ESBD_487720_1770827656552_PM-1415_Addendum No. [#1]_SOW Clarification.pdf

PDF 94 KB Posted

Attached to
PM-1415 PPHM Roof Replacement & Coating State and local contract opportunity
Solicitation number
PM-1415
Issued by
Ochiltree County, Texas

About this file

This is an Addendum clarifying the Scope of Work for West Texas A&M University (WTAMU) roofing projects across multiple campus buildings and facilities in Texas. The document outlines nine base proposals organized into three scope of work packages, encompassing roof replacement and repair work at WTAMU Classroom Center, Jack B. Kelly Student Center, Cornette Library, Connor Hall, Greenhouses, and Panhandle Plains Historical Museum. Proposals 1 through 5 involve removal of existing roof systems and installation of new two-ply modified bitumen roofing with polyisocyanurate insulation boards of varying thicknesses; Proposal 6 specifies removal and replacement of shingle roofing with architectural composition shingles at Connor Hall; Proposal 7 involves replacement of polycarbonate panels at the greenhouses; and Proposals 8 and 9 address roof coating and modified bitumen installation at the Panhandle Plains Historical Museum. All work includes HVAC and electrical disconnection and reconnection, removal and replacement of flashings and sheet metal, and requires compliance with NRCA, SMACNA, and ANSI/SPRI standards. Master plumber certification is required for all gas line testing and certification.

All proposals include manufacturer warranties ranging from two to twenty years for the new roof materials and systems, with two-year contractor warranties provided across all base proposals. New metal components, including coping caps, flashing, and accessories, shall be prefinished aluminum or as selected by the owner from available color ranges. Work specifications require compliance with ASCE 7 criteria for mechanically fastened base sheets and adherence to manufacturer guidelines for installation. The scope of work clarification addendum provides detailed specifications for deck preparation, insulation board installation methods, cricket installation, cover board application, and lap welding procedures, with cold-applied adhesive specified for most assemblies. The document does not specify pricing terms, bidding deadlines, site visit dates, or award timelines within the provided addendum text.

View the file

Other files for this state and local contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK PACKAGE I:

BASE PROPOSAL 1 – WTAMU CLASSROOM CENTER – SINGLE-PLY – ROOF

SECTIONS (A2, A3, B2, B3, C2, & D2)

• WORK SHALL INCLUDE REMOVAL OF THE EXISTING ROOF SYSTEM DOWN TO

LIGHTWEIGHT CONCRETE DECK.

• MECHANICALLY FASTEN A VENTING BASE SHEET TO THE DECK AS PER ASCE 7

CRITERIA.

• PROVIDE A TWO INCH (2”) POLYISOCYANURATE INSULATION BOARD SET IN

SPECIFIED ADHESIVE.

• PROVIDE A ONE-QUARTER INCH (1/4”) PER FOOT TAPERED POLYISOCYANURATE

SYSTEM SET IN SPECIFIED ADHESIVE.

• INSTALL ALL ASSOCIATED CRICKETS SET IN SPECIFIED ADHESIVE AS NOTED ON

ROOF PLANS.

• PROVIDE A ONE-HALF INCH (1/2”) COVER BOARD SET IN SPECIFIED ADHESIVE.

• PROVIDE A NEW TWO-PLY MODIFIED BITUMEN ROOF SYSTEM SET IN COLD

APPLIED ADHESIVE. ALL END AND SIDE LAPS TO BE HOT AIR WELDED.

• PROVIDE A TWENTY (20) YEAR NDL MANUFACTURER ’S WARRANTY AND A TWO

(2) YEAR CONTRACTOR ’S WARRANTY.

• NEW METAL SHALL BE PREFINISHED, SELECTED BY THE OWNER FROM A FULL

RANGE OF COLORS.

• WORK SHALL ALSO INCLUDE ALL HVAC AND ELECTRICAL, PIPING DISCONNECT

AND RECONNECTION.

• INSTALLATION SHALL BE AS PER NRCA, SMACNA, ANSI/SPRI, SPECIFICATIONS,

DETAILS AND MANUFACTURER’S GUIDELINES.

