Design Drawings Mechanical_654-212.pdf
PDF 3 MB Posted
- Solicitation number
- QSE--36C10F24R50000
About this file
This document appears to be design drawings for a mechanical system at the VA Sierra Nevada Health Care System in Reno, Nevada. The drawings depict the mechanical systems and equipment for a new Central Utility Plant (CUP) that will replace an existing boiler plant. Key details include:
The CUP will house new boilers, chillers, cooling towers, and a bulk oxygen system to provide steam, heating, and cooling for the entire VA campus. The project also includes demolishing the existing boiler plant, converting that site to a parking lot, and making improvements to an existing gravel parking lot. The contractor will be responsible for all design services and construction activities, which must be performed by licensed professionals and contractors in accordance with VA technical requirements. The drawings provide mechanical flow diagrams, details, and notes related to the new CUP and associated systems.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. DEPARTMENT OF VETERANS AFFAIRS
MECHANICAL 30x42 DRAWINGS
VA SIERRA NEVADA HEALTH CARE SYSTEM
975 KIRMAN AVE
RENO, NV 89502
VA PROJECT NUMBER: 654-212
[06] MECHANICAL
57 M-000 LEGEND AND ABBREVIATIONS
58 MH101 MECHANICAL FIRST FLOOR PLAN
59 MH102 MECHANICAL FLOOR PLAN AND ROOF PLAN
60 M-401 MECHANICAL FLOW DIAGRAMS
61 M-402 MECHANICAL FLOW DIAGRAMS
62 M-403 MECHANICAL FLOW DIAGRAMS
63 M-501 MECHANICAL DETAILS
64 M-502 MECHANICAL DETAILS
65 M-503 MECHANICAL DETAILS
66 M-504 MECHANICAL DETAILS
67 M-505 MECHANICAL DETAILS
CENTRAL UTILITY PLANT
ABBREVIATIONS
HVAC PIPING TYPES
GENERAL DUCT SYMBOLS
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACC AIR COOLED CONDENSER
ACU AIR CONDITIONING UNIT
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERAGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND REFRIGERATION
INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BFP BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BHX BOILER BLOWDOWN HEAT EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BSC BIOLOGICAL SAFETY CABINETS
BT BLOWOFF TANK
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C
C CENTIGRADE (CELSIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CENT CENTRIFUGAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CH CHILLER
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CI CAST IRON
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CARBON MONOXIDE
CO2 CARBON DIOXIDE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CS CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CC CHILLED WATER COOLING COIL
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
A
F
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FCW FORWARD CURVED WHEEL (FAN)
E
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC EVAPORATIVE COOLER
ECC ENGINEERING CONTROL CENTER
ECU EVAPORATIVE CONDENSER UNIT
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EGS EMERGENCY GAS SHUTOFF
EGT ENTERING GLYCOL TEMPERATURE
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
ETO ETHYLENE OXIDE
ETR EXISTING TO REMAIN
EUH ELECTRIC UNIT HEATER
EWC EVAPORATIVE WATER COOLER
EWT ENTERING WATER TEMPERATURE
EX. EXISTING
D
DB DECIBELS
Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
FD FIRE DAMPER
FF FINAL FILTER
FHX FLUE GAS/FEEDWATER HEAT EXCHANGER
FM FLOW METER
FOP FUEL OIL PUMP
FOT FUEL OIL TANK
FOHX FUEL OIL HEAT EXCHANGER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPTU FAN POWERED TERMINAL UNIT
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
FSD COMBINATION FIRE / SMOKE DAMPER
G
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
K kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
J
J INTENTIONALLY LEFT BLANK
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTEGRATED PART LOAD VALUE
IRH INFRARED HEATER
IS INSECT SCREEN
IU INDUCTION UNIT
IV INLET VANES
H
HU HUMIDIFIER
H&CW HOT & COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPC HIGH PRESSURE STEAM CONDENSATE RETURN
HPS HIGH PRESSURE STEAM (61-300 PSIG)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HTM HUMIDIFIER TERMINAL
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HC HOT WATER HEATING COIL
HHP HEATING HOT WATER PUMP
HHR HEATING HOT WATER RETURN
HHS HEATING HOT WATER SUPPLY
HHUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
HZ HERTZ
I
L
L LITER
L/h LITERS PER HOUR (OR LITERS/HOUR) L/m LITERS PER MINUTE (OR LITERS/MINUTE) L/s LITERS PER SECOND (OR LITERS/SECOND)
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LGT LEAVING GLYCOL TEMPERATURE
LH LATENT HEAT
LPG LIQUID PROPANE GAS
LPC LOW PRESSURE STEAM CONDENSATE RETURN
CLPC LOW PRESSURE STEAM CONDENSATE (CLEAN)
LLHX LIQUID TO LIQUID HEAT EXCHANGER
LPS LOW PRESSURE STEAM (0-15 PSIG)
CLPS LOW PRESSURE STEAM (CLEAN)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
N
NA NOT APPLICABLE
NC NOISE CRITERIA
NG NATURAL GAS
NGFM NATURAL GAS FLOWMETER
NOAA NATIONAL OCEANIC & ATMOSPHERIC
ADMINISTRATION
M
M METER, SI UNIT
M/s METERS PER SECOND
(OR METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MERV MINIMUM EFFICIENCY REPORTING VALUE
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPC MEDIUM PRESSURE STEAM CONDENSATE
RETURN
MPS MEDIUM PRESSURE STEAM (16-60 PSIG)
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
P
P PUMP
PA PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PGW PROPYLENE GLYCOL-WATER (SOLUTION)
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE) STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
PTAC PACKAGED TERMINAL AIR CONDITIONER
O
OA OUTSIDE AIR
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OFM OIL FLOWMETER
OSD ORGANIC SOIL FILTER
Q
Q INTENTIONALLY LEFT BLANK
T&PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TG TRANSFER GRILLE
TP TRAP
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TWU THRU-WALL UNIT
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCR SILICON CONTROLLED RECTIFIER
DSD DUCT SMOKE DETECTOR
SD SMOKE DAMPER
SEN SENSIBLE HEAT
SF SUPPLY FAN
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SS STAINLESS STEEL
SSHX STEAM TO STEAM HEAT EXCHANGER
SSR SOLID SEPARATOR
ST STEAM TRAP
SUH STEAM UNIT HEATER
SVS STEAM VENT SILENCER
SWHX STEAM TO WATER HEAT EXCHANGER
R
R/E RETURN OR EXHAUST
RA RETURN AIR
RAD REFRIGERANT AIR DRYER
RAF RADIO FREQUENCY
RAHX ROTARY AIR HEAT EXCHANGER
RAT RETURN AIR TEMPERATURE
RCCH REMOTE CONDENSER CHILLER
RCU RECIPROCATING CHILLER UNIT
RD REFRIGERANT DISCHARGE
REA RELIEF AIR
RF RETURN FAN
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
T
UC UNDER CUT
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
URV UPBLAST UNIT VENTILATOR
U
X INTENTIONALLY LEFT BLANK
W
W WATTS
WAG WASTE ANESTHESIA GAS
Wb WET-BULB (TEMPERATURE)
WC WATER COOLED
WCCH WATER COOLED CHILLER
WCCU WATER COOLED CONDENSING UNIT
WCHP WATER COOLED HEAT PUMPS
WCPU WATER COOLED PACKAGED UNIT
WF WATER FILTER
WFM WATER FLOWMETER
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VI VIBRATION ISOLATOR
VIV VARIABLE INLET VANES
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE) RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
X
V
GENERAL NOTES:
A. MECHANICAL PLANS AND SECTIONS ARE INTENDED TO ACCURATELY ILLUSTRATE THE
SCOPE OF WORK BUT ARE STILL DIAGRAMMATIC IN NATURE.
B. MECHANICAL DRAWINGS DO NOT SHOW ALL ACCESSORIES TO BE INSTALLED. THE
CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL SYSTEMS ARE FULLY
FUNCTIONAL AND COMPLIANT WITH APPLICABLE CODES.
C. THE EXISTING CONDITIONS DEPICTED IN THESE PLANS ARE BASED ON AS-BUILT
DOCUMENTATION AND INFORMATION OBTAINED FROM FIELD SURVEYS AND ARE AS
ACCURATE AS POSSIBLE. DUE TO OBSTRUCTIONS, CEILINGS, ETC., NOT ALL CONDITIONS
COULD BE VERIFIED. THE CONTRACTOR SHALL SURVEY THE SITE PRIOR TO BID AND
NOTIFY THE ARCHITECT/ENGINEER OF ANY CONFLICTS, OBSTRUCTIONS, OR
INCONSISTENCIES PREVENTING INSTALLATION OF THE MECHANICAL SYSTEM.
D. ALL EXPOSED UNINSULATED PIPING SHALL BE PAINTED PER THE SPECIFICATION SECTION
"PAINTING".
E. COORDINATE FAN COIL (FCU) AND TERMINAL UNIT (TU/VAV/CV) REHEAT COIL RIGHT OR
LEFT HAND COIL CONNECTIONS WITH PIPING PLANS.
