This document contains details for a federal construction contract opportunity and related design submittal specifications. The contract opportunity is for the construction of an Alert Facility and Alert Apron at NAS JRB New Orleans, including an Aerospace Control Alert Facility, Alert Apron, two aircraft shelters with drive-through capability, aircrew alert quarters with Alternate Command Post capabilities, and security upgrades. The specifications require the facilities to be designed and constructed in accordance with UFC criteria and include pile foundations, site preparation, utilities, lighting, and communications infrastructure. The contract will have a period of performance of 1300 calendar days and a total value between $25-100 million. It will be awarded on a firm-fixed-price basis through full and open competition to all responsible sources by the Naval Facilities Engineering Command.

View the file

Other files for this federal contract opportunity

Other files attached to Alert Facility and Alert Apron, newest first.
File Type Posted
N6945020R0129_Amendment_0007.pdf PDF
C201 SITE PLAN_Amd06_2020-10-21.pdf PDF
N69450-20-R-0129_AMENDMENT_0006.pdf PDF
Amd_0004_CLINS.pdf PDF
N6945020R0129_Amendment_0004.pdf PDF
PROJECT TOC Amendment 0003.pdf PDF
ESD106 - ELECTRICAL SITE DEMOLITION_Amd0003_2020-10-06.pdf PDF
32 11 20 Amendment 0003.pdf PDF
ESD107 - ELECTRICAL SITE DEMOLITION_Amd0003_2020-10-06.pdf PDF
32 12 16 Amendment 0003.pdf PDF
ESD108 - ELECTRICAL SITE DEMOLITION_Amd0003_2020-10-06.pdf PDF
ESD109 - ELECTRICAL SITE DEMOLITION_Amd0003_2020-10-06.pdf PDF
32 01 13.62 Amendment 0003.pdf PDF
32 11 23 Amendment 0003.pdf PDF
A351 - SHELTER_1 BUILDING SECTIONS Amd 0002.pdf PDF
P402 - ENLARGED CREW SANITARY PLAN SOUTH Amd 0002.pdf PDF
CA200 - APRON GEOMETY AND UTILITY PLAN Amd 0002.pdf PDF
A602 - DOOR_WINDOW_LOUVER DETAILS Amd 0002.pdf PDF
C201 - SITE PLAN Amd 0002.pdf PDF
C200 - OVERALL SITE PLAN Amd 0002.pdf PDF
08 34 02 Amendment 0002.pdf PDF
N6945020R0129_Amendment_0002.pdf PDF
A352 - SHELTER_ BUILDING SECTIONS Amd 0002.pdf PDF
10 26 00 Amendment 0002.pdf PDF
10 21 23.16 Amendment 0002.pdf PDF
13 34 19 Amendment 0002.pdf PDF
A353 - SHELTER WALL SECTIONS Amd 0002.pdf PDF
S152 SHELTER _1 SLAB PLAN_Amd01_2020-09-14.pdf PDF
P403 ENLARGED CREW PIPING PLAN NORTH_Amd01_2020-09-14.pdf PDF
E503 ELECTRICAL DETAILS_Amd01_2020-09-14.pdf PDF
26 20 00 Amendment 0001.pdf PDF
ESL101 EXTERIOR LIGHTING PLAN_Amd01_2020-09-14.pdf PDF
S001 GENERAL NOTES_DESIGN CRITERIA_Amd01_2020-09-14.pdf PDF
P102 OVERALL ECP PLUMBING FLOOR PLAN_Amd01_2020-09-14.pdf PDF
P103 OVERALL SHELTER 1 PLUMBING PLAN_Amd01_2020-09-14.pdf PDF
NOLA_Alert_R0129_SiteVisit_Roster.pdf PDF
S154 SHELTER _2 SLAB PLAN_Amd01_2020-09-14.pdf PDF
P104 OVERALL SHELTER 2 PLUMBING PLAN_Amd01_2020-09-14.pdf PDF
ES107 ELECTRICAL SITE PLAN - NEW WORK_Amd01_2020-09-14.pdf PDF
B-3 RQLH059034 NORTHCOM Construct Alert Apron Drawings.pdf PDF
Attachment B_COVID-19 Screening Questionnaire.pdf PDF
Exhibit E SB Participation Commitment Doc.docx DOCX document
Exhibit A Construction Experience Project Data Sheet.docx DOCX document
Exhibit D Historical SB Utilization.docx DOCX document
B-3 NORTHCOM Construct Alert Spec.pdf PDF
Exhibit F Small Business Subcontracting Plan.doc DOC document
N6945020R0129.pdf PDF
Attachment A_ProjNet_How To Guide.pdf PDF
B-3 RQLH189009 NORTHCOM Construct Alert Facility Drawings.pdf PDF
Exhibit B Past Performance Questionnaire.docx DOCX document
Show all 50

