTITION TYPES
37 AE101 REFERENCE PLANS
38 AE111 DIMENSION PLANS
39 AE121 ROOF PLAN
40 AC131 REFLECTED CEILING PLANS
41 AE201 BUILDING ELEVATIONS
42 AE301 BUILDING SECTIONS
43 AE311 WALL SECTIONS
44 AE401 INTERIOR ELEVATIONS AND ENLARGED PLANS
45 AE402 INTERIOR ELEVATIONS AND ENLARGED PLANS
46 AE403 INTERIOR DETAILS - TYP.
47 AE601 DOOR SCHEDULE
48 AF701 FINISH FLOOR PLANS
AREA
PLAN
N
LOCATION
PLAN
N
PROJECT LOCATION
PROJECT
LOCATION
SHEET INDEX
SEQUENCE NUMBER SHEET NAME
49 AE901 3D BUILDING SECTION VIEWS
50 AE902 PERSPECTIVE VIEWS
[05] PLUMBING
51 P-000 PLUMBING LEGEND
52 P-101 PLUMBING PLANS
53 P-501 PLUMBING DETAILS
54 P-502 PLUMBING DETAILS
55 P-503 PLUMBING DETAILS
56 P-601 PLUMBING SCHEDULES
[06] MECHANICAL
57 M-000 LEGEND AND ABBREVIATIONS
58 MH101 MECHANICAL FIRST FLOOR PLAN
59 MH102 MECHANICAL FLOOR PLAN AND ROOF PLAN
60 M-401 MECHANICAL FLOW DIAGRAMS
61 M-402 MECHANICAL FLOW DIAGRAMS
62 M-403 MECHANICAL FLOW DIAGRAMS
63 M-501 MECHANICAL DETAILS
64 M-502 MECHANICAL DETAILS
65 M-503 MECHANICAL DETAILS
66 M-504 MECHANICAL DETAILS
67 M-505 MECHANICAL DETAILS
[07] ELECTRICAL
68 E-000 ELECTRICAL LEGEND AND ABBREVIATIONS
69 ES101 ELECTRICAL SITE PLANS
70 ES102 ELECTRICAL SITE PLAN - CUP
71 EP101 ELECTRICAL POWER FLOOR PLAN - LEVEL 1
72 EP102 ELECTRICAL POWER FLOOR PLAN - MEZZANINE LEVEL
73 EP103 ELECTRICAL POWER FLOOR PLAN - ROOF
74 EL201 ELECTRICAL LIGHTING PLAN
75 EL202 ELECTRICAL LIGHTING PLAN - MEZZANINE LEVEL
76 E-600 NEW ELECTRICAL ONE-LINE DIAGRAM
77 E-601 NEW ELECTRICAL ONE-LINE DIAGRAM
[08] TELECOM
78 TS101 TELECOMMUNICATIONS SITE PLAN
79 TS102 TELECOMMUNICATIONS SITE PLAN - CUP
80 T-000 TELECOMMUNICATIONS SYMBOLS AND LEGENDS
81 TN101 LEVEL 1 - TELECOMMUNICATIONS FLOOR PLAN
82 TN102 MEZZANINE LEVEL - TELECOMMUNICATIONS FLOOR PLAN
83 TN402 TELECOMMUNICATIONS ENLARGED PLANS
84 TN500 TELECOM DETAILS
85 TN600 TELECOM RISERS AND DIAGRAMS
86 TY101 LEVEL 1 - SECURITY FLOOR PLAN
87 TY102 MEZZANINE LEVEL - SECURITY FLOOR PLAN
88 TY402 SECURITY ENLARGED PLANS
89 TY500 SECURITY DETAILS
90 TY600 SECURITY RISER AND DIAGRAMS
TOTAL SHEETS: 95
PROJECT
LOCATION
BELLI DR
BURNS ST
K
IR
M A
N A
V E
E TAYLOR ST
BALZAR CIR
K
IR
M A
N A
V E
E TAYLOR ST
VASSAR ST
S W
E
LL
S A
V E
DWIGHT D. EISENHOWER HIGHWAY
M A
R T
IN
LU
T H
E R
K
IN
G
JR
M E
M O
R
IA
L H
IG
H W
A Y
E 2ND ST
K
IE
T Z
K E
R L
N
S V
IR
G
IN
IA
S T
LO
C
U S
T S
T
No. REVISION DESCRIPTION DATE
[09] FIRE PROTECTION
91 FA001 FIRE ALARM NOTES, MATRIX, RISERS
92 FA101 FIRE ALARM FLOOR PLANS
93 FA500 FIRE ALARM DETAILS
94 FX101 FIRE SUPPRESSION FLOOR PLANS
FX500 FIRE SPRINKLER DETAILS95
ABBREVIATIONS CODES STANDARDS AND EXECUTIVE ORDERS
4' -0
M
A X
4' -0
M
A X
2' -1
0" M
A X
2' -3
M
IN
1'-6" MIN
1. GENERAL CONTRACTOR TO PROVIDE METAL SUPPORT
BLOCKING FOR ALL WALL MOUNTED ACCESSORIES,
FIXTURES, AND EQUIPMENT.
2. PROVIDE ADA SUPPORT BRACKETS PLACED AT ALL OPEN
COUNTERTOPS @ 36"-48" MAX ON CENTER.
3. SPECIFIED MAXIMUMS ARE MEASURED FROM AFTER
FINISHED FLOOR TO THE OPERABLE PART OF THE FIXTURE.
