N6945020R0129_0003.pdf
PDF 67 KB Posted
- Attached to
- Alert Facility and Alert Apron Federal contract opportunity
- Solicitation number
- N69450-20-R-0129
About this file
This modification to solicitation N69450-20-R-0129 provides revisions to drawings and specifications for the Alert Facility and Alert Apron project at Naval Air Station Joint Reserve Base New Orleans.
The project involves construction of an Aerospace Control Alert Facility with two aircraft shelters, aircrew alert quarters, and an Alternate Command Post building. An alert apron will be constructed for two alert ready aircraft along with site utilities, communications, exterior lighting, and security upgrades. The modification adds specifications for asphalt surface treatment, aggregate base courses, and hot-mix asphalt paving. Impacted drawings are replaced to indicate Building 24 location and note taxiway light removal details.
The proposal due date remains October 19, 2020. Interested parties may attend an optional pre-proposal conference on September 1 and submit technical inquiries through ProjNet by the specified key. Revisions to the solicitation are posted to beta.SAM.gov. The Navy will award a firm-fixed-price design-bid-build construction contract for $25-100 million with a 1300-day completion schedule.
View the file
Other files for this federal contract opportunity
Show all 50
Alert Facility and Alert Apron has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVFAC SOUTHEAST
PWD NEW ORLEANS- BLDG 552
NAVAL AIR STATION-JOINT RESERVE BASE
NEW ORLEANS LA 70143
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N69450-20-R-0129 ALERT FACILITIES & ALERT APRON AT NAVAL AIR STATION (NAS) JOINT RESERVE BASE (JRB) NEW ORLEANS, LOUISIANA
See Block 14 CONTINUATION PAGE on Page 2.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Oct-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6945020R0129
X 9B. DATED (SEE ITEM 11)
20-Aug-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Oct-2020
CODE
NAVFAC SOUTHEAST
CORE CONSTRUCTION
BLDG 903 YORKTOWN
PO BOX 0030
JACKSONVILLE FL 32212-0030
N69450 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE N69450
FACILITY CODECODE
EMAIL:TEL:
N6945020R0129
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES.
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0003
The purpose of this amendment is to:
1) Provide changes to the following Sections of the Drawings and Specifications as follows:
Specification Changes for Amendment #0003:
1. Delete Specification Project Table of Contents in its entirety and replace with new Project Table of Contents, with changes labeled Amendment 0003. Changes include but are not limited to:
A. Add 32 01 13.62 Asphalt Surface Treatment.
B. Delete 32 11 20 Base Course for Rigid Paving and replace with new 32 11 20 Subbases for Flexible Paving.
C. Add 32 11 23 Aggregate Base Courses.
D. Add 32 12 16 Hot-Mix Asphalt (HMA) for Roads.
2. Add new Specification Section “32 01 13.62 Asphalt Surface Treatment”, with changes labeled Amendment 0003.
3. Delete Specification Section “32 11 20 Base Course for Rigid Paving” in its entirety and replace with new Specification Section “32 11 20 Subbases for Flexible Paving”.
4. Add new Specification Section “32 11 23 Aggregate Base Courses”, with changes labeled Amendment 0003.
5. Add new Specification Section “32 12 16 Hot-Mix Asphalt (HMA) for Roads”, with changes labeled Amendment 0003.
B-3 RQLH059034 NORTHCOM Construct Alert Apron Drawing Changes for Amendment #0003:
1. Delete Drawing “G003 Overall Project Map” in its entirety and replace with new G003, with changes labeled Amendment 0003. Changes include but are not limited to:
A. Indicate location of Building 24, which is referenced on the Electrical Drawings.
2. Delete Drawing “ESD105 Electrical Site Demolition” in its entirety and replace with new ESD105, with changes labeled Amendment 0003. Changes include but are not limited to:
A. Add keyed note 6 to read as follows: “See sheets E505 and E506 for taxiway patch details.”
B. Add keyed note 6 symbol to taxiway lights on plan to be removed
3. Delete Drawing “ESD106 Electrical Site Demolition” in its entirety and replace with new ESD106, A. Add keyed note 3 to read as follows: “See sheets E505 and E506 for taxiway patch details.”
B. Add keyed note 3 symbol to taxiway lights on plan to be removed
4. Delete Drawing “ESD107 Electrical Site Demolition” in its entirety and replace with new ESD107, A. Add keyed note 3 to read as follows: “See sheets E505 and E506 for taxiway patch details.”
B. Add keyed note 3 symbol to taxiway lights on plan to be removed
5. Delete Drawing “ESD108 Electrical Site Demolition” in its entirety and replace with new ESD108, A. Add keyed note 4 to read as follows: “See sheets E505 and E506 for taxiway patch details.”
