N6945022R0032 Section F_Draft.pdf
PDF 731 KB Posted
- Attached to
- DRAFT Solicitation, Base Operations Support (BOS) Services at Naval Station Guantanamo Bay, Cuba
- Solicitation number
- N6945022R0032
About this file
This is a draft solicitation for base operations support services at Naval Station Guantanamo Bay, Cuba. The solicitation seeks a contractor to provide various base support services including family housing, facility management, facility investment, custodial services, pest control, integrated solid waste management, swimming pool maintenance, grounds maintenance and landscaping, utilities such as electrical, wastewater, and water services, and base support vehicles and equipment. The document outlines numerous deliverables and reporting requirements for each service area, including quality control plans, safety plans, staffing plans, preventative maintenance schedules, service reports, and equipment certifications. It also specifies delivery dates for many of these deliverables ranging from daily to annual reports. The solicitation is issued by the Department of the Navy Naval Facilities Engineering Command for base operations support at the Naval Station in Guantanamo Bay, Cuba.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N6945022R0032
SECTION F: DELIVERIES OR PERFORMANCE
Section F – 0200000
Management and Administration
DELIVERABLES
Spec Item
Form
Attachment
Number Deliverable Title
Date(s) of
Submission
Distribution
Frequency Original
Copies
(includin g original)
2.2.1.2 N/A Request to Work
Outside
Government’s
Regular Working
Hours
At least two calendar days prior to requested day.
KO 1 As required
2.3.1 N/A Sign-In Sheets and
Minutes
Within two working days.
KO/COR/
all attendees
1 As required
2.3.1 N/A Final Revision of
Minutes
Within two working days.
KO/COR/
all attendees
1 As required
2.3.4 N/A Permits and
Licenses
30 Days before work commences and as requested by the KO.
KO/COR 1 As specified
2.3.5 N/A Certificate of
Insurance
At least Within 30 calendar days prior to start of contract performance.
KO/COR 1 As specified
2.3.5 N/A Written Notice of
cancellation or material change in policy coverage
At least 30 calendar days prior to cancellation or material change in policy coverage
KO and
COR
1 As required
2.3.23 N/A Phase-In Plan Within 5 days
after award or as requested by the
KO
KO and
COR
1 As specified
2.3.23 N/A Phase-Out Plan Within 5 days
after award or as requested by the
KO
KO and
COR
1 As specified
2.3.18 N/A Re-Entry Medical
Screening
Questionnaire
Report/Results
Immediately after completion.
KO/Base
Medical
1 As specified/
Electronic
2.3.18 N/A Annual Medical
Screenings Report
Within 48 hours after each completion.
KO/Base
Medical
1 As required
/Electronic
Form
Attachment
Number Deliverable Title
Date(s) of
Submission
Distribution
Frequency Original
Copies
(includin g original)
2.6.2 N/A Status Updates Within 30
minutes of the inquiry during regular working hours, and by
0800 the following work day for inquiries after regular working hours
KO/COR 1 As required
2.6.3 N/A Difficulty in
Scheduling Work
By the end of each workday
KO/COR 1 As required
2.6.4 N/A Status of
Deliverables
Within 30 minutes of the inquiry during regular working hours, and by
0800 the following work day for inquiries after regular working hours
KO/COR 1 As required
2.6.6.3 J-0200000-12 List of Personnel
Requiring
MAXIMO
Accounts
At least 30 calendar days prior to start of contract performance and within 15 calendar days prior to any changes.
KO/COR 1 As specified
2.6.6.5 N/A Weekly MAXIMO
Work Order Report
By 0900 the first workday of each week
COR/KO/
PWO/DP
WO/FMD
1 Weekly
2.6.7.1 N/A Quality
Management Plan
At least 30 calendar days prior to start of contract performance and within 15 calendar days prior to any changes.
KO/COR 1 As specified
Form
Attachment
Number Deliverable Title
Date(s) of
Submission
Distribution
Frequency Original
Copies
(includin g original)
2.6.7.2 N/A QC Inspection File Within five
calendar days of completion/ termination of the contract.
KO/COR 1 As specified
2.6.7.3 N/A Contractor Quality
Inspection and
Surveillance
Report
First work day of each month.
KO/COR 1 Monthly
2.6.8 N/A Property
Management Plan
At least 30 calendar days prior to start of contract performance.
KO/COR 1 As specified
2.6.10 N/A Plans of Action
and Milestones
(POA&Ms)
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO/COR/
Command
Security
Manager
1 As required
2.6.11 N/A Cybersecurity
Incident
Immediately upon discovery during regular working hours and by
0800 the following work day for discoveries after regular working hours
KO/COR/
Command
Security
Manager
1 As required
2.7.1 N/A List of Key
Personnel and
Qualifications
At least 30 calendar days prior to start of contract performance.
KO/COR 1 As specified
2.7.1 N/A Organizational
Chart
At least 15 calendar days prior to start of contract performance.
KO/COR 1 As specified
2.7.2 N/A Monthly Employee
Roster
Fifth day of each month.
KO/COR 1 Monthly/
Electronic/
Yes
2.7.2 N/A Weekly Population
Report
0800 each
Monday
KO/COR 1 Weekly/
Electronic/
Yes
Form
Attachment
Number Deliverable Title
Date(s) of
Submission
Distribution
Frequency Original
Copies
(includin g original)
2.7.4 N/A Contractor Labor
Hours (eCMRA)
Report
No later than 31
October
KO/COR 1 Annually for labor executed during the period of performance during each
Government fiscal year
(FY)
2.8.1 N/A Employee List Upon request. KO/COR 1 As required
2.8.7 N/A Personnel Security
Investigation (PSI), Fingerprint Card
(FD87), and OF-
306 Declaration for
Federal
Employment
Prior to employee access to sensitive unclassified information.
KO/
Security
Manager/
COR
1 As required
2.9.2 N/A Accident
Prevention Plan
At least 30 calendar days prior to start of contract performance and
15 calendar days prior to any changes.
KO/COR 1 As specified
2.9.3 N/A Activity Hazard
Analysis
Together with the
Accident
Prevention Plan and for changes.
KO/COR 1 As specified
2.9.4 N/A Compliance Plans, Programs, and
Procedures
Together with the
Accident
Prevention Plan and for changes.
KO/COR 1 As specified
2.9.4.7 N/A GTMOSAF -
LOTO
(Verification and
Notification Form)
By COB the third workday of each month
KO/COR 1 Monthly
2.9.5 J-0200000-05 NAVFAC
Contractor Incident
Reporting System
(CIRS)
Within one calendar days of accident.
KO/COR 1 As required
2.9.5 J-0200000-05 Weight Handling
Equipment
Accident Report
Within 15 working days of accident.
KO/COR 1 As required
Form
Attachment
Number Deliverable Title
Date(s) of
Submission
Distribution
Frequency Original
Copies
(includin g original)
2.9.5 J-0200000-05 Crane and Rigging
Gear Near Miss
Report
Within 15 working days of accident.
KO/COR 1 As required
2.9.5.1 N/A Initial Accident
Reporting
Notification Report
Immediately after that an accident or near miss.