4. FIXTURES SHOWN ARE REPRESENTATIONAL ONLY. NOT ALL
FIXTURES MAY BE USED. REFER TO SPECIFICATIONS FOR
FIXTURE TYPES USED IN THIS PROJECT.
5. FIXTURES MAY OVERLAP WAINSCOT. WHERE APPLICABLE,
BACKING TO BE PROVIDED AS SHIM FOR FLUSH
APPLICATION. SHIM TO MATCH SCHEDULED WALL FINISH.
6" MAX
9" M
IN
SHOWER
VA TOILET ROOM
TURNING RADIUS
DRINKING
FOUNTAIN
PAPER TOWEL
DISPENSER
SANITARY
NAPKIN
DISPENSER
4' -0
"M A
X
WASTE
RECEPTACLE
LAVATORY
WITH MIRROR
ON CENTER
WALL
4' -0
M
A X
SOAP
DISPENSER
2' -1
0" M
A X
T O
B .O
. R E
F
LE
C T
IV
E
S U
R F
A C
E
3' -4
"M A
X
17 MIN
2' -3
M
IN
3' -0
M
A X
1'-6" MIN
WALL
2' -9
" 4' -0
M
IN
2'-0" MIN
8" MIN
WALL
LAVATORY
WITH APRON
1' -5
M
A X
1'-6" MIN
URINAL
WALL
1'-5" - 1'-7" (AMBULATORY)
1'-4" - 1'-6" (WHEELCHAIR)
CLEAR FLOOR
5'-6"
CLEAR FLOOR
6'-0"
3'-0" MIN
2' -9
3' -0
1'-0" MIN
3'-6" MIN 1'-0"MAX
4'-6" MIN
1' -5
'-7
1' -6
M
IN
A N
S I I
C C
A
7.
1)
1' -3
M
IN
A D
A /A
B A
2' -9
'-0
WALL
WALL
4' -0
M
A X
WALL HOOK
7' -0
CLOCK
WALL
FINISHED FLOOR
FIRE EXTINGUISHER
CABINET
WEIGHT > 40LBS
FIRE EXTINGUISHER
CABINET
WEIGHT < 40LBS
4' -0
"M A
X
4' -0
M
A X
TOILET SEAT
COVER
DISPENSER
BABY
CHANGING
STATION
CLEAR FLOOR SPACE
@ WATER CLOSET
5'-6"
2'-6"
4' -0
2'-6"
4' -0
HANDRAILS AND
BUMPER GUARDS
FIXTURE MOUNTING HEIGHTS AND CLEARANCES
18" MIN
M
IN
FRONT APPROACH,
PULL SIDE
36" MIN
M
IN
HINGE APPROACH,
PULL SIDE
HINGE APPROACH,
PULL SIDE
*12" MIN48
M
IN
FRONT APPROACH,
PUSH SIDE
M
IN
HINGE APPROACH,
PUSH SIDE
22" MIN 24" MIN
*4 8"
M
IN
LATCH APPROACH,
PULL SIDE
24" MIN*4
2"
M
IN
LATCH APPROACH,
PUSH SIDE
*IF BOTH CLOSER
AND LATCH ARE
PROVIDED
*54" MIN IF CLOSER
IS PROVIDED
*48" IF CLOSER IS
PROVIDED
FRONT APPROACH,
PUSH SIDE
M
IN
42" MIN
DOOR AND FIXTURE CLEARANCES
MATERIALS LEGEND
PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO PARTICIPATE IN
VOLUNTARY STANDARD BODIES.
GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS
SPECIFY OTHER CODES AND STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
• 2021 INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW)
• 2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC) (IF APPLICABLE)
• 2021 NFPA 101 LIFE SAFETY CODE (SEE NOTES BELOW)
• 2021 NATIONAL FIRE CODES (NFPA)
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• 2020 VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• 2021 INTERNATIONAL MECHANICAL CODE
• 2023 NATIONAL ELECTRICAL CODE (NEC), NFPA 70
• 2021 INTERNATIONAL PLUMBING CODE (IPC)
• 2016 SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.
• 2015 ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS INCLUDING VA SUPPLEMENT, VA BARRIER FREE DESIGN STANDARD (PG-18-13)
• 2017 ANSI ICC A117.1 ACCESIBLE AND USABLE BUILDINGS AND FACILITIES
• 2019 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND COMMENTARY, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318-19)
• 2017 STEEL CONSTRUCTION MANUAL (15TH EDITION), AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• 2007 DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND
NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
• 2006 FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
• 2018 EXECUTIVE ORDER 13834: EFFICIENT FEDERAL OPERATIONS
• 2021 THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 010000 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
• 2019 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1
• 2019 SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT
NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN.
DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES
EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
ASHRAE 90.1 - 2019 EDITION
BUILDING LOCATION: RENO, NV
CLIMATE ZONE (TABLE ANNEX 1-1): ZONE 5B
INTERIOR DESIGN CONDITIONS:
THE INTERIOR DESIGN TEMPERATURES FOR HEATING AND COOLING AS DEPICTED IN THE PROJECT DESIGN CONDITIONS SCHEDULE IN THE MECHANICAL CONTROL DRAWINGS SHALL BE THE MAXIMUM
AND MINIMUM VALUES FOR THE ASSOCIATED TEMPERATURE CONTROL ZONES.
