Attachment C - Safety Data Sheet w.Narrative.pdf

PDF 796 KB Posted

Attached to
P286 AHTS Aircraft Maintenance Hangar, NAS Whiting Field, FL
Solicitation number
N6945021R0064
Issued by

About this file

This document contains a safety data sheet and narrative for a federal construction contract opportunity. The contract is for a fixed price incentive construction project to build an Advanced Helicopter Training System compliant aircraft maintenance hangar at Naval Air Station Whiting Field in Florida. The hangar will optimize space for 37 new helicopters, maintenance crews, and three helicopter pilot training squadrons. It will consist of a drive-through high bay with additional spaces for training, administration, networking, and a limited food area. Construction will include a steel-framed structure on shallow foundations with brick veneer, insulated metal and translucent wall panels. Interior walls will be concrete masonry or metal studs with gypsum board. A low-slope metal roof and two hangar doors will also be provided. Offerors must submit safety data and narratives describing their safety management system, subcontractor evaluation process, and oversight of subcontractor safety compliance.

View the file

Other files

File Type Posted
N69450-21-R-0064-0007.pdf PDF
Attachment F - Revised_ SB Participation Commitment.pdf PDF
FPQCS Requirement In House DBB.pdf PDF
N69450-21-R-0064-0006.pdf PDF
N69450-21-R-0064-0005.pdf PDF
Asbestos Survey.pdf PDF
NAS Whiting Field IAP.pdf PDF
Lead Survey.pdf PDF
Geotechnical Report.pdf PDF
Building 2977.pdf PDF
N69450-21-R-0064-0004.pdf PDF
Bldg 2978.pdf PDF
N69450-21-R-0064-0003.pdf PDF
Wage and Determination Santa Rosa 3sep2021.pdf PDF
N69450-21-R-0064-0002.pdf PDF
P286 Sign-in roster.pdf PDF
N69450-21-R-0064-0001.pdf PDF
P286 Site Visit_Location.pptx PPTX presentation
Attachment J - Bidder Inquiry Instructions.pdf PDF
Attachment E - Historical Small Business Record.docx DOCX document
P286 Div 00 and O1 Specs.pdf PDF
Attachment G - NAS Whiting Field Access List.xlsx XLSX spreadsheet
Attachment B - Experience_Project_Data_Sheet.doc DOC document
Attachment C - Safety Data Sheet.pdf PDF
Attachment D - Past Performance Questionnaire.pdf PDF
Attachment F - SB Participation Commitment.docx DOCX document
Attachment H - SECNAV 5512.pdf PDF
N69450-21-R-0064.pdf PDF
Preliminary_Design_Drawings_P286_POM23_20210224.pdf PDF
Attachment A - Attachment 1 to Subcontracting Plan.docx DOCX document
Attachment K COVID-19 Screening Questionnaire.pdf PDF
Attachment A - Individual Small Business Subcontracting Plan.docx DOCX document
DD1391_POM23_P286_AHTS Aircraft Maintenance Hangar.pdf PDF
Preliminary_Design_Narrative_P286_POM23_20210224.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SAFETY DATA SHEET

This form is to be completed by the offeror. Use this form to provide safety information for the Safety factor.

DART and TRC rates shall not be submitted for subcontractors.

Joint Venture (JV) or Partnership: Provide a Safety Data Sheet for each contractor who is part of the JV or partnership; however, only one safety narrative is required.

1. Offeror Name:

Name of JV partner providing the information below (if applicable):

2. Insurance Carrier Information:

Insurance Carrier Name:

Agent’s name:

Phone No.:

Email:

Offeror’s Five Previous Complete Calendar Years of Reported Safety Data:

Only complete year safety data will be considered. Indicate data rates as decimal figures, not whole numbers.

3. OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate

2016 2017 2018 2019 2020

3a. If you do not have a DART Rate for a given year, affirmatively state so here and explain why:

3b. Explain any negative trend above moderate risk (DART Rates of 3.0 or greater), an acceptable/detailed explanation is required that includes any corrective actions taken for improvement:

4. Total Recordable Case (TCR) Rate

2016 2017 2018 2019 2020

4a. If you do not have a TCR Rate for a given year, affirmatively state so here and explain why:

4b. Explain any negative trend above moderate risk (TCR Rates of 4.5 or greater), an acceptable/detailed explanation is required that includes any corrective actions taken for improvement:

AHTS Aircraft Maintenance Hangar NAS Whiting Field, FL N69450-21-R-0064

SAFETY DATA SHEET (Continuation)

5. Technical Approach for Safety: Provide the Safety Narrative using this form. Do not exceed 2 pages. Any additional pages will not be considered.

a. Describe the Offeror’ s approach to implementing and executing a Safety Management System (SMS) including Management/Leadership involvement, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and health training, to include the standard(s) used to benchmark the SMS.

b. Describe the evaluation process used to select potential subcontractors.

c. Describe the processes of how the Offeror will oversee safety compliance of subcontractors at all levels throughout performance of the contract (to include the Offeror’s own in-house workforce).

File details come from the government source that posted it. Updated .