B. Add keyed note 4 symbol to taxiway lights on plan to be removed
6. Delete Drawing “ESD109 Electrical Site Demolition” in its entirety and replace with new ESD109, A. Add keyed note 5 to read as follows: “See sheets E505 and E506 for taxiway patch details.”
B. Add keyed note 5 symbol to taxiway lights on plan to be removed
7. Add new Drawing “E505 Electrical Details” with changes labeled Amendment 0003. Changes include but are not limited to:
A. Provide “Light Can Removal Asphalt Repair Details”.
8. Add new Drawing “E506 Electrical Details” with changes labeled Amendment 0003. Changes include but are not limited to:
A. Provide “Light Can Removal Concrete Full Depth Repair Details”.
2) The following attachments are provided to reflect these changes:
Specifications:
32 01 13.62 Amendment 0003 32 11 20 Amendment 0003 32 11 23 Amendment 0003 32 12 16 Amendment 0003 PROJECT TOC Amendment 0003
Alert Apron Drawings
G003 – OVERALL PROJECT MAP_Amd 0003_2020-10-06 ESD105 – ELECTRICAL SITE DEMOLITION_Amd 0003_2020-10-06 ESD106 – ELECTRICAL SITE DEMOLITION_Amd 0003_2020-10-06 ESD107 – ELECTRICAL SITE DEMOLITION_Amd 0003_2020-10-06 ESD108 – ELECTRICAL SITE DEMOLITION_Amd 0003_2020-10-06 ESD109 – ELECTRICAL SITE DEMOLITION_Amd 0003_2020-10-06 E505 – ELECTRICAL DETAILS_Amd 0003_2020-10-06 E506 – ELECTRICAL DETAILS_Amd 0003_2020-10-06
3) The proposal due date and time remains 3:30 PM ET, 19 October 2020. All other terms and conditions remain unchanged.
The following have been modified:
INSTRUCTIONS TO OFFERORS
List of Exhibits & Attachments
Exhibit A – Construction Experience Project Data Sheet
Exhibit B – Past Performance Questionnaire (PPQ)
Exhibit C – Safety Data Sheet
Exhibit D – Small Business Participation and Commitment Strategy (Historical SB Utilization)
Exhibit E – Small Business Participation Commitment Strategy Document
Exhibit F – Small Business Subcontracting Plan Template
Attachment A – ProjNet How To Guide
Attachment B – COVID-19 Screening Questionnaire (for Pre-Proposal Conference and Site Visit)
The following drawings and specification files have been posted on beta. SAM.gov:
− B-3 NORTHCOM Construct Alert Spec − B-3 RQLH059034 NORTHCOM Construct Alert Apron Drawings − B-3 RQLH189009 NORTHCOM Construct Alert Facility Drawings − ES107 ELECTRICAL SITE PLAN - NEW WORK_Amd01_2020-09-14 − ES109 ELECTRICAL SITE PLAN - NEW WORK_Amd01_2020-09-14 − E503 ELECTRICAL DETAILS_Amd01_2020-09-14 − ESL101 EXTERIOR LIGHTING PLAN_Amd01_2020-09-14 − P102 OVERALL ECP PLUMBING FLOOR PLAN_Amd01_2020-09-14 − P103 OVERALL SHELTER 1 PLUMBING PLAN_Amd01_2020-09-14 − P104 OVERALL SHELTER 2 PLUMBING PLAN_Amd01_2020-09-14 − P401 ENLARGED CREW SANITARY PLAN NORTH_Amd01_2020-09-14 − P402 ENLARGED CREW SANITARY PLAN SOUTH_Amd01_2020-09-14 − P403 ENLARGED CREW PIPING PLAN NORTH_Amd01_2020-09-14 − P502 PLUMBING DETAILS_Amd01_2020-09-14 − S001 GENERAL NOTES & DESIGN CRITERIA_Amd01_2020-09-14 − S152 SHELTER #1 SLAB PLAN_Amd01_2020-09-14 − S154 SHELTER #2 SLAB PLAN_Amd01_2020-09-14 − 26 20 00 Amendment 0001 − 01 30 01.00 22 Amendment 0002 − 01 35 13 Amendment 0002 − 08 34 02 Amendment 0002 − 10 21 23.16 Amendment 0002 − 10 26 00 Amendment 0002 − 10 51 13 Amendment 0002 − 13 34 19 Amendment 0002 − PROJECT TOC Amendment 0002 − C101 EXISTING CONDITIONS AND SURCHARGE SITE PLAN Amd 0002 − C200 OVERALL SITE PLAN Amd 0002 − C201 SITE PLAN Amd 0002 − C401 GRADING AND DRAINAGE PLAN Amd 0002 − CA200 APRON GEOMETY AND UTILITY PLAN Amd 0002 − S154 SHELTER #2 SLAB PLAN Amd 0002 − A201 ACQ & ECP EXTERIOR ELVATIONS Amd 0002 − A351 SHELTER #1 BUILDING SECTIONS Amd 0002 − A352 SHELTER #2 BUILDING SECTIONS Amd 0002