BUILDING ENVELOPE REQUIREMENTS (5.5 )
BUILDING ENVELOPE REQUIREMENTS FOR CLIMATE ZONE 4 (A,B,C)
ROOFS REQUIRED DESIGNED
INSULATION: R-30. c.i. TBD
METAL BUILDINGS: R-19 TBD
ATTIC AND OTHER: R-49 N/A
WALLS, ABOVE GRADE
MASS: R-11.4 c.i. TBD
METAL BUILDING: R-19.0 TBD
STEEL-FRAMED: R-13.0 + R-10.0 c.i. TBD WOOD-FRAMED AND OTHER: R-13.0 + R-7.5 c.i. TBD
FLOORS
MASS: R-14.6 c.i. TBD
STEEL-FRAMED: R-30 TBD
WOOD-FRAMED AND OTHER: R-30 TBD
SLAB-ON-GRADE FLOORS
UNHEATED SLABS: N/A N/A
OPAQUE DOORS
SWINGING: U-0.370 TBD
NONSWINGING: U-0.310 TBD
FENESTRATION (TABLE 5.5-4):
VERTICAL FENESTRATION, U-FACTOR
NONMETAL FRAMING: U-0.35 TBD
METAL FRAMING: U-0.45 TBD
(CURTAINWALL/STOREFRONT)
METAL FRAMING U-0.80 TBD
(ENTRANCE DOOR)
METAL FRAMING U-0.55 TBD
(ALL OTHERS)
DEFINITIONS
TBD = TO BE DETERMINED
c.i = CONTINUOUS INSULATION Ls = LINEAR SYSTEM
NR = NO (INSULATION) REQUIREMENT
ENERGY REQUIREMENTS
N
1. DRAWINGS ARE PART OF A COMPLETE DOCUMENTS SET. CONTRACTOR SHALL
CONFIRM ALL ITEMS REQUIRED BASED UPON THE OVERALL DESIGN INTENT OF THE
ENTIRE DOCUMENT SET.
2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, PRIOR TO BEGINNING ANY
WORK, TO CONFIRM THE ACCURACY OF THE DRAWINGS AND REPORT ANY
DISCREPANCIES TO THE ARCHITECT. DO NOT SCALE THE DRAWINGS. FIELD VERIFY
ALL DIMENSIONS AND EXISTING STRUCTURAL CONDITIONS.
3. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT
CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES.
4. ERECT BARRICADES AND WARNING SIGNS TO DIVERT AND WARN PASSERS-BY OF THE
CONSTRUCTION WORK. PROVIDE DUST PROOFING ENCLOSURES TO SEPARATE WORK
AREAS FROM THE EXISTING FACILITIES.
5. ALL TRASH AND DEBRIS TO BE REMOVED ON A DAILY BASIS.
6. PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN
PLACE DURING THE SCOPE OF WORK. SHOULD ANY DAMAGE OCCUR, PATCH AND
REPAIR ANY DAMAGE TO ADJACENT FINISHES TO MATCH EXISTING.
7. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED
OR REPLACED BACK TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE
OWNER. IN ADDITION, DAMAGE TO NON-VA PROPERTY AND EQUIPMENT SHALL BE THE
RESPONSIBLITY OF THE CONTRACTOR.
8. COVER ALL RETURN AIR GRILLES WITHIN THE AREA OF CONSTRUCTION TO PREVENT
PARTICULATE MATERIAL FROM EXHAUSTING INTO SURROUNDING SPACES.
9. APPROPRIATE LIGHT FIXTURES SHALL BE TEMPORARILY SUSPENDED TO PROVIDE
ADEQUATE LIGHTING LEVELS FOR CONSTRUCTION.
10. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO COORDINATE WITH OTHER
DISCIPLINES TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS. DRAWINGS, AS A
WHOLE, REPRESENT A COMPLETE SET AND DEPICT REQUIREMENTS FOR COMPLETE
AND OPERATIONAL SYSTEMS. INDIVIDUAL DRAWINGS MAY NOT DEPICT COMPLETE AND
ACCURATE INFORMATION TO COORDINATE COMPLETE AND OPERATIONAL SYSTEMS,
BUT DO SO AS AN ENTIRE DOCUMENT TO BE REFERENCED WITH OTHER INDIVIDUAL
DRAWINGS. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO REFERENCE
OTHER SHEETS AND SPECIFICATIONS AS AN ENTIRE SET OF CONSTRUCTION
DOCUMENTS THAT REFLECT WORK REQUIRED TO ACHIEVE A COMPLETE AND
OPERATIONAL GOAL. LACK OF COORDINATION AND REVIEW OF DRAWINGS AND
SPECIFICATIONS AS AN ENTIRE DOCUMENT TO INSTALL COMPLETE AND OPERATIONAL
SYSTEMS, BEING OBVIOUS AND TYPICAL INDUSTRY STANDARD, IDENTIFIED IN THE
DRAWINGS AND SPECIFICATIONS, SHALL NOT BE IN ANY WAY AN ADDITIONAL COST TO
THE GOVERNMENT.
