Preliminary_Design_Drawings_P286_POM23_20210224.pdf
PDF 5 MB Posted
- Solicitation number
- N6945021R0064
About this file
This document package includes preliminary design drawings and specifications for a federal construction contract opportunity. The Naval Facilities Engineering Command Southeast is soliciting proposals for a fixed price incentive construction contract to build a new Advanced Helicopter Training System compliant aircraft maintenance hangar at NAS Whiting Field in Florida. The project scope involves demolishing existing buildings, constructing a single-bay hangar with approximately 37,000 square feet of space, and associated facilities for maintenance crews, pilot training squadrons, and support functions. Key requirements include a steel-framed structure on concrete foundations, exterior walls of brick veneer, insulated metal and translucent panels, interior walls of CMU and metal studs, a low-slope metal roof, and two sets of hangar doors. The preliminary design drawings provide details on site plans, grading, utilities, and communications infrastructure relocation. Proposals are due under Solicitation N6945021R0064 by [DATE].
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
© 2020 Microsoft Corporation © 2020 DigitalGlobe ©CNES (2020) Distribution Airbus DS © 2020 HERE
© 2020 Microsoft Corporation © 2020 DigitalGlobe ©CNES (2020) Distribution Airbus DS © 2020 HERE
OV
ER
AL
L P
RO
JE
CT
M
AP
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D S
O U
TH
E
A S
T
P -2
A
H
TS
H E
LI
C
O P
TE
R
M A
IN
TE
N A
N C
E H
A N
G A
R
Main
C copyright 2019
VICINITY MAP
SCALE 1"=500'
LOCATION MAP
N.T.S
C001
LOCATION MAP
N.T.S
N
N
N
USS ENTERPRISE ST.
EX
IS
TI
NG
C
ON
DI
TI
ON
S
PL
AN
BLDG 2977 DEMOLITION IS
INCLUDED WITHIN PROJECT
SCOPE (INCLUDING
PHOTOVOLTAIC ARRAY PANELS)
BLDG 2978 DEMOLITION IS
INCLUDED WITHIN PROJECT
SCOPE
C100
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D S
O U
TH
E
A S
T
P -2
A
H
TS
H E
LI
C
O P
TE
R
M A
IN
TE
N A
N C
E H
A N
G A
R
Main
C copyright 2019
N
EXISTING FENCING
EXISTING STORM PIPE
EXISTING GAS LINE
EXISTING FIBER OPTIC CABLE
"RED LINES" *
EXISTING SANITARY SEWER
EXISTING WATER MAIN
"GREEN LINES" *
EXISTING STEAM PIPES
NOTE:
1. EXISTING INFORMATION SHOWN IS FROM GOVERNMENT
PROVIDED TOPOGRAPHIC SURVEY, BASE UTILITY MAPS, &
BASE GIS. DUPLICATES MAY BE SHOWN. "RED, GREEN, &
BLUE LINES" ARE PER LAYER NAMES IN PROVIDED CAD
FILE.
EXISTING HARDSCAPE
EXISTING BUILDING
EXISTING OVERHEAD &
UNDERGROUND POWER
"BLUE LINES" *
8"
ST
"ST
30"ST
2-30"ST 2-30"ST
TRENCH DRAIN
30"ST
SI
TE
LA
YO
UT
G
RA
DI
NG
P
LA
N
N
FUTURE PERMANENT SIMULATOR
& PARKING LOT LOCATION
(SEE SPECIAL NOTE #1)
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D S
O U
TH
E
A S
T
P -2
A
H
TS
H E
LI
C
O P
TE
R
M A
IN
TE
N A
N C
E H
A N
G A
R
Main
C copyright 2019
RELOCATED
PEDESTRIAN
TURNSTILE
PEDESTRIAN
TURNSTILE
MOTORIZED
SLIDING GATE
CHAINLINK SECURITY FENCE
TIE TO EXISTING SECURE
PERIMETER FENCING.
145 LF RETAINING
WALL (3' HIGH MAX)
PROPOSED AHTS HANGAR
FFE = 180.50
TREE SAVE AREA
R60'
R120'
(2) 25,000 GAL AFFF
CONTAINMENT TANKS
MECHANICAL
YARD
DUMPSTER
AREA
5:1
8%
5%
1.5%
180.17
4:1
OPEN DITCH BYPASS
CONNECTION
STORM WATER
MANAGEMENT
AREA
STORM WATER
MANAGEMENT
AREA
STORM WATER
MANAGEMENT
AREA
ASPHALT PAVING
CONCRETE PAVING
BUILDING HATCH
PARKING COUNT32
STORM STRUCTURES
STORM PIPING
EXISTING MINOR CONTOUR
FENCING
TREE SAVE BOUNDARY
SPECIAL NOTES:
1. BUILDING 2977 DEMOLITION INCLUDED IN PROJECT SCOPE.
THE PERMANENT SIMULATOR AND ASSOCIATED PARKING
NOT INCLUDED IN SCOPE OF PROJECT.