− A353 SHELTER WALL SECTIONS Amd 0002 − A601 DOOR - WINDOW ELEVATIONS & DOOR SCHEDULE Amd 0002 − A602 DOOR, WINDOW & LOUVER DETAILS Amd 0002 − A701 FINISH LEGEND AND SCHEDULE Amd 0002 − P402 ENLARGED CREW SANITARY PLAN SOUTH Amd 0002 − 32 01 13.62 Amendment 0003 − 32 11 20 Amendment 0003 − 32 11 23 Amendment 0003 − 32 12 16 Amendment 0003 − PROJECT TOC Amendment 0003 − G003 – OVERALL PROJECT MAP_Amd 0003_2020-10-06 − ESD105 – ELECTRICAL SITE DEMOLITION_Amd 0003_2020-10-06 − ESD106 – ELECTRICAL SITE DEMOLITION_Amd 0003_2020-10-06 − ESD107 – ELECTRICAL SITE DEMOLITION_Amd 0003_2020-10-06 − ESD108 – ELECTRICAL SITE DEMOLITION_Amd 0003_2020-10-06 − ESD109 – ELECTRICAL SITE DEMOLITION_Amd 0003_2020-10-06 − E505 – ELECTRICAL DETAILS_Amd 0003_2020-10-06 − E506 – ELECTRICAL DETAILS_Amd 0003_2020-10-06
PRE-PROPOSAL INQUIRIES (PPI)
Interested parties with technical inquiries shall submit their inquiries in writing via a "Bidder Inquiry" in ProjNet at www.projnet.org\projnet. A ProjNet How To Guide is provided as Attachment A. The bidder inquiry key for this solicitation is 9GMY2W-AN7FTB.
The Government reserves the right to decline addressing certain questions. Further, no questions, unless in the Government's interest, will be answered any later than ten (10) business days prior to the stated deadline for responses to this announcement. Simple questions and answers will be made via ProjNet. Official amendments to the RFP will be made via the beta.SAM.gov website. All Offerors are encouraged to register on ProjNet for alerts, to stay abreast of bidder inquiries and Government responses that are posted in reference to this solicitation. Only self-registered users on ProjNet can submit and review inquiries. To self- register, go to the webpage, click BID tab, select Bidder Inquiry, select agency NAVFAC and enter the key for this solicitation listed above and your e-mail address. After initial login, enter all the required information to create your user ID. Verify the information on the next screen; and, from there, you may submit and view inquiries. Those submitting inquiries will receive a system generated e-mail notification when their inquiry has been processed and provided a response. It is the Offeror's responsibility to monitor for inquiries and responses.
Beta.SAM.gov Amendments will be posted directly to beta.SAM.gov. The drawings and specifications are available on beta.SAM.gov under the Attachments/Links section of this solicitation. Additionally, other postings will be made to beta.SAM.gov, such as revised drawings, etc., under the Attachments/Links section of the solicitation. Postings to the Attachments/Links section of beta.SAM.gov do not generate an automated email to Offerors. It is recommended Offerors periodically check the beta.SAM.gov Attachments/Links section of the solicitation to see if additional postings have been made. It is the Offeror’s responsibility to check beta.SAM.gov for all postings.
PRE-PROPOSAL CONFERENCE AND SITE VISIT
In accordance with FAR 52.236-27 Alt 1, the Pre-Proposal Conference and Site Visit will be scheduled at Naval Air Station Joint Reserve Base New Orleans, Louisiana on 01 Septmber 2020 at 8:30 AM Central Time. The Pre- Proposal Conference and meeting location will be:
FEAD Public Works Department New Orleans
NAVFAC SE
Building 552, NAS JRB 400 Russell Avenue New Orleans, LA 70143
Registration: A maximum of three (3) individuals may attend the Site Visit on behalf of an Offeror. Each individual planning to attend the Site Visit must send an email listing their name and company name to Cynthia McMonigle at cynthia.mcmonigle@navy.mil and Rebecca Jones at rebecca.m.jones@navy.mil no later than 5:00 PM Central on 27 August 2020.
Base Access: All Contractors/Personnel will need to have registered by the due date and time above and bring two forms of identification with them to NAS JRB New Orleans on the date of the site visit. All vehicles driven on the base must have current registration and insurance.