11. PER RENO VA FMS POLICY- CONTRACTOR SHALL SUBMIT A REQUEST, IN WRITING, TO
INTERRUPT ANY SUCH SERVICES TO COR (CONTRACTING OFFICER’S
REPRESENTATIVE) 72 HOURS IN ADVANCE OF PROPOSED INTERRUPTION. REQUEST
SHALL STATE REASON, DATE, EXACT TIME OF, AND APPROXIMATE DURATION OF SUCH
INTERRUPTION. MAJOR INTERRUPTIONS OF ANY SYSTEM MUST BE REQUESTED, IN
WRITING, AT LEAST 60 CALENDAR DAYS PRIOR TO THE DESIRED TIME AND SHALL BE
PERFORMED AS DIRECTED BY THE COR. MAJOR INTERRUPTIONS SHALL BE
COORDINATED WITH OTHER MAJOR INTERRUPTIONS, WHICH ARE ACTIONS THAT HAVE
THE POTENTIAL TO IMPACT PATIENT CARE, AND MAY NOT BE SCHEDULED FOR ONE
DISCIPLINE MORE THAN TWICE THROUGHOUT THE OVERALL CONSTRUCTION
SCHEDULE UNLESS REQUESTED IN WRITING AND APPROVED BY THE COR.
CONTRACTOR WILL BE ADVISED, IN WRITING, OF APPROVAL OF REQUEST, OR OF
WHICH OTHER DATE AND/OR TIME SUCH INTERRUPTION WILL CAUSE THE LEAST
INCONVENIENCE TO OPERATIONS OF THE MEDICAL CENTER. INTERRUPTION TIME
APPROVED BY THE MEDICAL CENTER MAY OCCUR AT TIMES OTHER THAN
CONTRACTOR'S NORMAL WORKING HOURS. SCHEDULE INTERRUPTION MAY BE ON
WEEKENDS OR LATE HOURS AND MAY NOT BE AN ADDITIONAL COST TO THE
GOVERNMENT. COORDINATE ALL INTERRUPTIONS THAT MAY AFFECT THE NORMAL
OPERATION OF THE FACILITY WITH THE COR WHEN SUBMITTING THE CONSTRUCTION
SCHEDULE OR UPDATES TO THE CONSTRUCTION SCHEDULE.
12. NO ASBESTOS CONTAINING MATERIALS ARE TO BE USED ON THIS PROJECT. SPUR
DESIGN, THE A/E OF RECORD, CAN CERTIFY THAT NO ASBESTOS CONTAINING
BUILDING MATERIALS (ACBM) OR LEAD BASED PAINT (LBP) PRODUCTS WERE
DESIGNED/SPECIFIED AS BUILDING MATERIAL IN ANY OF THE CONSTRUCTION
DOCUMENTS.
GENERAL NOTES
AREA NAME
150 SF
A101
A101
SIM
A
00.0
A101
1 1
A101
LEVEL NAME
00'-00"
00'-00" 4B
3A
FIBERGLASS BATT
INSULATION
RIGID INSULATION
CONCRETE / PRECAST
CONCRETE
EARTH / SOIL
SAND, EIFS FINISH, OR
PLASTER FINISH
GYPSUM BOARD FINISH
BRICK
CONCRETE MASONRY
UNIT
STONE / CAST STONE
GYPSUM BOARD SECTION
EXTERIOR SHEATHING
BOARD SECTION
PLYWOOD SECTION
CLEAN UTILITY
000A
150 SF
/1 A101
X0000
6"
3' -0
M
A X
ROOM TAG
AREA TAG
SPECIALTY EQUIPMENT TAG
DOOR TAG
KEYED NOTE TAG
WALL TAG
WINDOW TAG
A101
SIM
A101
SIM
A
ACB ACOUSTIC CEILING BAFFLE
ACP ACOUSTIC CEILING PANEL
ACST ACOUSTIC
ADA AMERICANS WITH DISABILITIES ACT
ACT ACOUSTICAL CEILING TILE
ADDL ADDITIONAL
ADDN ADDITION
ADJ ADJACENT, ADJOINING, OR
ADJUSTABLE
ADMIN ADMINISTRATION
AE ARCHITECT/ENGINEER
AF ACCESS FLOORING
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AIA AMERICAN INSTITUTE OF
ARCHITECTS
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM (TRIM)
AMT AMOUNT
APPROX APPROXIMATE
ARCH ARCHITECT
ASC ABOVE SUSPENDED CEILING
AT ACOUSTIC CEILING TILE
AVG AVERAGE
B
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BOS BOTTOM OF STEEL
BOT BOTTOM
BRKT BRACKET
BTWN BETWEEN
C
CAB CABINET
CAV CAVITY
CBB CONCRETE BACKER BOARD
CD CONSTRUCTION DOCUMENTS
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CH BD CHALK BOARD
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CONTRACTING OFFICER
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUOUS
COORD COORDINATE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CP CONTRACTOR PROVIDED
CP/CI CONTRACTOR PROVIDED /
CONTRACTOR INSTALLED
CPT CARPET/CARPET TILE
CS CONCRETE SEALED
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTR CENTER
CU FT CUBIC FEET
D
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
DS DOWNSPOUT
DWG DRAWING
DWP DIMENSIONAL WALL PANEL
E
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
ELEV ELEVATOR
ENTR ENTRANCE
EPY EPOXY FLOORING
EQ EQUAL
ETR EXISTING TO REMAIN
EX EXISTING
EXP EXPOSED
EXT EXTERIOR
F
FAB FABRIC
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FP FIRE PROTECTION
FR FIRE RESISTANT
FT FEET
FTG FOOTING
FV FIELD VERIFY
FWC FABRIC WALL COVERING
G
GDR GUARDRAIL
GL GLASS/GLAZING
GRAN GRANITE
GR FL GROUND FLOOR
GT GROUT
GSM GALVANIZED SHEET METAL
GYP BD GYPSUM BOARD
H
HDW HARDWARE
HEPA HIGH EFFICIENCY
PARTICULATE AIR (FILTER)
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HANDRAIL
HT HEIGHT
I
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
J
J-BOX JUNCTION BOX
L
LAV LAVATORY
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LIN LINEAR
LN LINOLEUM
LOC LOCATION
LT LIGHT
LVR LOUVER
LVT LUXURY VINYL TILE
M
MAT CARPET MAT / WALK-OFF MAT
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEMB MEMBRANE
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MOD MODIFY
MTG MOUNTING
MTL METAL
MVBL MOVABLE
N
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P
P PAINT
PA PUBLIC ADDRESS
PBD PARTICLE BOARD
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PNL PANEL
PR PAIR
PRB PROFILE BASE
PRKG PARKING
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PORCELAIN TILE
PWR POWER
Q
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QTY QUANTITY
REFERENCE SYMBOLS IDENTIFICATION TAGS
NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS WILL BE UTILIZED FOR THIS PROJECT.
