PM-1415_CSP Part 1 00 42 13.pdf

PDF 180 KB Posted

Attached to
PM-1415 PPHM Roof Replacement & Coating State and local contract opportunity
Solicitation number
PM-1415
Issued by
Ochiltree County, Texas

About this file

This is a Competitive Sealed Proposal Form for a construction project issued by West Texas A&M University through SSC Services for Education Facilities Services for Package C - PPHM Roof Replacement & Coating at the Panhandle Plains Historical Museum in Canyon, Texas (Project No. PM-1415). The scope of work includes removal and installation of new two-ply modified bitumen roofing systems with polyisocyanurate insulation, replacement of flashings and sheet metal, HVAC and electrical disconnection and reconnection, and application of fluid-applied acrylic coating systems, with all work requiring compliance with NRCA, SMACNA, and ANSI/SPRI standards and master plumber certification for gas line testing. A pre-proposal meeting was scheduled for February 12, 2026, at 10:00 AM at the WTAMU Physical Plant Conference Room, with proposals due by February 26, 2026, at 2:00 PM. Contractors must submit proposals on the specified form with line items for applicable divisions organized under the MasterFormat system, and proposals remain valid for 90 calendar days after submittal. The selected contractor must execute the contract within 10 business days of award notification and achieve substantial completion within a timeframe specified by the respondent that includes materials, equipment lead times, and construction duration, with final completion required within 30 consecutive calendar days thereafter.

Proposals must include a base proposal amount for the complete construction work as shown in the drawings by Armko Industries dated 1/20/2026. Contractors must be approved applicators of the primary coating manufacturer and must submit evidence of approved applicator status and a list of successfully completed similar projects prior to bid submission, with the coating manufacturer required to have a minimum of 20 years in roof coating production and membership in good standing with the National Roofing Contractors' Association. Evaluation criteria include total bid amount (51%), construction time (10%), technical proposal (24%), litigation and claims history (5%), safety and risk assessment (5%), and quality control (5%). Manufacturer warranties range from two to twenty years for roofing materials and systems, with two-year contractor warranties and five-year contractor warranties for coating work, along with ten-year manufacturer warranties for coating systems. A Historically Underutilized Business (HUB) subcontracting plan is required, with monthly HUB Progress Assessment Reports mandated to accompany each pay application. Prior award information indicates bids ranged from $533,473.25 to $3,317,650.00, with construction timelines ranging from 45 to 180 days, and Lydick-Hooks was selected as the contractor offering best value with a base bid of $590,186.00 and a 110-day construction timeline.

View the file

Other files for this state and local contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SSC Services for Education Facilities Services Revised 2/2024

CSP Part 1 - Proposal Form & Pricing Schedule Projects over $100,000

Page - 1 of 4

SSC SERVICES FOR EDUCATION

COMPETITIVE SEALED PROPOSAL

PART 1

PROPOSAL FORM & PRICING SCHEDULE

SECTION 00 42 13

West Texas A&M University – Canyon, TX Project No.: PM-1415 Project Title: Pkg C – PPHM Roof Replacement & Coating

__________________________________________doing business as _________________________________

Business Name (Corporation, Partnership or Individual) hereby proposes to furnish and install all work required by the Contract Documents that includes, SSC Uniform General and Supplementary Conditions ("UGSC"), SSC Special Conditions, the Drawings, the Project Manual/Specifications and any Addenda issued prior to the Proposal.

The "Total Contract Cost" shall include the cost of delivery, insurance, bonds, taxes, labor, materials, supervision, overhead, profit, incidentals and the use of all equipment and tools required to complete the work. The proposed Contract Cost, indicated in the Pricing Schedule included shall constitute full compensation for work required by the Contract Documents and the Addenda.

• The RESPONDENT certifies that this proposal is made in good faith, without collusion or connection with any other person or persons offering a proposal for the same work, and that it is made in pursuance of and subject to all the terms and conditions of the Construction Documents for the work to be accomplished, all of which have been examined by the RESPONDENT.

• All work required by the Contract Documents and enumerated in the Pricing Schedule included, whether specifically mentioned, included by implication or appurtenant thereto, shall be performed by the RESPONDENT, irrespective of whether it is named in the Pricing Schedule.