2. ADA PARKING NOT DEPICTED IN CURRENT LAYOUT.
3. ± 20 TREES TO BE REMOVED AND REPLACED.
R12 0'
R60
MAJOR CONTOUR
MINOR CONTOUR
OUTLET
CONTROL
STRUCTURE
OUTLET
CONTROL
STRUCTURE
EXISTING EDGE
OF PAVEMENT
LID
FEATURE
LID
FEATURE
LID
FEATURE
EXISTING MAJOR CONTOUR
FLOW PATH
8' PEDESTRIAN
SIDEWALK
6' PEDESTRIAN
SIDEWALK
PLANTING AREA / TREE REPLACEMENT
C201
PARKING COUNT
REMOVED: 317 SPACES
PROVIDED: 272 SPACES
SEE OVERALL
UTILITY SHEET
FOR TRENCH
INFORMATION
CHAINLINK SECURITY FENCE
TIE TO EXISTING SECURE
PERIMETER FENCING.
1.5%
3:1
SAVE EXISTING TREES IN
THIS AREA AS POSSIBLE
SAVE EXISTING TREES IN
THIS AREA AS POSSIBLE
8"
ST
"ST
30"ST
2-30"ST 2-30"ST
TRENCH DRAIN
30"ST
COMM
COMM
COMM
COMM
CO
MM
CO
MM
COMM
COMM
COMM
COMM
COMM
CO
MM
COMM
OV
ER
AL
L U
TI
LIT
Y
PL
AN
N
COMMUNICATION LINE
CONNECTION TO BLDG
COMMUNICATION
LINE
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D S
O U
TH
E
A S
T
P -2
A
H
TS
H E
LI
C
O P
TE
R
M A
IN
TE
N A
N C
E H
A N
G A
R
Main
C copyright 2019
SANITARY SEWER
WATER MAIN/SERVICE
COMMUNICATION LINES
GAS LINE
POWER LINE
SS
COMM
G
OHP
FH
FIRE HYDRANT
CONVERT LAST 3 EXISTING
AIRCRAFT PARKING SPACES IN THIS
ROW TO MAINTENANCE TURNS
OIL WATER SEPARATOR &
STORAGE TANK TO SUPPORT
(3) MAINTENANCE TURNS
SAWCUT EXISTING PAVEMENT ±4' WIDE
TRENCH UTILITY INSTALLATION.
REPLACE PAVEMENT IN LIKE KIND.
COMMUNICATION
LINE
±250 LF 8" DIP
DISCHARGE TO STORM
WATER MANAGEMENT AREA
C300
COMM
COMM
COMM
COMM
CO
MM
CO
MM
COMM
CO
MM
COMM
SI
TE
U
TI
LIT
Y
PL
AN
4-4" ENCASED
COMMUNICATION LINE
GAS SERVICE
CONNECTION
TO EXISTING
WATER MAIN
CONNECTION
TO EXISTING
WATER MAIN
15'X10' PREFAB FIRE
PUMP BLDG & 2-25,000
GAL STORAGE TANKS
REMOTE
FDC
RELOCATED 12"
(C-900) WATER
MAIN
WATER
SERVICE
PUMP
STATION
SANITARY SEWER
FORCE MAIN
CONNECTION TO EXISTING
SANITARY SEWER
STUB FOR FUTURE
CONNECTION
CONNECTION TO
EXISTING GAS MAIN
PROPOSED AHTS HANGAR
FFE = 180.50
SS
SS
SS
SS
SS
UNDERGROUND POWER TO
BE REMOVED/RELOCATED
UNDERGROUND
POWER TO BE
REMOVED/RELOCATED
UNDERGROUND COMMUNICATIONS
TO BE REMOVED/RELOCATED
UNDERGROUND COMMUNICATIONS
TO BE REMOVED/RELOCATED
"RED LINE" TO BE
REMOVED/RELOCATED
"GREEN LINE" TO BE
REMOVED/RELOCATED
SANITARY SEWER TO
BE CAPPED/REMOVED
OVERHEAD POWER
TO BE RELOCATED
AS NEEDED
UNDERGROUND POWER
TO BE RELOCATED AS
NEEDED
UNDERGROUND
COMMUNICATIONS TO BE
REMOVED/RELOCATED
AFFF CONTAINMENT
TANKS
MECHANICAL
YARDTRANSFORMER
& GENERATOR
POLE S-64
POLE S-67
POLE S-70
POLE S-71
POLE S-73
POLE S-72
POLE S-73A
POLE S-74
SEE OVERALL UTILITY
PLAN FOR CONTINUATION
SEE OVERALL UTILITY
PLAN FOR CONTINUATION
C301
T G
W W W
W W
W W
W W
FIELD VERIFY NO ACTIVE
CONNECTIONS. REMOVE
OR RELOCATE AS NEEDED.
