This DD Form 1391 project proposal and related federal solicitation outline requirements for the construction of an Advanced Helicopter Training System aircraft maintenance hangar. The Navy seeks a fixed-price incentive construction contract awarded through design-bid-build procedures to build a 183,288 square foot hangar at NAS Whiting Field, Florida to support three helicopter training squadrons and 130 aircraft. The steel structure will include maintenance, training, administrative and food service spaces. Site work involves clearing, utilities installation, paving and landscaping. The Navy estimates a $114.26 million budget for construction scheduled from 2023 to 2025. Early contractor involvement will be employed to leverage industry experience.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number: P286Project Title: AHTS Aircraft Maintenance Hangar
FY:2023
Date: 19-JUL-21
UIC: N60508
Location: WHITING FIELD, FLORIDA
Prepared By:
Cover Sheet/Team List for:
NAS WHITING FLD MILTON FL
Completed: Working: XA. Team Check List:
B. Team Meeting:
On-Site:
Date:
VTC: Conference Call:
Name Position Command Phone Number C. Team Members:
Signature Position Date F. Sign Offs:
1)The Department of Defense is discontinuing the use of AFFF, but has not determined what fire protection system will be used in the future for fueled aircraft hangars. The budget for this project assumes that the cost of the hangar fire protection system will cost the same as an AFFF system.
2) P-288, the Temporary AHTS Hangar, is a lease that expires in Mar 2026.
MILCON CHECKLIST
Economic Analysis
Site Plan
Facility Planning Document(s)/P-80
Calculations
R19 (Bachelor Housing Survey)
Notice of Violation (NOV)
Other
PHOTOGRAPHS
E. Required Attachments:D. Remarks:
114260
Project Cost ($000)
3. Installation(SA) and Location/UIC:
MILITARY CONSTRUCTION PROGRAM
2. Date
4. Project Title
5. Program Element 6. Category Code 7. Project Number
1. Component
Page No. 1DD Form
1 Dec 76
8. Project Cost ($000)
19 JUL 2021
114,2600712876N 21105
AHTS Aircraft Maintenance Hangar
NAVY
2023FY
NAS WHITING FLD MILTON FL
WHITING FIELD, FLORIDA
P286
N60508
Level: FMB_REVIEW Draft: REGN_FEC TEAM REVIEW 2023 24-AUG-21
Project Details ID: 201015
AIRCRAFT MAINTENANCE
HANGAR
4,527.21 17028 m2 17028 m2 1.0000 4,527.21
Cat
Code
OSD
Guid.
Guid.
Cost
Guid.
Size
Project
Scope
Size
Fctr
Area
Cost
Fctr Unit Cost
Guidance Unit Cost Analysis
9. COST ESTIMATES
Item UM Quantity Unit Cost Cost($000)
AHTS AIRCRAFT MAINTENANCE HANGAR (183,288SF)
AIRCRAFT MAINTENANCE HANGAR CC21105
(183,288SF)
CYBERSECURITY FEATURES
BUILT-IN EQUIPMENT
SPECIAL COSTS
OPERATION & MAINTENANCE SUPP INFO (OMSI)
SUPPORTING FACILITIES
PAVEMENT FACILITIES
SITE PREPARATIONS
PAVING AND SITE IMPROVEMENTS
ELECTRICAL UTILITIES
MECHANICAL UTILITIES
DEMOLITION
SUBTOTAL
CONTINGENCY (5%)
TOTAL CONTRACT COST
SIOH (5.7%)
SUBTOTAL
TOTAL REQUEST ROUNDED
TOTAL REQUEST
EQUIPMENT FROM OTHER APPROPRIATIONS (NON ADD)
m2 m2
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
17,028
17,028 4,527.21
87,040
(77,090)
(500)
(5,650)
(3,120)
(680)
15,910
(40)
(2,440)
(5,280)
(3,920)
(3,830)
(400)
102,950
5,150
108,100
6,160
114,260
114,260
114,260
(5,233)
Constructs an Advanced Helicopter Training System (AHTS) aircraft maintenance hangar, with capacity for servicing 37 of the 130 new helicopters being procured for the AHTS, and space for three-helicopter pilot training squadrons. The building consists of one, drive-through, high-bay hangar, with crew, equipment, training, administrative, data network areas and a limited food vending area. Construction will consist of a steel-framed super
10. Description of Proposed Construction:
For category code 21105, an in-house cost estimate was developed by NAVFAC SE in 032021. A
TRACES MII version 4.4.2. estimate was used to create the unit cost. This estimate was internally escalated in MII to the Mid-Point of Construction date 052024.
