01 35 13 Amendment 0002.pdf
PDF 29 KB Posted
- Attached to
- Alert Facility and Alert Apron Federal contract opportunity
- Solicitation number
- N69450-20-R-0129
About this file
This document contains details for a federal construction contract opportunity and related design submittal specifications. The contract opportunity is for the construction of an Alert Facility and Alert Apron at NAS JRB New Orleans, including an Aerospace Control Alert Facility, Alert Apron, two aircraft shelters with drive-through capability, aircrew alert quarters with Alternate Command Post capabilities, and security upgrades. The specifications require the facilities to be designed and constructed in accordance with UFC criteria and include pile foundations, site preparation, utilities, lighting, and communications infrastructure. The contract will have a period of performance of 1300 calendar days and a total value between $25-100 million. It will be awarded on a firm-fixed-price basis through full and open competition to all responsible sources by the Naval Facilities Engineering Command.
View the file
Other files for this federal contract opportunity
Show all 50
Alert Facility and Alert Apron has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NORTHCOM CONSTRUCT ALERT APRON/FACILITIES WON: 1323108/1621243
NAS JRB NEW ORLEANS, LOUISIANA B-3 DESIGN SUBMITTAL
SECTION 01 35 13
SPECIAL PROJECT PROCEDURES
11/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. FEDERAL AVIATION ADMINISTRATION (FAA)
FAA AC 70/7460-1 (2015; Rev L) Obstruction Marking and Lighting
FAA AC 150/5300-13 (2012; Rev A; Change 1 2014; Errata 2016;
Errata 2 2017; Errata 3 2018) Airport Design
1.2 DEFINITIONS
1.2.1 Landing Areas
"Landing Areas" means:
a. The primary surfaces, comprising the surface of the runway, runway shoulders, and lateral safety zones. The length of each primary surface is the same as the runway length. The width of each primary surface is 2000 feet ( 1000 feet on each side of the runway centerline).
b. The "clear zone" beyond the ends of each runway is the extension of the primary surface for a distance of 1000 feet beyond each end of each runway.
c. All taxiways, plus the lateral clearance zones along each side for the length of the taxiways (the outer edge of each lateral clearance zone is laterally 250 feet from the far or opposite edge of the taxiway (example: a 75 foot widetaxiway must have a combined width and lateral clearance zone of 425 feet.)
d. All aircraft parking aprons, plus the area 125 feet in width extending beyond each edge all around the aprons.
1.2.2 Safety Precaution Areas
"Safety Precaution Areas" means those portions of approach-departure clearance zones and transitional zones where placement of objects incident to contract performance might result in vertical projections at or above the approach-departure clearance, or the transitional surface.
a. The "approach-departure clearance surface" is an extension of the primary surface and the clear zone at each end of each runway, for a distance of 50,000 feet, first along an inclined (glide angle) and then along a horizontal plane, both flaring symmetrically about the runway centerline extended.
SECTION 01 35 13 Page 1 michelle.contestabil Typewritten Text
REVISION 1: AMENDMENT 0002
(1) The inclined plane (glide angle) begins in the clear zone 200 feet past the end of the runway (and primary surface) at the same elevation as the end of the runway. It continues upward at a slope of 50:1 ( one foot vertically for each 50 feet horizontally) to an elevation of 500 feet above the established airfield elevation. At that point the plane becomes horizontal, continuing at that same uniform elevation to a point 50,000 feet longitudinally from the beginning of the inclined plane (glide angle) and ending there.
(2) The width of the surface at the beginning of the inclined plane (glide angle) is the same as the width of the clear zone. It then flares uniformly, reaching the maximum width of 16,000 feet at the end.
b. The "approach-departure clearance zone" is the ground area under the approach-departure clearance surface.
c. The "transitional surface" is a sideways extension of all primary surfaces, clear zones, and approach-departure clearance surfaces along inclined planes.
(1) The inclined plane in each case begins at the edge of the surface.
(2) The slope of the incline plane is 7:1 ( one foot vertically for each 7 feet horizontally). It continues to the point of intersection with the:
(a) Inner horizontal surface (which is the horizontal plane 150 feet above the established airfield elevation); or
(b) Outer horizontal surface (which is the horizontal plane 500 feet above the established airfield elevation), whichever is applicable.
d. The "transitional zone" is the ground area under the transitional surface. (It adjoins the primary surface, clear zone, and approach-departure clearance zone.)