GRID HEAD AND
LINE
LEVEL INDICATOR
MATCH LINE AND
VIEW REFERENCE
NORTH ARROW W/
PROJECT NORTH
SPOT ELEVATION
DETAIL
SECTION
**48" MIN IF BOTH CLOSER
AND LATCH PROVIDED
WALL
SECTION
BUILDING
SECTION
DETAIL
ELEVATION
INTERIOR
ELEVATION
BUILDING
ELEVATION
1 1
6'- 0"
5'- 6"
BARIATRIC TOILET ROOM
TURNING RADIUS
CLEAR FLOOR SPACE
@ ADA LAVATORY
CLEAR FLOOR SPACE @ ADA
DRINKING FOUNTAIN
4"
6"
3"
6" 1'
-6
6" MAX
7" - 9" 11" MIN
17" - 25"
M
IN
6' -0
(ANSI ICC A117.1)
39"- 41"
(A N
S I I
C C
A
7.
1)
M
IN
(A N
S I I
C C
A
7.
1)
1"
3' -6
M
A X
5' -0
M
A X
R
RAF RESILIENT ATHLETIC FLOORING
RB RUBBER BASE/RESILIENT BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RES RESINOUS FLOORING
RES-W RESINOUS / EPOXY WALL / CEILING
RF RUBBER FLOORING
RFG ROOFING
RM ROOM
RO ROUGH OPENING
RP RESIN PANEL
RSF RESILIENT SHEET FLOORING
RV ROOF VENT
RWC RIGID VINYL WALLCOVERING
S
SC SPECIALTY COATING
SD STATIC DISSIPATIVE FLOORING/TILE
SCHED SCHEDULE
SECT SECTION
SF SQUARE FOOT (FEET)
SGL SINGLE
SIM SIMILAR
SJ SCORED JOINT
SLNT SEALANT
SM SHEET METAL
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SOLID SURFACE
ST STONE
STD STANDARD
STOR STORAGE
SV SHEET VINYL (ROLLED OR TILE)
T
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZZO
TOF TOP OF FOOTING/ FOUNDATION
TOM TOP OF MASONRY
TOS TOP OF SLAB/ STEEL
U
UNO UNLESS NOTED OTHERWISE
UTIL UTILITY
V
VAR VARIES
VC VA PROVIDED / CONTRACTOR
INSTALLED
VCT VINYL COMPOSITION TILE
VFAT VINYL FACED ACOUSTICAL TILE
VP VENEERED PLASTER
VT VINYL TILE
VV VA PROVIDED / VA INSTALLED
VWC VINYL WALLCOVERING
VWF VINYL WALL FABRIC
W
W/ WITH
W/O WITHOUT
W/C WATER CLOSET
WC WHEELCHAIR
WD WOOD
WFAB WALL FABRIC
WPM WATERPROOF MEMBRANE
WSF WELDED SHEET FLOOR
X
X BRACE CROSS BRACE
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
OKLAHOMA CITY, OK 73109
(405) 842-6100
CODY DOUGLAS
ARCH - SETH A. CAVIN #7580 EXP. 12/31/2023
MECH - JAMES R. MYLES #027005 EXP. 12/31/2023
ELEC - BRADY MERZ #027238 EXP. 12/31/2023
CIVIL ENGINEER
CALIBRE ENGINEERING
9090 S. RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH, CO 80129
(303) 730-0434
BEN MURPHY
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
2519 MADISON AVENUE, SUITE 100
KANSAS CITY, MO. 64108
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FULLY SPRINKLERED
STRUCTURAL ENGINEER
DEGENKOLD ENGINEERS
375 BEALE STEET, SUITE 500
SAN FRANCISCO, CA 94105
(415) 354-6439
ROBERT GRAFF
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
FRANK FINLEY
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
FIRE PROTECTION ENGINEER
RATED ENGINEERING
609 S. KELLY AVE. SUITE H2
EDMOND, OK 73003
(405) 856-2965
/1
/2
:1
:0
P
M
GENERAL INFORMATION
CAB 02 92NR
LEVEL 1 SD2 RFP
CENTRAL UTILITY PLANT
04/21/2023
654-212
VA SIERRA NEVADA HEALTH CARE SYSTEM
975 KIRMAN AVE
RENO, NV 89502
GI001
SPUR #: 1791.06
No. REVISION DESCRIPTION DATE
UP
UPDN
DN
NEW 1 HOUR FIRE RATED WALLS
NEW NON-RATED WALLS
PARTITION LEGEND
BUILDING HEIGHT: BUILDING 16
1 STORY AND A MEZZANINE LEVEL, APPROX. 35'-0" HEIGHT