COVID-19: All Contractors/Personnel will need to comply with COVID-19 Screening Questionnaire (Attachment B) and bring it with them on the day of the site visit. Effective 5 April 2020, the Navy requires the use of cloth face coverings for all military, Navy civilian and contractors, while on DoD property, installations and facilities when maintaining proper social distancing between people isn’t possible. The Government will not provide cloth face coverings; therefore, contractors are responsible for bringing their own to the site visit. If a contractor does not have a cloth face covering for the site visit, base access cannot be guaranteed. Information on cloth face coverings can be found on the Centers for Disease Control and Prevention (CDC) website at https://www.cdc.gov/coronavirus/2019-ncov/prevent-getting-sick/diycloth-facecoverings.html Although interested parties are highly encouraged to attend, participation in this meeting and site visit is voluntary and in no way obligates the Government to award any contracts, or pay any costs associated with such participation.
PROPOSAL SUBMISSION INSTRUCTIONS
In response to this request for proposal, the complete proposal shall include both the Price Proposal and the Non- Price Proposal, submitted as follows:
Price Proposal and Non-Price Proposal - The Price Proposal and the Non-Price Proposal shall be shall be e-mailed to cynthia.mcmonigle@navy.mil with copy to rebecca.m.jones@navy.mil and contain “N69450-20-R-0129” in the subject line no later than 3:30 PM (ET) 19 October 2020. Price Proposal and Non-Price Proposal shall be separate attached files and shall be labeled “Price Proposal” and “Non-Price Proposal” accordingly. File shall be Adobe PDFformatted and under 10MB. Proposals must be received by electronic mail (e-mail) no later than the date and time stated above. Hard copies will not be accepted. PROPOSALS SUBMITTED IN RESPONSE TO THIS
REQUEST FOR PROPOSAL MUST BE RECEIVED NO LATER THAN THE DATE AND TIME SPECIFIED.
Proposals not received by the time and date specified shall be treated in accordance with FAR 52.215-1 "Instructions to Offerors – Competitive Acquisitions" and may be rejected. You are highly advised to submit at least one day prior to avoid late submission (See FAR 15.208(b)(1)(i)). The Offeror’s proposal must include all data and information required and must be submitted in accordance with these instructions.
A. Price Proposal - The entire Price proposals shall not exceed 30 pages in length utilizing a minimum
Arial Font of 12 with pages numbered. Title page, table of contents, dividers, acknowledgement of all amendments, and any pages specifically excluded under each section do not count towards the total page count and should not be numbered. If page count exceeds 30 pages, only the first 30 pages will be reviewed.
Price proposals shall be submitted separately from the technical proposals. Provide one (1) electronic copy as an Adobe PDF file of the solicitation submittal requirements for pricing identified below.
(i) Cover letter containing the following information:
Authorized negotiator’s (Point of Contract (POC)) name with middle initial POC telephone number POC email address DUNS number CAGE code Federal Tax ID Number (TIN) Business Size (Large or Small Business) It is recommended to also include an additional POC’s contact information
(ii) It shall be further organized as follows:
Section 1 – Executed DD1442 and acknowledgment of all amendments
Section 2 – Section 00 10 00 CLIN Pricing Section 3 – Original Bid Bond (SF-24) Section 4 – Representations & Certifications required by Section 00 45 00 of the RFP Section 5 – FAPIIS Certification Section 6 – Copy of annual VETS-4212 Report Section 7 – Sub-Contracting Plan (Exhibit E)
Section 8 – Responsibility Determination Information
Note: The bid bond, SAM, FAPIIS, and VETS-4212 registrations must be in the name/CAGE and DUNS of the Offeror identified on the SF 1442.
B. Non-Price Proposal - Submit one electronic copy of the Non-Price Proposal as an Adobe PDF file. The entire Non-Price Proposal shall not exceed 50 pages in length utilizing a minimum Arial Font of 12 with pages numbered. Joint Venture Agreement, CPARS Evaluations, and/or Past Performance Questionnaires are specifically excluded under each factor do not count towards the total page count and should not be numbered.
If page count exceeds 50 pages, only the first 50 pages will be reviewed.
It shall be organized as follows:
Factor 1 – Construction Experience Factor 2 – Safety Factor 3 -- Technical Solution Factor 4 – Small Business Utilization Factor 5 – Past Performance
The Offeror’s proposal must include all data and information required by the solicitation and must be submitted in accordance with these instructions. The Offeror shall be compliant with the requirements as stated herein. Non-conformance may result in an unfavorable proposal evaluation.
INCURRED EXPENSES
The Government is not responsible for any costs incurred or associated with preparation and submission of a proposal in response to this solicitation.
NO ALTERNATE OR MULTIPLE PROPOSALS
Neither multiple proposals, nor proposal variations or options, nor alternate or alternative proposals will be considered in the evaluation.
(End of provision)
(End of Summary of Changes)