F. ALL FLUE AND COMBUSTION AIR PIPING FROM GAS-FIRED EQUIPMENT SHALL BE SIZED BY
THE GAS-FIRED EQUIPMENT MANUFACTURER BASED ON THE SPECIFIC PIPE ROUTING AND
ELEVATIONS FOR THIS PROJECT. REFER TO MANUFACTURERS INSTALLATION MANUAL AND
LOCAL CODE REQUIREMENTS FOR REQUIRED FLUE AND COMBUSTION AIR PIPING
MATERIALS.
G. PROVIDE VIBRATION ISOLATION FOR ALL MECHANICAL EQUIPMENT TO PREVENT
TRANSMISSION OF VIBRATION TO BUILDING STRUCTURE.
H. PROVIDE VIBRATION ISOLATORS FOR ALL PIPING SUPPORTS CONNECTED TO AND WITHIN
50' OF ISOLATED EQUIPMENT (EXCEPT AT BASE ELBOW SUPPORTS AND ANCHOR POINTS)
THROUGHOUT MECHANICAL EQUIPMENT ROOMS. DO THE SAME FOR SUPPORTS OF STEAM
MAINS WITHIN 50' OF BOILER OR PRESSURE REDUCING VALVES.
I. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL,
STRUCTURAL, CIVIL, ELECTRICAL WORK, ETC., SHOWN ON OTHER CONTRACT DOCUMENT
DRAWINGS.
J. MAINTAIN A MINIMUM OF 6′-8″ CLEARANCE TO UNDERSIDE OF PIPES, DUCTS, CONDUITS,
SUSPENDED EQUIPMENT, ETC., THROUGHOUT ACCESS ROUTES IN MECHANICAL ROOMS.
K. ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT OR PIPING
INSULATION IS APPLIED.
L. LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN ACCESSIBLE
LOCATIONS WITH STRAIGHT SECTION OF PIPE OR DUCT UP AND DOWNSTREAM AS
RECOMMENDED BY THE MANUFACTURER FOR GOOD ACCURACY.
M. COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURERS CERTIFIED
DRAWINGS. COORDINATE AND PROVIDE ALL DUCT AND PIPING TRANSITIONS REQUIRED
FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND
COORDINATE ALL DUCT AND PIPING DIMENSIONS BEFORE FABRICATION.
CWR
CWS
CD
LPC
LPS
MPC
MPS
HPC
HPS
CONDENSATE DRAIN
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
HIGH PRESSURE STEAM CONDENSATE
HIGH PRESSURE STEAM SUPPLY
MEDIUM PRESSURE STEAM CONDENSATE
MEDIUM PRESSURE STEAM SUPPLY
LOW PRESSURE STEAM CONDENSATE
LOW PRESSURE STEAM SUPPLY
VACUUM RETURN
FEEDWATER PUMP DISCHARGE
FEEDWATER PUMP SUCTION
VR
CONTINUOUS BLOWDOWN
CHEMICAL FEED
BOILER BLOWOFF BO
CF
CBD
FWPD
FWPS
A. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO
INSTALL COMPLETE AND OPERABLE PIPING SYSTEMS AS INDICATED ON THE DRAWINGS, AS
SPECIFIED AND AS REQUIRED BY CODE.
B. ELEVATIONS AS SHOWN ON THE DRAWINGS ARE TO THE CENTERLINE OF ALL PRESSURE
PIPING AND TO THE INVERT OF ALL GRAVITY PIPING.
C. MAINTAIN A MINIMUM OF 3′-6″ OF GROUND COVER OVER ALL UNDERGROUND HVAC PIPING
(EDIT DEPTH OF GROUND COVER TO SUIT FROST LINE DEPTH AND PROJECT
REQUIREMENTS).
D. UNLESS OTHERWISE NOTED, ALL CHILLED WATER AND HEATING WATER PIPING SHALL BE
3/4" SIZE (EDIT SYSTEM TYPE OR PIPE SIZE TO SUIT PROJECT REQUIREMENTS).
E. PROVIDE AN AIR VENT AT THE HIGH POINT OF EACH DROP IN THE HEATING WATER, CHILLED
WATER, AND OTHER CLOSED WATER PIPING SYSTEMS (EDIT SYSTEM TYPES TO SUIT
PROJECT REQUIREMENTS). ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END
DRAIN VALVES AT THE BOTTOM OF ALL RISERS AND LOW POINTS.
F. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO UNDERSIDE OF
STRUCTURE OR SLAB, WITH SPACE FOR INSULATION IF REQUIRED.
G. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES, AND OTHER
APPURTENANCES REQUIRING ACCESS ARE ACCESSIBLE.
H. ALL VALVES SHALL BE INSTALLED SO THAT VALVE REMAINS IN SERVICE WHEN EQUIPMENT
OR PIPING ON EQUIPMENT SIDE OF VALVE IS REMOVED.
I. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE PROVIDED WITH POSITION
INDICATORS AND MAXIMUM ADJUSTABLE STOPS (MEMORY STOPS).
J. PROVIDE CHAINWHEEL OPERATORS FOR ALL VALVES IN EQUIPMENT ROOMS MOUNTED
GREATER THAN 7′-0″ ABOVE FLOOR LEVEL; CHAIN SHALL EXTEND TO 7′-0″ ABOVE FLOOR
LEVEL.
K. ALL VALVES (EXCEPT CONTROL VALVES) AND STRAINERS SHALL BE FULL SIZE OF PIPE
BEFORE REDUCING SIZE TO MAKE CONNECTIONS TO EQUIPMENT AND CONTROLS.
L. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE OF EQUIPMENT, IN
BYPASSES, AND IN LONG PIPING RUNS (100' OR MORE) TO PERMIT DISASSEMBLY FOR
ALTERATION AND REPAIRS.
M. PITCH STEAM PIPING DOWNWARD IN THE DIRECTION OF FLOW 1/4" IN 10' (1" IN 40') MINIMUM.
PITCH ALL STEAM RETURN LINES DOWNWARD IN THE DIRECTION OF CONDENSATE FLOW
1/2" PER 10' (1" IN 20') MINIMUM. WHERE LENGTH OF BRANCH LINES ARE LESS THAN 8', PITCH
BRANCH LINES TOWARD MAINS 1/2" PER FOOT MINIMUM.
N. PITCH UP ALL STEAM AND CONDENSATE RUNOUTS TO RISERS AND EQUIPMENT 1/2" PER
FOOT. WHERE THIS PITCH CANNOT BE OBTAINED, RUNOUTS OVER 8' IN LENGTH SHALL BE
ONE SIZE LARGER THAN NOTED.
O. TAP ALL BRANCH LINES FROM TOP OF STEAM MAINS (45° PREFERRED, 90° ACCEPTABLE).
A. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO
INSTALL COMPLETE AND OPERABLE HVAC SYSTEMS AS INDICATED ON THE DRAWINGS, AS
SPECIFIED AND AS REQUIRED BY CODE.
B. CERTAIN ITEMS SUCH AS RISES AND DROPS IN DUCTWORK, ACCESS DOORS, VOLUME
DAMPERS, ETC., ARE INDICATED ON THE CONTRACT DOCUMENT DRAWINGS FOR CLARITY
FOR A SPECIFIC LOCATION REQUIREMENT AND SHALL NOT BE INTERPRETED AS THE
EXTENT OF THE REQUIREMENTS FOR THESE ITEMS.
C. IN CORRIDORS WHERE CEILING SPEAKERS AND AIR DIFFUSERS ARE INDICATED BETWEEN
THE SAME LIGHT FIXTURES, INSTALL BOTH DEVICES AT THE QUARTER POINTS BETWEEN
THE SAME FIXTURE.
D. UNLESS OTHERWISE SHOWN, LOCATE ALL ROOM THERMOSTATS AND HUMIDISTATS 4′-0″
(CENTERLINE) ABOVE FINISHED FLOOR.
E. ALL DUCTWORK SHALL CLEAR DOORS AND WINDOWS.
F. ALL DUCTWORK DIMENSIONS, AS SHOWN ON THE DRAWINGS, ARE INTERNAL CLEAR
DIMENSIONS AND DUCT SIZE SHALL BE INCREASED TO COMPENSATE FOR DUCT LINING
THICKNESS.
G. PROVIDE ALL 90° SQUARE ELBOWS WITH DOUBLE RADIUS TURNING VANES UNLESS
OTHERWISE INDICATED. ELBOWS IN DISHWASHER, KITCHEN, AND LAUNDRY EXHAUST
SHALL BE UNVANED SMOOTH RADIUS CONSTRUCTION WITH A RADIUS EQUAL TO 1.5 TIMES
THE WIDTH OF THE DUCT. PROVIDE ACCESS DOORS UPSTREAM OF ALL ELBOWS WITH
TURNING VANES.
H. COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATIONS WITH ARCHITECTURAL
REFLECTED CEILING PLANS, LIGHTING, AND OTHER CEILING ITEMS AND MAKE MINOR DUCT
MODIFICATIONS TO SUIT.
