S152 SHELTER _1 SLAB PLAN_Amd01_2020-09-14.pdf

PDF 134 KB Posted

Attached to
Alert Facility and Alert Apron Federal contract opportunity
Solicitation number
N69450-20-R-0129
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document contains a solicitation for the construction of an Alert Facility and Alert Apron at NAS JRB New Orleans. The scope of work includes the construction of an Aerospace Control Alert Facilities and Alert Apron utilizing conventional design and construction methods to accommodate the mission of the facility. Key requirements include the construction of two aircraft shelters with drive-through capability and installed systems, an aircrew alert quarters/mission support structure with Alternate Command Post capabilities and a secure area, and an entry control facility with standby power. The alert apron scope requires providing all associated utilities, site improvements, lighting and security upgrades for a parking apron to accommodate two alert ready aircraft. The contract will be a firm-fixed-price design-bid-build project with a completion schedule of 1300 calendar days from award. The total project value is estimated between $25 million to $100 million. The solicitation is unrestricted and open to all responsible sources. The agency is the Department of the Navy Naval Facilities Engineering Command.

View the file

Other files for this federal contract opportunity

Other files attached to Alert Facility and Alert Apron, newest first.
File Type Posted
C511 STORM DRAINAGE DETAILS_Amd06_2020-10-21.pdf PDF
N6945020R0129_0005.pdf PDF
Amd_0004_CLINS.pdf PDF
PROJECT TOC Amendment 0003.pdf PDF
ESD106 - ELECTRICAL SITE DEMOLITION_Amd0003_2020-10-06.pdf PDF
32 11 20 Amendment 0003.pdf PDF
ESD107 - ELECTRICAL SITE DEMOLITION_Amd0003_2020-10-06.pdf PDF
32 12 16 Amendment 0003.pdf PDF
N6945020R0129_0003.pdf PDF
E506 - ELECTRICAL DETAILS_Amd0003_2020-10-06.pdf PDF
E505 - ELECTRICAL DETAILS_Amd0003_2020-10-06.pdf PDF
ESD105 - ELECTRICAL SITE DEMOLITION_Amd0003_2020-10-06.pdf PDF
G003 - OVERALL PROJECT MAP_Amd0003_2020-10-06.pdf PDF
A351 - SHELTER_1 BUILDING SECTIONS Amd 0002.pdf PDF
P402 - ENLARGED CREW SANITARY PLAN SOUTH Amd 0002.pdf PDF
CA200 - APRON GEOMETY AND UTILITY PLAN Amd 0002.pdf PDF
A602 - DOOR_WINDOW_LOUVER DETAILS Amd 0002.pdf PDF
S154 - SHELTER_2 SLAB PLAN Amd 0002.pdf PDF
10 51 13 Amendment 0002.pdf PDF
01 30 01_00 22 Amendment 0002.pdf PDF
13 34 19 Amendment 0002.pdf PDF
A353 - SHELTER WALL SECTIONS Amd 0002.pdf PDF
C401 - GRADING AND DRAINAGE PLAN Amd 0002.pdf PDF
A201 - ACQ_ECP EXTERIOR ELVATIONS Amd 0002.pdf PDF
A701 - FINISH LEGEND AND SCHEDULE Amd 0002.pdf PDF
01 35 13 Amendment 0002.pdf PDF
C101 - EXISTING CONDITIONS AND SURCHARGE SITE PLAN Amd 0002.pdf PDF
PROJECT TOC Amendment 0002.pdf PDF
A601 - DOOR - WINDOW ELEVATIONS_DOOR SCHEDULE Amd 0002.pdf PDF
P403 ENLARGED CREW PIPING PLAN NORTH_Amd01_2020-09-14.pdf PDF
E503 ELECTRICAL DETAILS_Amd01_2020-09-14.pdf PDF
N6945020R0129_Amendment_0001.pdf PDF
P502 PLUMBING DETAILS_Amd01_2020-09-14.pdf PDF
P402 ENLARGED CREW SANITARY PLAN SOUTH_Amd01_2020-09-14.pdf PDF
ES109 ELECTRICAL SITE PLAN - NEW WORK_Amd01_2020-09-14.pdf PDF
P401 ENLARGED CREW SANITARY PLAN NORTH_Amd01_2020-09-14.pdf PDF
P104 OVERALL SHELTER 2 PLUMBING PLAN_Amd01_2020-09-14.pdf PDF
ES107 ELECTRICAL SITE PLAN - NEW WORK_Amd01_2020-09-14.pdf PDF
B-3 RQLH059034 NORTHCOM Construct Alert Apron Drawings.pdf PDF
Attachment B_COVID-19 Screening Questionnaire.pdf PDF
Exhibit C Safety Data Sheet.docx DOCX document
Exhibit D Historical SB Utilization.docx DOCX document
B-3 NORTHCOM Construct Alert Spec.pdf PDF
Exhibit F Small Business Subcontracting Plan.doc DOC document
N6945020R0129.pdf PDF
Attachment A_ProjNet_How To Guide.pdf PDF
B-3 RQLH189009 NORTHCOM Construct Alert Facility Drawings.pdf PDF
Exhibit B Past Performance Questionnaire.docx DOCX document
Exhibit E SB Participation Commitment Doc.docx DOCX document
Exhibit A Construction Experience Project Data Sheet.docx DOCX document
Show all 50

Alert Facility and Alert Apron has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S5 S6 S7

SA

SB

SC

SE

SD

S4

S503

S503

S503

S503

S503

'-1

1"

'-0

'-0

'-1 1"

1' -6

NOTE 3, TYP.

8"

3'-2 15/16"

1'-5" 76'-8" 76'-8" 1'-5" 0"

INDICATES LOCATION OF

VERTICAL X-BRACING TO BE

SPECIFIED & PROVIDED BY THE

PEMB MANUFACTURER TYP.

SEE PLAN NOTE 5.

5'-6" 5'-6"

4'-10" 66'-4" 5'-6" 5'-6"

'-1

0"

156'-2"

S503

66'-4" 4'-10"

1'-5" 4'-10" 66'-4" 66'-4" 4'-10" 1'-5"

DOWELED SAWCUT

CONTRACTION JOINT

TYP. U.O.N.; SEE 1/S504

AND PLAN NOTE 7

DOWELED EXPANSION JOINT - SEE 9/S504 DOWELED EXPANSION JOINT - SEE 9/S504

DOWELED EXPANSION JOINT - SEE 9/S504DOWELED EXPANSION JOINT - SEE 9/S504

NOTE 6, TYP.

S503

S503

FIN. FLOOR

EL. = 0'-0"

FIN. FLOOR

EL. = 0'-0"

FIN. FLOOR

EL. = (-)0'-1"

FIN. FLOOR

EL. = (-)0'-1"

FIN. FLOOR

EL. = (-)0'-1"

FIN. FLOOR

EL. = (-)0'-1"

FIN. FLOOR

EL. = 0'-0"

FIN. FLOOR

EL. = 0'-0"

FIN. FLOOR

EL. = 0'-0"

FIN. FLOOR

EL. = 0'-0"

SLOPE SLOPE

SL

O

PE

SL

O

PE

FIN. FLOOR

EL. = 0'-0"

FIN. FLOOR

EL. = 0'-0"

FIN. FLOOR

EL. = (-)0'-1"

FIN. FLOOR

EL. = (-)0'-1"

FIN. FLOOR

EL. = (-)0'-1"

FIN. FLOOR

EL. = (-)0'-1"

FIN. FLOOR

EL. = 0'-0"

FIN. FLOOR

EL. = 0'-0"

FIN. FLOOR

EL. = 0'-0"

FIN. FLOOR

EL. = 0'-0"

SLOPESLOPE

SL

O

PE

SL

O

PE

S504

S504

S503

S503

S503

8' -4

8'

-4

8' -4

8'

-4

33'-2" 33'-2" 33'-2" 33'-2"

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

DRAWFORM REVISION: 5 APRIL 2012

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

DE

PA

RT

ME

NT

O

F

TH

E

NA

VY

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

C

OM

MA

ND

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

S O

U

TH

EA

ST

NA

VA

L A

IR

S

TA

TI

ON

JA

CK

SO

NV

ILL

E

SHEET FORMAT IS 22" X 34". IF PRINTED SHEET IS NOT 22" X 34", THEN IT IS NOT TO SCALE

B-3 SUBMITTAL 02/28/2020

DESIGN MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

PROJECT MANAGER

ANTHONY DISANTO

Michelle Contestabile

KURT W. WITTMAN

JOANNE DIZ

1/8" = 1'-0"

IP

T

SO

U

TH

EA

ST

1621243

N69450-XX-C-XXXX

S152

NO

RT

HC

O

M R

EP

LA

CE

A

LE

RT

C O

M

PL

EX

SH

EL

TE

R

SL

AB

P

LA

N

N

AS

J R

B N

EW

O

R

LE

AN

S

BE

LL

E C

H

AS

SE

, L

O U

IS

IA

N A

GGS GGS KWW

19 164

AM

EN

D

M

EN

T

/1 4/

15135259

1/8" = 1'-0"

AIRCRAFT SHELTER #1 - SLAB PLAN

PLAN NORTH

M

AT

CH

LI

N E

M

AT

CH

LI

N E

PLAN NOTES:

1. SEE SHEETS S001 & S002 FOR GENERAL STRUCTURAL NOTES & DESIGN

CRITERIA.

2. REFERENCE FINISHED FLOOR ELEVATION = 0'-0". SEE CIVIL DWG'S FOR ACTUAL

ELEVATION.

3. SHELTER SLAB IS AN 14" CAST-IN-PLACE CONCRETE SLAB-ON-GRADE WITH

#5 AT 12" o.c. CONT. EA. WAY TOP & BOTTOM ON COMPACTED SUB-BASE

CONSISTING OF 6" RIGID PAVEMENT BASE COURSE (SPEC. 32 11 20) ON

STABILIZED SUB-GRADE (SPEC. 31 23 00.00 20).

4. PROVIDE (2)-#4x4'-0" TOP, TYP. AT REENTRANT CORNERS.

5. THE PRE-ENGINEERED METAL BUILDING (PEMB) SUPER-STRUCTURE SHALL BE

DESIGNED FOR THE DESIGN CRITERIA MENTIONED IN THE GENERAL

STRUCTURAL NOTES, AS WELL AS ANY ADDITIONAL LOADS SHOWN ON PLAN.

THE PEMB SUPPLIER SHALL PROVIDE SHOP DRAWINGS THAT MUST BE

REVIEWED AND APPROVED BY THE SEOR PRIOR TO FABRICATION

AND FOUNDATION CONSTRUCTION.

6. PROVIDE (3) AIRCRAFT TIE DOWNS EMBEDDED IN THE CONCRETE SLAB, ON EA.

SIDE OF THE AIRCRAFT. SEE 7/S503. VERIFY FINAL LOCATIONS w/ LOUISIANA

AIR NATIONAL GUARD.

7. THE CONTRACTOR MAY SUBSTITUTE DOWELED CONSTRUCTION JOINTS

PER DETAIL 3/S504 AT DOWELED CONTRACTION JOINT LOCATIONS.

8. APPLY LIQUID-CHEMICAL FLOOR HARDENER/SEALER TO SLAB SURFACE

IN ACCORDANCE WITH THE SPECIFICATIONS AND THE MANUFACTURER'S

INSTRUCTIONS.

Sheets
S001 - GENERAL NOTES & DESIGN CRITERIA
S152 - SHELTER #1 SLAB PLAN
S154 - SHELTER #2 SLAB PLAN

File details come from the government source that posted it. Updated .