KO/COR 1 As specified/
Electronic
2.9.5.1 N/A Follow-on
Accident
Reporting
Notification Report
Close of business the day of the accident, or if the accident occurs after hours, at start of business the following morning.
KO/COR 1 As specified/
Electronic
2.9.5.1 N/A Final Accident
Reporting
Notification Report
Within 24 hours after completing the investigation of the accident.
KO/COR 1 As specified/
Electronic
2.9.7 N/A Monthly On-Site
Labor Report
First work day of each month.
KO/COR 1 Monthly
2.9.8 N/A OSHA Citations
and Violations
Corrective Action
Report
Within 48 hours after receiving a citation.
KO/COR 1 As required
2.9.9 N/A Safety Inspection
and Monitoring
Report
Upon request. KO/COR 1 As required
2.9.10 N/A Safety
Certifications
At least 15 calendar days prior to start of contract performance and prior to expiration of certifications.
KO/COR 1 As specified
2.10 N/A EMS Goals and
Policy
Measurement
Information
Upon request. KO/COR 1 As required
2.10.1.1 N/A Water
Conservation Plan
At least 30 calendar days prior to start of contract performance and
15 calendar days prior to any changes.
KO/COR 1 As specified
Form
Attachment
Number Deliverable Title
Date(s) of
Submission
Distribution
Frequency Original
Copies
(includin g original)
2.10.2 N/A ECATTS Training
Documentation/
Certificates
Within 60 calendar days after award and for changes.
KO/COR/
PWD
Environm ental
Manager
1 As specified/
Electronic
2.10.2.1 N/A Written Sampling
Plan
Prior to each sampling event
KO /COR 1 As required
2.10.2.1 N/A Sampling Results Within 24 hours
after receipt of laboratory analysis
KO/COR 1 As required
2.10.2.2 N/A Class I and II ODS
Report
Within 24 hours following delivery of refrigerant to
DLA
KO/COR/
PWD
Environm ental
Manager
1 As required
2.10.2.4 N/A Waste Stream
Determination
At least 30 calendar days prior to start of contract performance and within 14 days of identification of any new waste stream.
KO/COR 1 As required
2.10.2.6 N/A Spill Report Within 48 hours
of spill occurrence
KO/COR 1 As required
2.10.2.7 N/A Emergency
Planning and
Community Right-
To-Know Act
(EPCRA) Report
At least 15 calendar days prior to start of contract performance and not less than 10 working days prior to planned use of hazardous material.
KO/COR 1 As specified
2.10.2.7 J-0200000-05 Contractor
Hazardous
Material Inventory
Log
Within 15 calendar days after the end of each calendar year and at termination of the contract.
KO/COR 1 Annually
Form
Attachment
Number Deliverable Title
Date(s) of
Submission
Distribution
Frequency Original
Copies
(includin g original)
2.10.2.11 N/A Asbestos
Containing
Material (ACM)
Written notification within 24 hours of discovery
KO/COR 1 As specified
2.10.3 N/A Sustainable
Procurement and
Practices Plan
Within 15 calendar days after award and within 15 calendar days after exercised option periods.
KO/COR/
PWD
Environm ental
Manager
1 Annually
2.10.3 N/A Sustainable
Delivery of
Services Report
Within five calendar days after each contract period.
KO/COR/
PWD
Environm ental
Manager
1 Annually
2.10.3.2 N/A Recovered
Material
Certification
As specified KO/COR/
PWD
Environm ental
Manager
1 When a product containing recovered materials is equal to or better than the original and could be used.
2.14.2 N/A Detailed Scope of
Work and Detailed
Estimate
Within two work days
KO/COR 1 As required
2.15.1.1 N/A Non-Recurring
Work Quantities
Ordered via
FedMall
First work day of each month.
KO/COR 1 Monthly
2.15.2.1 N/A Non-Recurring
Work Proposals
Within two working days following receipt of request
KO/COR 1 As required
2.15.2.2 N/A Work Status
Updates
Weekly and within 30 minutes of request by the
Government.
KO/COR 1 As Required
Section F – 1401000
Family Housing
Form
Attachment
Number
Deliverable
Title
Date (s) of
Submission
Distribution
Frequency Original/ Copies
Number of
Copies
(including original)
2.2.2 N/A Resumes of
Family Housing
Key Personnel
15 calendar days after contract award
KO 2 Once for initial submittal, then as requested or change of personnel /
Electronic
2.3.2 N/A Updated
Inventories
First work day of each quarter
KO 1 Quarterly
3 N/A NSGB SAF -
LOTO
(Verification and
Notification
Form)
By COB the third workday of each month
KO/COR/Housing
Officer
2 Monthly
3.2 N/A FA&E Inventory
List
First work day of each quarter
KO/COR/Housing
Officer
1 Quarterly
3.2 N/A FA&E Disposal
Documentation
Within 2 days of disposal
KO/COR/Housing
Officer
1 As required
3.3.1 N/A Maintenance
Program
30 calendar days after contract award
KO/COR/Housing
Officer
2 Annually
3.3.1 N/A Monthly PM
Work Schedule and
Unaccomplished
Maintenance
Report
Five work days prior to the beginning of each month
KO/COR/Housing
Officer
1 Monthly
3.3.2 N/A Daily Service
Call Report
0900 AM
Daily
Housing Officer/
KO/ FMD/ COR
4 Daily/
Electronic
3.3.2 N/A Monthly Service
Call Report
First work day of each month
KO/COR/Housing
Officer
2 Monthly/
Electronic
3.3.3 N/A Playground PM
Program
45 calendar days after contract award
KO/COR/Housing
Officer
2 Annually/
Electronic
3.3.3 N/A Monthly
Playground PM
Work Schedule and
Five work days prior to the
KO/COR/Housing
Officer
2 Monthly/
Electronic
Unaccomplished
Maintenance
Report beginning of each month
3.3.4 N/A HVAC
Integrated
Maintenance
Program
45 calendar days after contract award and one business day after any changes
KO/COR/Housing
Officer
2 Annually/
Electronic
3.3.4 N/A Monthly HVAC
IMP Schedule and HVAC IMP
Maintenance and
Repair Status
Five work days prior to the beginning of each month
KO/COR/Housing
Officer
1 Monthly/
Electronic
3.3.5 N/A COM Inspection
Report
At completion of each
COM
KO/COR/Housing
Officer
1 At completion of each
COM
3.3.4 N/A Scheduled
Maintenance
Schedule
Five work days prior to the beginning of each month
KO/COR/Housing
Officer
1 Monthly
3.3.6 N/A Housing Area
Sign Painting
Schedule
45 calendar days after contract award
KO/COR/Housing
Officer
2 Annually/
Electronic
3.3.7 N/A Preventive
Maintenance
Program Plan
30 calendar days after contract award and one working day after any changes
KO/COR/Housing
Officer
2 Annually
3.3.7, 3.3.8 N/A Monthly PM
Work Schedule
Five work days prior to the beginning of each month
KO/COR/Housing
Officer
1 Monthly
3.3.7, 3.3.8 N/A Weekly
Unaccomplished
Work Report
0800 each
Monday
KO/COR/Housing
Officer
3 Weekly/
Section F – 1501000
Facility Management
Spec
Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency
Original/
Copies
Number of Copies
(includin g original)
2.3.1 N/A System Access
Personnel Listing
Within 30 calendar days after contract award
COR/KO 2 Upon award and any change in personnel
3 N/A GTMOSAF - LOTO
(Verification and
Notification Form)
By COB the third workday of each month
COR/KO 2 Monthly
3.1.1 N/A MAXIMO Asset
Changes Report
By COB the third workday of each month
COR/KO
& FMD
3 Monthly
1502000 – Facility Investment
Section F – 1502000
Facility Investment
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency
Original
/ Copies
Number of
Copies
(including original)
2.2.1 N/A Certification and
Licenses
Within 15 days after award, as requested by the
KO and within one business day after any personnel changes.