BUILDING AREA:
AREA LIMITATION: 69,000 SQUARE FEET (2021 IBC TABLE 506.2)
FIRST FLOOR 8,136 GROSS SQUARE FEET
MEZZANINE 2,821 GROSS SQUARE FEET
TOTAL 10,957 GROSS SQUARE FEET
NFPA 101-2021 CHAPTER 7- TABLE 7.3.1.2 OCCUPANT LOADS
NFPA 101-2021 CHAPTER 7- 7.2.1.2.3.2) MINIMUM DOOR LEAF WIDTH
MINIMUM DOOR OPENING WIDTH OF 32"
NFPA 101-2021 CHAPTER 7- TABLE 7.3.3.1 CAPACITY FACTORS
NFPA 220-2021 CHAPTER 4- TABLE 4.1.1
CONSTRUCTION TYPE: TYPE II (000)
FIRE RESISTANCE RATINGS
COLUMNS: 0 HR
BEAM, GIRDERS, TRUSSES: 0 HR
FLOOR/CEILING ASSEMBLIES: 0 HR
ROOF/CEILING ASSEMBLIES: 0 HR
EXTERIOR NON-BEARING WALLS: 0 HR
INTERIOR NON-BEARING WALLS: 0 HR
FIRE-RESISTIVE REQUIREMENTS:
NON COMBUSTIBLE MATERIALS FOR STRUCTURAL FRAME, FLOORS, ROOF DECK, EXTERIOR
NON-BEARING WALLS, INTERIOR NON-BEARING WALLS (U.N.O. AT EXTERIOR)
NFPA 101-2021 CHAPTERS 40 & 42 TRAVEL DISTANCE
NFPA 101-2021 CHAPTERS 40 & 42 COMMON PATH OF TRAVEL
NFPA 101-2021 CHAPTERS 40 & 42 DEAD END CORRIDOR
PROTECTED AREAS: STORAGE ROOMS/CLEAN/SOILED:
PER VA FIRE PROTECTION DESIGN MANUAL 3.1.A, STORAGE ROOMS ARE HAZARDOUS AREAS.
PER NFPA 101: 39.3.2.1, HAZARDOUS AREAS SHALL BE PROTECTED AS STATED IN SECTION 8.7.
PER NFPA 101: 8.7, ANY AREA HAVING A DEGREE OF HAZARD GREATER THAN THAT NORMAL
TO THE GENERAL OCCUPANCY SHALL BE PROVIDED BY ONE OF THE FOLLOWING:
• 1 HR FIRE BARRIER OR PROTECTING THE AREA WITH AUTOMATIC EXTINGUISHING SYSTEM
1 HR FIRE BARRIER WITH SPRINKLER PROTECTION, PROVIDED.
SMOKE COMPARTMENTALIZATION: NOT REQUIRED FOR BUSINESS OCCUPANCIES, NOT PROVIDED.
FIRE ALARM SYSTEM: REQUIRED / PROVIDED MANUAL SYSTEM.
STANDPIPES: NOT REQUIRED / NOT PROVIDED.
LIFE SAFETY CODE ANALYSIS
LIFE SAFETY LEGEND
FIRE EXTINGUISHER CABINET
EXIT LIGHT / SIGN
NOT IN SCOPE
BUILDING EXIT
EGRESS PATH
EGRESS START
FEC
296 SF
OXYGEN YARD
N3112
369 SF
ELECTRICAL
SWITCHGEAR
N3113
587 SF
GENERATORS
N3114
804 SF
CONTROL
ROOM
N3115
193 SF
CONFERENCE /
BREAK ROOM
N3116
71 SF
RESTROOM
N3117
72 SF
RESTROOM
N3118
507 SF
ELECTRICAL
UTILITY ROOM
N3108
137 SF
OFFICE
N3106
87 SF
ELEC
N3107
147 SF
CORRIDOR
N3105
66 SF
HAC
N3104
131 SF
STORAGE
ROOM
N3103
194 SF
STEAM PIT
N3102
2529 SF
BOILER AREA
N3101
1298 SF
CHILLERS
N3111
59 SF
RISER ROOM
N3110
62 SF
PIT
N3109
TRAVEL DISTANCE 63' - 6"
T R
A V
E L
D
IS
T A
N C
E
6"
TRAVEL DISTANCE
92' - 0"
TRAVEL DISTANCE 59' - 0"
T R
A V
E L
D
IS
T A
N C
E
2'
6"
TRAVEL DISTANCE
112' - 6"
TRAVEL DISTANCE
75' - 6"
INDUSTRIAL,
SPECIAL-PURPOSE
8136 SF
FEC
FEC
F E
C
TRAVEL DISTANCE 34' - 0"
178 SF
TR
N3203
100 SF
SECURITY
N3204
516 SF
EMERGENCY
PANELS
N3205
254 SF
CORRIDOR
N3206
1357 SF
ELECTRICAL
AREA
N3201
1629 SF
COOLER
TOWERS &
PUMPS
N3202
T R
A V
E L
D
IS
T A
N C
E
7'
6"
T R
A V
E L
D
IS
T A
N C
E
7'
6"
T R
A V
E L
D
IS
T A
N C
E
1'
0"
1.02
1.02
F E
C
F E
C
INDUSTRIAL,
SPECIAL-PURPOSE
2700 SF
INDUSTRIAL USE, SPECIAL-PURPOSE
PARTITION LEGEND
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
OKLAHOMA CITY, OK 73109
(405) 842-6100
CODY DOUGLAS
ARCH - SETH A. CAVIN #7580 EXP. 12/31/2023