I. FIELD ERECTED AND FACTORY ASSEMBLED AIR HANDLING UNIT COILS SHALL BE
ARRANGED FOR REMOVAL FROM THE UPSTREAM SIDE WITHOUT DISMANTLING SUPPORTS.
PROVIDE GALVANIZED STRUCTURAL STEEL SUPPORTS FOR ALL COILS (EXCEPT LOWEST
COIL) IN BANKS OVER TWO COILS HIGH TO PERMIT INDEPENDENT REMOVAL OF ANY COIL.
J. ALL AIR HANDLING UNITS SHALL OPERATE WITHOUT MOISTURE CARRYOVER.
K. LOCATE ALL MECHANICAL EQUIPMENT (SINGLE DUCT, DUAL DUCT, VARIABLE VOLUME,
CONSTANT VOLUME AND FAN POWERED BOXES, FAN COIL UNITS, CABINET HEATERS, UNIT
HEATERS, UNIT VENTILATORS, COILS, STEAM HUMIDIFIERS, ETC.) FOR UNOBSTRUCTED
ACCESS TO UNIT ACCESS PANELS, CONTROLS AND VALVING.
L. FINNED TUBE RADIATION ENCLOSURES SHALL BE WALL TO WALL UNLESS OTHERWISE
INDICATED.
M. PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK SYSTEMS (SUPPLY, RETURN, AND
EXHAUST) CONNECTED TO AIR HANDLING UNITS, FANS, AND OTHER EQUIPMENT WHICH
REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL BE PROVIDED AT THE
POINT OF CONNECTION TO THE EQUIPMENT UNLESS OTHERWISE INDICATED.
PIPING GENERAL NOTES: HVAC/SHEET METAL GENERAL NOTES:
EXISTING TO BE DEMOLISHED
LIMIT OF DEMOLITION
CONNECT NEW TO EXISTINGEXISTING TO REMAIN
NEW DUCT (INSIDE DIMENSIONS: W" X D")
RS
RL
REFRIGERANT SUCTION
REFRIGERANT LIQUID
SUPPLY AIR DUCT UP
SUPPLY AIR DUCT DOWN
H
T
H
T
26-P-3
MH-100
PUMP NO. 3 IN BUILDING NO. 26
EQUIPMENT ABBREVIATION (PUMP)
DETAIL NUMBER
SHEET NUMBER
SHEET NUMBER
SECTION NUMBER
THERMOSTAT
HUMIDISTAT
TEMPERATURE SENSOR
HUMIDITY SENSOR
BUILDING NUMBER WHERE EQUIPMENT
IS LOCATED
26-TU-1-1
ITEM NUMBER (TERMINAL UNIT NO. 1)
ITEM (TERMINAL UNIT)
BUILDING NUMBER WHERE EQUIPMENT
IS LOCATED
SERVED BY AIR HANDLER UNIT NO. 1
TERMINAL UNIT TAG
MECHANICAL EQUIPMENT TAG
1 OWNER FURNISHED, CONTRACTOR
INSTALLED EQUIPMENT DESIGNATION
EXISTING TO BE DEMOLISHED
EXISTING TO REMAIN
NEW PIPE
CONNECT NEW TO EXISTING
LIMIT OF DEMOLITION
GENERAL PIPING SYMBOLS
GENERAL ANNOTATIONS
AV
STRAINERFLOAT & THERMOSTATIC
STEAM TRAP
INVERTED BUCKET
STEAM TRAP
FLANGE CONNECTION PIPE DROP
PIPE RISER TEE DOWN
TEE UP
UNION
PRESSURE REDUCING
VALVE
BALL VALVE
ANGLE GLOBE VALVE
SAFETY RELIEF VALVE
GLOBE VALVE
MANUAL OR
AUTOMATIC AIR VENT
EXPANSION JOINT
EJ
PRESSURE AND
TEMPERATURE TEST PLUG
QUICK-COUPLE HOSE
CONNECTOR
FLOW METER
HVAC PIPING SYMBOLS
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CHR
CHS
HEATING HOT WATER RETURN
HEATING HOT WATER SUPPLY
HHR
HHS QV CRYOGEN VENT
DR DRIP RETURN
CAP
REDUCER (ECCENTRIC)
TYPE
AIRFLOW (CFM)
SD-1
TYPE
AIRFLOW (CFM)
RG-1
TYPE
AIRFLOW (CFM)
EG-1
SQUARE TO ROUND TRANSITION
ELBOW WITH TURNING
VANES
ROUND ELBOW
EXHAUST, RELIEF, MAKE UP, OR
OUTSIDE AIR DUCT DOWN
EXHAUST, RELIEF, MAKE UP, OR
OUTSIDE AIR DUCT UP
RETURN DUCT DOWN
RETURN DUCT UP
BRANCH DUCT WITH HIGH EFFICIENCY
TAKE-OFF (HETO) BRANCH FITTING &
MANUAL VOLUME DAMPER
BRANCH DUCT WITH CONICAL
FITTING & MANUAL VOLUME
DAMPER
DAMPERS: (BD, FD, FSD, MD, SD, VD)
BD
XX-XX
ANCHOR
TEEDIRECTION OF FLOW
S
N. CONCRETE HOUSEKEEPING PADS TO SUIT MECHANICAL EQUIPMENT SHALL BE SIZED AND
LOCATED BY THE MECHANICAL CONTRACTOR. MINIMUM CONCRETE PAD THICKNESS SHALL
BE 4". PAD SHALL EXTEND BEYOND THE EQUIPMENT A MINIMUM OF 4" ON EACH SIDE.
CONCRETE HOUSEKEEPING PADS SHALL BE PROVIDED BY THE GENERAL CONTRACTOR. IT
SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO COORDINATE SIZE
AND LOCATION OF CONCRETE HOUSEKEEPING PADS.
O. WHEN MECHANICAL WORK (HVAC, PLUMBING, SHEET METAL, ETC.) IS SUB-CONTRACTED, IT
SHALL BE THE MECHANICAL CONTRACTOR’S RESPONSIBILITY TO COORDINATE
SUBCONTRACTORS AND THE ASSOCIATED CONTRACTS. WHEN DISCREPANCIES ARISE
PERTAINING TO WHICH CONTRACTOR PROVIDES A PARTICULAR ITEM OF THE MECHANICAL
CONTRACT OR WHICH CONTRACTOR PROVIDES FINAL CONNECTIONS FOR A PARTICULAR
ITEM OF THE MECHANICAL CONTRACT, IT SHALL BE BROUGHT TO THE ATTENTION OF THE
MECHANICAL CONTRACTOR, WHOSE DECISION SHALL BE FINAL.
P. THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE
SPECIFICATIONS THAT ARE NOT DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE
ONLY. THE EXACT LOCATIONS NECESSARY TO SECURE THE BEST CONDITIONS AND
RESULTS MUST BE DETERMINED BY THE PROJECT SITE CONDITIONS AND SHALL HAVE THE
APPROVAL OF THE ENGINEER BEFORE BEING INSTALLED. DO NOT SCALE DRAWINGS.
Q. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND AS SHOWN
IN DETAILS FOR PIPING, DUCTWORK, AND EQUIPMENT (UNLESS OTHERWISE NOTED) SHALL
BE FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR.
R. PROVIDE ACCESS PANELS FOR INSTALLATION IN WALLS AND CEILINGS WHERE REQUIRED
TO SERVICE DAMPERS, VALVES, SMOKE DETECTORS, AND OTHER CONCEALED
MECHANICAL EQUIPMENT.
S. ALL DUCTWORK, PIPING AND EQUIPMENT SUPPORTED FROM STRUCTURAL STEEL SHALL
BE COORDINATED WITH GENERAL CONTRACTOR. ALL ATTACHMENTS TO STEEL BAR
JOISTS, TRUSSES, OR JOIST GIRDERS SHALL BE AT PANEL POINTS. PROVIDE BEAM CLAMPS
MEETING MANUFACTURER STANDARDS.WELDING TO STRUCTURAL MEMBERS SHALL NOT
BE PERMITTED. THE USE OF C-CLAMPS SHALL NOT BE PERMITTED.
T. ALL ROOF MOUNTED EQUIPMENT CURBS FOR EQUIPMENT PROVIDED BY THE MECHANICAL
CONTRACTOR SHALL BE FURNISHED BY THE MECHANICAL CONTRACTOR. COORDINATE
INSTALLATION WITH GENERAL CONTRACTOR.
U. LOCATIONS AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENINGS SHALL BE
COORDINATED WITH ALL OTHER TRADES INVOLVED.
V. ALL OPENINGS IN FIRE WALLS DUE TO DUCTWORK, PIPING, CONDUIT, ETC., SHALL BE FIRE
STOPPED WITH AN APPROVED FIRE STOPPING MATERIAL.