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
SD-01 Preconstruction Submittals
Heavy Equipment and Vehicle List
Construction Operations Plan
Safety Plan
Schedule of Work
SECTION 01 35 13 Page 2
PART 2 PRODUCTS
2.1 AIRFIELD OBSTRUCTION LIGHTS
Airfield obstruction lights must conform to FAA AC 70/7460-1 and have red or white lenses.
PART 3 EXECUTION
3.1 HAZARDS TO AIRFIELD OPERATION
In addition to DFARS 252.236-7005 Airfield Safety Precautions, the following paragraphs apply.
3.1.1 Work in Proximity to Landing Areas
Place nothing upon the landing area or applicable portions of safety precaution areas without authority of the Contracting Officer.
Use of landing areas for purposes other than aircraft operation,is prohibited without permission of the Contracting Officer, and the landing area is closed by order of the Contracting Officer and marked as indicated herein.
Accomplish all construction work on the landing strip, 75 feet to each side thereof, and on the taxiways and parking aprons with extreme care regarding the operation of aircraft. Cooperate closely, and coordinate with the Operations Officer and the Contracting Officer. Park equipment in an area designated by the Contracting Officer. Parking of equipment, vehicles, or any type of storage overnight or for any extended period of time in the proximity of the landing areas or taxiways is strictly prohibited. Leave no material in areas where extreme care is to be taken regarding the operation of aircraft.
During periods of active performance of work on the airfield by the Contractor, govern all operations of mobile equipment per the safety provisions.
3.1.2 Schedule of Work/Aircraft Operating Schedules
Schedule work to conform to aircraft operating schedules. The Government will exert every effort to schedule aircraft operations so as to permit the maximum amount of time for the Contractor's activities; however, in the event of emergency, intense operational demands, adverse wind conditions, and other such unforeseen difficulties, the Contractor must cease operations at the specified locations in the aircraft operational area for the safety of the Contractor and military personnel and Government property. Submit a schedule of the work to the Contracting Officer for transmittal to the Operations Officer describing the work to be accomplished; the location of the work, noting distances from the ends of landing areas, taxiways and buildings and other structures as necessary;
and dates and hours during which the work is to be accomplished. Keep the approved schedule of work current, and notify the Contracting Officer of any changes prior to beginning each day's work.
Prior to commencement of work, submit the following to the Contracting Officer for transmittal to the Operations Officer:
Construction Operations Plan
SECTION 01 35 13 Page 3
Safety Plan Heavy Equipment and Vehicle List
Where flying is controlled, additional permission must be obtained from the control tower operator to enter a landing area unless such area is marked as hazardous to aircraft.
3.1.3 Daytime Markings
During daylight, mark stationary and mobile equipment with international orange and white checkered flags, mark the material, and work with yellow flags.
Vehicles operating in the landing area, must be identified by means of a flag on a staff attached to and flying above the vehicle. Flag size must be not less than 3 feet square and consist of a checkered pattern of international orange and white squares not less than one foot on each side. Flags varying in any dimension by not more than 10 percent of the specified dimensions are considered to comply with the stated requirements.
3.1.4 Nighttime Markings
During nighttime, which begins 2-hours before sundown and ends 2-hours after sunrise, mark stationary and mobile equipment and material, and work with battery-operated, low-intensity, red flasher lights. Where the Operations Officer determines that the red flasher lights may confuse pilots approaching for landings, the Operations Officer may direct that the red flasher lights be left off or that the color of the lights be changed.
Light construction and installation must comply with FAA AC 70/7460-1.
Lights must be operational during periods of reduced visibility, darkness, and as directed by the Contracting Officer.
No separate payments will be made for lighting and protection necessitated by the safety provisions.
3.1.5 Contractor Safety Precautions
The Contractor is advised that aircraft operations will produce extremely high noise levels and will induce vibrations in pavements, structures, and equipment in the vicinity, and may result in high velocity flying debris in the area. The Contractor is responsible for providing all necessary protective eye and ear gear and other safety devices for his personnel, for insuring protection of his equipment, and for scheduling the work to eliminate hazards to his personnel and equipment and to prevent damage to work performed by him.
Boundary areas for hazardous work locations and restrictions are defined in FAA AC 150/5300-13. Construction activity within the limits of the boundary areas without approval of the Contracting Officer is prohibited.
Provide a minimum of two aviation red or high intensity white obstruction lights on temporary structures (including cranes) over 100 feet above ground level.
3.1.6 Radio Contact
Provide necessary battery powered portable radios, including one radio for the tower. During work within the landing area, have an operator (who
SECTION 01 35 13 Page 4 speaks fluent English) available for radio contact with the tower at all times. Radio frequency must be approved by the tower.
-- End of Section --
SECTION 01 35 13 Page 5