J-1602000-06_LNG_Schematic.pdf

PDF 409 KB Posted

Attached to
DRAFT Solicitation, Base Operations Support (BOS) Services at Naval Station Guantanamo Bay, Cuba
Solicitation number
N6945022R0032
Issued by

About this file

This document contains a draft solicitation for base operations support services at Naval Station Guantanamo Bay, Cuba and an associated file regarding schematic layouts for liquefied natural gas off-loading.

The draft solicitation from the Department of the Navy Naval Facilities Engineering Command seeks proposals for base operations support services at Naval Station Guantanamo Bay, including family housing, facility management, facility investment, custodial services, pest control, integrated solid waste management, grounds maintenance and landscaping, utilities like electrical, wastewater and water, and base support vehicles and equipment. The associated file provides schematic layouts for two 1,000 cubic meter liquefied natural gas tanks, off-loading headers, flexible hoses, an off-loading skid and crane, and related equipment at Pier Charlie for off-loading liquefied natural gas to storage tanks.

View the file

Other files

File Type Posted
JL-10 NSGB Industry Day Brief_June Updated.pdf PDF
JL-10 NSGB Industry Day Brief_June Updated.pdf PDF
Jl-4_N6945022R0032_SECNAV5512.pdf PDF
JL-10 NSGB Industry Day Brief_June.pdf PDF
JL-11_N6945022R0032_AwardFeePlan DRAFT.pdf PDF
NSGB_FY23_BOS_AwardFeePlan DRAFT.pdf PDF
N6945022R0032_DRAFT.pdf PDF
NSGB BOS Pre-Proposal Site Visit Final.pdf PDF
J-0200000-12 Energy Policy CNRSEINST 4101.1C.pdf PDF
J-1502000-02(DHA)-02_Infection Control Risk Assessment.pdf PDF
N6945022R0032 Section C_Draft.pdf PDF
J-1604000-05_Sample Reports.pdf PDF
JL-6_ENCL (1) ENTRY CLEARANCE COVER SHEET.pdf PDF
N6945022R0032 Section J_Draft.pdf PDF
J-1606000-04_Sample Reports.pdf PDF
J-0200000-14_N6945023R0032_Contractor_Housing_Site.pdf PDF
J-0200000-09_CHARACTERISTIC METER READING INFORMATION.xlsx XLSX spreadsheet
JM-2_N6945022R0032_PPQ.docx DOCX document
JL-4_N6945022R0032_SECNAV5512.pdf PDF
J-1502000-15_(DHA)MedicalAirGasAndVacuumSystemsMaps.pdf PDF
J-1602000-05_LNG_SOP.pdf PDF
JL-3_N6945022R0032_AMAG.xls XLS spreadsheet
J-1503050-05_Site.pdf PDF
JL-1_N6945022R0032_Draft.xlsx XLSX spreadsheet
J-1700000-09_DDForm1970.pdf PDF
J-TECHNICAL_N6945022R0032_SectionJ_Technical Attachments_draft.xlsx XLSX spreadsheet
JL-7_ENCL (3) AMC Flight Reservation request blank.doc DOC document
JM-1_N6945022R0032_Corporate_Experience.docx DOCX document
_J-0200000-13_N6945022R0032_Draft.xlsx XLSX spreadsheet
JL-9 NSGB Industry Day Brief_January.pdf PDF
J-1502000-20_(DHA)FireWallsandFireDoorsMap.pdf PDF
J-0200000-07_ASSET INFORMATION.xlsx XLSX spreadsheet
J-1502000-02(DHA)-04_ISLM Assessment Form.pdf PDF
J-1502000-02(DHA)-01_Above Ceiling Penetration Permit.pdf PDF
J-1503050-08_Roads.pdf PDF
J-0200000-08_ASSET SPECIFICATION.xlsx XLSX spreadsheet
JL-8_PWD JAX Building 27 Location Map.pdf PDF
J-0200000-16_N6945022R0032_CAT_Call_Request.pdf PDF
J-0200000-06_ SERVICE PROVIDER INFORMATION.xlsx XLSX spreadsheet
N6945022R0032_DRAFT.pdf PDF
J-0200000-15_N6945022R0032_Additional Requirements for CCMUEB.pdf PDF
J-1601000-12_Outage request.pdf PDF
J-1501000-04_BaseMap.pdf PDF
J-1502000-32_N6945022R0032_ESPC_Role and Responsibilities.pdf PDF
J-1502000-02(DHA)-03_Pre-Construction Site Survey.pdf PDF
JL-2_N6945022R0032_GPIF.xls XLS spreadsheet
N6945022R0032 Section F_Draft.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J-1602000-06

SCHEMATIC LAYOUT OF LNG OFF-LOADING

Two (2) 1,000 Cubic Meter LNG Tanks Vessel’s LNG pumps and Controls

Off-loading Header w/

Breakaway Couplings

Off-loading LNG Flexible Hose

PIER CHARLIE

Pier Charlie Off-loading Header

Off-loading

Skid

To LNG

Storage

Tanks

Off-loading Crane

BARGE

Equipment Inventory Pier Charlie 65’ Guttleling Hose, LNG, Rubber 1 skid, LNG, Unloading; Emergency shutdown and sampling ports 1 Caldwell Krane-King A360-1-18/20 Jib Crane with manual hoist (sheaves) and rope 100 lf, 4” steel piping w/steel armor insulation, painted; mounted on existing pier pipe rack

File details come from the government source that posted it. Updated .