W. ALL AIR CONDITIONING CONDENSATE DRAIN LINES FROM EACH AIR HANDLING UNIT AND
ROOFTOP UNIT SHALL BE PIPED FULL SIZE OF THE UNIT DRAIN OUTLET, WITH P-TRAP, AND
PIPED TO NEAREST DRAIN. SEE DETAILS AND SPECIFICATIONS FOR DEPTH OF AIR
CONDITIONING CONDENSATE TRAP.
X. REFER TO TYPICAL DETAILS FOR DUCTWORK, PIPING, AND EQUIPMENT INSTALLATION.
P. PROVIDE AN END OF MAIN DRIP AT EACH RISE IN THE STEAM MAIN. PROVIDE CONDENSATE
DRIPS AT THE BOTTOM OF ALL STEAM RISERS, DOWNFED RUNOUTS TO EQUIPMENT,
RADIATORS, ETC., AT END OF MAINS AND LOW POINTS, AND AHEAD OF ALL PRESSURE
REGULATORS, CONTROL VALVES, ISOLATION VALVES, AND EXPANSION JOINTS.
Q. ON STRAIGHT STEAM PIPING RUNS WITH NO NATURAL DRAINAGE POINTS, INSTALL DRIP
LEGS AT INTERVALS NOT EXCEEDING 200' WHERE PIPE IS PITCHED DOWNWARD IN THE
DIRECTION OF STEAM FLOW AND A MAXIMUM OF 100' WHERE THE PIPE IS PITCHED UP SO
THAT CONDENSATE FLOW IS OPPOSITE OF STEAM FLOW.
R. STEAM TRAPS SHALL BE MINIMUM 3/4″ IN SIZE.
S. INSTALL ALL PIPING WITHOUT FORCING OR SPRINGING.
T. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.
U. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY OPERATION.
V. ALL PIPING WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN
PIPING AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE
OWNER.
W. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS CONNECTED TO PUMPS,
CHILLERS, COOLING TOWERS, AND OTHER EQUIPMENT WHICH REQUIRE VIBRATION
ISOLATION EXCEPT WATER COILS. FLEXIBLE CONNECTIONS SHALL BE PROVIDED AS CLOSE
TO THE EQUIPMENT AS POSSIBLE OR AS INDICATED ON THE DRAWINGS.
X. SLOPE REFRIGERANT PIPING ONE PERCENT IN THE DIRECTION OF OIL RETURN. LIQUID
LINES MAY BE INSTALLED LEVEL.
Y. INSTALL HORIZONTAL REFRIGERANT HOT GAS DISCHARGE PIPING WITH 1/2″ PER 10'
DOWNWARD SLOPE AWAY FROM THE COMPRESSOR.
Z. INSTALL HORIZONTAL REFRIGERANT SUCTION LINES WITH 1/2″ PER 10' DOWNWARD SLOPE
TO THE COMPRESSOR, WITH NO LONG TRAPS OR DEAD ENDS WHICH MAY CAUSE OIL TO
SEPARATE FROM THE SUCTION GAS AND RETURN TO THE COMPRESSOR IN DAMAGING
SLUGS.
AA. PROVIDE LINE SIZE LIQUID INDICATORS IN MAIN LIQUID LINE LEAVING CONDENSER OR
RECEIVER. INSTALL MOISTURE LIQUID INDICATORS IN LIQUID LINES BETWEEN FILTER
DRYERS AND THERMOSTATIC EXPANSION VALVES AND IN LIQUID LINE TO RECEIVER.
BB. PROVIDE LINE SIZE STRAINER UPSTREAM OF EACH AUTOMATIC VALVE. PROVIDE SHUTOFF
VALVE ON EACH SIDE OF STRAINER.
CC. PROVIDE PERMANENT FILTER DRYERS IN LOW TEMPERATURE SYSTEMS AND SYSTEMS
USING HERMETIC COMPRESSORS.
DD. PROVIDE REPLACEABLE CARTRIDGE FILTER DRYERS WITH THREE-WAY VALVE BYPASS A
ASSEMBLY FOR SOLENOID VALVES, ADJACENT TO RECEIVERS.
EE. PROVIDE REFRIGERANT CHARGING VALVE CONNECTIONS IN LIQUID LINE BETWEEN
RECEIVER SHUTOFF VALVE AND EXPANSION VALVE.
N. UNLESS OTHERWISE NOTED, ALL DUCTWORK IS OVERHEAD, TIGHT TO THE UNDERSIDE OF
THE STRUCTURE, WITH SPACE FOR INSULATION IF REQUIRED.
M. RUNS OF FLEXIBLE DUCT SHALL NOT EXCEED 5' MAXIMUM LENGTH.
O. ALL DUCTWORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN
DUCTS, INCLUDING DIVIDED DUCTS AND TRANSITIONS AROUND OBSTRUCTIONS, SHALL BE
PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
P. PROVIDE ACCESS DOORS IN DUCTWORK TO PROVIDE ACCESS FOR ALL SMOKE
DETECTORS, FIRE DAMPERS, SMOKE DAMPERS, VOLUME DAMPERS, HUMIDIFIERS, COILS,
AND OTHER ITEMS LOCATED IN THE DUCTWORK WHICH REQUIRE SERVICE AND/OR
INSPECTION.
Q. PROVIDE ACCESS DOORS IN DUCTWORK FOR OPERATION, ADJUSTMENT, AND
MAINTENANCE OF ALL FANS, VALVES, AND MECHANICAL EQUIPMENT.
R. ALL DUCTS SHALL BE GROUNDED ACROSS FLEXIBLE CONNECTIONS WITH FLEXIBLE
COPPER GROUNDING STRAPS. GROUNDING STRAPS SHALL BE BOLTED OR SOLDERED TO
BOTH THE EQUIPMENT AND THE DUCT.
S. SMOKE DETECTORS SHALL BE FURNISHED AND WIRED BY THE ELECTRICAL CONTRACTOR.
THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR MOUNTING THE SMOKE
DETECTOR IN DUCTWORK AS SHOWN ON THE DRAWINGS AND IN ACCORDANCE WITH
MANUFACTURER’S PRINTED INSTRUCTIONS.
T. TERMINATE GAS VENTS FOR UNIT HEATERS, WATER HEATERS, HIGH PRESSURE PARTS
WASHER, HIGH PRESSURE CLEANER, AND OTHER GAS APPLIANCES A MINIMUM OF 3′-0″
ABOVE ROOF WITH RAIN CAP (NOTE TO DESIGNER: EDIT APPLIANCES AND HEIGHT ABOVE
ROOF TO MEET CODE AND TO SUIT PROJECT REQUIREMENTS).
U. SEE SPECIFICATIONS FOR DUCTWORK GAUGES, BRACING, HANGERS, AND OTHER
REQUIREMENTS.
V. LOUVER SIZES, LOCATIONS, MOUNTING, AND DETAILS SHALL BE COORDINATED WITH
OTHER TRADES INVOLVED. REFER TO ARCHITECTURAL SPECIFICATIONS FOR DETAILED
DESCRIPTIONS.
DIRECTION OF PIPE
PITCH (DOWN)
FM
MV
HVAC VALVE SYMBOLS
PC PUMPED CONDENSATE
ROOM TAG
FLEXIBLE CONNECTOR
PUMP
REDUCER (CONCENTRIC)
GATE VALVE
BUTTERFLY VALVE
CHECK VALVE
THERMOMETER
PRESSURE GAUGE
STRAINER WITH BLOWOFF
AND HOSE CONNECTION
YR YEAR
Y
Z INTENTIONALLY LEFT BLANK
Z
M
CONTROL VALVE
CONTROL VALVE, THREE WAY
MOTOR CONTROLLED
VALVE
M
M
NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS WILL BE UTILIZED FOR THIS PROJECT.
A. MECHANICAL TRADES BIDDING DEMOLITION WORK SHALL ALLOW FOR A FULL DAY ON SITE TO REVIEW EXISTING MECHANICAL SERVICES AND EQUIPMENT IN DEMOLITION AND REMOVED AREAS. ACCESS WILL BE GIVEN TO ROOF AND EXISTING MECHANICAL AND ELECTRICAL ROOMS AS REQUIRED. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK. BRING ANY DISCREPANCIES FROM THE DRAWINGS AND NOTES TO THE ENGINEER OF RECORD IMMEDIATELY. MINOR CHANGES IN THE SCOPE OF THE
DEMOLITION WORK SHALL NOT JUSTIFY AN ADDITIONAL COST.
B. DEMOLISHED WORK SHALL INCLUDE FOR TEMPORARY AND PERMANENT WORK REQUIRED TO KEEP
NON-SCOPE AREAS IN OPERATION. COORDINATE UTILITY SHUT-OFFS AND TEMPORARY POWER,
STORAGE, AND ACCESS NEEDED TO COMPLETE WORK WITH GENERAL CONTRACTOR AND RESIDENT
ENGINEER.
C. REMOVAL OF EXISTING FIXTURES AND EQUIPMENT WILL REQUIRE ISOLATION OF EXISTING PIPING BRANCHES AND/OR MAINS USING SHUTOFF VALVES. INSTALL NEW ISOLATION VALVES AS REQUIRED TO
COMPLETION DEMOLITION WORK.
