This document contains an above ceiling penetration permit template and policy for Naval Hospital Guantanamo Bay, Cuba. The permit template requires information on the location and reason for ceiling penetrations, as well as signatures approving and inspecting the work. The policy states that all hospital personnel and outside contractors must obtain a permit from Facilities Management before performing any above ceiling work. Contractors must submit schedules of planned penetrations and location details in advance. Facilities Management will accompany contractors during work and sign off on completed projects before payment. Completed permits and letters of conformance documenting firestopping compliance are required for payment.

The related federal contract opportunity is a draft solicitation for base operations support services at Naval Station Guantanamo Bay, Cuba. Services include family housing, facility management, facility investment, custodial services, pest control, integrated solid waste management, grounds maintenance and landscaping, utilities like electrical and water, and base vehicles and equipment. The solicitation is issued by the Department of the Navy Naval Facilities Engineering Command for these services at Naval Station Guantanamo Bay.

View the file

Other files

File Type Posted
JL-10 NSGB Industry Day Brief_June Updated.pdf PDF
JL-10 NSGB Industry Day Brief_June Updated.pdf PDF
Jl-4_N6945022R0032_SECNAV5512.pdf PDF
JL-10 NSGB Industry Day Brief_June.pdf PDF
JL-11_N6945022R0032_AwardFeePlan DRAFT.pdf PDF
NSGB_FY23_BOS_AwardFeePlan DRAFT.pdf PDF
N6945022R0032_DRAFT.pdf PDF
NSGB BOS Pre-Proposal Site Visit Final.pdf PDF
J-0200000-12 Energy Policy CNRSEINST 4101.1C.pdf PDF
J-1502000-02(DHA)-02_Infection Control Risk Assessment.pdf PDF
N6945022R0032 Section C_Draft.pdf PDF
J-1604000-05_Sample Reports.pdf PDF
JL-6_ENCL (1) ENTRY CLEARANCE COVER SHEET.pdf PDF
N6945022R0032 Section J_Draft.pdf PDF
J-1606000-04_Sample Reports.pdf PDF
J-0200000-14_N6945023R0032_Contractor_Housing_Site.pdf PDF
J-0200000-09_CHARACTERISTIC METER READING INFORMATION.xlsx XLSX spreadsheet
JM-2_N6945022R0032_PPQ.docx DOCX document
JL-4_N6945022R0032_SECNAV5512.pdf PDF
J-1502000-15_(DHA)MedicalAirGasAndVacuumSystemsMaps.pdf PDF
J-1602000-05_LNG_SOP.pdf PDF
JL-3_N6945022R0032_AMAG.xls XLS spreadsheet
J-1503050-05_Site.pdf PDF
JL-1_N6945022R0032_Draft.xlsx XLSX spreadsheet
J-1700000-09_DDForm1970.pdf PDF
J-TECHNICAL_N6945022R0032_SectionJ_Technical Attachments_draft.xlsx XLSX spreadsheet
JL-7_ENCL (3) AMC Flight Reservation request blank.doc DOC document
JM-1_N6945022R0032_Corporate_Experience.docx DOCX document
_J-0200000-13_N6945022R0032_Draft.xlsx XLSX spreadsheet
JL-9 NSGB Industry Day Brief_January.pdf PDF
J-1502000-20_(DHA)FireWallsandFireDoorsMap.pdf PDF
J-0200000-07_ASSET INFORMATION.xlsx XLSX spreadsheet
J-1502000-02(DHA)-04_ISLM Assessment Form.pdf PDF
J-1503050-08_Roads.pdf PDF
J-0200000-08_ASSET SPECIFICATION.xlsx XLSX spreadsheet
JL-8_PWD JAX Building 27 Location Map.pdf PDF
J-0200000-16_N6945022R0032_CAT_Call_Request.pdf PDF
J-0200000-06_ SERVICE PROVIDER INFORMATION.xlsx XLSX spreadsheet
N6945022R0032_DRAFT.pdf PDF
J-0200000-15_N6945022R0032_Additional Requirements for CCMUEB.pdf PDF
J-1601000-12_Outage request.pdf PDF
J-1602000-06_LNG_Schematic.pdf PDF
J-1501000-04_BaseMap.pdf PDF
J-1502000-32_N6945022R0032_ESPC_Role and Responsibilities.pdf PDF
J-1502000-02(DHA)-03_Pre-Construction Site Survey.pdf PDF
JL-2_N6945022R0032_GPIF.xls XLS spreadsheet
N6945022R0032 Section F_Draft.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABOVE CEILING, FIRE AND SMOKE BARRIER PENETRATION PERMIT