• ALL GAS LINES TO BE TESTED AND CERTIFIED BY A MASTER PLUMBER.

BASE PROPOSAL 2 – WTAMU JACK B. KELLY STUDENT CENTER – SINGLE PLY

- ROOF SECTION J & J1

THE STRUCTURAL CONCRETE DECK.

• PROVIDE A TWO INCH (2”) POLYISOCYANURATE INSULATION BOARD SET IN

SPECIFIED ADHESIVE.

• PROVIDE A ONE-QUARTER INCH (1/4”) PER FOOT TAPERED POLYISOCYANURATE

SYSTEM SET IN SPECIFIED ADHESIVE.

• INSTALL ALL ASSOCIATED CRICKETS SET IN SPECIFIED ADHESIVE AS NOTED ON

ROOF PLANS.

• PROVIDE A ONE-HALF INCH (1/2”) COVER BOARD SET IN SPECIFIED ADHESIVE.

• PROVIDE A NEW TWO-PLY MODIFIED BITUMEN ROOF SYSTEM SET IN COLD

APPLIED ADHESIVE. ALL END AND SIDE LAPS TO BE HOT AIR WELDED.

• PROVIDE A TWENTY (20) YEAR NDL MANUFACTURER ’S WARRANTY AND A TWO

(2) YEAR CONTRACTOR ’S WARRANTY.

• NEW METAL SHALL BE ALUMINUM TO MATCH EXISTING GAUGE AND FINISH.

• WORK SHALL ALSO INCLUDE ALL HVAC AND ELECTRICAL, PIPING DISCONNECT

AND RECONNECTION.

• INSTALLATION SHALL BE AS PER NRCA, SMACNA, ANSI/SPRI, SPECIFICATIONS,

BASE PROPOSAL 3 – WTAMU JACK B. KELLY STUDENT CENTER – SINGLE PLY

– ROOF SECTION L

THE GYPSUM DECK.

• MECHANICALLY FASTEN A VENTING BASE SHEET TO THE DECK AS PER ASCE 7

CRITERIA.

• PROVIDE A TWO INCH (2”) POLYISOCYANURATE INSULATION BOARD SET IN

SPECIFIED ADHESIVE.

• PROVIDE A ONE-QUARTER INCH (1/4”) PER FOOT TAPERED POLYISOCYANURATE

SYSTEM SET IN SPECIFIED ADHESIVE.

• INSTALL ALL ASSOCIATED CRICKETS SET IN SPECIFIED ADHESIVE AS NOTED ON

ROOF PLANS.

• PROVIDE A ONE-HALF INCH (1/2”) COVER BOARD SET IN SPECIFIED ADHESIVE.

• PROVIDE A NEW TWO-PLY MODIFIED BITUMEN ROOF SYSTEM SET IN COLD

APPLIED ADHESIVE. ALL END AND SIDE LAPS TO BE HOT AIR WELDED.

• PROVIDE A TWENTY (20) YEAR NDL MANUFACTURER ’S WARRANTY AND A TWO

(2) YEAR CONTRACTOR ’S WARRANTY.

• NEW METAL SHALL BE ALUMINUM TO MATCH EXISTING GAUGE AND FINISH.

• WORK SHALL ALSO INCLUDE ALL HVAC AND ELECTRICAL, PIPING DISCONNECT

AND RECONNECTION.

• INSTALLATION SHALL BE AS PER NRCA, SMACNA, ANSI/SPRI, SPECIFICATIONS,

BASE PROPOSAL 4 – WTAMU JACK B. KELLY STUDENT CENTER – SINGLE PLY

- ROOF SECTIONS (A1, B1, C1, D1, E, F, G, H, & K)

THE METAL DECK.

• MECHANICALLY FASTEN (2) LAYERS OF TWO INCH (2”) POLYISOCYANURATE

INSULATION BOARD TO THE DECK AS PER ASCE 7 CRITERIA.