D. REMOVAL OF EXISTING PLUMBING FIXTURES AND EQUIPMENT WILL REQUIRE CAPPING AND SEALING EXISTING MAINS OR BRANCHES, WITHOUT LEAVING DEAD LEGS, TO KEEP REMAINING SYSTEMS IN OPERATION. THE CONTRACTOR SHALL PROVIDE PROTECTIVE MEASURES TO PROTECT THE EXISTING
OCCUPIED AREAS AND EQUIPMENT DURING THE CONSTRUCTION WORK. THE CONTRACTOR SHALL
CLEAN THE AREAS OF ALL CONSTRUCTION DIRT DAILY, AND UPON COMPLETION OF THE WORK.
E. ALL DRAINED PIPING RISERS AND MAINS SHALL BE REFILLED AND PROPERLY VENTED BY THE
CONTRACTOR ONCE NEW WORK HAS BEEN COMPLETED.
F. COORDINATE REMOVAL, REPLACEMENT, AND/OR REPAIRS OF ANY EXISTING WALLS, CEILING, ETC.
REQUIRED FOR MECHANICAL DEMOLITION WORK WITH GENERAL CONTRACTOR.
G. PROVIDE TIGHTLY SEALED AND INSULATED TERMINATIONS FOR ALL PIPING, DUCTWORK, AND EQUIPMENT REMOVED FROM THE PROJECT. THERE SHALL BE NO "DEAD LEG" SECTIONS OF PIPING
WHERE WATER CAN SIT AND BECOME STAGNANT.
H. REFER TO THE RESIDENT ENGINEER FOR INSTRUCTIONS REGARDING THE REMOVAL AND RETURN OR
DEMOLITION OF EXISTING EQUIPMENT AND FIXTURES.
I. PORTIONS OF EXISTING SYSTEMS ARE SHOWN FOR CLARITY AND MAY NOT BE NECESSARY TO MODIFY OR REVISE THEM. ALL EXISTING SYSTEMS ARE SHOWN BASED ON AVAILABLE AS-BUILT DRAWINGS AND SITE SURVEYS OF ACCESSIBLE AREAS. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS.
J. ALL WORK MUST BE COORDINATED AND SCHEDULED WITH THE RESIDENT ENGINEER TO ENSURE THE
LEAST AMOUNT OF DISRUPTION OF BUILDING ACTIVITIES AS POSSIBLE.
K. ALL ACCESSIBLE ABANDONED PIPING AND DUCTWORK SHALL BE REMOVED AND PROPERLY DISPOSED
OF.
L. SUPPLY AIR DUCTWORK AND PIPING NOT SHOWN HATCHED IS TO BE RETAINED, ANY DAMAGE TO
EXISTING INSULATION AND DUCTS TO BE REPAIRED TO MATCH EXISTING.
GENERAL DEMOLITION NOTES:
Name th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
OKLAHOMA CITY, OK 73109
(405) 842-6100
CODY DOUGLAS
ARCH - SETH A. CAVIN #7580 EXP. 12/31/2022
MECH - JAMES R. MYLES #027005 EXP. 12/31/2023
ELEC - BENJAMIN E. NOE #027238 EXP. 12/31/2023
CIVIL ENGINEER
CALIBRE ENGINEERING
9090 S. RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH, CO 80129
(303) 730-0434
BEN MURPHY
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
2519 MADISON AVENUE, SUITE 100
KANSAS CITY, MO. 64108
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FULLY SPRINKLERED
STRUCTURAL ENGINEER
DEGENKOLD ENGINEERS
375 BEALE STEET, SUITE 500
SAN FRANCISCO, CA 94105
(415) 354-6439
ROBERT GRAFF
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
FRANK FINLEY
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
/2
/2
:3 :1
A
M
LEGEND AND ABBREVIATIONS
CMT 57 95JRM
LEVEL 1 SD2 RFP
CENTRAL UTILITY PLANT
04/21/2023
654-212
VA SIERRA NEVADA HEALTH CARE SYSTEM
975 KIRMAN AVE
RENO, NV 89502
M-000
SPUR #: 1791.06
No. REVISION DESCRIPTION DATE
MH101
2 5431
E
A
B
C
D
16-CH-1 16-CH-2 16-CH-3 16-CH-4
16-SCWP-1
16-SCWP-2
16-SCWP-3
16-ST-1
16-ST-2 16-VP-1
16-DA-1
16-CP-2
CONFERENCE /
BREAK ROOM
N3116
CHILLERS
N3111
PIT
N3109
RISER ROOM
N3110
ELECTRICAL
SWITCHGEAR
N3113
GENERATORS
N3114
CONTROL ROOM
N3115
RESTROOM
N3117
RESTROOM
N3118
ELECTRICAL
UTILITY ROOM
N3108
OFFICE
N3106
BOILER AREA
N3101
HAC
N3104
STORAGE ROOM
N3103
16-TT-1
16-FP-1
-S
H -1
16-AC-1
16-LV-1
16-LV-1
24"ø EA 24"ø EA 24"ø EA
16-FE-116-FE-216-FE-3
TEMPORARY CONNECTIONS FOR
CHILLED WATER
TEMPORARY CONNECTIONS
FOR STEAM
GENERAL PHASING NOTES:
A. CONTRACTOR SHALL PROVIDE TEMPORARY UTILITIES FOR CHILLED WATER AND
STEAM DURING THE CONSTRUCTION OF THE NEW CENTRAL UTILITY PLANT.
GENERAL AREA FOR ACCESS
FOR ELEMENTS LOCATED
ABOVE THE BOILERS. SPECIFIC
ACCESS CONFIGURATION
SHALL BE COORDINATED WITH
FINAL BOILER SELECTION.
16-B-116-B-216-B-3
16-PCWP-1
16-PCWP-2
16-PCWP-3
16-PCWP-4
GENERAL NOTES:
1. SELECTED BOILERS SHALL BE CAPABLE OF MEETING STATE OF NEVADA
EMISSIONS REQUIREMENTS. SELECTED BOILER MANUFACTURER SHALL
PROVIDE CERTIFICATE OF AIR QUALITY.
16-CWHX-1
16-CWP-4
16-CWP-3
16-CWP-2
16-CWP-1
GENERAL AREA FOR FLOOR
TRENCH LOCATED AROUND
AND BEHIND THE BOILERS FOR
BLOWDOWN AND FUEL PIPING.
SPECIFIC CONFIGURATION
SHALL BE COORDINATED WITH
FINAL BOILER SELECTION.
4 3
LEVEL 1
0"
MEZZANINE
15'-0"
ROOF
33'-0"
4 3
TOP OF PARAPET
36'-8"
3.9
16-CWP-4 16-CWP-2
16-CWP-116-CWP-3
16-PCWP-4 16-PCWP-2
16-PCWP-3 16-PCWP-1
CHILLERS
N3111
16-CT-1
16-LV-1
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
OKLAHOMA CITY, OK 73109
(405) 842-6100
CODY DOUGLAS
ARCH - SETH A. CAVIN #7580 EXP. 12/31/2022
MECH - JAMES R. MYLES #027005 EXP. 12/31/2023
ELEC - BENJAMIN E. NOE #027238 EXP. 12/31/2023
CIVIL ENGINEER
CALIBRE ENGINEERING
9090 S. RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH, CO 80129
(303) 730-0434
BEN MURPHY
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
2519 MADISON AVENUE, SUITE 100
KANSAS CITY, MO. 64108
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FULLY SPRINKLERED
STRUCTURAL ENGINEER
DEGENKOLD ENGINEERS
375 BEALE STEET, SUITE 500
SAN FRANCISCO, CA 94105
(415) 354-6439
ROBERT GRAFF
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
FRANK FINLEY
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
/2
/2
:3 :2
A
M
MECHANICAL FIRST FLOOR PLAN
CMT 58 95JRM
LEVEL 1 SD2 RFP
CENTRAL UTILITY PLANT
04/21/2023
654-212
VA SIERRA NEVADA HEALTH CARE SYSTEM
975 KIRMAN AVE
RENO, NV 89502
MH101
SPUR #: 1791.06
N
1/8" = 1'-0"
MECHANICAL FLOOR PLAN - FIRST FLOOR1
KEYNOTES
1 CHILLED WATER PRIMARY PUMPS AND CONDENSER WATER PUMPS ARE STACKED IN A TWO BY TWO
CONFIGURATION AND STAGGERED TO ALLOW FOR SPACING AND MAINTENANCE REQUIREMENTS.
