PM-1415_Notice of Project_TAMU-Regions.pdf
PDF 128 KB Posted
- Attached to
- PM-1415 PPHM Roof Replacement & Coating State and local contract opportunity
- Solicitation number
- PM-1415
- Issued by
- Ochiltree County, Texas
About this file
This is a Notice of Project issued by West Texas A&M University (WTAMU) through SSC Services for Education Facilities Services for roof replacement and coating construction services. The project, designated PM-1415 Package C, involves the Panhandle Plains Historical Museum (PPHM) building located at 2401 Russell Long Boulevard in Canyon, Texas. The scope of work encompasses removal and installation of new two-ply modified bitumen roofing systems with polyisocyanurate insulation, replacement of flashings and sheet metal, HVAC and electrical disconnection and reconnection, and application of fluid-applied acrylic coating systems. All work must comply with NRCA, SMACNA, and ANSI/SPRI standards and requires master plumber certification for gas line testing. A pre-proposal meeting is scheduled for February 12, 2026, at 10:00 AM at the WTAMU Physical Plant Conference Room. Sealed proposals are due by February 26, 2026, at 2:00 PM, with submissions directed to SSC Service Solutions at the WTAMU Physical Plant, 2401 Russell Long Boulevard, Canyon, Texas 79016. Project start and finish dates are to be determined.
Contractors must be approved applicators of the primary coating manufacturer and must provide evidence of approved applicator status and a list of successfully completed similar projects prior to bid submission. The coating manufacturer must have a minimum of twenty years in roof coating production and maintain good standing membership with the National Roofing Contractors' Association. Evaluation criteria include total bid amount (51%), construction time (10%), technical proposal (24%), litigation and claims history (5%), safety and risk assessment (5%), and quality control (5%). Manufacturer warranties range from two to twenty years for roofing materials and systems, with two-year and five-year contractor warranties for coating work, respectively, and ten-year manufacturer warranties for coating systems. A Historically Underutilized Business (HUB) subcontracting plan is required, with monthly HUB Progress Assessment Reports mandated to accompany each pay application. Technical questions should be directed to A/E Contact Greg Carroll of Armko Industries, Inc., while submission inquiries and HUB-related questions should be directed to SSC Project Manager Stephanie Young and Bryon McCafferty at WTAMU, respectively.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| ESBD_487720_1770331458668_PM-1415_Notice of Project_TAMU-Regions.pdf | ||
| PM-1415_Pkg C - PPHM Roof Replacement & Coating_Project Manual.pdf | ||
| PM-1415_CSP Part 2 00 45 16.pdf | ||
| Uniform General and Supplementary Conditions.pdf | ||
| Performance Bond.docx | DOCX document | |
| ESBD_487720_1771276855688_PM-1415_Armko_Addendum No. [#1].pdf | ||
| ESBD_487720_1770331458883_PM-1415 Bid Package.zip | ZIP file | |
| PM-1415_Pkg C - PPHM Roof Replacement & Coating_Construction Drawings.pdf | ||
| PM-1415_CSP Instructions 00 21 00.pdf | ||
| Certificate of Insurance (COI) Requirements_TAMU-Regions.pdf | ||
| SAMPLE Master Vendor Agreement_TAMU-Regions.pdf | ||
| ESBD_487720_1770827656552_PM-1415_Addendum No. [#1]_SOW Clarification.pdf | ||
| ESBD_487720_1773773049220_PM-1415_CSP Summary Tab.pdf | ||
| PM-1415_CSP Part 3 00 45 17.pdf | ||
| PM-1415_CSP Part 1 00 42 13.pdf | ||
| Payment Bond.docx | DOCX document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SSC Services for Education Facilities Services Revised 07/2018
NOTICE OF PROJECT (NOP) - Regions POSTED ON BEHALF OF SSC BY West Texas A&M University
Attention: Bryon McCafferty, bmccafferty@wtamu.edu Date of Request: 2/5/2026
PROJECT INFORMATION
Project Number: PM-1415 Project Name: Pkg C - PPHM Roof Replacement & Coating Project Location: Canyon, TX, PPHM, Bldg #0532 Project Start Date: TBD Project Finish Date: TBD Project Description: Roof Replacement & Coating
DOCUMENT ACQUSITION INFORMATION
Choose an item. and information are available electronically at (web link):https://app.e-builder.net/public/publicLanding.aspx?QS=8354914be22247f6837d091b2e3bb77a
SUBMISSION INFORMATION
Submissions are due by Date: 2/26/2026 Time: 2:00 PM
Mail or Hand-deliver to: SSC Service Solutions WTAMU Physical Plant 2401 Russell Long Blvd.
Canyon, TX, 79016
HISTORICALLY UNDERUTILIZED BUSINESS (HUB)
HUB Subcontracting Plan Required: Yes ☒ No ☐ If yes, monthly HUB Progress Assessment Reports (PARs) are required with each pay application.
Contact Bryon McCafferty, bmccafferty@wtamu.edu, (806)651-2111 with all HUB-related questions.
QUERY INFORMATION
Pre-proposal Meeting Location (if applicable): WTAMU Physical Plant Conference Room, 2401 Russell Long Blvd. Canyon, TX 79016 Date: 2/12/2026 Time: 10:00 AM Inquiries regarding the submission process/requirements should be directed to SSC Project Manager: Stephanie Young Email: stephanie.young@sscserv.com Phone: (806)-672-1839
If applicable, inquiries regarding the technical aspects of the Construction Documents shall be directed to:
A/E Contact: Greg Carroll A/E Firm: Armko Industries, Inc.
Email: GCarroll@armko.com Phone: (806)-789-3267
File details come from the government source that posted it. Updated .