Alert Facility and Alert Apron has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NORTHCOM CONSTRUCT ALERT APRON/FACILITIES WON: 1323108/1621243

NAS JRB NEW ORLEANS, LOUISIANA B-3 DESIGN SUBMITTAL

SECTION 01 35 13

SPECIAL PROJECT PROCEDURES

11/11

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. FEDERAL AVIATION ADMINISTRATION (FAA)

FAA AC 70/7460-1 (2015; Rev L) Obstruction Marking and Lighting

FAA AC 150/5300-13 (2012; Rev A; Change 1 2014; Errata 2016;

Errata 2 2017; Errata 3 2018) Airport Design

1.2 DEFINITIONS

1.2.1 Landing Areas

"Landing Areas" means:

a. The primary surfaces, comprising the surface of the runway, runway shoulders, and lateral safety zones. The length of each primary surface is the same as the runway length. The width of each primary surface is 2000 feet ( 1000 feet on each side of the runway centerline).

b. The "clear zone" beyond the ends of each runway is the extension of the primary surface for a distance of 1000 feet beyond each end of each runway.

c. All taxiways, plus the lateral clearance zones along each side for the length of the taxiways (the outer edge of each lateral clearance zone is laterally 250 feet from the far or opposite edge of the taxiway (example: a 75 foot widetaxiway must have a combined width and lateral clearance zone of 425 feet.)

d. All aircraft parking aprons, plus the area 125 feet in width extending beyond each edge all around the aprons.

1.2.2 Safety Precaution Areas

"Safety Precaution Areas" means those portions of approach-departure clearance zones and transitional zones where placement of objects incident to contract performance might result in vertical projections at or above the approach-departure clearance, or the transitional surface.

a. The "approach-departure clearance surface" is an extension of the primary surface and the clear zone at each end of each runway, for a distance of 50,000 feet, first along an inclined (glide angle) and then along a horizontal plane, both flaring symmetrically about the runway centerline extended.

SECTION 01 35 13 Page 1 michelle.contestabil Typewritten Text

REVISION 1: AMENDMENT 0002

(1) The inclined plane (glide angle) begins in the clear zone 200 feet past the end of the runway (and primary surface) at the same elevation as the end of the runway. It continues upward at a slope of 50:1 ( one foot vertically for each 50 feet horizontally) to an elevation of 500 feet above the established airfield elevation. At that point the plane becomes horizontal, continuing at that same uniform elevation to a point 50,000 feet longitudinally from the beginning of the inclined plane (glide angle) and ending there.

(2) The width of the surface at the beginning of the inclined plane (glide angle) is the same as the width of the clear zone. It then flares uniformly, reaching the maximum width of 16,000 feet at the end.

b. The "approach-departure clearance zone" is the ground area under the approach-departure clearance surface.

c. The "transitional surface" is a sideways extension of all primary surfaces, clear zones, and approach-departure clearance surfaces along inclined planes.

(1) The inclined plane in each case begins at the edge of the surface.

(2) The slope of the incline plane is 7:1 ( one foot vertically for each 7 feet horizontally). It continues to the point of intersection with the:

(a) Inner horizontal surface (which is the horizontal plane 150 feet above the established airfield elevation); or

(b) Outer horizontal surface (which is the horizontal plane 500 feet above the established airfield elevation), whichever is applicable.

d. The "transitional zone" is the ground area under the transitional surface. (It adjoins the primary surface, clear zone, and approach-departure clearance zone.)

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.

SD-01 Preconstruction Submittals

Heavy Equipment and Vehicle List

Construction Operations Plan

Safety Plan

Schedule of Work

SECTION 01 35 13 Page 2

PART 2 PRODUCTS

2.1 AIRFIELD OBSTRUCTION LIGHTS

Airfield obstruction lights must conform to FAA AC 70/7460-1 and have red or white lenses.