• INSTALL ALL ASSOCIATED CRICKETS SET IN SPECIFIED ADHESIVE AS NOTED ON

ROOF PLANS.

• PROVIDE A ONE-HALF INCH (1/2”) COVER BOARD SET IN SPECIFIED ADHESIVE.

• PROVIDE A NEW TWO-PLY MODIFIED BITUMEN ROOF SYSTEM SET IN COLD

APPLIED ADHESIVE. ALL END AND SIDE LAPS TO BE HOT AIR WELDED.

• PROVIDE A TWENTY (20) YEAR NDL MANUFACTURER ’S WARRANTY AND A TWO

(2) YEAR CONTRACTOR ’S WARRANTY.

• NEW METAL SHALL BE ALUMINUM TO MATCH EXISTING GAUGE AND FINISH.

• WORK SHALL ALSO INCLUDE ALL HVAC AND ELECTRICAL, PIPING DISCONNECT

AND RECONNECTION.

• INSTALLATION SHALL BE AS PER NRCA, SMACNA, ANSI/SPRI, SPECIFICATIONS,

BASE PROPOSAL 5 – WTAMU CORNETTE LIBRARY – SINGLE-PLY – ROOF

SECTIONS (A, B, C, & D)

LIGHTWEIGHT CONCRETE DECK.

• MECHANICALLY FASTEN A VENTING BASE SHEET TO THE DECK AS PER ASCE 7

CRITERIA.

• PROVIDE TWO LAYERS OF TWO INCH (4 ”) POLYISOCYANURATE INSULATION

BOARD SET IN SPECIFIED ADHESIVE.

• INSTALL ALL ASSOCIATED CRICKETS SET IN SPECIFIED ADHESIVE AS NOTED ON

ROOF PLANS.

• PROVIDE A ONE-HALF INCH (1/2”) COVER BOARD SET IN SPECIFIED ADHESIVE.

• PROVIDE A NEW TWO-PLY MODIFIED BITUMEN ROOF SYSTEM SET IN COLD

APPLIED ADHESIVE. ALL END AND SIDE LAPS TO BE HOT AIR WELDED.

• PROVIDE A TWENTY (20) YEAR NDL MANUFACTURER ’S WARRANTY AND A TWO

(2) YEAR CONTRACTOR’S WARRANTY.

• NEW METAL SHALL BE PREFINISHED, SELECTED BY THE OWNER FROM A FULL

RANGE OF COLORS.

• WORK SHALL ALSO INCLUDE ALL HVAC AND ELECTRICAL, PIPING DISCONNECT

AND RECONNECTION.

• INSTALLATION SHALL BE AS PER NRCA, SMACNA, ANSI/SPRI, SPECIFICATIONS,

SCOPE OF WORK PACKAGE II:

BASE PROPOSAL 6 – WTAMU CONNOR HALL – SHINGLES – ROOF SECTION A

• WORK SHALL INCLUDE REMOVAL OF THE EXISTING SHINGLE ROOF SYSTEM

DOWN TO THE DECK.

• PROVIDE NEW SYNTHETIC UNDERLAYMENT.

• PROVIDE ALL ASSOCIATED SHEET METAL AND ACCESSORIES.

• PROVIDE NEW ARCHITECTURAL COMPOSITION SHINGLES.

• REMOVE AND REPLACE ALL FLASHINGS.

• PROVIDE A TWO (2) YEAR CONTRACTOR’S WARRANTY.

• NEW METAL SHALL BE PREFINISHED, SELECTED BY THE OWNER FROM A FULL

RANGE OF COLORS.

• WORK SHALL ALSO INCLUDE ALL HVAC AND ELECTRICAL, PIPING DISCONNECT

AND RECONNECTION.

• INSTALLATION SHALL BE AS PER NRCA, SMACNA, ANSI/SPRI, SPECIFICATIONS,

BASE PROPOSAL 7 – WTAMU GREENHOUSES – POLYCARBONATE PANELS – ROOF

SECTIONS (A, B, & C)

• WORK SHALL INCLUDE REMOVAL OF THE EXISTING POLYCARBONATE PANELS.