No. REVISION DESCRIPTION DATE
1/4" = 1'-0"
CHILLED WATER PUMPS SECTION VIEW2
MH101
2 5431
E
A
B
C
D
24"ø EA
24"ø EA 24"ø EA
16-CT-1
16-MAU-116-MAU-216-MAU-3
16-EF-116-EF-216-EF-3
16-GV-1
16-VRF-1
16-CU-1
16-CU-2
2 5431
E
A
B
C
D
16-CT-1
16-ST-1
ELECTRICAL
AREA
N3201
TR
N3203
SECURITY
N3204
CORRIDOR
N3206
EMERGENCY
PANELS
N3205
16-LV-1
16-LV-1
16-LV-1
16-LV-1
24"ø EA 24"ø EA 24"ø EA
16-FE-116-FE-216-FE-3
16-LV-1
16-LV-1
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
OKLAHOMA CITY, OK 73109
(405) 842-6100
CODY DOUGLAS
ARCH - SETH A. CAVIN #7580 EXP. 12/31/2022
MECH - JAMES R. MYLES #027005 EXP. 12/31/2023
ELEC - BENJAMIN E. NOE #027238 EXP. 12/31/2023
CIVIL ENGINEER
CALIBRE ENGINEERING
9090 S. RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH, CO 80129
(303) 730-0434
BEN MURPHY
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
2519 MADISON AVENUE, SUITE 100
KANSAS CITY, MO. 64108
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FULLY SPRINKLERED
STRUCTURAL ENGINEER
DEGENKOLD ENGINEERS
375 BEALE STEET, SUITE 500
SAN FRANCISCO, CA 94105
(415) 354-6439
ROBERT GRAFF
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
FRANK FINLEY
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
/2
/2
:3 :4
A
M
MECHANICAL FLOOR PLAN AND ROOF
PLAN
CMT 59 95JRM
LEVEL 1 SD2 RFP
CENTRAL UTILITY PLANT
04/21/2023
654-212
VA SIERRA NEVADA HEALTH CARE SYSTEM
975 KIRMAN AVE
RENO, NV 89502
MH102
SPUR #: 1791.06
N
1/8" = 1'-0"
MECHANICAL PLAN - ROOF LEVEL2
N
1/8" = 1'-0"
MECHANICAL FLOOR PLAN - MEZZANINE LEVEL1
M
M
M
M
M
M
M
M
M
F W
P S
FROM FEEDWATER DEAERATOR
R
FWPS
[30" VAC-30PSI]
0-2000kPa
[0-300PSI]
0-150°C [30-300°F]
F W
P D
-1
F W
P D
-2
BOILER FEEDWATER
PUMP NO. 1
(TYPICAL)
F W
P S
F W
P S
FWPD-1
FWPD-2
TO BOILERS
AND ECONOMIZERS
NOTE:
CAPACITY OF EACH PUMP APPROX. 125% OF ONE BOILER.
FLEX
CONNECTION
TO TANK
UNION
ORIFICE
PUMP
DISCHARGE
HEADER
DETAIL - PUMP RECIRCULATION
ORIFICE ASSEMBLY
EMERGENCY BOILER
CONNECTION TO
OUTSIDE OF BUILDING
762mm VAC-207kPa
TO FEEDWATER DEAERATOR
WITH BYPASS TO
CONDENSATE STORAGE TANK
RECIRCULATION
ORIFICE. SEE
DETAIL THIS SHEET.
F W
P S
BOILER FEEDWATER
PUMP NO. 2
F W
P S
BOILER
FEEDWATER
PUMP NO. 3
F W
P D
F W
P D
RECIRCULATION LINE
VALVES WILL BE
SHUT AND LOCKED.
[3 '-0
4m m
M
BO
CF
C B
D
BOILER
(TYPICAL)
ECONOMIZER
(TYPICAL)
V
D
OSD
D
CV-6,7,8
10-260°C [50-500°F]
F W
P D
FWPD
F W
P D
FWPD
SRV-1
F W
P D
-2
F W
P D
-1
FROM
FEEDWATER
PUMPS
VENT INTO
BOILER
ROOM
20mm [3/4"]
STACK
B W
S
BO TO SAMPLE
COOLER
FROM
CHEMICAL
FEEDER
TO BO TANK
OR, IF
SPECIFIED, TO
BLOWDOWN
HEAT RECOVERY
BO
2ND BO LINE
REQUIRED IF
BOILER HAS
TWO BO
CONNECTIONS
FWPD
CONTROLLER
BOILER WATER LEVEL CONTROL SCHEMATIC
(SEE SPECS FOR TYPE OF SYSTEM)
CV-6,7,8
BOILER WATER
LEVEL TRANSMITTER
BOILER STEAM
FLOW TRANSMITTER
BOILER FEEDWATER
PRESSURE TRANSMITTER
0-150°C [30-300°F]
0-2000kPa
[0-300PSIG]
C V
-9 ,1
0, PROVIDE
TEMPERATURE
TRANSMITTERS HERE
0-2000kPa
[0-300PSIG]
20mm [3/4"]
THIS RELIEF VALVE IS HOT WATER UNDER PRESSURE AND
SHOULD BE VENTED DOWN TO THE FLOOR TWO INCHES ABOVE
FLOOR DRAIN OR IN A TRENCH DRAIN IS PREFERRED. LIKE A
SAFETY VALVE ON A HOT WATER HEATER.
20mm [3/4"]
20mm [3/4"]
51mm [2"]
V
TR
LP
C
H P
C /M
P C
CW
SW
C T
P
S CTPDEMERGENCY MAKE-UP
(TANK BY PASSED)
CONDENSATE STORAGE TANK
CONDENSATE
TRANSFER PUMPS
NC
OSD
NC O
F
L
V
TO FEEDWATER
DEAERATOR
R
CPD
CPD
30-300°F
30-300°F
30-300°F
30-300°F
OSD
NC
NC
NC
NC NC
NC
NC
NC
R
R
30"VAC-30PSI 0-60PSI
TANK BYPASS
NC
2" D
1"
1 1/2"
FLEX CONN.
STRAINER
RECIRCULATION ORIFICE (SEE
DETAIL ON 23 21 11-07)
LEVEL
TRANSMITTER
LOW LEVEL
ALARM SW
GAGE GLASS
HIGH LEVEL
ALARM SW
SW
CW
CONTROLLER
WATER LEVEL
TRANSMITTER
CONTROL SCHEMATIC
0-100PSI
0-100PSI
EMERGENCY
MAKE-UP CW
SW
NC NC
CV-2
FM
NC NC
CV-1
FIRE HOSE
CONNECTION
F R
O M
S T
E A
M T
R A
P S
4" M
IN
T
H R
O U
G H
R O
O F
F R
O M
S T
E A
M T
R A
P S
TOP OF TANK
OFL LINE
HIGH LEVEL ALARM
NORMAL MAKE-UP
LOW LEVEL ALARM
EMERGENCY MAKE-UP
BOTTOM OF TANK
CV-1
CV-2
OFL PIPE IN TANK
INLET 12" FROM
BOTTOM OF TANK
NORMAL
MAKE-UP
FROM DISTRIBUTION
SYSTEMS
FROM DISTRIBUTION
SYSTEMS
O F
T A
N K
D
IA
6"
6" 4"
6"
FM
FM
FM
LEGEND:
CPD - CONDENSATE PUMP
DISCHARGE
CTPD - CONDENSATE TRANSFER
PUMP DISCHARGE
CTPS - CONDENSATE TRANSFER
PUMP SUPPLY
R - RECIRCULATION LINE
SW - SUPPLY WATER
VTR - VENT TO ROOF
SW
CTPD
CONTROLLER
WATER LEVEL
TRANSMITTER
LPS
HPC/MPC
F W
P S
O F
L T
O F
LO
O
R D
R A
IN
CTPD
CV-3
CV-4
NC
1 1/2"
NC NCNCNC
1"
GAGE GLASS
D
OSD
NC
2"
F W
S
C F
P
1/4" 1"
30-300°F
VALVE LOCKED OPEN
CV-5
SW
R
30-300°F 30"VAC-30PSI
M
FG
R [1 m m
[1 m m
TOP OF TANK
OFL LINE
HIGH LEVEL ALARM
LOW LEVEL ALARM
SAFETY DEVICE MANUAL
CAN BE 1/3 OF TANK
EMERGENCY MAKE-UP
[1 m m
NORMAL WATER LEVEL
C OF TANKL
CV-3
CV-4
OFL
CV-5
WATER LEVEL
CONTROL SCHEMATIC
OVERFLOW(OFL)
CONTROL SCHEMATIC
OFL CONTROL
SWITCH
OFL
CONTROLLER
FROM PRV STATION
SEE STEAM PIPING
DIAGRAM
FROM BOILER FEED
WATER PUMPS
OFL PIPE IN TANK-INLET
6" BELOW LOW LEVEL
ALARM SET POINTHIGH LEVEL
ALARM SW
OFL CONTROL
SWITCH
LOW LEVEL
ALARM SW
LEVEL
TRANSMITTER
T O
B O
IL
E
R
F E
E D
E R
P U
M P
S
T O
S A
M P
LE
C O
O
LE
R
F R
O M
C H
E M
IC
A
L P
U M
P
FEEDWATER DEAERATOR
AND STORAGE TANK
EMERGENCY
MAKE-UP
NORMAL
MAKE-UP
4" 4"
4" B
Y D
A
LEGEND:
CFP - CHEMICAL FEED PUMP
CTPD - CONDENSATE TRANSFER
PUMP DISCHARGE
D - DRAIN LINE
FWS - FEEDWATER SUPPLY
OFL - OVERFLOW
R - RECIRCULATION LINE
SW - SUPPLY WATER
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
OKLAHOMA CITY, OK 73109
(405) 842-6100
CODY DOUGLAS
ARCH - SETH A. CAVIN #7580 EXP. 12/31/2022
MECH - JAMES R. MYLES #027005 EXP. 12/31/2023
ELEC - BENJAMIN E. NOE #027238 EXP. 12/31/2023
CIVIL ENGINEER
CALIBRE ENGINEERING
9090 S. RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH, CO 80129
(303) 730-0434
BEN MURPHY
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
2519 MADISON AVENUE, SUITE 100
KANSAS CITY, MO. 64108
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FULLY SPRINKLERED