• The Proposal will remain subject to acceptance for 90 calendar days after submittal, or for such longer time as the RESPONDENT may agree to in writing upon request by the Owners Designated Representative

(ODR).

• The RESPONDENT will submit a construction schedule and execute the contract within 10 business days after notification of contract award.

• Proposal amounts must be shown in both written words and figures. In case of discrepancy, the amount shown in words will govern.

Revised 2/2024

CSP Part 1 - Proposal Form & Pricing Schedule

Page - 2 of 4

DESCRIPTION TOTAL PRICE

Contractor must list an amount for each line item as required for the scope of this project OR bid will be disqualified for being incomplete. Blank division entries are acceptable if the division is not in the scope of work.

Division 01 - General Requirements

Division 02 - Existing Conditions

Division 03 - Concrete

Division 04 - Masonry

Division 05 - Metals

Division 06 - Wood, Plastics and Composites

Division 07 - Thermal and Moisture Protection

Division 08 - Openings

Division 09 - Finishes

Division 10 - Specialties

Division 11 - Equipment

Division 12 - Furnishings

Division 13 - Special Construction

Division 14 - Conveying Equipment

Division 21 - Fire Suppression

Division 22 - Plumbing

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC)

Division 25- Integrated Automation

Division 26 - Electrical

Division 27 - Communications

Division 28 - Electronic Safety and Security

Division 31 - Earthwork

Division 32 - Exterior Improvements

Division 33 - Utilities

Division 34 - Transportation

Division 44 - Pollution Control Equipment

Division 45 - Industry-Specific Manufacturing Equipment

BASE PROPOSAL AMOUNT

Revised 2/2024

CSP Part 1 - Proposal Form & Pricing Schedule

Page - 3 of 4

ITEM NO. 1 - BASE PROPOSAL AMOUNT

The amount for the complete construction of Pkg C - PPHM Roof Replacement & Coating, including all general, plumbing, mechanical, and electrical work indicated on the drawings by Armko Industries dated 1/20/2026:

__________________________________________________________Dollars $_________________________

SUBSTANTIAL COMPLETION DATE

After Commitment Approval or Notice to Proceed is issued by SSC Services for Education, all of the work shall be substantially completed within ______ calendar days. Number of days listed must include materials & equipment lead times and construction duration. Final Completion shall be achieved within 30 consecutive calendar days after the date of Substantial Completion as determined by the ODR.

ADDENDA – Contractor must list number of Addenda issued.

Respondent has received the following Addenda to the Request for Proposals, but agrees and understands that it will be responsible for performing the Work in accordance with all terms and conditions in all Addenda issued in connection with the Request for Proposals, and that it’s Proposal will be construed to include all requirements of all such Addenda.

Addenda No.(s)

NOTE: Failure to acknowledge Addenda does not release Contractor from financial obligation to complete all Addenda.

Revised 2/2024

CSP Part 1 - Proposal Form & Pricing Schedule

Page - 4 of 4

The undersigned Respondent has carefully examined and considered the Project Site and relevant conditions and circumstances for the Work, information and requirements set out in the Request for Proposals, the Drawings and Project Manual/Specifications, and the requirements of the proposed Contract Documents, including the ODR’s Agreement, the Uniform General and Supplemental Conditions, Special Conditions, and Tex. Gov. Code pertaining to Prevailing Wages Rates, in making this Proposal. Capitalized terms used but not otherwise defined in this Proposal Form shall have the same meanings as designated in the Request for Proposals.

The undersigned Proposer further agrees to the following conditions:

1. An incomplete Proposal or one having additional information or other modifications or qualifications inscribed thereon, may be cause for rejection of the entire Proposal.

2. That, if accepted by the Owner ODR, this Proposal becomes a part to the Contract Documents upon the signing of the Contract Agreement, and failing to comply with any part of this Bid will be taken as failure of the Proposer to comply with the Contract Documents, and will be just cause for rejection of the Work.

RESPONDENT:

Company Employer Federal Identification Number (EIN)

By:

Signature

Title Company Phone Number

Date Company Email or Fax Number

Company Contact and Address for Invoice

END OF SECTION

File details come from the government source that posted it. Updated .