1.000 1.000000000
Esc. Factor
Room
Size
Fctr
21105
Facility
2. Date
4. Project Title
5. Program Element 6. Category Code 7. Project Number
1. Component
Page No. 2DD Form
1 Dec 76 1391C
8. Project Cost ($000)
19 JUL 2021
114,2600712876N 21105
AHTS Aircraft Maintenance Hangar
NAVY
2023FY
NAS WHITING FLD MILTON FL
WHITING FIELD, FLORIDA
P286
N60508
Level: FMB_REVIEW Draft: REGN_FEC TEAM REVIEW 2023 24-AUG-21
Project Details ID: 201015 structure bearing on shallow concrete foundations. Exterior wall systems include brick veneer, insulated metal wall panels and insulated translucent wall panels. Interior wall systems include a combination of concrete masonry unit walls and gypsum board on cold-formed metal supports walls. A low-slope standing-seam metal roofing system will be provided, as well as two sets of hangar sliding doors.
Facility-related control systems include cybersecurity features in accordance with current
Department of Defense (DoD) criteria.
This project will provide Antiterrorism (AT) features and comply with AT regulations, and physical security mitigation in accordance with DoD Minimum Antiterrorism Standards for
Buildings.
Built-in equipment includes a floor level aviation fire suppression and containment system in the hangar bay, two bridge cranes (five-ton each), two passenger elevators, emergency power backup generator, lockers and compressed air system.
Special Costs include temporary facilities to house Line Operations for the duration of construction, Post Construction Contract Award Services (PCAS) and cybersecurity commissioning. The cybersecurity commissioning cost is to cover the Navy (DON) cybersecurity requirements as well as DON in-house cost to review contractor submittals and implement steps necessary for obtaining Authority to Operate.
Operations and maintenance support information is included in this project.
DoD and DON principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and
Executive Orders. Low Impact Development will be included in the design and construction of this project as appropriate.
Site preparation includes clearing and grubbing, grading, excavation, and relocation/removal of existing utilities.
Paving and site improvements include parking facilities for approximately 270 vehicles, sidewalks, landscaping, fencing, gates, retaining wall, mechanical and dumpster enclosure, chiller/boiler/fire pump building, airfield pavement and exterior signage.
Electrical utilities include electrical distribution, communications system, site lighting and airfield lighting.
Mechanical utilities include potable water distribution, firewater distribution, gas utility line, sanitary distribution, stormwater distribution catch basins and oil-water separator.
2. Date
4. Project Title
5. Program Element 6. Category Code 7. Project Number
1. Component
Page No. 3DD Form
1 Dec 76 1391C
8. Project Cost ($000)
19 JUL 2021
114,2600712876N 21105
AHTS Aircraft Maintenance Hangar
NAVY
2023FY
NAS WHITING FLD MILTON FL
WHITING FIELD, FLORIDA
P286
N60508
Level: FMB_REVIEW Draft: REGN_FEC TEAM REVIEW 2023 24-AUG-21
Project Details ID: 201015
The project will include the demolition of existing Building 2977, a 2609.37 m2 training facility that will be replaced under project P282 AHTS flight simulator facility, on the same site and Building 2978, a 221.85 m2 line operations building, to clear the site for this project.
Facilities will be designed to meet or exceed the useful service life specified in DoD
Unified Facility Criteria. Facilities will incorporate features that provide the lowest practical life cycle cost solutions satisfying the facility requirements with the goal of maximizing energy efficiency.
REQUIREMENT:
FACILITY PLANNING DATA:
Category Code Requirement UM Adequate Substandard Inadequate
Deficit/
Surplus 21105 17028 m2 0 0 0 -17,028MAINTENANCE HANGAR - OH
SPACE (HIGH BAY)
The project scope was derived using Facility Planning for Navy and Marine Corps Shore
Installations (UFC 2-000-05N, formerly known as P-80) based on criteria for category code number (CCN) 21105, Maintenance Hangar/O/H Space (High Bay).
NOTES:
The AHTS air vehicle and associated Ground Based Training System simulators and curriculum will replace legacy TH-57 Sea Ranger helicopters and simulators at NAS Whiting Field.
This rapid acquisition of Commercial off the Shelf products and contract services includes the procurement of up to 130 replacement aircraft, with the full rate production contract award in in December 2020.
During the transition, the Chief of Naval Air Training (CNATRA) anticipates a 16 percent increase in rotary-wing and tilt-rotor pilot production quotas to meet Fleet demand.
Pilot production throughput must be maintained during the transition from TH-57 to AHTS, and Whiting Field is the only production location for helicopter and tilt-rotor pilots.