KO 1 Once for initial submittal, then as requested or after any personnel changes
2.2.2 N/A Resumes of HVAC
Supervisor
Within 15 days after award, as requested by the
KO and within one business day after any personnel changes.
KO 1 Once for initial submittal, then as requested or change of personnel /
Electronic
3 N/A GTMOSAF - LOTO
(Verification and
Notification Form)
By COB the third workday of each month
COR/KO 2 Monthly
3.1 N/A Service Order
Summary Report
First work day of each month
KO/
COR/
FMD
2 Monthly
3.2 N/A Preventive
Maintenance
Program Plan
30 calendar days after contract award and one working day after any changes
KO/
COR/
FMD
2 Annually
3.2 N/A Monthly PM Work
Schedule
Five work days prior to the beginning of each month
KO/
COR/
FMD
1 Monthly
3.2, 3.3 N/A Weekly
Unaccomplished
Maintenance Report
0800 each
Monday
KO/COR
3 Weekly/
Electronic
3.3 N/A Integrated
Maintenance
Program Plan
30 calendar days after contract award and one working day after any changes
KO/
COR/
FMD
2 Annually
3.3 N/A Monthly IMP
Schedule and IMP
Maintenance and
Repair Status
Five work days prior to the beginning of each month
KO/
COR/
FMD
1 Monthly
3.4 N/A Inspection, Testing, and Certification
Program Summary
Report
First work day of each month
KO/
COR/
FMD
2 Monthly
3.4 N/A Inspection, Testing
and Certification
Schedule and
Equipment
Certifications
First work day of each month
KO/
COR/
FMD
2 Monthly
3.4.2 N/A Certification of
Load Test and
Condition
Inspection Form
First work day of each month
KO/
COR/
FMD
2 Monthly
3.4.4 N/A Inspection and Test
Report for Vertical
Transportation
Equipment
First work day of each month
KO/
COR/
FMD
2 Monthly
3.5 N/A Other Recurring
Services Program
Summary Report
First work day of each month
KO/
COR/
FMD
2 Monthly
3.5 N/A Other Recurring
Work Schedule
Five work days prior to the beginning of each month
KO/COR
/ FMD
3 Monthly/
Electronic
3.5.3 N/A Exterior Lighting
Systems Inspection, Re-lamping, and
Repair Program
30 calendar days after contract award and one working day after any changes
KO/
COR/
FMD
3 Annually and as specified/
Electronic
3.6 N/A Minor Maintenance, Repair, and
Replacement Report of Accomplish and
Unaccomplished
Work
Five work days prior to the beginning of each month
KO/ UH
Manager
Section F – 1502000 (DHA)
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency/
Media Original
Copies
(including original)
2.2.1 N/A Certification and
Licenses
15 calendar days after award or as requested by the
KO
KO/ COR/
USNH
Facility
Manager
3 Once for initial submittal, then as requested or change of personnel /
Electronic
2.2.2 N/A Resumes of Key
Personnel
15 days after award or as requested by the
KO
KO/ COR/
USNH
Facility
Manager
3 Once for initial submittal, then as requested or change of personnel /
Electronic
2.3.2 J-1502000-
02(DHA)
Above Ceiling
Work Permits
Prior to any work where ceiling tiles are moved
COR/ USNH
Facility
Manager
As specified/
Electronic
2.3.3.1 J-1502000-
02(DHA)
Infection Control
Construction Permit
Form
Five business days prior to any work involving construction, repairs, demolition or evasive maintenance
Features of
USNH facilities
COR/ USNH
Facility
Manager
As specified/
Electronic
2.3.4 J-1502000-
02(DHA)
Pre-Construction
Survey-External
Form
Five business days prior to any work involving construction, repairs, demolition or evasive maintenance
Features of
USNH facilities
COR/ USNH
Facility
Manager
As specified/
Electronic
2.3.5 J-1502000-
02(DHA)
Life Assessment
Tool Form
Five business days prior to any work involving work to Life
Safety Feature of
USNH facilities
Features of
USNH facilities
COR/ USNH
Facility
Manager
As specified/
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency/
Media Original
Copies
(including original)
3 J-0200000-05 GTMOSAF - LOTO
(Verification and
Notification Form)
By COB the third workday of each month
COR/KO 2 Monthly
3.1 N/A Service Call
Summary Report
First work day of each month
KO/ COR/
USNH
Facility
Manager
3 Monthly/
Electronic
3.2 N/A Preventive
Maintenance
Program Plan
45 calendar days after award and one business day after any changes
KO/ COR/
USNH
Facility
Manager
3 Annually and as specified /
Electronic
3.2 N/A Monthly PM Work
Schedule
Five work days prior to the beginning of each month
KO/ COR/
USNH
Facility
Manager
3 Monthly/
Electronic
3.2, 3.3 N/A Weekly
Unaccomplished
Maintenance Report
0800 each
Monday
KO/ COR/
USNH
Facility
Manager
3 Weekly/
Electronic
3.3 N/A Integrated
Maintenance
Program Plan
45 calendar days after award and one business day after any changes
KO/ COR/
USNH
Facility
Manager
3 Annually and as specified /
Electronic
3.3 N/A Monthly IMP
Schedule
Five work days prior to the beginning of each month
KO/ COR/
USNH
Facility
Manager
3 Monthly/
Electronic
3.3 N/A IMP Maintenance
and Repair Status
First work day of each month
KO/ COR/
USNH
Facility
Manager
3 Monthly/
Electronic
3.4 N/A Inspection, Testing, and Certification
Program Summary
Report
First work day of each month
KO/ COR/
USNH
Facility
Manager
3 Monthly/
Electronic
3.4 N/A Inspection, Testing
and Certification
Schedule and
Equipment
Certifications
First work day of each month
KO/ COR/
USNH
Facility
Manager
3 Monthly/
Electronic
3.4.3 N/A Inspection and Test
Report for Vertical
Transportation
Equipment
First work day of each month
KO/ COR/
USNH
Facility
Manager
3 Monthly/
Electronic
3.4.4 N/A Medical Air, Gas &
Vacuum Systems
Certification And
Within 30 calendar days from inspection.