• PROVIDE NEW POLYCARBONATE ROOF SYSTEM PER LIKE, KIND, AND QUALITY.

• PROVIDE NEW ROOF ACCESSORIES TO MATCH EXISTING SIZE AND STYLE.

• NEW METAL SHALL BE PREFINISHED, SELECTED BY THE OWNER FROM A FULL

RANGE OF COLORS.

• PROVIDE A TWO (2) YEAR CONTRACTOR’S WARRANTY.

• WORK SHALL ALSO INCLUDE ALL HVAC AND ELECTRICAL, PIPING DISCONNECT

AND RECONNECTION.

• INSTALLATION SHALL BE AS PER NRCA, SMACNA, ANSI/SPRI, SPECIFICATIONS,

SCOPE OF WORK PACKAGE III:

BASE PROPOSAL 8 – WTAMU PANHANDLE PLAINS HISTORICAL MUSEUM – ROOF

COATING – ROOF SECTIONS (A, B, B1, B2, C, G, H, J, K, L & M)

• WORK SHALL INCLUDE POWER WASHING THE EXISTING MODIFIED BITUMEN

ROOF SYSTEM .

• MAKE ALL NECESSARY REPAIRS TO ANY AND ALL DEFICIENCIES BEFORE

INSTALLING THE BASE LAYER OF COATING

• INSTALL NEW COATING AS PER THE MANUFACTURER ’S WRITTEN

INSTRUCTIONS AND SPECIFIED RATES.

• PROVIDE A TWO (2) YEAR CONTRACTOR'S WARRANTY.

• NEW METAL COPING CAP AND ACCESSORIES SHALL BE PREFINISHED,

SELECTED BY THE OWNER FROM A FULL RANGE OF COLORS INCLUDING

PREMIUM AND METALLICS.

• WORK SHALL ALSO INCLUDE ALL HVAC AND ELECTRICAL, PIPING DISCONNECT

AND RECONNECTION.

• INSTALLATION SHALL BE AS PER NRCA, SMACNA, ANSI/SPRI, SPECIFICATIONS,

DETAILS AND MANUFACTURER'S GUIDELINES. ALL GAS LINES TO BE TESTED

AND CERTIFIED BY A LICENSED PLUMBER.

BASE PROPOSAL 9 – WTAMU PANHANDLE PLAINS HISTORICAL MUSEUM – MODIFIED

BITUMEN – ROOF SECTIONS (D, E, & F)

THE LIGHTWEIGHT CONCRETE DECK.

• MECHANICALLY FASTEN A VENTING BASE SHEET TO THE DECK AS PER ASCE 7

CRITERIA.

• PROVIDE A THREE-QUARTER INCH (3/4”) PERLITE INSULATION BOARD SET IN

SPECIFIED ADHESIVE.

• INSTALL ALL ASSOCIATED CRICKETS SET IN SPECIFIED ADHESIVE AS NOTED ON

ROOF PLANS.

• PROVIDE A ONE-HALF INCH (1/2”) COVER BOARD SET IN SPECIFIED ADHESIVE.

• PROVIDE A NEW TWO-PLY MODIFIED BITUMEN ROOF SYSTEM SET IN COLD

APPLIED ADHESIVE. ALL END AND SIDE LAPS TO BE HOT AIR WELDED.

• PROVIDE A TWENTY (20) YEAR NDL MANUFACTURER ’S WARRANTY AND A TWO

(2) YEAR CONTRACTOR’S WARRANTY.

• NEW METAL SHALL BE PREFINISHED, SELECTED BY THE OWNER FROM A FULL

RANGE OF COLORS.

• WORK SHALL ALSO INCLUDE ALL HVAC AND ELECTRICAL, PIPING DISCONNECT

AND RECONNECTION.

• INSTALLATION SHALL BE AS PER NRCA, SMACNA, ANSI/SPRI, SPECIFICATIONS,

File details come from the government source that posted it. Updated .