STRUCTURAL ENGINEER
DEGENKOLD ENGINEERS
375 BEALE STEET, SUITE 500
SAN FRANCISCO, CA 94105
(415) 354-6439
ROBERT GRAFF
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
FRANK FINLEY
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
/2
/2
:3 :4
A
M
MECHANICAL FLOW DIAGRAMS
CMT 60 95JRM
LEVEL 1 SD2 RFP
CENTRAL UTILITY PLANT
04/21/2023
654-212
VA SIERRA NEVADA HEALTH CARE SYSTEM
975 KIRMAN AVE
RENO, NV 89502
M-401
SPUR #: 1791.06
NOT TO SCALE
BOILER FEEDWATER PUMPS FLOW DIAGRAM2
NOT TO SCALE
BOILER FLOW DIAGRAM312" = 1'-0"
CONDENSATE STORAGE AND TRANSFER FLOW DIAGRAM4
NOT TO SCALE
FEEDWATER DEAERATOR FLOW DIAGRAM1
DESIGNER NOTE:
INSERT
OPERATING
PRESSURE
HPR
H P
R
HPR
H P
S
HPR
LPR
LPR
LPS(
LP
S
V
LPS(
LPS(
VV
H P
S
H P
S
H P
S
H P
S
H P
S
H P
S
H P
S
HPS( )
HPS( )
HPS( )
HPS( )
H P
S
HPR
HPR
D D
HPR
D
D
HPS( )
HPS( )
V
MPS( )
HPR
MPS( )
VV
HPR
HPR
HPS( )
PS
VENT PIPE - ALL
VERTICAL NO HORIZONTAL
SECTIONS
HOLE DRILLED IN
VALVE WEDGE FOR
DEAERATOR
VENTING VACUUM
BREAKER
PRIMARY ELEMENT
BOILER PLANT
FLOW SENSOR
BOILER
ROOM FLOOR
MASTER STEAM PRESSURE
TRANSMITTER
25mm [1"]
TO BLDG.
HEATING (UH.
HV UNITS)
20mm [3/4']
(TYP.)
20MM [3/4"]
(TYP.)
PRIMARY ELEMENT-HPS
LAUNDRY FLOW SENSOR
FACTORY INSTALLED
BYPASSES ON VALVES
102mm [4"] &
LARGER
20mm [3/4"] (TYP.)
MAIN STEAM
HEADER HPS(
FUTURE BOILER
CONNECTION SHALL BE
PIPED TO AN OUTSIDE
WALL FOR
EMERGENCY/RENTAL
BOILER CONNECTION
20mm [3/4"]
HALF-COUPLING THREADED
FOR CALORIMETER
CONNECTION (LOCATE TO
ALLOW SPACE FOR
PROVIDED PLUG (TYP.)
CALORIMETER)
PRIMARY
ELEMENT-BOILER STEAM
FLOW SENSOR
PRIMARY
ELEMENT-HPS
DISTRIBUTION
FLOW SENSOR
LATERAL
CONNECTION
(TYP.)(REQUIRED
FOR SOUND
REDUCTION)
PRIMARY ELEMENT-HPS
DISTRIBUTION FLOW SENSOR
35kPa
[5 PSIG]
ROOFROOF
WHISTLE VALVE
0-150°C [30-300°F]
NOTE:
SEE DETAIL SD232213-01 FOR ADDITIONAL DETAILS FOR PRV STATION.
V
SV
PRV-___
D
V
H P
S
H P
S
T-___
NC
WHISTLE
T-___
PRV-___
W
TO BLDG
HEATING
(CONVECTORS)
100kPa VAC-100kPa
[30" HG VAC-15
PSIG]
H FEEDWATER DEAERATER
0-150°C [30-300°F]
ELL
NON-RETURN
STOP-CHECK (SIZE__)
BURNER
ROOF
BOILERB
FD
NC SV-___
PRV-___
T-___
NC BYPASS
PRV-___PRV-___
PRV-___
T-___
T-___
S
VTR
SV-___ SV-___
PRV STATION
(TYP.)
T-___
TO MPS
DISTRIBUTION
0-700kPa
[0-100 PSIG]
TO HPS DISTRIBUTION
TO LAUNDRY
TO OTHER STEAM
ATOMIZING
BURNERS
20mm [3/4"]
T-___
0-
P
S
IG
[0 -1
0k
P a]
T-___
0-1500kPa
[0-200 PSIG ]
0-400kPa
[0-60 PSIG]
0-1500kPa
[0-200 PSIG] T-___
T-___
VTR VTR
VTR
0-100kPa
[0-15 PSIG]
0-1500kPa [0-200
PSIG]
T-___
VTR
FE
FE
FE
PRV-___
0-kP a [0
-2
P S
IG
SV-__
(SET AT
70kPa
[10 PSIG])
V V
SV-__
(SET AT 100kPa
[15 PSIG])
0-1500kPa
[0-200 PSIG]
S T
E A
M S
IL
E
N C
E R
E
X H
A U
S T
S Y
S T
E M
F O
R B
O
IL
E R
-B U
R N
E R
T E
S T
IN
G
A
D
JU
S T
IN
G
TO STEAM
ATOMIZING
OIL BURNER
FROM OTHER BOILERS
914mm - 1524mm
[36"-60"] AFF.
AIR-GAP IS
REQUIRED.
AIR-GAP IS
REQUIRED.
TYPICAL FOR
VALVES ON
MAIN STEAM
HEADER
2m m m m
[3 0"
-4 8"
[3 ' M
A X
4m m
[7 m m
M
IN
STRAIGHT PIPE AS
RECOMMENDED
BY FLOWMETER
MANUFACTURER (TYP.)
STRAIGHT PIPE AS
RECOMMENDED
BY FLOWMETER
MANUFACTURER (TYP.)
3048mm [10']
MIN. (TYP. ALL
VENTS)
1829mm [6']
MIN. (TYP)
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
OKLAHOMA CITY, OK 73109
(405) 842-6100
CODY DOUGLAS
ARCH - SETH A. CAVIN #7580 EXP. 12/31/2022
MECH - JAMES R. MYLES #027005 EXP. 12/31/2023
ELEC - BENJAMIN E. NOE #027238 EXP. 12/31/2023
CIVIL ENGINEER
CALIBRE ENGINEERING
9090 S. RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH, CO 80129
(303) 730-0434
BEN MURPHY
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
2519 MADISON AVENUE, SUITE 100
KANSAS CITY, MO. 64108
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FULLY SPRINKLERED
STRUCTURAL ENGINEER
DEGENKOLD ENGINEERS
375 BEALE STEET, SUITE 500
SAN FRANCISCO, CA 94105
(415) 354-6439
ROBERT GRAFF
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
FRANK FINLEY
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
/2
/2
:3 :4
A
M
MECHANICAL FLOW DIAGRAMS
CMT 61 95JRM
LEVEL 1 SD2 RFP
CENTRAL UTILITY PLANT
04/21/2023
654-212
VA SIERRA NEVADA HEALTH CARE SYSTEM
975 KIRMAN AVE
RENO, NV 89502
M-402
SPUR #: 1791.06
12" = 1'-0"
STANDARD STEAM BOILER PLANT PIPING DIAGRAM1
16-CH-1
16-CH-2
16-CH-3
16-CH-4
ECONOMIZER
PLATE & FRAME
CHWR FROM BUILDING(S)
CHWS TO BUILDING(S)
16-PCWP-2
16-PCWP-3
16-PCWP-4
16-PCWP-1
16-SCWP-2
16-SCWP-1
S
FM
S
FM
S
FM
S
FM
S
FM
DECOUPLER PIPING
16-CH-1
16-CH-2
16-CH-3
16-CH-4
ECONOMIZER
PLATE & FRAME
-C
T-
-C
T-
-C
T-
-C
T-
WATER TREATMENT
FILTRATION SYSTEM
WATER MAKEUP
16-CWP-1 16-CWP-2 16-CWP-3 16-CWP-4
BLOWDOWN
S
FM
S
FM
S
FM
S
FM
S
FM
S S S S th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
OKLAHOMA CITY, OK 73109
(405) 842-6100
CODY DOUGLAS
ARCH - SETH A. CAVIN #7580 EXP. 12/31/2022
MECH - JAMES R. MYLES #027005 EXP. 12/31/2023
ELEC - BENJAMIN E. NOE #027238 EXP. 12/31/2023
CIVIL ENGINEER
CALIBRE ENGINEERING
9090 S. RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH, CO 80129
(303) 730-0434
BEN MURPHY
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
2519 MADISON AVENUE, SUITE 100
KANSAS CITY, MO. 64108
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FULLY SPRINKLERED
STRUCTURAL ENGINEER
DEGENKOLD ENGINEERS
375 BEALE STEET, SUITE 500
SAN FRANCISCO, CA 94105
(415) 354-6439
ROBERT GRAFF
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
FRANK FINLEY
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
/2
/2
:3 :4
A
M
MECHANICAL FLOW DIAGRAMS
CMT 62 95JRM
LEVEL 1 SD2 RFP
CENTRAL UTILITY PLANT
04/21/2023
654-212
VA SIERRA NEVADA HEALTH CARE SYSTEM
975 KIRMAN AVE
RENO, NV 89502
M-403
SPUR #: 1791.06
NTS
CHILLED WATER SYSTEM FLOW DIAGRAM2
NTS
CONDENSER WATER SYSTEM FLOW DIAGRAM1
PI
FLOW IN
AIR SEPARATOR
CW MAKEUP
TO PUMP
SUCTION
CHARGING
VALVE
PRESSURIZED
EXPANSION
TANK
ROUTE TO NEAREST
FLOOR DRAIN
CONDENSATE RETURN LINE
PROVIDE TWO "U" BOLTS WITH
NUT & LOCK NUT ON STEAM LINE.
