N69450-21-R-0064-0004.pdf
PDF 150 KB Posted
- Solicitation number
- N6945021R0064
About this file
This document contains an amendment to a solicitation for a fixed price incentive construction contract and related federal contract opportunity. The amendment revises the request for proposal by updating anticipated award dates, defining meeting locations and methods, correcting technical evaluation factors and requirements, and attaching relevant documents. The solicitation is for the P286 Aircraft Maintenance Hangar project at NAS Whiting Field, Florida, which involves early contractor involvement to construct a hangar, maintenance, and training facility for 37 new helicopters being acquired by the AHTS program. The general scope of work includes a steel framed hangar building with brick, metal panel and translucent wall systems, as well as interior concrete and gypsum walls. A low slope metal roof and two sets of hangar doors will also be provided. The Navy is the contracting agency.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is hereby executed to revise Request for Proposal, clarify and update scheduling requirements, define meeting locations and methods, correct technical evaluation factors proposal requirements and basis of evaluation, and provide attachments.
1. CONTRACT ID CODE PAGE OF PAGES
L 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Sep-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6945021R0064
X 9B. DATED (SEE ITEM 11)
24-Aug-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Sep-2021
CODE
NAVFAC ENGINEERING SYSTEMS COMMAND SE
CORE CONSTRUCTION
BLDG 903 YORKTOWN
PO BOX 0030
JACKSONVILLE FL 32212-0030
N69450 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6945021R0064
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0004
14 A. The purpose of this amendment is to clarify and update scheduling requirements.
14 B. The purpose of this amendment is to define meeting locations and methods.
14 C. The purpose of this amendment is to correct technical evaluation factors proposal requirements and basis of evaluation.
14 D. The purpose of this amendment is to provide the following attachments:
(1) Asbestos Survey.pdf
(2) Lead Survey.pdf
(3) Bldg. 2978.pdf
(4) Bldg. 2977.pdf
(5) Geotechnical Report.pdf
(6) NAS Whiting Field IAP.pdf
14 E. The purpose of this amendment is to revise Request for Proposal.
The request for proposal is revised as follows:
DELETE in RED and Revise in Blue:
00 22 12 1.3 ANTICIPATED AWARD PERIOD
Replace: “The Government anticipates award of this contract by August 2021.”
Revise with: “The Government anticipates award of this contract by 14 Apr 2022.”
00 22 12 1.3 ANTICIPATED AWARD PERIOD
Replace: “Award of construction option for work described is tentatively planned for Feb 2023.”
Revise with: “Award of construction option for work described is tentatively planned for 31 Oct 2023.”
00 22 12 3.2.4.1 Project Orientation Add: “The Project Orientation and Initial Partnering Session will be conducted at NAS Whiting Field.”
00 22 12 3.2.4.2 Design Reviews Add: “The 35% design review will be conducted at NAS Whiting Field. The 65% and pre-final design review will be conducted at NAS Jacksonville. All other design review meetings will be conducted virtually.”
00 22 12 3.2.4.4 Design Development Add: “The bi-weekly design development meetings will be conducted virtually.”
RFP TECHNICAL EVALUATION FACTORS
Page 24, second sentence Delete: “This factor will be rated on an Acceptable or Unacceptable basis.”
00 22 12 3.2.1 Construction Cost Estimate and Anticipated Construction Schedule
Replace: “At each phase, the estimate and the schedule must be submitted 14 calendar days after receipt of the design submittal.”
Revise with: “At each phase, the estimate and the schedule must be submitted 14 calendar days after receipt of the design submittal, except after 100% design. The estimate and the schedule must be submitted 21 calendar days after receipt of the 100% pre-final design.”
00 22 12 3.3.3.2.2 Firm Target Cost
Replace: “Within 30 days after the Production Points (triggered by contractor’s receipt of the Pre-Final Construction Documents)…”
Revise with: “Within 21 days after the Production Points (triggered by contractor receipt of the Pre-Final Construction Documents)…”
RFP Page 24, Paragraph 7 Delete: “& Design” and “and design”.
RFP Page 24, Paragraph 13 Delete: “and design”.
01 14 00 1.2 SPECIAL SCHEDULING REQUIREMENTS
Add:
“c. The work under this contract requires special attention to the scheduling and conduct of the work in connection with existing operations. Identify on the construction schedule each factor which constitutes a potential interruption to operations. The following conditions apply:
1. The temporary line operations building must be completed, and 6 weeks must be allowed, for operations to move to the temporary facility, before proceeding with the demolition of building 2978.
2. The new AHTS hangar must be completed, and 6 months must be allowed, for the squadrons to move to the new hangar, before proceeding with the demolition of building 2977.”
14 F. All other terms and conditions of this RFP remain unchanged.
14 G. Offerors must acknowledge this amendment in writing.
End amendment 0004
(End of Summary of Changes)
File details come from the government source that posted it. Updated .