This solicitation is for the construction of an Aerospace Control Alert Facilities and Alert Apron at NAS JRB New Orleans. The project includes building two aircraft shelters with drive-through capability, installed heating, fire suppression, metal walls, and standing seam metal roofs. An aircrew alert quarters/mission support structure will be built with Alternate Command Post capabilities, a secure area, and entry control facility. Standby power, pile foundations, and site preparation including surcharging will be provided. The Alert Apron portion of the project requires all utilities, communication support, site improvements, exterior lighting, lightning protection, and security upgrades be provided. An aircraft parking apron for two alert ready aircraft will be constructed along with security fencing, access gates, airfield lighting, security lighting with controls and communications and electrical conduit. Pile foundations and site preparation including soil dewatering as required will also be provided. The contract type will be Firm-Fixed Price for Design-Bid-Build construction. The completion schedule is 1300 calendar days from award. The project magnitude is estimated between $25-100 million. The solicitation is unrestricted and open to all responsible sources. The acquisition is subject to World Trade Organization Government Procurement Agreement and Free Trade Agreements.
View the file
Other files
Show 40 more
Latest 50 of 72 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P103
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D S
O U
TH
E
A S
T
N O
R
TH
C O
M
C O
N S
TR
U
C T
A
LE
R T
FA
C
IL
IT
IE
S
GENERAL SHEET NOTES
GRAPHIC SCALE
KEYPLAN
B-3 SUBMITTAL 02/28/2020
AutoCAD SHX Text
EWS-1
AutoCAD SHX Text
HB-1
AutoCAD SHX Text
HB-1
AutoCAD SHX Text
ROUTE BELOW GRADE BEAM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text NEW WORK PLAN NOTES: : 1. 1-1/4" COLD WATER DOWN TO SHOWER AND EYE WASH STATION EWS-1. 1-1/4" COLD WATER DOWN TO SHOWER AND EYE WASH STATION EWS-1. EWS-1. 2. TO SHELTER #2. FOR CONTINUATION SEE P104. TO SHELTER #2. FOR CONTINUATION SEE P104. 3. 3/4" COLD WATER DOWN TO HB-1. 3/4" COLD WATER DOWN TO HB-1. HB-1. . 4. PROVIDE 3 W/FT SELF-REGULATING HEAT TRACING ON ALL EXTERIOR MOUNTED PROVIDE 3 W/FT SELF-REGULATING HEAT TRACING ON ALL EXTERIOR MOUNTED DCW PIPING. PROVIDE END SEALS, SPLICE & TEE KITS, CABLE TIES, THERMOSTATS, ETC. FOR A COMPLETE AND FUNCTIONING SYSTEM. SET THERMOSTAT TO ENABLE HEAT TRACE AT 40°F (ADJUSTABLE). INSULATE ANDIDENTIFY HEAT-TRACED PORTIONS OF PIPING. 5. 12" SPILL CONTAINMENT PIPING UNDER SLAB SLOPE AT 1/16" PER FOOT. SEE 12" SPILL CONTAINMENT PIPING UNDER SLAB SLOPE AT 1/16" PER FOOT. SEE CONSTRUCT ALERT FACILITIES PROJECT STRUCTURAL SHEET S154 FOR TRENCH DRAIN CONNECTION LOCATION. SEE CONSTRUCT ALERT APRON PROJECT CIVIL SHEET CA400 FOR CONTINUATION 6. SEE DETAIL 5/P501. TYPICAL FOR ALL BELOW SLAB PIPING.SEE DETAIL 5/P501. TYPICAL FOR ALL BELOW SLAB PIPING.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AMENDMENT 0001
AutoCAD SHX Text 09/14/2020
AutoCAD SHX Text SHEET FORMAT IS 22" X 34". IF PRINTED SHEET IS NOT 22" X 34", THEN IT IS NOT TO SCALE
AutoCAD SHX Text
DEPARTMENT OF THE NAVY
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CONSTR. CONTR. NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NAVFAC DRAWING NO.
AutoCAD SHX Text
NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
DES
AutoCAD SHX Text
DRW
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
AutoCAD SHX Text
DRAWFORM REVISION: 7 AUGUST 2009
AutoCAD SHX Text
CHK
AutoCAD SHX Text
SATISFACTORY TO DATE
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
ACTIVITY
AutoCAD SHX Text
FOR COMMANDER NAVFAC / B.L.T.L.
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
A/E INFO
AutoCAD SHX Text
OF
AutoCAD SHX Text
EPROJECT NO.:
AutoCAD SHX Text
OVERALL SHELTER 1 PLUMBING PLAN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 15135327
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NAVAL AIR STATION JACKSONVILLE
AutoCAD SHX Text
NAS JRB NEW ORLEANS
AutoCAD SHX Text
NEW ORLEANS, LA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DESIGN MANAGER
AutoCAD SHX Text
M CONTESTABILE
AutoCAD SHX Text
BRANCH MANAGER
AutoCAD SHX Text
JOANNE DIZ
AutoCAD SHX Text
CHIEF ENG/ARCH
AutoCAD SHX Text
AutoCAD SHX Text
FIRE PROTECTION
AutoCAD SHX Text
ANTHONY DISANTO
AutoCAD SHX Text 1621243
AutoCAD SHX Text
N69450-XX-C-XXXX
AutoCAD SHX Text Scale:
AutoCAD SHX Text A
AutoCAD SHX Text
OVERALL SHELTER 1 PIPING PLAN
AutoCAD SHX Text 1/8" = 1'-0"
AutoCAD SHX Text 0'
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text 30'
AutoCAD SHX Text 5'
AutoCAD SHX Text 10'
AutoCAD SHX Text 20'
AutoCAD SHX Text
PLAN NORTH
| Sheets and Views |
| P103 OVERALL SHELTER 1 PLUMBING PLAN |
| SHELTER 1 PIPE |
| SHELTER 1 PIPE NOTES |
File details come from the government source that posted it. Updated .