MECH - JAMES R. MYLES #027005 EXP. 12/31/2023
ELEC - BRADY MERZ #027238 EXP. 12/31/2023
CIVIL ENGINEER
CALIBRE ENGINEERING
9090 S. RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH, CO 80129
(303) 730-0434
BEN MURPHY
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
2519 MADISON AVENUE, SUITE 100
KANSAS CITY, MO. 64108
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FULLY SPRINKLERED
STRUCTURAL ENGINEER
DEGENKOLD ENGINEERS
375 BEALE STEET, SUITE 500
SAN FRANCISCO, CA 94105
(415) 354-6439
ROBERT GRAFF
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
FRANK FINLEY
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
FIRE PROTECTION ENGINEER
RATED ENGINEERING
609 S. KELLY AVE. SUITE H2
EDMOND, OK 73003
(405) 856-2965
/1
/2
:1
:5
P
M
LIFE SAFETY PLANS
CAB 03 92NR
LEVEL 1 SD2 RFP
CENTRAL UTILITY PLANT
04/21/2023
654-212
VA SIERRA NEVADA HEALTH CARE SYSTEM
975 KIRMAN AVE
RENO, NV 89502
GI011
SPUR #: 1791.06
INDUSTRIAL, SPECIAL-PURPOSE 40.2.6.1- SHALL NOT EXCEED 400'-0"
INDUSTRIAL, SPECIAL-PURPOSE 100 NET SF/PERSON
INDUSTRIAL, SPECIAL-PURPOSE 40.2.5.1- SHALL NOT EXCEED 100'-0"
INDUSTRIAL, SPECIAL-PURPOSE 40.2.5.1- SHALL NOT EXCEED 50'-0"
OCCUPANT LOAD PER NFPA 101-2021
OCCUPANT TYPE
PER TABLE 7.3.1.2.
AREA
OCC. LOAD
FACTOR IN SF
OCC. LOAD
LEVEL 1
INDUSTRIAL, SPECIAL-PURPOSE 8136 SF 100 SF 81
8136 SF 81
MEZZANINE
INDUSTRIAL, SPECIAL-PURPOSE 2700 SF 100 SF 27
2700 SF 27
TOTALS: 2 10836 SF 108
OCCUPANT TYPE
LEVEL COMPONENTS
(WIDTH/PERSON)
STAIRWAYS
(WIDTH/PERSON)
INDUSTRIAL, SPECIAL-PURPOSE .2" .3"
N
1/8" = 1'-0"
LEVEL 1 - LIFE SAFETY PLAN1
N
1/8" = 1'-0"
MEZZANINE - LIFE SAFETY PLAN2
KEYNOTE LEGEND
1.02 OPEN TO BELOW
PLUMBING FIXTURE REQUIREMENTS
CLASSIFICATION OCCUPANT LOAD WATER CLOSETS LAVATORIES
INDUSTRIAL, SPECIAL USE 110 2 2
BELLI DR.
K
IR
M A
N A
V E
EXISTING
BOILER PLANT
EXISTING YARD
EXISTING YARD
EXISTING PARKING TO BE
DEMOLISHED AND PREPARED FOR
NEW CONSTRUCTION
EXISTING
PARKING
GARAGE
BUILDING 8
CONTRACTOR
STAGING
AREA
BELLI DR.
K
IR
M A
N A
V E
EXISTING
BOILER PLANT
EXISTING YARD
EXISTING YARD
EXISTING
PARKING
GARAGE
BUILDING 8
NEW CUP
BUILDING 16
CONTRACTOR
STAGING
AREA
BELLI DR.
K
IR
M A
N A
V E
EXISTING
PARKING
GARAGE
EXISTING
BOILER PLANT
BUILDING 8
EXISTING PARKING TO BE
DEMOLISHED AND PREPARED FOR
NEW CONSTRUCTION
EXISTING BUILDING TO
BE DEMOLISHED
NEW CUP
BUILDING 16
K
IR
M A
N A
V E
EXISTING PARKING TO BE
DEMOLISHED AND PREPARED FOR
NEW CONSTRUCTION
E TAYLOR ST
K
IR
M A
N A
V E
E TAYLOR ST
BELLI DR.
K
IR
M A
N A
V E
EXISTING
PARKING
GARAGE
NEW CUP
BUILDING 16
PHASING LEGEND AND DESCRIPTION
PHASE 2
SURROUND ALL WORKING AREAS WITH SECURE CONSTRUCTION
FENCE AND ACCESS-CONTROLLED GATES
CONSTRUCT A PROTECTED PEDESTRIAN WALKWAY DIRECTLY
NORTH OF THE EXISTING BOILER PLANT. IF CONTRACTOR
OPERATIONAL MEANS AND METHODS PREVENTS THE
CONSTRUCTION OF THE PEDESTRIAN WALKWAY NORTH OF THE
BOILER PLANT, AN ALTERNATIVE PROTECTED AND WELL SIGNED
PATH SHALL BE PROVIDED FOR PEDESTRIAN ACCESS TO THE
PARKING LOTS EAST OF THE PROJECT SITE.