PART 3 EXECUTION

3.1 HAZARDS TO AIRFIELD OPERATION

In addition to DFARS 252.236-7005 Airfield Safety Precautions, the following paragraphs apply.

3.1.1 Work in Proximity to Landing Areas

Place nothing upon the landing area or applicable portions of safety precaution areas without authority of the Contracting Officer.

Use of landing areas for purposes other than aircraft operation,is prohibited without permission of the Contracting Officer, and the landing area is closed by order of the Contracting Officer and marked as indicated herein.

Accomplish all construction work on the landing strip, 75 feet to each side thereof, and on the taxiways and parking aprons with extreme care regarding the operation of aircraft. Cooperate closely, and coordinate with the Operations Officer and the Contracting Officer. Park equipment in an area designated by the Contracting Officer. Parking of equipment, vehicles, or any type of storage overnight or for any extended period of time in the proximity of the landing areas or taxiways is strictly prohibited. Leave no material in areas where extreme care is to be taken regarding the operation of aircraft.

During periods of active performance of work on the airfield by the Contractor, govern all operations of mobile equipment per the safety provisions.

3.1.2 Schedule of Work/Aircraft Operating Schedules

Schedule work to conform to aircraft operating schedules. The Government will exert every effort to schedule aircraft operations so as to permit the maximum amount of time for the Contractor's activities; however, in the event of emergency, intense operational demands, adverse wind conditions, and other such unforeseen difficulties, the Contractor must cease operations at the specified locations in the aircraft operational area for the safety of the Contractor and military personnel and Government property. Submit a schedule of the work to the Contracting Officer for transmittal to the Operations Officer describing the work to be accomplished; the location of the work, noting distances from the ends of landing areas, taxiways and buildings and other structures as necessary;

and dates and hours during which the work is to be accomplished. Keep the approved schedule of work current, and notify the Contracting Officer of any changes prior to beginning each day's work.

Prior to commencement of work, submit the following to the Contracting Officer for transmittal to the Operations Officer:

Construction Operations Plan

SECTION 01 35 13 Page 3

Safety Plan Heavy Equipment and Vehicle List

Where flying is controlled, additional permission must be obtained from the control tower operator to enter a landing area unless such area is marked as hazardous to aircraft.

3.1.3 Daytime Markings

During daylight, mark stationary and mobile equipment with international orange and white checkered flags, mark the material, and work with yellow flags.

Vehicles operating in the landing area, must be identified by means of a flag on a staff attached to and flying above the vehicle. Flag size must be not less than 3 feet square and consist of a checkered pattern of international orange and white squares not less than one foot on each side. Flags varying in any dimension by not more than 10 percent of the specified dimensions are considered to comply with the stated requirements.

3.1.4 Nighttime Markings

During nighttime, which begins 2-hours before sundown and ends 2-hours after sunrise, mark stationary and mobile equipment and material, and work with battery-operated, low-intensity, red flasher lights. Where the Operations Officer determines that the red flasher lights may confuse pilots approaching for landings, the Operations Officer may direct that the red flasher lights be left off or that the color of the lights be changed.

Light construction and installation must comply with FAA AC 70/7460-1.

Lights must be operational during periods of reduced visibility, darkness, and as directed by the Contracting Officer.

No separate payments will be made for lighting and protection necessitated by the safety provisions.

3.1.5 Contractor Safety Precautions

The Contractor is advised that aircraft operations will produce extremely high noise levels and will induce vibrations in pavements, structures, and equipment in the vicinity, and may result in high velocity flying debris in the area. The Contractor is responsible for providing all necessary protective eye and ear gear and other safety devices for his personnel, for insuring protection of his equipment, and for scheduling the work to eliminate hazards to his personnel and equipment and to prevent damage to work performed by him.

Boundary areas for hazardous work locations and restrictions are defined in FAA AC 150/5300-13. Construction activity within the limits of the boundary areas without approval of the Contracting Officer is prohibited.

Provide a minimum of two aviation red or high intensity white obstruction lights on temporary structures (including cranes) over 100 feet above ground level.

3.1.6 Radio Contact

Provide necessary battery powered portable radios, including one radio for the tower. During work within the landing area, have an operator (who

SECTION 01 35 13 Page 4 speaks fluent English) available for radio contact with the tower at all times. Radio frequency must be approved by the tower.