Permit Number: ___________________________ Issue Date: ___________________

Approved by: Estimated Completion Date: ______________________

(Facilities Representative)

Permit Issued To:

(Department / Contractor Name) (Individual’s Name) (Phone Number)

Location of Corridor Wall(s) or Barrier(s) to be Penetrated: (building, floor, room number) (Attached Sketch if applicable) (Attached photos of existing condition of wall pentetrations if applicable)

Reasons for Penetration or Work to be Performed:

Final Inspection by Department/Contractor:

Sign: __________________________________________ Date: ______________________

Facilities Management:

Sign: __________________________________________ Date: ______________________

Instructions:

1. Maintain a copy of this permit at the work area at all times.

2. Promptly repair penetration in an approved (NFPA/MFG/CDC/etc…) manner. Contact the hospital’s Facilities

Management office, if there are any questions regarding the repairs.

3. Notify Facilities Management when repairs are complete to schedule a final inspection.

4. Contractors must fill all penetrations with a rated fire stopping product approved by the hospital.

5. Prior to performing related tasks within patient care, laboratory, surgery or other areas where the services rendered are directly impacting patient care; you will be required to obtain an Infection Control Permit.

6. All ceiling tile(s) will be reinstalled or replaced to the satisfaction of the final inspection.

7. Pictures will be taken of the fire and smoke barrier walls before the penetrations are made by department/contractor performing work. Pictures will be taken after the work has been completed by department/contractor performing work. Pictures will be sent to the Facilities Management office.

Pictures required for this permit? Yes No

NAVAL HOSPITAL, GUANTANAMO BAY, CUBA

POLICY AND PROCEDURE

SUBJECT: ABOVE THE CEILING INSTALLATION PERMIT PROGRAM

POLICY STATEMENT:

The above the ceiling permit program is designed to ensure the integrity of fire rated walls, doors and smoke compartments through the use of monitoring; inspecting and providing a permit to all outside contractors or subcontractors, and hospital personnel that may be creating penetrations.

PROCEDURE:

1. Each maintenance, telecommunications, I.T./MID, and contract employee shall submit a schedule of anticipated penetrations to Facilities Management Department (FMD) prior to the start of any construction project. All outside contractors and any Naval Hospital employee doing above ceiling work will be required to obtain a permit from the Facilities Management Department (FMD) before work begins.

2. The location of each penetration will be identified on a floor plan for the area under construction, and submitted to FMD.

3. Upon submission of all required documentation, an "Above Ceiling Installation Permit" will be issued to the contractor by FMD.

4. FMD will accompany the contractor to the construction site and will post the permit in a visibly prominent location, and the permit will remain posted for the duration of the project.

5. Upon completion of the permitted project, the contractor will notify the FMD that the project is complete and ready for inspection. Once inspected, FMD will sign off on the construction project.

6. No payment to any construction contractor will be allowed without documentation of a completed Above the Ceiling Installation Permit, signed by FMD and a completed Letter of Conformance signed by FMD.

LETTER OF CONFORMANCE

Project Name: _________________________________________________________________

Job Location: __________________________________________________________________

Brief Description of Job: __________________________________________________________

Firestop Manufacture Used: ______________________________________________________

I, _______________________ of _____________________, on this Date _______________, by completing and signing this letter certify that all firestop systems used on this project have been installed in accordance with Naval Hospital Guantanamo Bay, Cuba guidelines.

In addition, all firestop systems have been installed to system details and written instructions in accordance with UL 1479 / ASTM E 814 and/or UL 2079 / ASTM E 1966 test Standards.

The following supporting document s must be attached:

Approved UL or OPL systems used on the Job (may differ from initial permit)

Any Engineering Judgments provided for this project.

Signed, completed Above Ceiling Installation Permit (necessary for payment, if applicable)

Contractor Signature FMD Signature

Contractor Name (printed) FMD Representative (printed)

Date Date

Permit Number:
Issue Date:
Estimated Completion Date:
Individuals Name:
Phone Number:
Date:
Date_2:
Department Contractor Name:
FM:
2:
3:
4:
5:
6:
7:
8:
9:
10:
Text1:
12:
11:
Sketch 1:
Sketch 2:
Sketch 3:
Sketch 4:
Reasons 1:
Reasons 2:
Reasons 3:
Reasons 4: