J-1602000-06_LNG_Schematic.pdf
PDF 409 KB Posted
- Attached to
- DRAFT Solicitation, Base Operations Support (BOS) Services at Naval Station Guantanamo Bay, Cuba
- Solicitation number
- N6945022R0032
About this file
This document contains a draft solicitation for base operations support services at Naval Station Guantanamo Bay, Cuba and an associated file regarding schematic layouts for liquefied natural gas off-loading.
The draft solicitation from the Department of the Navy Naval Facilities Engineering Command seeks proposals for base operations support services at Naval Station Guantanamo Bay, including family housing, facility management, facility investment, custodial services, pest control, integrated solid waste management, grounds maintenance and landscaping, utilities like electrical, wastewater and water, and base support vehicles and equipment. The associated file provides schematic layouts for two 1,000 cubic meter liquefied natural gas tanks, off-loading headers, flexible hoses, an off-loading skid and crane, and related equipment at Pier Charlie for off-loading liquefied natural gas to storage tanks.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment J-1602000-06
SCHEMATIC LAYOUT OF LNG OFF-LOADING
Two (2) 1,000 Cubic Meter LNG Tanks Vessel’s LNG pumps and Controls
Off-loading Header w/
Breakaway Couplings
Off-loading LNG Flexible Hose
PIER CHARLIE
Pier Charlie Off-loading Header
Off-loading
Skid
To LNG
Storage
Tanks
Off-loading Crane
BARGE
Equipment Inventory Pier Charlie 65’ Guttleling Hose, LNG, Rubber 1 skid, LNG, Unloading; Emergency shutdown and sampling ports 1 Caldwell Krane-King A360-1-18/20 Jib Crane with manual hoist (sheaves) and rope 100 lf, 4” steel piping w/steel armor insulation, painted; mounted on existing pier pipe rack
File details come from the government source that posted it. Updated .