The project will be designed in-house using design-bid-build approach to ensure that all its special characteristics and requirements are met. Due to the size and complexity of the project, Early Contractor Involvement will be employed to leverage the contractors contruction experience and value engineering resources.
SCOPE:
PROJECT:
(Current Mission)
11. Requirement: 17028 m2 Adequate: Substandard:
Constructs a custom high-bay aircraft maintenance hangar to support three advanced non-standard helicopter training squadrons and the associated 130 AHTS aircraft.
2. Date
4. Project Title
5. Program Element 6. Category Code 7. Project Number
1. Component
Page No. 4DD Form
1 Dec 76 1391C
8. Project Cost ($000)
19 JUL 2021
114,2600712876N 21105
AHTS Aircraft Maintenance Hangar
NAVY
2023FY
NAS WHITING FLD MILTON FL
WHITING FIELD, FLORIDA
P286
N60508
Level: FMB_REVIEW Draft: REGN_FEC TEAM REVIEW 2023 24-AUG-21
Project Details ID: 201015
Hangar 1406, is a three training squadron aircraft maintenance hangar constructed in 1943.
The three HT squadrons with 113 TH-57 helicopters have more than twice the number of aircraft and personnel as was designed for Hangar 1406. The maintenance high-bay requires upgrades to the crane capacity, lacks built-in maintenance equipment, seismic, fire suppression, and capacity due to the new aircraft model now using this hangar. There is a
29 percent deficit of maintenance shop, support, and flight operations spaces, and the existing spaces are configured for squadrons with half the number of personnel and equipment. These deficits have caused the shops and storage requirements to spill into two critically needed high-bay maintenance areas resulting in being only to provide maximum capacity 60 percent availability of the existing TH-57 aircraft.
Additionally, the hangar has a wind rating of only 74 mph, which is insufficient in an area where there is a threat of inclement weather from summer thunderstorms to hurricanes.
Current shortfalls include insufficient aviation life support system facilities and pyrotechnic storage, insufficient facilities for female instructors and students, lack of academic facilities, and fragmented squadron spaces.
This project is not located within the 100-year floodplain.
This project does not have scope elements above and beyond the Unified Facilities Criteria and Facilities Criteria regarding adverse long-term environmental effects.
The installation provides training for 100 percent of the Navy, Marine Corps and Coast
Guard helicopter pilots. Without a new modern hangar to provide maintenance for the new
AHTS aircraft, the Navy risks failure that will ultimately result in a severe degradation of Fleet pilots.
An adequately sized and configured hangar is required for the maintenance and repair of new helicopter platform for AHTS, assigned to advanced training Helicopter Training
Squadron 8 (HT-8), Helicopter Training Squadron 18 (HT-18) and Helicopter Training
Squadron 28 (HT-28) of Training Air Wing Five.
Adequate and efficiently configured space is required for classroom instruction providing a consolidated training environment for the three rotary squadrons. Adequate parking facilities are also required for personnel working at the hangars.
Mission need date is February 2026.
IMPACT IF NOT PROVIDED:
CURRENT SITUATION:
ADDITIONAL: Economic Alternatives Considered:
The existing facilities do not meet the requirements, lack sufficient maintenance shop, storage, and flight operations space to support the HT squadrons.
A. Status Quo:
2. Date
4. Project Title
5. Program Element 6. Category Code 7. Project Number
1. Component
Page No. 5DD Form
1 Dec 76 1391C
8. Project Cost ($000)
19 JUL 2021
114,2600712876N 21105
AHTS Aircraft Maintenance Hangar
NAVY
2023FY
NAS WHITING FLD MILTON FL
WHITING FIELD, FLORIDA
P286
N60508
Level: FMB_REVIEW Draft: REGN_FEC TEAM REVIEW 2023 24-AUG-21
Project Details ID: 201015
No additional hangar space is locally available. There is neither maintenance shop nor flight operations space available in the local area large enough to meet the requirement.
C. Lease:
New Construction is the preferred alternative.
F. Analysis Results:
New construction provides a complete, useable, modern and adequate facility. It will support the transition from the TH-57 to the AHTS.
D. New Construction:
There are no existing facilities on the base that are available for renovation or modernization.
B. Renovation/Modernization:
The Facility Condition Index (FCI) for Bulding 2977 is 77 and for Building 2978 is 87.
N/A
E. Other Alternatives:
Issues (If yes, please provide discussion under issue):
Yes No
The selected AHTS platform requires NOSSA/DDESB certification.
There will be a fee for cutting trees (salvable timber), which is included in the estimate, under site preparation.