N
SANITARY SEWER
WATER MAIN/SERVICE
COMMUNICATION LINES
GAS LINE
POWER LINE
SS
COMM
G
OHP
FH
FIRE HYDRANT
SPECIAL NOTES:
1. ALL UTILITIES SHALL BE RELOCATED AS
NECESSARY TO MAINTAIN SERVICE TO BUILDINGS
NOT BEING DEMOLISHED. DISCONNECTED UTILITIES
SHALL BE REMOVED COMPLETELY.
W
APPROXIMATE LIMIT OF
REMOVAL OR RELOCATION N
A V
A L
FA
C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
S O
U
TH
E A
S T
P -2
A
H
TS
H E
LI
C
O P
TE
R
M A
IN
TE
N A
N C
E H
A N
G A
R
Main
C copyright 2019
FH
FH
FH
FH
COMM
COMM
COMM
COMM
CO
MM
CO
MM
COMM
CO
MM
COMM
COMM
COMM
COMM
COMM
COMM
CO
MM
COMM
COMM
COMM
COMM
COMM
CO
MM
COMM
SCALE 1"=400'
N
SCALE: 1"=50'
50 100
25 75
N
COMMUNICATION LINE
CONNECTION TO BLDG
NEW 4-WAY 4"
COMMUNICATION
DUCTBANK
SEE INSERT FOR CONTINUATION
(THIS SHEET)
NEW 4-WAY 4" CONCRETE
ENCASED COMMUNICATION
DUCTBANK
STUB FOR FUTURE
CONNECTION
PROPOSED AHTS HANGAR
SS
SS
SS
SS
SS
SANITARY SEWER
WATER MAIN/SERVICE
COMMUNICATION LINES
GAS LINE
POWER LINE
SS
COMM
G
OHP
FH
FIRE HYDRANT
UNDERGROUND POWER TO
BE REMOVED/RELOCATED
UNDERGROUND
POWER TO BE
REMOVED/RELOCATED
UNDERGROUND COMMUNICATIONS
TO BE REMOVED/RELOCATED
UNDERGROUND COMMUNICATIONS
TO BE REMOVED/RELOCATED
"RED LINE" TO BE
CAPPED/REMOVED/RELOCATED
"GREEN LINE" TO BE
CAPPED/REMOVED/RELOCATED
OVERHEAD PRIMARY
TO BE REMOVED
FROM POLE S-70 TO
POLE S-74
UNDERGROUND POWER
TO BE RELOCATED AS
REQUIRED
UNDERGROUND
COMMUNICATIONS TO BE
REMOVED/RELOCATED
NEW TRANSFORMER
& GENERATOR
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D S
O U
TH
E
A S
T
P -2
A
H
TS
H E
LI
C
O P
TE
R
M A
IN
TE
N A
N C
E H
A N
G A
R
ES101
POLE S-64 TO
BE REMOVED
AND REPLACED
POLE S-67 TO BE
REMOVED AND
REPLACED
POLE S-70 TO
BE REMOVED
AND REPLACED
POLE S-71 TO BE REMOVED
POLE S-73 TO
BE REMOVED
POLE S-72 TO
BE REMOVED
POLE S-73A TO
BE REMOVED
POLE S-74 TO
BE REMOVED
OVERHEAD POWER TO
BE REPLACED BETWEEN
POLE S-64 AND S-70
NEW 6-WAY PAD
MOUNTED SWITCH
NEW 25 KVA
PAD MOUNTED
TRANSFORMER
NEW UNDERGROUND PRIMARY
TO EXISTING BLDG 3152 PAD
MOUNTED TRANSFORMER
(APPROXIMATELY 250' FROM
THIS POINT)
EXISTING UNDERGROUND PRIMARY
TO EXISTING BLDG 3152 PAD
MOUNTED TRANSFORMER TO BE
REMOVED FROM POLE S-73A
NEW UNDERGROUND PRIMARY TO EXISTING
BLDGS 1046 AND 3152 TRANSFORMERS, NEW
25 KVA TRANSFORMER AND NEW HANGAR
TRANSFORMER.
NEW 2-WAY 4" CONCRETE
ENCASED COMMUNICATION
DUCTBANK
File details come from the government source that posted it. Updated .