KO/ COR/
USNH
3 As Specified/
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency/
Media Original
Copies
(including original)
System Verification
Documentation And
Reports
Facility
Manager
3.4.5 N/A Fire Doors And Fire
Walls Inspections
And The Findings
Report
No later than 14 calendar days from the completion of each inspection
KO/ COR/
USNH
Facility
Manager
3 As Specified/
Electronic
3.5 N/A Other Recurring
Service Program
45 calendar days after award and one business day after any changes
KO/ COR/
USNH
Facility
Manager
3 Annually/
Electronic
3.5 N/A Other Recurring
Work Schedule
Five work days prior to the beginning of each month
KO/ COR/
USNH
Facility
Manager
3 Monthly/
Electronic
3.5 N/A Other Recurring
Services Program
Summary Report
Five work days prior to the beginning of each month.
KO/ COR/
USNH
Facility
Manager
3 Monthly/
Electronic
3.5.1 N/A The Contractor shall
submit a Schedule
For Cleaning And
Sanitizing
Designated Grease
Trap
45 calendar days after award and one business day after any changes
KO/ COR/
USNH
Facility
Manager
3 Annually and as specified/
1502000 (JTF) – Facility Investment
Section F – 1502000 (JTF)
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency
Original
/ Copies
Number of
Copies
(including original)
2.2.1 N/A Certification and
Licenses
Within 15 days after award, as requested by the
KO and within one business day after any personnel changes.
KO/COR
/JTF Org
Box
1 Once for initial submittal, then as requested or after any personnel changes
2.2.2 N/A Resumes of HVAC
Supervisor
Within 15 days after award, as requested by the
KO and within one business day after any personnel changes.
KO/COR
/JTF Org
Box
1 Once for initial submittal, then as requested or change of personnel /
Electronic
2.3.4 N/A Updated Inventories First work day of
each quarter
KO/COR
.JTF UH
Manager
1 Quarterly
3 N/A GTMOSAF - LOTO
(Verification and
Notification Form)
By COB the third workday of each month
COR/KO
/JTF Org
Box
2 Monthly
3.1 N/A Service Order
Summary Report
First work day of each month
KO/
COR/
FMD
/JTF Org
Box
2 Monthly
3.2 N/A Preventive
Maintenance
Program Plan
30 calendar days after contract award and one working day after any changes
KO/
COR/
FMD
/JTF Org
Box
2 Annually
3.2 N/A Monthly PM Work
Schedule
Five work days prior to the beginning of each month
KO/
COR/
FMD
/JTF Org
Box
1 Monthly
3.2, 3.3 N/A Weekly
Unaccomplished
Maintenance Report
0800 each
Monday
KO/COR
/JTF Org
Box
3.3 N/A Integrated
Maintenance
Program Plan
30 calendar days after contract award and one working day after any changes
KO/
COR/
FMD
/JTF Org
Box
2 Annually
3.3 N/A Monthly IMP
Schedule and IMP
Maintenance and
Repair Status
Five work days prior to the beginning of each month
KO/
COR/
FMD
/JTF Org
Box
1 Monthly
3.4 N/A Inspection, Testing, and Certification
Program Summary
Report
First work day of each month
KO/
COR/
FMD
/JTF Org
Box
2 Monthly
3.4 N/A Inspection, Testing
and Certification
Schedule and
Equipment
Certifications
First work day of each month
KO/
COR/
FMD
/JTF Org
Box
2 Monthly
3.4.3 N/A Inspection and Test
Report for Vertical
Transportation
Equipment
First work day of each month
KO/
COR/
FMD
/JTF Org
Box
2 Monthly
3.5 N/A Other Recurring
Services Program
Summary Report
First work day of each month
KO/
COR/
FMD
/JTF Org
Box
2 Monthly
3.5 N/A Other Recurring
Work Schedule
Five work days prior to the beginning of each month
KO/
COR/
FMD
/JTF Org
Box
4 Monthly/
Electronic
3.5.3 N/A Minor Maintenance, Repair, and
Replacement Report of Accomplish and
Unaccomplished
Work
Five work days prior to the beginning of each month
KO/
COR/JT
F UH
Manager
2 Monthly/
Electronic
3.5.4 N/A FA&E Inventory
List
First work day of each quarter
KO/COR
/ JTF UH
Manager
1 Quarterly
3.5.4 N/A FA&E Disposal
Documentation
Within 2 days of disposal
KO/COR
/ JTF UH
Manager
1 As required
3.5.5, 3.5.6 N/A Monthly PM Work
Schedule
Five work days prior to the beginning of each month
KO/COR
/ JTF UH
Manager
1 Monthly
3.5.5, 3.5.6 N/A Weekly
Unaccomplished
Work Report
0800 each
Monday
KO/COR
/ JTF UH
Manager
1502000 (OMC) – Facility Investment
Section F – 1502000 (OMC)
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency
Original
/ Copies
Number of
Copies
(including original)
2.2.1 N/A Certification and
Licenses
Within 15 days after award, as requested by the
KO and within one business day after any personnel changes.
KO/COR
/OMC
Logistics
1 Once for initial submittal, then as requested or after any personnel changes
2.2.2 N/A Resumes of HVAC
Supervisor
Within 15 days after award, as requested by the
KO and within one business day after any personnel changes.