DDESB, AICUZ, Airfield, EMR, or wetlands
Endangered species/sensitive habitat
Air quality
Cultural/archeological resources
Clearing of trees
Known contamination at selected site
Operational problems
Traffic patterns impact
Existing utilities upgrade
Ordnance sweep required prior to Construction
Planning (If no, please provide an explanation):
12. Supplemental Data:
Yes, obtained date:
X 09/2022No, expected date:
Site Approval:
Site approval pending NOSSA/DDESB certification, expected six months after design is complete.
X
X
X
X
X
X
X
X
X
X
2. Date
4. Project Title
5. Program Element 6. Category Code 7. Project Number
1. Component
Page No. 6DD Form
1 Dec 76 1391C
8. Project Cost ($000)
19 JUL 2021
114,2600712876N 21105
AHTS Aircraft Maintenance Hangar
NAVY
2023FY
NAS WHITING FLD MILTON FL
WHITING FIELD, FLORIDA
P286
N60508
Level: FMB_REVIEW Draft: REGN_FEC TEAM REVIEW 2023 24-AUG-21
Project Details ID: 201015
Mitigation Issues:
Level of NEPA:
NEPA Documentation:
Project Issues:
Host Nation Approval: N/A
National Capital Region Approval: N/A
X
Yes No
Consistent w/ Master Plan or Base/Regional Dev.
Yes No
FONSI signed 17 Sep 2019
X Complete
Yes No
X
X
X
X
Categorical Exclusion
Environmental Assessment(EA)
Environmental Impact Statement(EIS)
Memorandum of Negative Decision
Yes No
X
X
X
X
Wetlands replacement/enhancement
Hazardous waste
Contaminated soil/water
Other
Environmental Cleanup: N/A
Yes No
X
X
X
X
X
X
X
X
X
X
X
X
System safety
Soils - foundation and seismic conditions
Construction/operational permits
Local air quality/wastewater permits
Complies with Final Governing Standard (Environmental standard for Spain, Italy &
Greece)
Land Acquisition (i.e. location, quantity)
Technical Operating Manuals
Feasibility/Constructibility in FY
Historical Preservation
Does the facility have an overhead crane requirement?
Navy Crane Center contacted to assist with dev. of crane estimate (lifting capacity < 10-tons)?
Navy Crane Center contacted to coord. procurement and timelines (lifting capacity
>= 10-tons)?
Yes No
X Physical Security:
2. Date
4. Project Title
5. Program Element 6. Category Code 7. Project Number
1. Component
Page No. 7DD Form
1 Dec 76 1391C
8. Project Cost ($000)
19 JUL 2021
114,2600712876N 21105
AHTS Aircraft Maintenance Hangar
NAVY
2023FY
NAS WHITING FLD MILTON FL
WHITING FIELD, FLORIDA
P286
N60508
Level: FMB_REVIEW Draft: REGN_FEC TEAM REVIEW 2023 24-AUG-21
Project Details ID: 201015
Special Construction Features:
Utilities and Site Improvements:
PAVEMENT FACILITIES
Equipment Pads
SITE PREPARATIONS
Fill and Borrow
Site Grading and Erosion Control
Clear and Grub
Site Cleanup and Pavement Disposal
PAVING AND SITE IMPROVEMENTS
Parking Lot
Sidewalks
Landscaping
Fencing and Gates
Retaining Wall
Storm Water Detention
Mechanical and Dumpster Enclosures
LS
m2
LS
m3 m2 ha m2
LS
m2 m2 m2 m m m2
EA
47826
13922
10451.5
733.93
181.40
296.05
15.86
38,419.64
52.93
129.32
107.98
217.38
753.92
1,409.09
123.14
170,199.98
42,085
42,085
2,439,152
905,321
758,520
38,420
736,891
5,280,578
1,351,588
79,250
1,155,157
119,119
62,000
630,600
340,400
OTHER COSTS (other Primary Facility items)
SPECIAL COSTS
OPERATION & MAINTENANCE SUPP INFO (OMSI)
LS
LS
LS
500,000
3,116,711
678,787
CYBERSECURITY FEATURES
PCAS
Third Party Commissioning
Cybersecurity Commissioning
Temporary Line Shack
OMSI
LS
EA
EA
EA
EA
EA
.015
.5
.005
.008
500,000.00
100,767,393.26
1,511,487.21
84,841,417.93
425,249.79
84,848,319.25
500,000
1,511,511
755,744
424,207
425,250
678,787
Item UM Quantity Unit Cost Total Cost
Aviation Fire Suppression System