SPOT WELD "U" BOLT TO PIPE &
BOLT TO CHANNEL.
SIZE OF STEAM LINE
GOVERNS SIZE OF
CHANNEL.
SCHEDULE FOR 8 FT. [2.4m] SPAN OR LESS.
PLAN VIEW
1 - 2 [25 - 50]
2-1/2 - 5 [65 - 125]
6 - 8 [150 - 200]
SIZE OF PIPE
INCH [mm]
3/8 [10] DIA.
1/2 [15] DIA.
3/4 [20] DIA.
SCHEDULE
SIZE OF "U" BOLT
INCH [mm]
6 x 10.5 [150x265]
8 x 13.75 [200x345]
10 x 20 [250x500]
SIZE OF CHANNEL
INCH [mm]
PROVIDE ONE "U" BOLT WITH NUT &
LOCK NUT ON RETURN LINE. SPOT
WELD "U" BOLT TO PIPE & BOLT TO
CHANNEL
CHANNEL TO BE SET IN SIDE WALL
OF TRENCH.
CONCRETE TRENCH
STEAM LINESHEET METAL FLASHING RECEIVER
SHEET METAL COUNTERFLASHING
ROOFTOP UNIT BASE RAIL
SPECIFIED MEMBRANE BASE FLASHING
ROOFTOP UNIT
DUCT
SPECIFIED ROOF MEMBRANE
COVERBOARD INSULATION
THERMAL INSULATION
ROOF DECK
SEALING MATERIAL
1", 22 GA. ANCHOR STRAP NEAR EACH CORNER
(MIN 4 REQD)
NOTES:
1. CUT METAL DECKING TO ALLOW CURB INSTALLATION ON STEEL FRAMING. AFTER CURB IS
SET IN PLACE, TRIM REMAINING METAL DECKING AND INSTALL WITHIN CURB. TACK WELD
DECKING TO SUPPORT STEEL. DO NOT WELD INTERIOR DECKING TO ROOF CURB.
2. LOCATE ANCHOR STRAPS NEAR EACH OF FOUR UNIT CORNER POINTS. SECURE STRAPS TO
JOISTS OR FRAMING ANGLE. KEEP STRAP AS TIGHT AS POSSIBLE.
WOOD NAILER - OMIT WHERE NOT ALLOWED BY
LOCAL BUILDING CODE
HIGH-DOMED, CAPPED, GASKETED FASTENERS
(APPROX. 18" O.C. AND MINIMUM TWO FASTENERS
PER SIDE)
FILL ENTIRE CURB SPACE, ALTERNATING LAYERS
OF 2", 3# DENSITY, RIGID, ACOUSTICAL FIBER
BOARD AND 5/8" SHEETROCK.
EXTENSION OF FIELD PLIES ABOVE HEAD OF CANT
(NOT SHOWN FOR CLARITY)
FOR RTU WITH NET WEIGHT UNDER 1,000 LBS
CURB MAY BEAR ON METAL DECK
FOR RTU WITH NET WEIGHT OVER 1,000 LBS
CURB SHALL BEAR ON STEEL FRAMING
FRAME CURB AND DECKING WITH STEEL ANGLE.
COORDINATE WITH STRUCTURAL ENGINEER.
CAULK OPENING
AROUND DUCT
LOOP ANCHOR STRAP
AND BOLT TO STEEL
SUPPORT
SECURE ANCHOR STRAPS TO
CURB WITH STAINLESS STEEL
SCREWS
APPROX.
4"
C U
R B
H E
IG
H
T A
S S
P E
C
IF
IE
D
90°
ROOF
1-1/2" INSULATION
NOTE:
1. STACK TO BE SUPPORTED WITH GUY WIRES AND BRACING AS
REQUIRED. DO NOT SUPPORT WEIGHT OF STACK FROM BOILER.
RAIN CAP
CURB & FLASHING
3" AIR SPACE ALL
AROUND
METAL STOP OVER END
OF INSULATION; WELD
TO STACK
STORM COLLAR
WELD TO STACK
8"
4' -0
9"
9"
36"
18" Ø
CHS
CHR
CHS
DOUBLE CHECK
VALVE
ISOLATION
VALVE
STRAINER
EXPANSION TANK
GAUGE GLASS
H.B.
FROM SYSTEM
TO CHILLER
FLOWSET OLYMPIC VENTURI
CASE STEEL, FLANGE
CHEMICAL POT
FEEDER
PRESSURE GAUGE
GAUGE COCK
H.B.H.B.
CHP-01
HOUSEKEEPING
PAD (TYP)
3/4"
1" TO
F.D.
1" TO F.D.
X"X"
PRV
CHP-02
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
OKLAHOMA CITY, OK 73109
(405) 842-6100
CODY DOUGLAS
ARCH - SETH A. CAVIN #7580 EXP. 12/31/2022
MECH - JAMES R. MYLES #027005 EXP. 12/31/2023
ELEC - BENJAMIN E. NOE #027238 EXP. 12/31/2023
CIVIL ENGINEER
CALIBRE ENGINEERING
9090 S. RIDGELINE BLVD, SUITE 105
HIGHLANDS RANCH, CO 80129
(303) 730-0434
BEN MURPHY
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
2519 MADISON AVENUE, SUITE 100
KANSAS CITY, MO. 64108
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FULLY SPRINKLERED
STRUCTURAL ENGINEER
DEGENKOLD ENGINEERS
375 BEALE STEET, SUITE 500
SAN FRANCISCO, CA 94105
(415) 354-6439
ROBERT GRAFF
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
FRANK FINLEY
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
/2
/2
:3 :4
A
M
TYPICAL SCHEMATIC MECHANICAL
DETAILS
CMT 63 95JRM
LEVEL 1 SD2 RFP
CENTRAL UTILITY PLANT
04/21/2023
654-212
VA SIERRA NEVADA HEALTH CARE SYSTEM
975 KIRMAN AVE
RENO, NV 89502
M-501
SPUR #: 1791.06
NOT TO SCALE
AIR SEPARATOR / EXPANSION TANK DETAIL1NOT TO SCALE
ANCHOR INSTALLATION - STEAM CONDENSATE PIPING IN TRENCH2
NOT TO SCALE"
ROOF BASE RAIL DETAIL3
NOT TO SCALE
BOILER STACK DETAIL4
NOT TO SCALE
CHILLED WATER PUMP PIPING DETAIL5
No. REVISION DESCRIPTION DATE
GENERAL NOTE:
1. THE DETAILS SHOWN ON THIS SHEET ARE TYPICAL SCHEMATIC MECHANICAL DETAILS USED IN SIMILAR SYSTEMS ON SIMILAR PROJECT. THEY ARE NOT EDITED FOR THE SPECIFIC REQUIREMENTS OF THIS PROJECT NOR DO THESE DOCUMENTS CONTAIN ALL OF THE REQUIRED DETAILS FOR THIS PROJECT.
THE CONTRACTOR SHALL VERIFY THE SPECIFIC REQUIREMENTS FOR THIS PROJECT, PROVIDE ALL OF THE REQUIRED DETAILS, AND EDIT THEM TO MEET THE SPECIFIC REQUIREMENTS OF THIS PROJECT.
TYPICAL ANCHOR BOLT
NUT & WASHER
PROVIDE #3 BARS 12" [300mm] O.C.
EACH WAY…
This is the start of the file's text. The full file is on GovTribe.