KO/COR
/OMC
Logistics
1 Once for initial submittal, then as requested or change of personnel /
Electronic
2.3.4 N/A Updated Inventories First work day of
each quarter
KO/COR
/OMC
1 Quarterly
3 N/A GTMOSAF - LOTO
(Verification and
Notification Form)
By COB the third workday of each month
COR/KO
/OMC
Logistics
2 Monthly
3.1 N/A Service Order
Summary Report
First work day of each month
KO/
COR/
FMD/
OMC
Logistics
2 Monthly
3.2 N/A Preventive
Maintenance
Program Plan
30 calendar days after contract award and one working day after any changes
KO/
COR/
FMD/
OMC
Logistics
2 Annually
3.2 N/A Monthly PM Work
Schedule
Five work days prior to the beginning of each month
KO/
COR/
FMD/
OMC
Logistics
1 Monthly
3.2, 3.3 N/A Weekly
Unaccomplished
Maintenance Report
0800 each
Monday
KO/COR
/OMC
Logistics
3 Weekly/
Electronic
3.3 N/A Integrated
Maintenance
Program Plan
30 calendar days after contract award and one
KO/
COR/
FMD/
2 Annually working day after any changes
OMC
Logistics
3.3 N/A Monthly IMP
Schedule and IMP
Maintenance and
Repair Status
Five work days prior to the beginning of each month
KO/
COR/
FMD/
OMC
Logistics
1 Monthly
3.4 N/A Inspection, Testing, and Certification
Program Summary
Report
First work day of each month
KO/
COR/
FMD/
OMC
Logistics
2 Monthly
3.4 N/A Inspection, Testing
and Certification
Schedule and
Equipment
Certifications
First work day of each month
KO/
COR/
FMD/
OMC
Logistics
2 Monthly
3.5 N/A Other Recurring
Services Program
Summary Report
First work day of each month
KO/
COR/
FMD/
OMC
Logistics
2 Monthly
3.5 N/A Other Recurring
Work Schedule
Five work days prior to the beginning of each month
KO/COR
/ FMD/
OMC
Logistics
4 Monthly/
Electronic
3.5.3 N/A Minor Maintenance, Repair, and
Replacement Report of Accomplish and
Unaccomplished
Work
Five work days prior to the beginning of each month
KO/
COR/
OMC
Logistics
2 Monthly/
Electronic
3.5.4 N/A FA&E Inventory
List
First work day of each quarter
KO/COR
/OMC
Logistics
1 Quarterly
3.5.4 N/A FA&E Disposal
Documentation
Within 2 days of disposal
KO/COR
/OMC
Logistics
1 As required
3.5.5, 3.5.6 N/A Monthly PM Work
Schedule
Five work days prior to the beginning of each month
KO/COR
/OMC
Logistics
1 Monthly
3.5.5, 3.5.6 N/A Weekly
Unaccomplished
Work Report
0800 each
Monday
KO/COR
/OMC
Logistics
Section F – 1503010
Custodial
Annex/
Spec Item
Form
Attachment
Number
Deliverable
Title
Date (s) of
Submission
Distribution
Frequency
Original/
Copies
Number of Copies
(including original)
1503010/
2.2.1
N/A Pathogen
Training
Certificates
Upon request KO/COR 1 Upon request
1503010/
3.1
N/A Annual Work
Schedule
Within 15 calendar days prior to contract start
KO/COR/
School
Principal
1 Annually and five calendar days prior to implementing any changes to the schedule
1503010/
3.1
N/A Monthly Work
Plan
First work day of each month and five calendar days prior to implementing any changes to the schedule
KO/COR 2 Monthly
1503010/
3.2
N/A Custodial
Service Order
Report
First work day of each month
KO/COR 2 Monthly
Section F – 1503020
Pest Control
Form
Attachment
Number
Deliverable Title
Date(s) of
Submission
Distribution
Frequency
Original
/ Copies
Number of Copies
(includin g original)
2.2.1 N/A Copy of State
Certification for
Contractor Personnel
15 calendar days prior to start of work.
Copies of renewed certifications shall also be submitted.
KO/COR
/IPMC
3 As required
2.3.1 N/A Permits 5 days prior to
the start of work requiring permits.
KO/COR 2 As required
2.3.3 N/A Ultra-Low Volume
(ULV) Equipment
Calibration and
Droplet Analysis
Report
15 days prior to the start of work and thereafter every 50 hours of ULV equipment use.
KO/COR 2 As required
2.3.4 J-1503020-02 Planned Pesticide Use
Sheets including
Pesticide Labels and
Safety Data Sheets
(SDS)
By
31/Oct/2020.
Note: Any proposed changes in pesticide usage shall be submitted for
KO approval at least 5 business days in advance of pesticide use.
KO/COR
/IPMC
3 1 for each pesticide per pest as required
3 N/A Contractor's Work
Plan
By
31/Oct/2020.
KO/COR
/IPMC
3 1 per proposal
3 N/A Report of Conditions
Conducive to Pest
Infestation
1 working day after citing conditions.
KO/COR
/IPMC
3 As required
3, 4 N/A Five-year Termite
Treatment Warranties
10 days following the treatment.
KO/COR
/IPMC
3 As required
Form
Submission
Distribution
Frequency
Original
/ Copies
Number of Copies
(includin g original)
3, 4 N/A Termite and Wood
Decay Inspection (DD
Form 1070) (per the appropriate Pest
Group Sheet)
10 working days after inspection completed.
KO/COR
/IPMC
3 As required
3, 4 N/A Adult Mosquito Catch
(per the appropriate
Pest Group Sheet)
The same day as collected in a labeled, re-sealable plastic bag.
Installati on
Preventiv e
Medicine
Departm ent
2 As required
3, 4 N/A Larval Mosquito
Survey Report (per the appropriate Pest
Group Sheet)
Within 1 day of the survey.
KO/COR
/IPMC
3 As required
3, 4 N/A Stored Product Pest
Survey (per the appropriate Pest
Group Sheet)
Within 1 day of the survey.
KO/COR
/IPMC
3 As required
3, 4 N/A Pharaoh Ant
Treatment: Floor Plan
Diagram (per the appropriate Pest
Group Sheet)
2 calendar days prior to beginning the treatment.
KO/PAR 2 As required
3, 4 N/A Tick Survey Report
(per the appropriate
Pest Group Sheet)
Within 1 day of the survey.
Installati on
Preventiv e
Medicine
Departm ent/KO/P
AR
3 As required
3, 4 N/A Mole Cricket Survey
Report (per the appropriate Pest
Group Sheet)
Within 1 day of the survey.
KO/PAR 2 As required
3.1.2 N/A Monthly Larvaciding
Work Schedule
Five work days prior to the beginning of each month and immediately after any revisions
KO/COR
/IPMC
3 Monthly /
Form
Submission
Distribution
Frequency
Original
/ Copies
Number of Copies
(includin g original)
3.2 N/A Service Call Summary
Report
First work day of each month
KO/COR 2 Monthly /
Electronic
3.3 J-1503020-14 Report of Pest
Management
Operations
Electronically once per month by the
15th of the following month
(Example:
July data must be submitted by August
15).
KO/COR
/IPMC
3 Monthly
Instructions for Contractor's Work Plan
The CWP shall adhere to applicable publications and directives contained in J-1503020-04 (Applicable Publications and Directives). The CWP will require approval by the Contracting Officer (KO). The CWP shall establish the strategy and methods for conducting a safe, effective, and environmentally sound pest management program in compliance with these specifications. Prospective contractors may review the installation’s historical records of pest activity and abatement actions, survey facilities and grounds, and consult with the Installation PMC in development of a plan. The CWP shall address continuous monitoring, pest response and removal procedures, record keeping, warranties, education and communication to installation personnel to prevent pests and disease vectors, bird control on applicable airfields and in hangars, etc. The IPM approach should use targeted (i.e., effective, environmentally sound) methods including habitat/facility modification, biological/genetic/cultural control, mechanical/physical control, and where necessary, the judicious use of least hazardous pesticides. The CWP shall include labels, MSDS sheets, and planned pesticide use sheets and comply with all applicable local, state, and Federal regulations, and the
IPMP.
Instructions for Field Pest Management Record Form
The Contractor shall use the NAVFAC PPMC approved/provided on-line reporting system to provide a summary printout electronic copy of the data. The website is: https://clients.emainc.com/dcs/ pestmanagement/PesticideLogon.asp. The regional NAVFAC Applied Biology Center should be contacted to obtain a password and instructions to use the system. The report shall include individual daily records of all pest control operations, both chemical and non-chemical, including surveys. Records should be electronically submitted on a monthly basis to the KO by the 15th day of the month in Microsoft Excel (1997 or later version) via diskette, e-mail attachment, etc. J-1503020-14 (Field Pest Management Record Form) may be used as a field data entry sheet at the contractor’s discretion.
https://clients.emainc.com/dcs/
Section F – 1503030
Integrated Solid Waste Management (ISWM)
Item
Form
Attachment
Number
Deliverable
Title
Date (s) of
Submission
Distribution
Frequency
Original/
Copies
Number of Copies
(including original)
2.3.1 N/A Weight Tickets As
specified
KO 12 With invoice/Monthly
3.1 N/A Solid Waste
Collection
Schedule
As specified
KO 1 15 days after award/Annually
3.1 N/A Weekly Solid
Waste Collection
Work
Completion
Report
At 0900 on
Tuesday of each week.
