Attachment A - Attachment 1 to Subcontracting Plan.docx

DOCX document 13 KB Posted

Attached to
P286 AHTS Aircraft Maintenance Hangar, NAS Whiting Field, FL
Solicitation number
N6945021R0064
Issued by

About this file

This document contains an attachment template for a subcontracting plan related to a federal solicitation for construction services. The solicitation is for a fixed price incentive contract to construct an aircraft maintenance hangar at Naval Air Station Whiting Field in Florida. Key details include that the project requires early contractor involvement and construction of a drive-through, high bay optimization hangar with additional spaces for crew, training areas, administrative functions, data networks, and a limited food vending area. The building will have a steel frame structure on shallow concrete foundations and exterior walls of brick veneer, insulated metal panels, and insulated translucent wall panels. Interior walls will consist of concrete masonry units and gypsum board on cold-formed metal stud walls. A low slope standing seam metal roof and two sets of hangar sliding doors will also be provided. The Navy is the contracting agency through the Naval Facilities Engineering Command. The attachment template requires contractors to provide subcontracting cost amounts and percentages planned for various socioeconomic categories of small businesses over the potential multiple year contract periods.

View the file

Other files

File Type Posted
N69450-21-R-0064-0007.pdf PDF
Attachment F - Revised_ SB Participation Commitment.pdf PDF
FPQCS Requirement In House DBB.pdf PDF
N69450-21-R-0064-0006.pdf PDF
N69450-21-R-0064-0005.pdf PDF
Asbestos Survey.pdf PDF
NAS Whiting Field IAP.pdf PDF
Lead Survey.pdf PDF
Geotechnical Report.pdf PDF
Building 2977.pdf PDF
N69450-21-R-0064-0004.pdf PDF
Bldg 2978.pdf PDF
N69450-21-R-0064-0003.pdf PDF
Wage and Determination Santa Rosa 3sep2021.pdf PDF
N69450-21-R-0064-0002.pdf PDF
P286 Sign-in roster.pdf PDF
N69450-21-R-0064-0001.pdf PDF
P286 Site Visit_Location.pptx PPTX presentation
Attachment J - Bidder Inquiry Instructions.pdf PDF
Attachment E - Historical Small Business Record.docx DOCX document
P286 Div 00 and O1 Specs.pdf PDF
Attachment G - NAS Whiting Field Access List.xlsx XLSX spreadsheet
Attachment B - Experience_Project_Data_Sheet.doc DOC document
Attachment C - Safety Data Sheet.pdf PDF
Attachment D - Past Performance Questionnaire.pdf PDF
Attachment F - SB Participation Commitment.docx DOCX document
Attachment C - Safety Data Sheet w.Narrative.pdf PDF
Attachment H - SECNAV 5512.pdf PDF
N69450-21-R-0064.pdf PDF
Preliminary_Design_Drawings_P286_POM23_20210224.pdf PDF
Attachment K COVID-19 Screening Questionnaire.pdf PDF
Attachment A - Individual Small Business Subcontracting Plan.docx DOCX document
DD1391_POM23_P286_AHTS Aircraft Maintenance Hangar.pdf PDF
Preliminary_Design_Narrative_P286_POM23_20210224.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 to Sub-Contracting Plan:

Base Period
Option Period 1
Option Period 2
Option Period 3
Option Period 4
Total Periods
1.a Total Contract
$ ___________
$ ___________
$ ___________
$ ___________
$ ___________
$ ___________
1.b Total Subcontracted
$ ___________
$ ___________
$ ___________
$ ___________
$ ___________
$ ___________
(% of Line 1.a)
% __________
% __________
% __________
% __________
% __________
% __________
1.c Total Prime
$ ___________
$ ___________
$ ___________
$ ___________
$ ___________
$ ___________
(% of Line 1.a)
% __________
% __________
% __________
% __________
% __________
% __________
2.a To LB
$ ___________
$ ___________
$ ___________
$ ___________
$ ___________
$ ___________
(% of Line 1.b)
% __________
% __________
% __________
% __________
% __________
% __________
2.b To SB
$ ___________
$ ___________
$ ___________
$ ___________
$ ___________
$ ___________
(% of Line 1.b)
% __________
% __________
% __________
% __________
% __________
% __________
2.c To HUBZone SB
$ ___________
$ ___________
$ ___________
$ ___________
$ ___________
$ ___________
(% of Line 1.b)
% __________
% __________
% __________
% __________
% __________
% __________
2.d To WOSB
$ ___________
$ ___________
$ ___________
$ ___________
$ ___________
$ ___________
(% of Line 1.b)
% __________
% __________
% __________
% __________
% __________
% __________
2.e To SDB
$ ___________
$ ___________
$ ___________
$ ___________
$ ___________
$ ___________
(% of Line 1.b)
% __________
% __________
% __________
% __________
% __________
% __________
2.f To VOSB
$ ___________
$ ___________
$ ___________
$ ___________
$ ___________
$ ___________
(% of Line 1.b)
% __________
% __________
% __________
% __________
% __________
% __________
2.g To SDVOSB
$ ___________
$ ___________
$ ___________
$ ___________
$ ___________
$ ___________
(% of Line 1.b)
% __________
% __________
% __________
% __________
% __________
% __________
2.h To AbilityOne
$___________
$___________
$___________
$___________
$___________
$___________
(% of Line 1.b)
%___________
%___________
%___________
%___________
%___________
$___________

2.i To ANCs/Indian Tribes

$___________
$___________
$___________
$___________
$___________
$___________
(% of Line 1.b)
%___________
%___________
%___________
%___________
%___________
%___________

File details come from the government source that posted it. Updated .