REROUTE THE TEMPORARY CHILLED WATER AND OXYGEN LINES.
REF: PLUMBING DRAWINGS
DEMOLISH EXISTING PARKING LOT NORTH OF THE EXISTING
BOILER PLANT.
PHASE 3
CONSTRUCT NEW CENTRAL UTILITY PLANT INCLUDING NEW UTILITY
CONNECTIONS, SECURITY FENCING, ACCESS GATES, PAVED
COURTYARDS, AND WATER QUALITY. REF: CIVIL DRAWINGS
INSTALL BOLLARDS TO BLOCK OFF LOWER ACCESS TO PARKING
LOT EAST OF NEW CUP
PHASE 4
SWITCH UTILITY SYSTEMS FROM EXISTING BOILER PLANT TO NEW
CUP. REF: PLUMBING AND ELECTRICAL
DEMOLISH THE EXISTING BOILER PLANT AND UTILITY CONNECTIONS
INCLUDING TEMPORARY CHILLED WATER AND OXYGEN LINES
CONSTRUCTED IN PHASE 2.
PHASE 5
CONSTRUCTION OF NEW PARKING LOT, SIGNAGE, STRIPING,
WALKWAYS, ACCESSIBLE RAMPS, GATES, STORM SEWER AND OTHER
SITE FEATURES SOUTH OF THE NEW CUP. REF: CIVIL DRAWINGS
PHASE 1
DEMOLISH EXISTING GRAVEL PARKING LOT NW OF TAYLOR ST AND
KIRMAN AVE INTERSECTION. DEMOLISH EXISTING CURB CUT
ENTRANCE ALONG KIRMAN AVENUE. REF: CIVIL DRAWINGS
CONSTRUCT NEW AUXILIARY PARKING LOT NORTHWEST OF
TAYLOR ST AND KIRMAN AVENUE PER GRADING AND HORIZONTAL
DESIGN. REF: CIVIL DRAWINGS
STRIPE AND PROVIDE SIGNAGE FOR PARKING LOT LAYOUT. REF:
CIVIL DRAWINGS
CONSTRUCT NEW DETENTION POND, STORM SEWER
CONNECTIONS, KIRMAN AVENUE ROW PAVING, AND ACCESSIBLE
RAMPS. REF: CIVIL DRAWINGS
PHASE 6
RESTRIPE AND SIGN THE AUXILIARY PARKING LOT AT THE NW
CORNER OF KIRMAN ST AND TAYLOR AVE. REF: CIVIL DRAWINGS
ALL PHASES
INSTALL CONSTRUCTION FENCING AROUND ALL AREAS WHERE WORK
IS OCCURRING THROUGHOUT ALL PHASES OF THE PROJECT.
CONSTRUCT AND MAINTAIN AN ACCESSIBLE AND PROTECTED
PEDESTRIAN PATHWAY FROM THE EXISTING CROSSWALK ON KIRMAN
ST TO THE PARKING GARAGES EAST OF THE PROJECT SITE
THROUGHOUT THE DURATION OF CONSTRUCTION.
REROUTED PEDESTRIAN WALKWAY
TEMPORARY UTILITIES
TEMPORARY PEDESTRIAN WALKWAY
CONSTRUCTION FENCE
K
IR
M A
N A
V E
E TAYLOR ST
K
IR
M A
N A
V E
E TAYLOR ST
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
OKLAHOMA CITY, OK 73109
(405) 842-6100
CODY DOUGLAS
ARCH - SETH A. CAVIN #7580 EXP. 12/31/2023
MECH - JAMES R. MYLES #027005 EXP. 12/31/2023
ELEC - BRADY MERZ #027238 EXP. 12/31/2023
CIVIL ENGINEER
CALIBRE ENGINEERING
9090 S. RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH, CO 80129
(303) 730-0434
BEN MURPHY
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
2519 MADISON AVENUE, SUITE 100
KANSAS CITY, MO. 64108
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FULLY SPRINKLERED
STRUCTURAL ENGINEER
DEGENKOLD ENGINEERS
375 BEALE STEET, SUITE 500
SAN FRANCISCO, CA 94105
(415) 354-6439
ROBERT GRAFF
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
FRANK FINLEY
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
FIRE PROTECTION ENGINEER
RATED ENGINEERING
609 S. KELLY AVE. SUITE H2
EDMOND, OK 73003
(405) 856-2965
/1
/2
:1
:5
P
M
PHASING PLANS
CAB 04 92NR
LEVEL 1 SD2 RFP
CENTRAL UTILITY PLANT
04/21/2023
654-212
VA SIERRA NEVADA HEALTH CARE SYSTEM
975 KIRMAN AVE
RENO, NV 89502
GI021
SPUR #: 1791.06
N
1" = 40'-0"
PHASE 23
N
1" = 40'-0"
PHASE 34
N
1" = 40'-0"
PHASE 45
N
1" = 30'-0"
PHASE 1 - DEMO1
N
1" = 30'-0"
PHASE 68
N
1" = 40'-0"
PHASE 56
N
1" = 30'-0" 1/ AE201
PHASE 1 - NEW2
N
1" = 30'-0" 1/ AE201
PHASE 6 - DEMO7