KO 2 Weekly / Electronic
3.1.1.2, 3.1.2.2, 3.2.2
J-1503030-06 Recyclable
Products Report
Submit by
5th of the month following the end of the Quarter
KO 2 Quarterly /
Electronic
3.1.1.2, 3.1.2.2, 3.2.2
J-1503030-07 Recoverable
Recyclable
Products
Collection
Report
Submit by
5th of following month
KO /
Environmental
Department
2 Monthly / Electronic
3.1.1.2 N/A Recycling
Residents
Weekly Report
At 0900 on
Tuesday of each week
KO /
Environmental
Department
2 Weekly / Electronic
3.1.1.3, 3.1.2.3
N/A Weekly Curbside
Bulk Item
Pickup Program
At 0900 on
Tuesday of each week
KO 2 Weekly / Electronic
3.5 N/A Recyclable
Stockpile
Processing
Schedule
60 days after contract award
KO 2 Annually /
Electronic
3.6 N/A Landfill Daily
Logs
Upon
Request of
KO
KO 2 As specified
3.6 N/A Landfill Monthly
Reports
Submit by
5th of following month
KO /
Environmental
Department
2 Daily / Electronic
3.6 N/A Landfill
Quarterly
Reports
Submit by
5th of the month following the end of the Quarter
KO /
Environmental
Department
2 Quarterly /
1503040 – Other (Swimming Pools)
Section F – 1503040
Other (Swimming Pools)
Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.2.1 N/A Certifications and
Training
Within 15 days after award or as requested by the KO
KO 1 Once for initial submittal, then as requested or change of personnel /
Electronic
3 N/A Maintenance
Summary Report
First work day of each month
KO/COR 2 Monthly/
3.1 N/A
Integrated
Maintenance Plan
Within 45 days after award or as requested by the KO
KO/COR 2 Annually/
Electronic
3.1 N/A Monthly IMP
schedule
Five work days prior to the beginning of each month
KO/COR 2 Monthly/
Electronic
3.1 N/A Unaccomplished
maintenance report
Five work days prior to the beginning of each month
KO/COR 2 Monthly/
Electronic
3.1 N/A Repair status
report
Five work days prior to the beginning of each month
KO/COR 2 Monthly/
Electronic
3.1 N/A Summary of
maintenance and repair accomplished under the IMP report
Five work days prior to the beginning of each month
KO/COR 2 Monthly/
Electronic
3.1.1 N/A Water Analysis
Report
First work day of each
KO 1 Monthly
Section F – 1503050
Grounds Maintenance and Landscaping
Form
Attachment
Number
Deliverable
Title
Date (s) of
Submission
Distribution
Frequency
Original/
Copies
Number of Copies
(including original)
2.3 N/A Permits Within 15
calendar days prior to start of work.
KO/COR 2 As required
2.3.9.1 N/A Water
Conservation
Plan
As specified KO 2 15 days after award/Annually
3.1 N/A Improved
Grounds
Schedule
Five work days prior to the beginning of each month
KO/COR 2 Monthly/
Electronically
3.1.1.3 N/A Soil Analysis Within 15
days after receipt of the test results by the
Contractor
KO/COR 2 As Required
3.1.1.3 N/A Top Dressing
and Over
Seeding Seed
Type
Within 15 calendar days prior to contract start
KO/COR 2 Annually and five calendar days prior to implementing changes to the schedule
3.1.2 N/A Vegetation
Control
Schedule
As specified KO 2 15 days after award/Annually
3.1.4 N/A Debris
Removal
Schedule
As specified KO 2 15 days after award/Annually
3.2.5 N/A Policing of
Roads and
Locations
45 calendar days after award
KO/COR 2 Annually/
Electronically
3.4 N/A Grounds
Maintenance
Service Order
Summary of
Completion
Report
By the fifth day of each
KO/COR 2 Monthly
Section F – 1601000
Utilities Management
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency
Original/
Copies
Number of Copies
(including original)
2.3.1 N/A System Access
Personnel Listing
Within 30 calendar days after contract award
COR/KO/
Utilities
Branch Head
2 Upon award and any change in personnel
3 N/A Mid-to-Mid Report 0900 each day
KO/COR/
Utilities
Branch Head
3 Daily/ Electronic
3 N/A GTMOSAF - LOTO
(Verification and
Notification Form)
By COB the third workday of each month
COR/KO 2 Monthly
3.1 N/A Service Order
Summary Report
Monday
KO/COR/
Utilities
Branch Head
3 Weekly/ Electronic
3.2.2 N/A Scheduled Outage
Plan/ Service
Disruption Plan
Within 15 days prior to contract start
KO/COR/
Utilities
Branch Head
2 Once for initial submittal, then as requested /
Electronic
3.2.2 N/A Unscheduled Outage
Report
Within one business day of the outage.
KO/COR/
Utilities
Branch Head
2 As needed/
Electronic
3.2.2 J-1601000-
Outage Request Form Within three business days of the outage.
KO/COR/
Utilities
Branch Head
2 As needed/
Electronic
3.2.3 N/A Monthly Meter
Reading Report
By the 25th day of each month
Utilities
Branch
Head/KO
2 Monthly
3.2.4 N/A Excavation Permit Upon
issuance
Utilities
Branch
Head/COR and KO
3 As required
3.2.5 N/A Utility Locate
Documentation
By COB the third workday of each month
KO/COR/
Utilities
Branch Head
2 Monthly
3.3.1 N/A MAXIMO Asset
Changes Report
By COB the third workday of each month
COR/KO &
FMD/
Utilities
Branch Head
4 Monthly
Section F – 1602000
Electrical
Item
Form
Attachment
Number
Deliverable
Title
Date (s) of
Submission
Distribution
Frequency Original/ Copies
Number of Copies
(including original)
2.2.1 N/A Certification
and Licenses
30 calendar days after award and as required by the KO
KO/COR 2 Once for initial submittal, then as requested or change of personnel /
Electronic
3.1 N/A Standard
Operation
Procedures
Within 30 days after contract start and within five days of any changes
KO/COR/UEM 4 Once. Update if the requirements change.