Bridge Crane, 5 Ton
Passenger Elevator, 2 Stops/EA
Emergency Generator 500 KVA
Lockers
Compressed Air System m2
EA
EA
EA
EA
EA
17,028.00
2.00
2.00
1.00
802.00
3.00
94.42
192,834.25
235,301.62
1,165,564.65
887.00
437,597.58
1,607,784
385,669
470,603
1,165,565
711,374
1,312,793
BUILT-IN EQUIPMENT LS 5,653,787
BUDGET ESTIMATE SUMMARY SHEET:
Shielding
SCIF
Fencing
IDS
Other Type:
2. Date
4. Project Title
5. Program Element 6. Category Code 7. Project Number
1. Component
Page No. 8DD Form
1 Dec 76 1391C
8. Project Cost ($000)
19 JUL 2021
114,2600712876N 21105
AHTS Aircraft Maintenance Hangar
NAVY
2023FY
NAS WHITING FLD MILTON FL
WHITING FIELD, FLORIDA
P286
N60508
Level: FMB_REVIEW Draft: REGN_FEC TEAM REVIEW 2023 24-AUG-21
Project Details ID: 201015
A. Estimated Design Data:
1. Status:
2. Basis:
Chiller/Boiler/Fire Pump Building
Airfield Pavement (Apron, Towway, Other)
Exterior Signage
ELECTRICAL UTILITIES
Electrical Distribution
Communcation System
Site Lighting
Airfield Lighting
MECHANICAL UTILITIES
Potable Water Distribution
Fire Water Distribution
Gas Utility Line
Sanitary Distribution
Storm Water Distribution
Catch Basins
Oil Water Separator
DEMOLITION
LINE OPERATIONS BLDG. Fac No: 2978 CCN:
14130
HELICOPTER TRAINING SQ BLDG Fac No: 2977
CCN: 1712
m2 m2
EA
LS
m m
EA
m2
LS
m m m m m
EA
EA
LS
m2 m2
5590.3
201.22
221.85
2609.37
2,113.41
218.39
1,772.98
371.02
3,399.43
19,248.90
23.45
3,644.86
503.53
86.57
6,424.73
1,096.49
13,125.32
194,383.85
257.12
133.13
257,836
1,220,800
63,827
3,922,977
678,225
2,824,926
288,734
131,093
3,829,855
733,419
86,104
10,129
918,736
1,262,060
236,256
583,152
404,428
57,042
347,385
Item UM Quantity Unit Cost Total Cost
(A) Date design or Parametric Cost Estimate started 09/2019
(B) Date 35% Design or Parametric Cost Estimate complete 02/2021
(C) Date design completed
(D) Percent completed as of
09/2022
15%
(E) Percent completed as of 50%
(F) Type of design contract Design Bid Build
(G) Parametric Estimate used to develop cost
(H) Energy Study/Life Cycle Analysis performed
Yes
Yes
(A) Standard or Definitive Design
(B) Where design was previously used
No
(A) Production of plans and specifications
(B) All other design costs
$6,856
$3,428
3. Total cost($000) (C) = (A) + (B) = (D) + (E):
(C) Total
(D) Contract
(E) In-house
$10,284
$1,429
$8,855
04/2023 4. Contract award:
September 2021
January 2022
2. Date
4. Project Title
5. Program Element 6. Category Code 7. Project Number
1. Component
Page No. 9DD Form
1 Dec 76 1391C
8. Project Cost ($000)
19 JUL 2021
114,2600712876N 21105
AHTS Aircraft Maintenance Hangar
NAVY
2023FY
NAS WHITING FLD MILTON FL
WHITING FIELD, FLORIDA
P286
N60508
Level: FMB_REVIEW Draft: REGN_FEC TEAM REVIEW 2023 24-AUG-21
Project Details ID: 201015
5. Construction start: 05/2023
6. Construction complete: 09/2025
CERTIFYING OFFICIAL STATEMENT:
The Regional Commander certifies that this project has been considered for joint use potential. Unilateral Construction is recommended. This Facility can be used by other components on an as available basis; however, the scope of the project is based on
Department of the Navy requirements.
Major Equipment
Fund
Year
Funding
Source
Installation
Start-End
Mo/Yr
Shakedown
Start-End
Mo/Yr
IOC
Date
Mo/Yr Cost Audio Visual Equipment
Furniture, Fixtures and Equipment
Information Technology
Equipment
Telecommunications
OMN
OMN
OMN
OMN
462,584
3,877,486
276,000
617,000
B. Equipment associated with this project which will be provided from other appropriations:
Attachments:
NAVFAC HQ MILCON Program Manager 202-685-9401Activity POC: Phone No: