Attachment B - Experience_Project_Data_Sheet.doc
DOC document 112 KB Posted
- Solicitation number
- N6945021R0064
About this file
This document contains an Attachment B Experience Project Data Sheet template and details of a federal solicitation for the P286 Aircraft Maintenance Hangar at NAS Whiting Field, FL. The Experience Project Data Sheet is to be completed by offerors to provide details of up to five relevant past construction and five design projects for evaluation. It requests information on the firm and project name, location, award/completion dates, contract type and value, description of work performed, and sustainable or LEED certifications. The federal solicitation is for a Fixed Price Incentive (Successive Targets) design-bid-build contract to construct a new AHTS-compliant aircraft maintenance hangar at NAS Whiting Field, FL. The project scope includes one drive-through high bay hangar, additional crew and training spaces, and administrative/network areas. Construction will utilize steel framing on shallow foundations with exterior walls of brick, metal panels and translucent panels, and an interior of CMU and metal stud walls. The solicitation is issued by the Naval Facilities Engineering Command.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT B
CONSTRUCTION & DESIGN EXPERIENCE PROJECT DATA SHEET
Project No. (check one) : FORMCHECKBOX
CON #1 FORMCHECKBOX
CON #2 FORMCHECKBOX
CON #3 FORMCHECKBOX
CON #4 FORMCHECKBOX
CON #5
FORMCHECKBOX
DESIGN #1 FORMCHECKBOX
DESIGN #2 FORMCHECKBOX
DESIGN #3 FORMCHECKBOX
DESIGN #4 FORMCHECKBOX
DESIGN #5
1. Experience for: FORMCHECKBOX Offeror FORMCHECKBOX Joint-Venture FORMCHECKBOX Other (Explain) Firm Name:
Address:
Phone Number:
DUNS Number:
Point of Contact: Contact Phone Number:
2. Work Performed as: FORMCHECKBOX Prime Contractor FORMCHECKBOX Sub Contractor FORMCHECKBOX Joint Venture FORMCHECKBOX Other (Explain) Percent of project work performed:
If subcontractor, who was prime (Name/Phone #):
3. Contract Number: Delivery/Task Order Number:
Title:
Location:
4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):
5. Type of work:
FORMCHECKBOX
New Construction FORMCHECKBOX Renovation FORMCHECKBOX Repair FORMCHECKBOX Alteration FORMCHECKBOX Other (explain):
6. Type of Contract/Task Order: (Check ALL that apply)
Firm-Fixed Price FORMCHECKBOX Cost/Time and Material FORMCHECKBOX
Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.
7. Construction Project:
Award Amount: Final Price:
Type of Contract/Task Order: (Check ALL that apply)
FORMCHECKBOX
Design-Build FORMCHECKBOX Design-Bid-Build FORMCHECKBOX Delivery/Task Order (IDIQ) FORMCHECKBOX
If Design-Build, identify the Lead Design Firm:______________________________________________
8. Design Project:
A/E Design Fee: Total Construction Value:
Type of Contract/Task Order: (Check ALL that apply)
FORMCHECKBOX
Design-Build FORMCHECKBOX RFP Development FORMCHECKBOX Designer of Record FORMCHECKBOX Engineering Services FORMCHECKBOX Full Plans & Specs
9. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design-build, include a description of the design-effort.
10. Provide a detailed description of what work your firm self-performed on this project:
11. Other Information:
PAGE
Attachment B (10-02-12)
File details come from the government source that posted it. Updated .