3.1 N/A Fuel Tickets Close of
Business each day
KO/COR/UEM 2 Daily
3.1.2 N/A Mid to Mid
Report
By 0900 each day
KO/COR/UEM 1 Daily
3.1.2 N/A Operating
Records Report, Diesel/Gas
3 days after following the end of the month during which work is performed
KO/COR 4 Monthly
3.3 N/A Integrated
Maintenance
Program (IMP)
15 days after award
KO/COR 4 Annually and one business day after any change is made to the schedule
3.3 N/A Monthly IMP
schedule
By the 25th day of each month
KO/COR 4 Monthly
3.3 N/A Unaccomplished
maintenance report
0800 each
Monday
KO/COR 4 Weekly
3.3 N/A Repair status
report
3 days after following the end of the month
KO/COR 4 Monthly
Section F – 1602000
Electrical
Item
Form
Attachment
Number
Deliverable
Title
Date (s) of
Submission
Distribution
Frequency Original/ Copies
Number of Copies
(including original)
3.3 N/A Summary of
maintenance and repair accomplished under the IMP report
3 days after following the end of the month
KO/COR 4 Monthly
3.3 N/A Corrosion
Control Plan
45 days after award
KO/COR 2 Annually/
Electronic and one business day after any changes
3.3 N/A Distribution and
transmission lines be thermal imaged each year
Month Pole
Completed
COR/UEM
Supervisor/KO/UEM
Electrical
2 Monthly/Electronic by 5th of month.
3.3 N/A Generator Issues 24 Hours Notification of issue
with Generator
2 As Needed
3.4 N/A Other Recurring
Services
Program
Summary
Report
Five work days prior to the beginning of each month.
KO/COR 2 Monthly/
Section F – 1604000
Wastewater
Spec Item Form
Attachment
Number
Deliverable
Title
Date (s) of
Submission
Distribution Frequency
Original/
Copies
Number of Copies
(including original)
2.2.1 N/A Certification
and Licenses
15 days after award
KO/COR 2 Once for initial submittal, then as requested or change of personnel /
Electronic
3.1, 3.2 N/A Standard
Operation
Procedures
Within 30 days after contract start and within five days after making changes to any plant operating procedure, equipment or component.
KO/COR
and
Onsite/
Utilities
Branch
Head
4 Once. Update if the requirements change.
3.1.1, 3.2.1 J-1604000-
Laboratory
Analysis of
Wastewater
Effluent Report
Within 2 days of discovery when found non-compliant.
4 days after the end of the month if compliant.
KO/COR/
Utilities
Branch
Head
4 Monthly or within 2 days if found non-compliant
3.1.2, 3.2.2 N/A Schedule of
Operator
Attendance
7 prior to the start of work
Within 2 days of Request
KO/COR/
Utilities
Branch
Head
4 7 prior to the start of work and as requested
3.1.3, 3.2.3 J-1604000-
Wastewater
Treatment
Operating
Records, Logs and Reports
3 days after the end of the month during which work is performed
KO/COR/
Utilities
Branch
Head
3.3 N/A Integrated
Maintenance
Program (IMP)
15 days after award
KO/COR/
Utilities
Branch
Head
4 Annually and any time a change is made.
3.3 N/A Monthly IMP
Schedule
By the 25th day of each month
KO/COR/
Utilities
Branch
Section F – 1604000
Wastewater
Attachment
Number
Deliverable
Title
Date (s) of
Submission
Distribution Frequency
Original/
Copies
Number of Copies
(including original)
3.3 N/A IMP
Maintenance and Repair
Status Report
Monday 0900 KO/COR/
Utilities
Branch
Head
4 Weekly
3.3 N/A Corrosion
Control Plan
45 calendar days after award
KO/COR/
Utilities
Branch
Head
2 Annually/
Electronic and one business day after any changes
3.4 N/A Other Recurring
Services
Program
45 calendar days after award
KO/COR/
Utilities
Branch
Head
2 Annually/
Electronic and one business day after any changes
3.4 N/A Other Recurring
Services
Program
Summary
Report
Five work days prior to the beginning of each month.
KO/COR/
Utilities
Branch
Head
2 Monthly/
Electronic
3.4.2 N/A Bilge and Oily
Waste Removal
Report
2 business days after each service
KO/COR/
Utilities
Branch
Head
2 As Needed/
Electronic
3.4.3 N/A Pier Side Sewer
Removal
Report
2 business days after each service
KO/COR/
Utilities
Branch
Head
2 As Needed/
Section F - 1606000
Water
Form
Attachment
Number
Deliverable
Title
Date (s) of
Submission
Distribution
Frequency
Original
/ Copies
Number of
Copies
(including original)
2.2 N/A Key Personnel At a
minimum of
30 calendar days prior to start of contract performanc e and immediately upon any changes
KO/COR
/ Utilities
Branch
Head/
Environ mental
Director
2 Once for initial submittal, then as requested or change of personnel /
Electronic
2.2.1 N/A Proof of all
Certification, Training, and
Licensing
Requirements
Within 30 days following award and as requested by KO
KO/COR
/ Utilities
Branch
Head/
Environ mental
Director
2 Once for initial submittal, then as requested or change of personnel /
Electronic
3 N/A Outage Request At a minimum of ten workdays prior to commence ment of work
KO/COR
/ Utilities
Branch
Head
2 As required
3.1 N/A Standard
Operating
Procedures
15 days after award and 5 days after changes
KO/COR
/ Utilities
Branch
Head
4 As required
3.1 J-1606000-05 Water
Interruption/Bre ak Report
Within
24hrs of break/servic es interruption
KO/COR
/ Utilities
Branch
Head
4 As required
3.1 N/A Notification of
Unsafe
Conditions
Report
Within 24 hours of occurrence
KO/COR
/ Utilities
Branch
Head
4 ea per occurrence
As Specified
3.1 J-1606000-04 Chemical
Usage/Storage
Report
3 days following the end of the month
KO/COR
/ Utilities
Branch
4 As Specified
3.1.1 J-1606000-08 Certified
Laboratory
Analyses Report
Daily KO/COR
/ Utilities
Branch
Head/
Environ mental
Director
2 As Specified /
Electronic
3.1.1 N/A Quality
Control/Quality
Assurance Plan
Within 30 days of award and within 15 calendar days prior to any changes.
KO/COR
/ Utilities
Branch
Head/
Environ mental
Director
2 Bi-Annually after initial submission or as changes occur
3.1.1 N/A Monthly Water
Quality (FAC, Inorganic/Organ ic Chemicals, and Radiological
Results) Report
Within three working days following the end of the month
KO/COR
/ Utilities
Branch
Head/
2 Monthly
3.1.1 N/A Fecal Coliform
Report
Within two days after positive result and
Monthly
KO/COR
/ Utilities
Branch
Head/
2 As Specified
3.1.1 N/A Total Coliform
Report
Within three working days following the end of the month
KO/COR
/ Utilities
Branch
Head/
2 Monthly
3.1.1 N/A Disinfection
Profiling and
Benchmarking -
Monitoring, Profiling and
Analysis Report
Within three working days following the end of the month
KO/COR
/ Utilities
Branch
Head/
2 Monthly
3.1.1 N/A Point Test -
Results and
Analysis
By the 15th of October
KO/COR
/ Utilities
Branch
Head/
2 Annually
3.1.3 N/A Operating
Records, Logs, and Reports
3 days following the end of the month
KO/COR
/ Utilities
Branch
3.1.3 J-1606000-05 Physical
Inspection
Program (PIP)
Report
5th day of month
KO/COR
/ Utilities
Branch
Head/
Environ mental
Director
4 Monthly
3.1.3 J-1606000-06 Bacteriological
Sampling Plan
Within 15 days after
KO/COR
/ Utilities
4 Once. Update as changes occur award of contract
Branch
Head/
Environ mental
Director
3.1.3 J-1606000-07 Disinfection
Profile, Disinfection
Benchmark, CT
Calculation
Within 30 days after award of contract
KO/COR
/Utilities
Branch
Head
Electronic Once, Update as changes occur
3.1.1 N/A Cross
Connection and
Backflow
Prevention Plan
Within 30 days after award of contract
KO/COR
/ Utilities
Branch
Head
4 Once. Update as changes occur
3.1.3 J-1606000-09 Mid-To-Mid
Report
Daily by
KO/COR
/ Utilities
Branch
Head
Electronic Daily by 0900
3.1.3 J-1606000-10 Daily Water
Report
Daily by
KO/COR
/ Utilities
Branch
Head/
Environ mental
Director
Electronic Daily by 0900
3.1.3 N/A Unidirectional
Flushing
Program
Within 30 days after award of contract
KO/COR
/ Utilities
Branch
Head
Once. Update as changes occur
3.1.3 N/A Emergency
Response Plan
Within 30 days after award of contract
KO/COR
/ Utilities
Branch
Head
Once. Update as changes occur
3.2 N/A Integrated
Maintenance
Program (IMP)
Within 15 days following award
KO/COR
/ Utilities
Branch
4 As specified
3.2 N/A IMP Schedule
and IMP
Maintenance and Repair
Status Report
3 days following the end of the month/0800 each
Monday
KO/COR
/ Utilities
Branch
Head
4 Monthly/Weekly
3.2 N/A Corrosion
Control Plan
45 calendar days after award
KO/COR
/ Utilities
Branch
Head
2 Annually/
Electronic and one business day after any changes
3.2.1 J-1606000-11 Valve Exercise
Spreadsheet
3 days following the end of the month
KO/COR
/ Utilities
Branch
Head
3 Monthly/
Electronic -update spreadsheet as tests are completed throughout year
3.2.1 J-1606000-13 Annual Hydrant
Flow Test
Spreadsheet
First work day of each month
KO/COR
/UEM
Monthly/
Electronic -update spreadsheet as tests are completed throughout year
3.2.1 J-1606000-14 Annual Hydrant
Flow Test
Report
Maintain file and provide as requested
KO/COR
/UEM
1 As completed
3.2.2 N/A Backflow
Prevention
(BFP) and Cross
Connection
Control (CCC)
Program
At a minimum of
30 calendar days prior to commence ment of work and 5 working days after changes
KO/COR
/ Utilities
Branch
Head
2 Once. Update as changes occur.
3.3 N/A Other Recurring
Services
Program
Summary
Report
Within 30 days following award
KO/COR
/ Utilities
Branch
Head
2 Annually/
Electronic and one business day after any changes
3.3.4 N/A Water System
Instrumentation and Control
Devices’ Testing and Calibration
Schedule
At a minimum of
30 calendar days prior to commence ment of work and 5 working days after changes
KO/COR
/ Utilities
Branch
Head
2 As Specified
3.3.5.1 N/A Water Service
Emergency Plan
At a minimum of
15 calendar days prior to commence ment of work and 5 working days after changes
KO/COR
/ Utilities
Branch
Head
2 Once. Update as changes occur.
3.3.5.2 N/A Public
Notification
Procedure
As
Specified
KO/COR
/ Utilities
Branch
Head
/Public
As necessary to meet requiremen t
As Required
3.3.5.2 N/A Water Quality
Public
Notification and
Water Quality
Violation Report
As
Specified
KO/COR
/ Utilities
Branch
Head
/Public
As necessary to meet requiremen t
As Required
3.3.5.3 N/A Consumer
Confidence
Reporting
Draft by
April 1st, Final by
June 1st, Distribute and make available to population before July
1st
KO/COR
/ Utilities
Branch
Head
/Public
As necessary to meet requiremen t
Annually
Section F – 1700000
Base Support Vehicles and Equipment
Attachmen t Number
Report Title Date (s) of
Submission
Distribution Frequency
Original/
Copies
Number of Copies
(including original)
2.2.1 N/A Certification and
Licenses
45calendar days after award or as requested by the
KO
KO/COR
/BSVE
Manager
2 Once for initial submittal, then as requested or change of personnel /
Electronic
2.2.2 N/A Resumes of Key
Personnel
45calendar days after award or as requested by the
KO
KO/COR
/BSVE
Manager
1 Once for initial submittal, then as requested or change of personnel /
Electronic
2.3.1.4 N/A Temporary
Suspension of
Downtime
Accumulation
Within two hours of notice to the
Contractor that the material delays will cause the downtime standard to be missed.
KO/COR
/BSVE
Manager
2 As required
3.1.4 N/A C-Pool VSO
Completion Report
0900 Tuesday of each week
KO/COR
/BSVE
Manager
2 Weekly/
Electronic
3.1.4 N/A VSO Completion
Report
By the 25th day of the preceding month
KO/COR
/BSVE
Manager
2 Monthly/
Electronic
3.2.2 N/A C-Pool Vehicle
Assignment Report
Every Morning by 0900
KO/COR
/BSVE
Manager
2 Daily/
Electronic
3.2.2 N/A C-Pool Utilization
Report
0900 Tuesday of each week
KO/COR
/BSVE
Manager
2 Weekly/
Electronic
3.2.3 N/A Vehicle Washing
Completion Report
By the 25th day of the preceding month
KO/COR
/BSVE
Manager
2 Monthly/
Electronic
3.3 N/A Critical Spare Parts
List
45 calendar days after award
KO/COR
/BSVE
Manager
2 Once for initial submittal, then as requested /
Electronic
3.3 N/A Vehicle Accident
Reports
Monthly KO/COR
/BSVE
Manager
4 Within five calendar days of the start of the month
Section F – 1700000
Base Support Vehicles and Equipment
Attachmen t Number
Report Title Date (s) of
Submission
Distribution Frequency
Original/
Copies
Number of Copies
(including original)
3.3 N/A Vehicle Maintenance
and Repair Status
Report
Every Morning by 0900
KO/COR
/BSVE
Manager
4 Daily/
Electronic
3.3.2 N/A Schedule for Testing
and Certification
As required KO/COR
/BSVE
Manager
4 Annually and as required after repairs
3.3.2 N/A Testing and
Certification
Qualifications
As required KO/COR
/BSVE
Manager
4 Prior to start of contract, annually and, prior to a new employee starting work.
3.3.3 N/A Preventive
Maintenance Schedule
Annually KO/COR
/BSVE
Manager
4 15 calendar days prior to the start of work and annually.
3.3.5 N/A MTV Preventive
Maintenance Schedule
By the 25th day of the preceding month
KO/COR
/BSVE
Manager
File details come from the government source that posted it. Updated .